OFFER_AND_ACCEPTANCE.pdf

PDF 25 KB Posted

Attached to
Annual Requirements for Fabrication of Station Control Panels (In-State Requirement)
Solicitation number
240048
Issued by
Pima County, Tucson City, Arizona

About this file

This is an Offer and Acceptance form for the City of Tucson related to RFP No. 240048 for the fabrication of Station Control Panels for the Tucson Water Department. The solicitation seeks contractors to establish an annual requirements contract for the fabrication of four specific panel types: Well C-120 (48x36-inch wall mount), Sundt Booster (48x60-inch wall mount), Plane Tech DR PRV (72x48-inch freestanding), and La Paloma Reservoir & Booster (72x72-inch freestanding). The City anticipates purchasing approximately 20 panels per year on an as-needed basis, with the Tucson Water Department providing specifications and requesting price quotes for each specific panel job. A pre-submittal conference was held on December 18, 2023, with proposals due on January 10, 2024, at 2:00 PM local Arizona time. The contract will be awarded to multiple contractors to ensure adequate product line selection and geographic coverage. The contract term is one year with potential extensions for up to four additional one-year periods.

Contractors must be Arizona-based to facilitate contract administration and panel testing, possess UL508A certification for building control panels, and maintain a dedicated controlled environment for fabrication. The City estimates an annual spend of approximately $980,000 and will award projects to contractors whose quotes are most advantageous regarding price and delivery time. The procurement includes Section 3 Program requirements mandating that 25 percent of labor hours be performed by Section 3 Workers and 5 percent by Targeted Section 3 Workers. Contractors must provide completely assembled, wired, and tested panels to UL 508 rating standards, along with all necessary documentation, calibration certificates, and as-built drawings. Allen-Bradley components must be supplied as spare parts, including CompactLogix controllers, I/O modules, interface cards, display units, and network switches. Panels must be capable of 120 and 480-volt power testing.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFER AND ACCEPTANCE

OFFER

TO THE CITY OF TUCSON:

The Undersigned hereby offers and shall furnish the material or service in compliance with all terms, scope of work, conditions, specifications, and addendum in the Request for Proposal which is incorporated by reference as if fully set forth herein.

For clarification of this offer, contact:

Name:

Company Name

Title:

Address

Phone:

City State Zip

Fax:

Signature of Person Authorized to Sign

E-mail:

Printed Name

Title

ACCEPTANCE OF OFFER

The Offer is hereby accepted. The Contractor is now bound to sell the materials or services specified in the Contract. This Contract shall be referred to as Contract No. ________________.

CITY OF TUCSON, a municipal corporation

Approved as to form: Awarded:

This ________ day of _______________ 20_____ This ________ day of _______________ 20_____

As Tucson City Attorney and not personally As Director of Business Services and not personally

File details come from the government source that posted it. Updated .