OED RFP QUESTIONS AND ANSWERS 10.1~1.xlsx
XLSX spreadsheet 85 KB Posted
- Attached to
- OED RFP for Enterprise Service Management System
- Solicitation number
- S-DASOBO-00017784
- Issued by
- Marion County, Oregon
About this file
OED RFP Questions and Answers for Enterprise Service Management System
This document is a comprehensive questions and answers file issued by the Department of Administrative Services, State Procurement Services (DAS SPS) on behalf of the Oregon Employment Department (OED) regarding the procurement of an Enterprise Service Management (ESM) system. The RFP seeks a cloud-based, configured (not customized) solution to replace two unsupported BMC FootPrints instances and provide IT service management capabilities including incident management, service requests, problem management, change management, asset management, and knowledge management. Proposers must complete a mandatory Vendor Evaluation Workbook addressing ten use cases and submit proposals by October 15, 2026, at 10:00 AM PDT, with a pre-proposal conference scheduled for September 10, 2026, at 1:30 PM PDT via Microsoft Teams. The initial contract term is five years with renewal options. Questions are due September 17, 2026, at 10:00 AM PDT. The scope includes development, test, and production environments; integrations with Azure Active Directory and SCCM at go-live; asset discovery and management for approximately 15,000+ hardware assets plus software assets; and configuration of approximately 75 software service catalog items. Production go-live must occur by June 30, 2027, with implementation to be performed entirely by US-based staff with no offshore work permitted.
The estimated total contract value over five years is approximately $9.09 million, comprising $6.69 million for implementation, maintenance, and operations services plus $1.4 million for platform licensing. One-time implementation costs are estimated at $6.69 million over two years, with recurring annual managed operations and maintenance costs of $1.75 million. User licensing is dependent on the vendor's model: either 150 licensed agents or 2,500 end-users, with potential scaling up to 5,000+ workers. OED does not have a preestablished budget range, and proposers should submit competitive, fair, and reasonable bids. The document clarifies that customization of code is excluded; however, configuration of workflows, forms, business rules, notifications, reports, dashboards, service catalogs, and portal content is in scope. Data migration from existing FootPrints systems is excluded; OED will not migrate historical ticket data and expects the new system to begin capturing information forward. A mandatory outreach requirement to Certified Firms (minority-owned, woman-owned, service-disabled veteran-owned, and emerging small businesses) applies, though the outreach plan is not scored. Evaluation uses two scoring rounds with 2,000 total possible points, including 1,000 points for the Vendor Evaluation Workbook and 50 points for references. No data regarding current ticket volumes is available; proposers should base sizing on the specified user counts of 150 agents or 2,500 end-users.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
By reference
| Document Link | Topic | Question No. | Solicitation Reference | Question | Response | Notify DAS Procurement of Change |
| L | Security | 1 | Attachment L Requirements | Could you please confirm whether the Oregon Employment Department (OED) will consider vendors who do not answer affirmatively to all security requirements identified as SEC-001 through SEC-005? | Please see Security section in Technical List tab for modified content. |
-System to be ISO 27001 certified is a nice to have -System must meet or exceed FEDRAMP or GOVRAMP requirements CSS expects the respondents to meet the Statewide IT Control Standards, which should be part of Exhibit K.
L Security 2 Would the Oregon Employment Department (OED consider proposals from vendors with a mature information security and privacy program has been validated through annual SOC 2 Type II audits, ISO/IEC 27001:2022 certification, and alignment with recognized frameworks including NIST CSF? Please see Security section in Technical List tab for modified content.
-System to be ISO 27001 certified is a nice to have -System must meet or exceed FEDRAMP or GOVRAMP requirements CSS expects the respondents to meet the Statewide IT Control Standards, which should be part of Exhibit K.
| L | Scoring/ Evaluation | 3 | Attachment L Requirements | What are OED's expectations for these requirements and how they will be evaluated during the proposal review process? | See Section 3.3 of RFP identifies how the Vendor Workbook will be evaluated. |
| L | Security | 4 | Attachment L, Tab 2 "Technical List," SEC-005 | SEC-005 lists "System must meet or exceed FEDRAMP or STATERAMP requirements" as a Must Have. Does this require formal FedRAMP/StateRAMP authorization at time of proposal, or will demonstrated equivalence to the FedRAMP/StateRAMP Moderate baseline (e.g., via the control mapping in Attachment J) satisfy this requirement? | Please see Security section in Technical List tab for modified content. |
-System to be ISO 27001 certified is a nice to have -System must meet or exceed FEDRAMP or GOVRAMP requirements CSS expects the respondents to meet the Statewide IT Control Standards, which should be part of Exhibit K.
If the proposer wishes to use FedRAMP or GovRAMP as a substitute for the Statewide standards, then it should be formalized either Ready/Authorized/Provisional verification for GovRAMP or a documented, working path to Class C verification L Security 5 Attachment L, Tab 2 "Technical List," SEC-001 through SEC-004 SEC-001–SEC-004 list SOC 1 (SAE 16), SOC 3, ISO 27001, and TRUSTe certifications as Must Have. Are all four required, or will proposers with a subset of these (e.g., SOC 2 Type II and ISO 27001) be considered responsive? Please see Security section in Technical List tab for modified content.
-System to be ISO 27001 certified is a nice to have -System must meet or exceed FEDRAMP or GOVRAMP requirements CSS expects the respondents to meet the Statewide IT Control Standards, which should be part of Exhibit K.
A Security 6 Attachment A, Exhibit K, Section 2.8 ("No Overseas Access, Storage, or Transmission") vs. RFP Section 3.2.18 Section 3.2.18 describes a process for proposers to submit an Offshore and Foreign Services Plan for EIS review and possible exception. Exhibit K, Section 2.8 states Agency Data will not be accessed, transmitted, or stored outside the U.S., and all Services must be performed by U.S.-based staff, with no stated exception. Could you clarify whether Exhibit K's prohibition is absolute, or whether an approved Offshore and Foreign Services Plan under Section 3.2.18 can except a proposer from Exhibit K 2.8? For example, all our data is hosted in the US, but our support services are delivered in house from Argentina. OED is not entertaining any offshore exceptions.
There is an offshore exception process required by EIS any time resources, including support, are located outside of the U.S.
Exhibit K is seperate from that, and doesn't cover support.
L Security 7 Requirement L- SEC-005 – FedRAMP/StateRAMP Does this requirement require the proposed SaaS solution to hold an active FedRAMP or StateRAMP authorization, or is demonstrating compliance with the applicable security requirements sufficient? Please see Security section in Technical List tab for modified content.
-System to be ISO 27001 certified is a nice to have -System must meet or exceed FEDRAMP or GOVRAMP requirements CSS expects the respondents to meet the Statewide IT Control Standards, which should be part of Exhibit K.
If the proposer wishes to use FedRAMP or GovRAMP as a substitute for the Statewide standards, then it should be formalized either Ready/Authorized/Provisional verification for GovRAMP or a documented, working path to Class C verification 8 Will there be a CRM element required for this platform? Customer Relationship Management (CRM)- Internal Customers only no external Questions: Do we want the system to send emails, provide analytics on customer behavior, provide information on recent interactions customers have had with the system?
| RFP DOC | Integrations | 9 | Will there will be integrations? | At this time, only Azure Active Directory. |
| RFP DOC | Reporting | 10 | Does the state have a specific set of reports required for this system? | Proposers should demonstrate the complete capabilities of their reporting system, both vendor created (canned) reports and Ad-Hoc agent-created reports. Some expamles of dashboards and reports among many are: |
Incident Management: Ticket Volume & Backlog, Mean Time to Resolve & Response Time, First Contact Resolution.
Service Request Reports: SLA Compliance Rate, Fulfillment Time by Category, Customer Satisfaction.
Change and Problem Management: Change Sucess vs. Failure Rate, Root Cause & Problem Backlogging.
Overall system dashboard/reports: Ticket Volume Trends, Agent Performance and Workload Distribution, Tickets by Category or Source, Real-Time Queue Status, SLA Jeopardy/At-Risk Report, Ticket Age, Reopnend Ticket Report, Tickets Needing Urgent Attention.
Exective reporting: Cost per Ticket, Total Downtime & Major Incidents, Long-Term Volume & Self-Service Trends, Quarterly SLA and OLA Performance, Infrastucture & Product Health Patterns.
| RFP DOC | Implementation | 11 | What will be the implementation method, it will be offshore, hybrid , onsite? | No Offshore work is allowed. Implementation will be primarily to completely remote (US based). Any onsite work will require pre-approval from the OED sponsor. | |
| User Numbers | 12 | How many agents or users are required the licenses? | This will depend on the licensing model for the system. If agents require a license we can scope this at 150. If end-users require a license we can scope at 2500. | ||
| RFP DOC | Customization vs Configuration | 13 | Section 2.4, Scope Excludes — "Customization" | Qualification 6 asks Proposers to "demonstrate how the software solution is rolled out, customized, and integrated into OED," while Section 2.4 lists "Customization" as excluded from scope. Please confirm that this exclusion refers to code-level modification of the base product, and that vendor-led configuration, workflow design, and use of the platform's standard low-code extensibility (forms, fields, business rules) are in scope and expected. | The first sentence in Qualification 6 (page 15), and in Evaluation Item 6 (page 28), should be amended to read "Demonstrate how the software solution is rolled out, configured, and integrated into OED." |
| L | Business Processes | 14 | Attachment L, Tab 1 "High-Value Use Cases | Detailed feature/requirement rows are provided for UC-001 through UC-008, but no itemized rows appear for UC-009 (Ticket Management/Creation) or UC-010 (System Administration and Maintenance), even though Section 3.3.2's scoring matrix allocates 100 points to each. Can OED publish the missing requirement detail for UC-009/UC-010, or clarify how Proposers should respond to these two use cases absent itemized sub-requirements? | The attachment L has been amended with the UC-009 and UC-010 included |
| 2 Docs L and RFP | WCAG | 15 | Section 3.3 / 3.2.18 vs. Attachment L UC-001-05 — WCAG version | The RFP body requires WCAG 2.1 Level AA conformance, while Attachment L's UC-001-05 states the system must meet "most current WCAG (2.0) accessibility standards." Please confirm which version governs for evaluation and compliance purposes. | WCAG 2.1 Level AA is the correct requirement. |
| L | Security | 16 | Attachment L, Technical List, SEC-005 | Please confirm whether FedRAMP or StateRAMP authorization must be in "Authorized" status at proposal submission, or whether a documented path to authorization prior to contract execution or go-live satisfies this Must Have requirement. | Please see Security section in Technical List tab for modified content. |
-System to be ISO 27001 certified is a nice to have -System must meet or exceed FEDRAMP or GOVRAMP requirements CSS expects the respondents to meet the Statewide IT Control Standards, which should be part of Exhibit K.
If the proposer wishes to use FedRAMP or GovRAMP as a substitute for the Statewide standards, then it should be formalized either Ready/Authorized/Provisional verification for GovRAMP or a documented, working path to Class C verification
| L | Security | 17 | Attachment L, Technical List, SEC-006–SEC-008 | Regarding the prohibition on third-party AI vendors appearing on the "State of Oregon Covered Vendor List": can OED provide or direct Proposers to the current version of this list so AI subprocessors can be verified before submission? | Enterprise Information Services : Covered Vendors : Cyber Security Services : State of Oregon |
| L | Implementation | 18 | Attachment L, Tab 4, IMP-001 | This deliverable requires the vendor to "perform the implementation themselves and will not use any sub-contractors." Please clarify whether this restriction applies only to professional-services/implementation delivery staff, or also to underlying cloud infrastructure/hosting providers and other third parties integral to a standard SaaS delivery model. | The proposer is expected to perform the implemenation without using any sub-contracted resources. |
Cloud infrastructure / hosting is not included in this RFP
| RFP DOC | Business Processes | 19 | Section 2.4, Scope Excludes — "Process Changes" | Please clarify whether this means the implementation will configure the platform strictly to OED's current business processes as-is, or whether the vendor may recommend platform-aligned best-practice process changes as part of the Implementation Approach & OCM deliverable (Qualification 6). | The proposer may recommend, however there are certain established business processes that will remain in place, i.e. who can approve access, who can approve procurement. |
| RFP DOC | Business Processes | 20 | Section 2.3.3.5, Current State | Change Enablement currently runs on a separate, older FootPrints (v11) instance used by the Application Development team. Will Application Development be a distinct user/administrator group in the new system, and should Proposers include this group in licensed seat/role counts? | the Application development team is already included in the license count |
| RFP DOC | Problem Identification | 21 | Section 2.4, Scope Excludes — data migration | Migration of existing FootPrints data is out of scope, yet several requirements (e.g., UC-004-04: "the system captures and organizes data from previous interactions so that incidents can be used to identify problems") imply reliance on historical ticket data. Will OED provide a historical data extract or read-only access to the legacy instances to support problem-management trend analysis, even though full migration is excluded? | OED will not be using historical ticket data. System should begin capturing information to identify problems going forward. |
| E | Ticket Volume | 22 | Sizing/General | To accurately size licensing and pricing, can OED provide current annual ticket volume (incidents + service requests), current ITS/Service Desk staff (agent/fulfiller) headcount, and the estimated total end-user/self-service population? | Ticket volume is not available at this time. If agents require a license we can scope this at 150. If end-users require a license we can scope at 2500. |
| E | Pricing | 23 | Section 2.1, Funding | Is there an established budget range or not-to-exceed total contract value (across the 5-year initial term plus anticipated renewals) that Proposers should be aware of when developing the Price Proposal (Attachment E)? | Suggest proposers submit their most competitive, fair, reasonable bid possible. |
| RFP DOC | Demo's Round 2 | 24 | Section 1.2, Schedule — "Round 2" | Round 2 (Presentations, Demonstrations, or Interviews) is listed as TBD. Given Attachment L Tab 1's instruction that the workbook be completed "prior to a product demonstration," can OED confirm whether Round 2 includes a live demo scored against the Attachment L requirements, and the anticipated advance notice Proposers will receive? | Vendor's who are moved to round 2 will receive the demo script and scoring information. |
tc={533EDA97-7117-4E1A-9881-4702A8556896}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Want to ask about this during 9/22 meeting.
| L | Integrations | 25 | Attachment L, Technical List, INT-005 | Define development environment integrations" is listed as a Must Have under UC-008 but isn't further specified. Can OED clarify what this refers to (e.g., a specific source-control platform, CI/CD toolchain, or IDE already standardized at OED)? | Discuss what this may mean. Migration from Test to Prod?? |
| RFP DOC | Integrations | 26 | Section 2.4, Scope Includes — APIs | Scope includes "APIs needed for OED Systems (Access Management/Remote Desktop)," while Attachment L's Integrations section (INT-001–INT-008) separately lists SCCM, Cisco phone system, MS Teams, M365, and ADSI/LDAP. Please confirm whether the Attachment L list is the complete and final integration scope for this award, or whether additional integrations may be identified during Planning and Configuration (IMP-002). | The list in Attachment L is not complete. Additional integrations may be identified as part of the design phase, depending on selected tool capabilities. |
| RFP DOC | Additional environments - HR, Finance etc integrations | 27 | Section 2.3.3, Strategic Alignment | The RFP references a broader "multi-biennia Modernization Program." Are there other enterprise systems already selected or under separate procurement (e.g., HR, Finance, Facilities platforms) that this ESM solution should anticipate integrating with as OED expands ESM beyond IT in the future, per the RFP's own ESM definition? | Yes, possible integration with Workday (HR), after IT services have been established. |
| RFP DOC | User Numbers | 28 | Section 2.4, “Scope of Work/Specifications | Please provide the total number of anticipated end users, IT fulfillers/agents, system administrators, and managers who will use the solution. | This will depend on the licensing model for the system. If agents require a license we can scope this at 150. If end-users require a license we can scope at 2500. |
| E | Pricing | 29 | Attachment E, “Price Proposal” | Should vendors include all software subscription/license costs in Attachment E, or only professional implementation services? | Suggest proposers submit all items needed for a full implementation including any items needed to run and maintain that implementation. |
| RFP DOC | Ticket Volume | 30 | Section 2.4, Scope of Work/Specifications | Please provide the approximate annual/monthly ticket volumes for Incidents, Service Requests, Problems and Changes. | Ticket volume is not avaialbe at this time. |
| RFP DOC | Service Catalog | 31 | Section 2.4, Scope of Work/Specifications | How many Service Catalog items are expected to be configured as part of the initial implementation? Please identify the catalog items/processes that are considered in scope for go-live. | User Software catalog items will be in scope for Go-Live. There are around 75 software items. |
| RFP DOC | Delivery schedule | 32 | Section 2.4, Delivery Schedule | Does OED have a required target date for production go-live? | Production go-live date is TBD pending process timelines and final negotiations. Go-live date must occur prior to 30 June 2027. |
| RFP DOC | Delivery schedule | 33 | Section 1.2, Schedule | Please confirm OED’s anticipated start date. | Production go-live date is TBD pending process timelines and final negotiations. Go-live date must occur prior to 30 June 2027. |
| RFP DOC | References | 34 | Section 3.3, Round 1 Proposal Requirements | Please confirm whether proposers are required to include a written narrative or project summary for each client reference within the proposal, in addition to providing the required reference(s) in Attachment D with submission. | A written narritive is not required but suggested. |
| RFP DOC | Administration | 35 | Section 3.1.1, Business Requirements | Are vendors expected to provide ongoing platform administration/managed services after implementation, or will OED fully assume administration following knowledge transfer? | OED will fully assume Administration, the remaining level of support will be negotiated in the contract |
| RFP DOC | Proposal Submission | 36 | Section 3.2.3, “Proposal Format and Quantity,” and Section 3.2.4, “Authorized Representative.” | Please confirm whether an authorized representative’s signature on Attachment C satisfies the RFP’s proposal-signature requirement, or whether the proposer must also sign a separate proposal cover letter, executive summary, or other document. |
Additionally, please confirm whether required attachments must be addressed separately in the proposal narrative, or whether it is sufficient to complete and include each attachment unless the RFP specifically requests a narrative response.
| DAS SPS would require a signature on the proposal submission, usually through cover letter. Attachments are completed and submitted seperately. | |||||
| RFP DOC | Asset Management | 37 | Section 2.4, “Scope of Work/Specifications | Scope of work requires asset management to be configured and implemented. Is this the base asset management or are you wanting to purchase HAM and SAM Pro? | We expect what's internal to the vendor's system (OOB) |
| RFP DOC | Integrations | 38 | Section 2.4, “Scope of Work/Specifications | Scope of work indicated APIs needed. How many integrations are you expecting? | This will depend on the capabilities of the proposed system. |
| RFP DOC | ITIL Practices | 39 | Section 2.4, “Scope of Work/Specifications | Please confirm the specific capabilities expected to be implemented at go-live, including Incident Management, Request Management, Problem Management, Change Management, Knowledge Management, Asset Management, and any additional capabilities. | Section 2.4 Scope of Work/Specifications lists Purpose & Expected Results and Success Criteria |
| RFP DOC | Service Catalog | 40 | Section 2.3.2, “Project Overview and Background” | How many service catalog items/request forms are expected to be configured as part of the implementation? | See answer to Question # 31 |
| RFP DOC | CMDB | 41 | Section 2.4, “Scope of Work/Specifications” | The RFP excludes development of a CMDB. Please confirm whether any initial Configuration Item records, asset-to-CI relationships, or foundational CMDB data are expected as part of the Asset Management implementation. The RFP specifically lists Asset Management as in scope while CMDB development is excluded | OED does not use a CMDB |
| RFP DOC | Asset Management | 42 | Section 2.4, “Scope of Work/Specifications” | How many assets do you have? | Before answering, need to know whether you are referring to categories of assets, number of assets, or number of assets by category |
| RFP DOC | Asset Management | 43 | Section 2.4, “Scope of Work/Specifications” | Where is the asset data coming from (integration with another system or from a spreadsheet)? | Integration with SCCM unless vendor system has better functionality. |
| RFP DOC | Scoring/ Evaluation | 44 | Sections 3.3 and 3.14 | Section 3.3 identifies Implementation Approach & OCM as “Mandatory, Scored 150 pts,” while the Scoring Matrix and Section 3.14 assign 50 points to this criterion. Please confirm the maximum points available for Implementation Approach & OCM for the Round 1 evaluation. | Implementation and OCM are scored as 50 points scoring matrix section 3.3 is correct. |
| RFP DOC | Scoring/ Evaluation | 45 | Sections 3.3 and 3.14 | Section 3.3 identifies Attachment L, Vendor Evaluation Workbook, as “Mandatory, Scored 150 pts,” while the Scoring Matrix and Section 3.14 assign 1,000 total points to the Vendor Evaluation Workbook, consisting of 100 points for each of ten use cases. Please confirm the maximum points available for Attachment L and the scoring methodology that will be applied. | Vendor Evaluation L will be scored at 1000 points using Scored Criteria Section 2 Vendor's Evaluation Workbook Matrix in Section 3.3 and section 3.14 Point and score calculations |
| RFP DOC | Scoring/ Evaluation | 46 | Sections 3.3, 3.13.3, 3.14, and 3.15 | Section 3.3 identifies the Price Proposal as “Mandatory, Not Scored,” and Section 3.14 does not assign points to price. However, Section 3.13.3 references calculation of a “price score,” and Section 3.15 states that the SPC will combine each Proposal’s average score with the Proposer’s price score and reference score. Please confirm whether price will be scored and, if so, provide the price-scoring methodology and maximum points available for price. | Please see DAS SPS ODF RFP Amendment #2. |
| RFP DOC | Scoring/ Evaluation | 47 | Sections 3.2.1 and 3.3 | Section 3.2.1 identifies “Technical Solution” as a required Round 1 proposal element; however, Section 3.3 does not appear to provide a separate response requirement or evaluation criterion titled “Technical Solution.” Please clarify whether OED expects a separate Technical Solution narrative and, if so, identify the required content and whether it is scored. If no separate narrative is required, please confirm which Round 1 response elements satisfy this requirement. | The Technical Solution to OED RFP S-DASOBO-00017784 should include the following elements with an emphasis on Attachment L – Vendor Evaluation Workbook. |
Technical Solution Increased Efficiency Valuable Reporting Self Service Sustainable Administration Statewide Security Standards Spreadsheet (Attachment J) Security Statements (Mandatory, Pass/Fail) Implementation Approach & OCM Vendors Evaluation Workbook (Attachment L)
| RFP DOC | Proposal Submission | 48 | Sections 3.2.1 and 3.3 | Section 3.2.1 lists the required Round 1 proposal elements but does not include “Key Persons and their Resumes,” while Section 3.3 identifies Key Persons and their Resumes as mandatory. Please confirm that Key Persons and their Resumes are required for Round 1 and identify any required Key Person roles or minimum number of Key Persons. | DAS SPS and OED do not require a minimum number. The OED RFP Reads: "Specify key persons to be assigned to this project" |
| RFP DOC | Proposal Submission | 49 | Sections 3.2.3 and 3.3 | Section 3.3 states that proposal elements should be submitted as separate documents in Microsoft Word or PDF format, while Section 3.2.3 permits Microsoft Excel (.xlsx) submissions and the RFP requires completion of Excel-based attachments. Please confirm that Excel-based Attachments E, J, and L should be submitted in their original Excel format. Additionally, please confirm whether narrative response sections may be consolidated into a single proposal document or must each be uploaded separately. | Attachments E, J, and L should be submitted in their original Excel Format. The narritive response may be consolidated into a single proposal document. |
| RFP DOC | Customization vs Configuration | 50 | Section 1.1; Section 2.4 | Section 1.1 states that the procurement seeks a cloud-based solution including necessary “customization and configuration,” while Section 2.4 expressly excludes customization. Please confirm that OED intends for the proposed solution to be implemented through configuration rather than customization and that customization should be excluded from proposed scope and pricing. | Yes, OED intends for the proposed solution to be implemented through configuration rather than customization and that customization should be excluded from proposed scope and pricing. |
| RFP DOC | Asset Management | 51 | Section 2.4, Scope Includes/Excludes | The Scope includes Asset Management configuration and implementation but expressly excludes development of a CMDB. Please clarify the intended scope of Asset Management, including the asset types to be managed and any existing asset repositories or data sources that will support the implementation. | Hardware (PCs, Laptops, Tablets, Monitors, Docks, etc.), software & mobile devices. See answer to Question #41 and Question #43. |
| RFP DOC | Data | 52 | Section 2.4, Scope Excludes | The Scope excludes migration of current FootPrints data from either existing instance. Please confirm whether all legacy data migration is excluded or whether OED expects any user, group, knowledge, asset, configuration/reference, or other data to be loaded into the new solution. If data loading is expected, please identify the applicable data sets and approximate volumes. | No data will be migrated from the current ITSM system. |
| RFP DOC | Solution: Ticket volume Number of users | 53 | Sections 2.3 and 2.4 | To support solution sizing, licensing, and implementation planning, please provide available current-state volumes, including the approximate number of end users/customers, service desk technicians or agents, other fulfillers, administrators, annual incidents/service requests, annual changes, knowledge articles, and assets to be managed. | Data regarding current-state volumes is not available at this time. |
End users: 2500, agents: 150
| RFP DOC | Integrations | 54 | Section 2.4; Attachment A | The Scope identifies APIs needed for OED systems, including Access Management and Remote Desktop, while Attachment A also references Single Sign-On, authentication, external databases, and database connectors. Please identify the systems OED expects to integrate with the new ESM solution during the initial implementation, including the intended integration purpose and available integration method/API, where known. | Azure Active Directory, SCCM |
| RFP DOC | Dev/Test/Prod | 55 | Attachment A, Statement of Work | Attachment A requires the Contractor to plan and create Development, Test, and Production environments for OED. Please confirm that all three environments should be included in the proposed solution and Price Proposal and identify whether any additional environments are required. | Yes, All three environments should be part of the project. |
| RFP DOC | Delivery schedule | 56 | Section 2.4; Attachment A, Delivery Schedule | The RFP states that the Contractor and OED will develop the delivery schedule based on a Start Date and Completion Date, but no target implementation duration or production go-live date is identified. Please provide OED’s anticipated implementation start date, target production go-live date, and/or desired implementation duration, if available. | Production go-live date is TBD pending process timelines and final negotiations. Go-live date must occur prior to 30 June 2027. |
| RFP DOC | Delivery schedule | 57 | Section 3.1.1; Attachment A | The RFP describes a vendor-led implementation with knowledge handover to OED IT resources who will own configuration, internal administration, and daily maintenance. Please identify the OED roles and approximate number of personnel expected to participate in implementation activities, including project management, technical administration, process ownership, integrations, testing, training, security, and OCM. | To be defined during negotiations |
| RFP DOC | Implementation | 58 | Attachment A, Statement of Work | Attachment A states that the Contractor will “perform the implementation themselves and will not use any sub-contractors.” Please confirm whether subcontractors and/or authorized implementation teaming partners are prohibited from performing implementation services under this Contract. | The proposer is expected to perform the implemenation without using any sub-contracted resources. |
Cloud infrastructure / hosting is not included in this RFP
| E | Pricing | 59 | Section 2.4; Attachment E, Price Proposal | Please provide OED’s anticipated budget or funding range for the Enterprise Service Management System procurement, including implementation services and software subscription/licensing costs, if available. | See questions 23 and 29 answers |
| RFP DOC | Implementation | 60 | Section 2.4; Attachment A, Statement of Work | Please clarify OED’s expected delivery model for the implementation, including whether services may be performed fully remotely or whether OED expects any project activities to be performed on-site or through a hybrid delivery model. If on-site participation is expected, please identify the anticipated activities, frequency, and location(s). | No Offshore work is allowed. Implementation will be primarily to completely remote (US based). Any onsite work will require pre-approval from the OED sponsor. |
| E | Pricing | 61 | Attachment E – Price Proposal | The RFP identifies Attachment E – Price Proposal Form as a mandatory submission. Will the Agency publish Attachment E in OregonBuys prior to the proposal due date? | DAS SPS will be issuing Amendment #2 with a REVISED Attachment E. |
| User Numbers | 62 | User and Agent Quantities | Please provide the anticipated number of end users and Service Desk agents who will require access to the proposed ESM solution for licensing and solution-sizing purposes. | This will depend on the licensing model for the system. If agents require a license we can scope this at 150. If end-users require a license we can scope at 2500. | |
| Delivery schedule | 63 | Target Go-Live | Does OED have a target production go-live date or desired implementation timeframe for the ESM solution? | Production go-live date is TBD pending process timelines and final negotiations. Go-live date must occur prior to 30 June 2027. | |
| RFP DOC | Integrations | 64 | Integrations – Section 2.4, Scope of Work, Page 13 | Please identify the current Access Management and Remote Desktop solutions that OED expects to integrate with the new ESM solution. In addition, please identify any other integrations expected within the initial implementation scope and indicate which integrations are required for initial Go-Live versus those that may be implemented in a future phase. | Azure Active Directory, SCCM - at go-live |
Future implementation - To Be Determined
| User Numbers | 65 | Licensed Users / Administrators | Please provide the anticipated number of users requiring licensed agent/technician and administrator access to the new ESM solution. If available, please provide a breakdown by role or functional area. | 150 - Infrastructure/System Administrators, Helpdesk, Data Administrator, Operations Security Administrators, Application Developers. | |
| RFP DOC | Asset Management | 66 | Asset Management – Section 2.4, Scope of Work, Page 13 | Asset Management is included within the implementation scope, while development of a CMDB is specifically excluded. | See answer to Question #41 |
| RFP DOC | Asset Management | 67 | Asset Management – Section 2.4, Scope of Work, Page 13 | Please describe OED's current source(s) of asset data and identify any asset discovery, endpoint management, or inventory tools currently in use that OED expects to integrate with the new ESM solution. | See answer to Question #43 |
| RFP DOC | OCM/ Training | 68 | Training – Section 2.4, Scope of Work, Page 13 | Please provide the anticipated number and types of users requiring training and OED's preferred delivery format (e.g., remote, onsite, role-based and/or train-the-trainer). | Provide the types of training and delivery formats that are available. |
| RFP DOC | Reporting | 69 | Reporting and Metrics – Section 3.1.1, Qualification 3: Valuable Reporting, Pages 14–15 | 1. Are there specific reports, dashboards, KPIs, SLAs, or other performance measures that OED considers mandatory for initial Go-Live beyond the reporting requirements identified in the RFP and Vendor Evaluation Workbook? If so, please identify them. | Proposers should demonstrate the complete capabilities of their reporting system, both vendor created (canned) reports and Ad-Hoc agent-created reports. Some expamles of dashboards and reports among many are: |
Incident Management: Ticket Volume & Backlog, Mean Time to Resolve & Response Time, First Contact Resolution.
Service Request Reports: SLA Compliance Rate, Fulfillment Time by Category, Customer Satisfaction.
Change and Problem Management: Change Sucess vs. Failure Rate, Root Cause & Problem Backlogging.
Overall system dashboard/reports: Ticket Volume Trends, Agent Performance and Workload Distribution, Tickets by Category or Source, Real-Time Queue Status, SLA Jeopardy/At-Risk Report, Ticket Age, Reopnend Ticket Report, Tickets Needing Urgent Attention.
Exective reporting: Cost per Ticket, Total Downtime & Major Incidents, Long-Term Volume & Self-Service Trends, Quarterly SLA and OLA Performance, Infrastucture & Product Health Patterns.
| RFP DOC | Delivery schedule | 70 | Implementation Timeline – Section 2.4, Delivery Schedule, Page 12 | Does OED have a target or required date for production Go-Live or completion of the initial implementation? | Production go-live date is TBD pending process timelines and final negotiations. Go-live date must occur prior to 30 June 2027. |
| D | Proposal Submission | 71 | Attachment D – Reference Check Form | Could OED please confirm the process for completing and submitting Attachment D – Reference Check Form? Should the Proposer have each proposed reference complete the form and include it with the proposal, or should the proposed reference submit the completed form directly to OED? | Provide 3 references from current or former client firms for similar projects performed for any clients within the last 2 years. References must be able to verify the quality of previous, related Work. |
Proposer shall send the Reference Check Form (Attachment D) to its references. Reference forms must be completed by the reference, returned to the proposer and submitted by the Proposer.
Agency may check to determine if references provided support Proposer’s ability to comply with the requirements of this RFP. Agency may use references to obtain additional information, or verify any information needed. Agency may contact any reference (submitted or not) to verify Proposer’s qualifications.
Proposer shall submit reference names and contact information.
F Proposal Submission 72 Attachment F – Certified Disadvantaged Business Outreach Plan, Question 4 If the Proposer does not anticipate any subcontracting or outreach opportunities under this procurement, could OED please confirm that the Proposer should select “No” for Question 4, submit only the first page of Attachment F, and that the remaining sections may be left blank or marked “Not Applicable”? OED RFP Attachment F - 4. Does Proposer foresee any subcontracting opportunities for this procurement? YES NO If no, do not complete the rest of this form and submit this first page with your Proposal.
| RFP DOC | User Numbers | 73 | Page 12–13, Section 2.4 – Scope of Work / Specifications | Could OED please confirm the number of users who will require paid software licenses, including agents/technicians, administrators, and any other licensed user types? This information will help us prepare accurate pricing. | This will depend on the licensing model for the system. If agents require a license we can scope this at 150. If end-users require a license we can scope at 2500. |
| RFP DOC | Delivery schedule | 74 | Page 12, Section 2.4 – Delivery Schedule | Could OED please confirm the anticipated implementation start date and target production go-live date? | Production go-live date is TBD pending process timelines and final negotiations. Go-live date must occur prior to 30 June 2027. |
| RFP DOC | Implementation | 75 | Pages 21–22, Section 3.2.18 – Security Statements / Offshore and Foreign Services | Please confirm whether the agency has a preferred implementation delivery model (fully onsite, remote onshore, blended offshore/onshore, or fully offshore with U.S. time-zone overlap). | No Offshore work is allowed. Implementation will be primarily to completely remote (US based). Any onsite work will require pre-approval from the OED sponsor. |
| RFP DOC | Current State | 76 | Pages 9–10, Section 2.3.3.5 – Current State | The RFP identifies BMC FootPrints version 12 for Service Requests and version 11 for Change Enablement. Could OED please confirm whether these are the only ITSM systems being replaced and identify any other systems that the new ESM solution must replace or integrate with? | BMC Footprints is the only system being replaced. |
| A | Contract | 77 | Page 34, Section 4.4.1 – Contract Negotiation | Could OED please confirm that Attachment A – Sample Contract does not need to be completed or executed with the proposal and that proposers are only required to identify requested contract exceptions during the Questions/Requests for Clarification period? | Yes, that is correct~ |
| RFP DOC | Data | 78 | Page 13, Section 2.4 – Scope Excludes | The RFP states that migration of current FootPrints data is excluded from scope. Could OED please confirm whether any historical tickets, knowledge articles, asset data, user data, or other existing data are expected to be imported into the new solution? | No data will be migrated from the current ITSM system. |
| RFP DOC | Vendor SLA | 78 | Page 15, Qualification 5 – Sustainable Administration | Would the software vendor's standard technical support included with the proposed licensing be sufficient, provided it meets OED's required service levels, or does OED expect dedicated support personnel to be included in the proposal? | Depends on the proposal, we would like options. |
| RFP DOC | Integrations | 79 | Page 13, Section 2.4 – Scope Includes / APIs | Could OED please provide a list of systems that must integrate with the new ESM solution as part of the initial implementation? | Azure Active Directory, SCCM |
| RFP DOC | User Numbers | 80 | Page 13, Section 2.4 – Training and Documentation | Could OED please provide the approximate number of system administrators, agents/technicians, and other users who will require training and confirm the preferred training approach? | This will depend on the licensing model for the system. If agents require a license we can scope this at 150. If end-users require a license we can scope at 2500. |
| RFP DOC | Delivery schedule | 81 | Page 12, Section 2.4 – Delivery Schedule | Does OED have a preferred or maximum implementation duration from project kickoff through production go-live? | No preferred or maximum implemenation duration has been established. Production go-live date is TBD pending process timelines and final negotiations. Go-live date must occur prior to 30 June 2027. |
| RFP DOC | Customization vs Configuration | 82 | Sections 1.1, 2.3.1, 2.4; Qualification 6 | The RFP states that the proposed solution should be a COTS solution that is configured and not customized, while the Implementation Approach section refers to how the solution is “rolled out, customized, and integrated.” Please clarify whether any customization or custom development is permitted under this RFP. | We plan to configure an out-of-the-box system and would avoid any solution that requires deeper customization to satisfy our requirements. |
| RFP DOC | Customization vs Configuration | 83 | Sections 2.2, 2.4 | Please clarify whether configuration of workflows, forms, business rules, notifications, reports, dashboards, service catalogs, and portal content is considered configuration and therefore within the permitted scope. | Yes, configuration of workflows, forms, business rules, notifications, reports, dashboards, service catalogs, and portal content is considered configuration and therefore within the permitted scope. |
| RFP DOC | Integrations | 84 | Sections 2.2, 2.4 | Please clarify whether integrations developed using the proposed platform's standard integration capabilities are considered configuration or customization. | Configuration if API's are already built into the system, e.g. Azure Acticve Directory for Single Sign-on. |
Customization if OED requests an API not already developed for the system by the vendor.
| RFP DOC | Additional environments - HR, Finance etc integrations | 85 | Sections 2.2, 2.3.3.11 | Please clarify whether the proposed solution is expected to support IT services only during the initial implementation or whether the initial implementation must establish the platform architecture for future non-IT enterprise workflows. | Yes, we will implement IT practices first, e.g., ticketing, and then offer services to other groups outside of IT, e.g., Risk Saftey, Finacial Services, etc. Your solution should show the ability to add workflow for other internal business groups. |
| RFP DOC | Additional environments - HR, Finance etc integrations | 86 | Section 2.2 | The RFP defines ESM as extending ITSM capabilities to areas such as HR, Facilities, Finance, Procurement, and Legal. Please clarify which non-IT departments, if any, are included in the initial implementation scope. | None are in the initial implementation, just IT practices. However, your solution should be able to add internal business group workflows to the system as needed in the future. |
| RFP DOC | Additional environments - HR, Finance etc integrations | 87 | Section 2.2; Attachment L | Please clarify whether future ESM workflows outside the initial IT scope are expected to be demonstrated as part of the proposal or Vendor Evaluation Workbook. | None are in the initial implementation, just IT practices. However, your solution should be able to add internal business group workflows to the system as needed in the future. |
| RFP DOC | User Numbers | 88 | Section 2.4; Attachment E | Please identify the expected number of OED users, agents, fulfiller users, approvers, requesters, and administrators for the initial implementation. | This will depend on the licensing model for the system. If agents require a license we can scope this at 150. If end-users require a license we can scope at 2500. |
| RFP DOC | User Numbers | 89 | Section 2.4 | Please provide the anticipated number of concurrent users and peak transaction volumes for incidents, service requests, changes, and other ticket types. | This will depend on the licensing model for the system. If agents require a license we can scope this at 150. If end-users require a license we can scope at 2500. Peak transaction times are Monday through Friday, 8:00 through 11:00 a.m. |
| RFP DOC | Dev/Test/Prod | 90 | Section 2.4 | Please clarify whether the State expects one production environment and separate non-production/development/test environments, and if so, how many environments are required. | See Question 55 |
| RFP DOC | Data | 91 | Section 2.4 | Since migration of current FootPrints data is explicitly excluded, please clarify whether the contractor is expected to perform any data export, archival, transformation, or preparation activities. | No. |
| RFP DOC | Data | 92 | Section 2.4 | Please clarify whether OED will retain read-only access to the existing FootPrints environments after implementation. | Yes |
| RFP DOC | Integrations | 93 | Section 2.4 | Please clarify whether the contractor will be responsible for configuring links or other mechanisms from the new solution to historical FootPrints records. | No, integration of historical Footprints records. |
| RFP DOC | Integrations | 94 | Section 2.4 | Please clarify whether historical ticket information will be available to users through the new solution in any form, even though formal data migration is excluded. | No |
| RFP DOC | Data | 95 | Section 2.3.3.5 | Please provide the approximate number of records currently contained in each FootPrints instance. | No data will be migrated from the current ITSM system. |
| RFP DOC | Current State | 96 | Section 2.3.3.5 | Please provide the current FootPrints versions and identify any existing integrations/interfaces associated with each instance. | Footprints v11 & v12. Other than Active Directory, there are no integrations with this product. |
| RFP DOC | Current State | 97 | Sections 2.3.3.5, 2.4 | Please clarify whether the contractor is expected to document the current FootPrints workflows and configurations before replacement. | OED has already documented our current workflows and configurations to support the implementation of a new ITSM system. However, if our documentation is found to be lacking in it's relevance to implementation, contractor will be expected to work with OED administrators to correct any deficiency to allow for implementation of the new system. |
| RFP DOC | Sunset | 98 | Section 2.4 | Please clarify whether sunsetting the existing FootPrints instances is completely excluded from the contract, including decommissioning planning and technical assistance. | Sunsetting of the current Footprints instances is excluded from this project. |
| RFP DOC | Asset Management | 99 | Section 2.4 | The Scope of Work includes Asset Management but explicitly excludes development of a CMDB. Please clarify the expected scope of Asset Management without CMDB development. | See answer to Question #41 |
| RFP DOC | Asset Management | 100 | Section 2.4; UC-005 | Please identify the asset types that must be supported during initial implementation, such as hardware, software, peripherals, mobile devices, or other asset categories. | Hardware (PCs, Laptops, Tablets, Monitors, Docks, etc.), software & mobile devices |
| RFP DOC | Asset Management | 101 | Section 2.4; UC-005 | Please clarify whether asset discovery is required as part of the initial implementation. | Yes |
| RFP DOC | Asset Management | 102 | Section 2.4; UC-005 | If asset discovery is required, please identify the systems or tools from which asset information is expected to be obtained. | See answer to Question #43 |
| RFP DOC | Asset Management | 103 | Section 2.4 | Please clarify whether the State has an existing CMDB or configuration data repository that the proposed solution must integrate with. | See answer to Question #41 |
| RFP DOC | Asset Management | 104 | Section 2.4 | Please clarify whether the contractor is expected to establish relationships between assets, incidents, changes, problems, users, and services despite CMDB development being excluded. | Yes, we expect proposer to establish relationships between assets, incidents, changes, problems, users, and services despite CMDB development being excluded. |
| RFP DOC | Asset Management | 105 | Section 2.4 | Please clarify whether asset data must be imported from any existing OED system. If so, please identify the source system and approximate record volume. | See answer to Question #43 |
| RFP DOC | Asset Management | 106 | Section 2.4; UC-005 | Please clarify whether software asset management, license management, or software entitlement tracking is included in the Asset Management requirement. | Software Asset Management and License Management are required. |
| RFP DOC | Asset Management | 107 | Section 2.4 | Please identify the specific Access Management system that must be integrated with the proposed solution. | Integrating with Active Directory is a must |
| RFP DOC | Integrations | 108 | Section 2.4 | Please identify the specific Remote Desktop system/tool that must be integrated with the proposed solution. | Possilbe integration with Beyond Trust if a remote tool is not available or is not selected by OED within the proposed system. |
| RFP DOC | Integrations | 109 | Section 2.4 | Please provide the available API documentation for the Access Management and Remote Desktop systems. | Access - Azure Active Directory |
Remote Desktop - Beyond Trust
| RFP DOC | Integrations | 110 | Section 2.4 | Please clarify the expected integration use cases for Access Management and Remote Desktop. | Support of OED staff only. |
| RFP DOC | Integrations | 111 | Section 2.4 | Please identify any additional systems that OED anticipates integrating with the proposed ESM solution during the initial implementation. | Azure Active Directory, SCCM |
| RFP DOC | Integrations | 112 | Section 2.4 | Please clarify whether integrations with email, directory services, identity management, monitoring, endpoint management, or other IT systems are required. | Azure Active Directory, SCCM |
| RFP DOC | Security | 113 | Section 2.4; Attachment J | Please identify the identity provider used by OED for authentication and whether SSO is required. | OED uses an identity authentication and SSO. Also see answer to question 114. |
| RFP DOC | Security | 114 | Attachment J | Please clarify whether multi-factor authentication is required for administrators, IT staff, and/or general users. | In order: yes, possibly, and ideally. IT users would depend on business needs and rights granted to the "IT users". For general users, again, depending on business needs. If it will tie to an agency identity store (like Active Directory) then Yes to all. Also see answer to question 113. |
| RFP DOC | Integrations | 115 | Section 2.4 | Please clarify whether the contractor is responsible for developing, testing, documenting, and maintaining all required integrations during implementation. | Yes, for anything that is required. |
| RFP DOC | Integrations | 116 | Attachment E | Please clarify whether third-party integration licenses, middleware, connectors, or API subscriptions are expected to be included in the proposed price. | Yes, anything third-party needs to be clearly stated in the proposal and itemized in the price proposal. |
| RFP DOC | Service Catalog | 117 | Section 2.4; Qualification 4 | Please provide the approximate number of existing service catalog items that OED expects to be configured during implementation. | See answer to Question # 31 |
| RFP DOC | Business Processes | 118 | Sections 2.3.2, 2.4 | Please clarify whether OED will provide the service catalog requirements, workflows, forms, approvals, and fulfillment procedures, or whether the contractor is expected to develop these through discovery workshops. | OED currently has these, but the Proposer should include how their product is pre-configured with the service catalog, workflows, forms and approvals. |
| RFP DOC | Service Catalog | 119 | Section 2.4 | Please clarify whether the service catalog is limited to IT services for the initial implementation. | See answer to Question #31 |
| RFP DOC | Service Catalog | 120 | Qualification 4; UC-001 | Please clarify whether the self-service portal must support external users or only OED employees. | System will be for OED Employees |
This is the start of the file's text. The full file is on GovTribe.