About this file

This file is a Requirements Workbook for an Enterprise Service Management System RFP issued by the Oregon Employment Department (OED) through the Department of Administrative Services, State Procurement Services (DAS SPS). The workbook serves as a vendor evaluation tool requiring proposers to complete four tabs prior to product demonstrations: High-Value Use Cases, Requirements Scoring Sheet, Qualifications & References, and Implementation Deliverables. The RFP addresses ten primary use cases encompassing customer support improvement through self-service capabilities, incident and IT operations management, change management, problem management, asset management, knowledgebase functionality, process automation, and development/project management capabilities. Proposals are due October 15, 2026, at 10:00 AM PDT, with a pre-proposal conference scheduled for September 10, 2026, at 1:30 PM PDT via Microsoft Teams. Questions must be submitted by September 17, 2026, at 10:00 AM PDT. The anticipated contract award is for one vendor, with an initial five-year term and renewal options available.

The estimated total contract value over five years is approximately $9.09 million, comprised of $6.69 million for implementation, maintenance, and operations services and $1.4 million for platform licensing. One-time design, development, and implementation costs total approximately $6.69 million over two years, with recurring annual managed operations and maintenance costs of $1.75 million. The pricing structure includes HHS Low Code Platform licensing with AWS hosting and per-worker licensing scaled from 3,000 to greater than 5,000 workers at $128 per worker annually with declining rates for larger user bases. The solution will replace two unsupported BMC FootPrints instances currently operated by OED. Oregon applies a 10% price preference to qualifying proposers offering Oregon goods and services. Evaluation uses a two-round methodology with potential additional rounds including demonstrations or interviews, with the vendor evaluation workbook accounting for 1,000 of 2,000 total scoring points and references accounting for 50 points. Proposers must document outreach to Certified Firms (minority-owned, woman-owned, service-disabled veteran-owned, and emerging small businesses certified by COBID) in a mandatory but non-scored Outreach Plan. System implementation must achieve WCAG 2.1 Level AA accessibility compliance by April 24, 2027.

View the file

Other files

File Type Posted
Addendum 7 to RFP S-DASOBO-00017784 10.22.docx DOCX document
Addendum 2 to OED RFP S-DASOBO-00017784~1.docx DOCX document
OED RFP Attachment C.docx DOCX document
OED RFP Attachment J.xlsx XLSX spreadsheet
OED RFP Attachment G.docx DOCX document
Addendum 4 to OED RFP S-DASOBO-00017784.docx DOCX document
Addendum 6 to RFP S-DASOBO-00017784 10.22 (003).docx DOCX document
OED RFP Attachment E.xlsx XLSX spreadsheet
OED RFP Attachment D.docx DOCX document
OED RFP - Enterprise Service Management System.docx DOCX document
OED RFP Attachment L Requirements UPDATE 2026-09-21.xlsx XLSX spreadsheet
OED RFP Pre-Conference Attendance.xlsx XLSX spreadsheet
OED RFP QUESTIONS AND ANSWERS 10.1~1.xlsx XLSX spreadsheet
OED RFP REVISED Attachment E~1.xlsx XLSX spreadsheet
Addendum 3 to RFP S-DASOBO-00017784.docx DOCX document
OED RFP Attachment A - Sample Contract.docx DOCX document
OED RFP Preconference Presentation Final.pptx PPTX presentation
OED RFP Attachment F.docx DOCX document
OED RFP Attachment B.docx DOCX document
Addendum 5 to RFP S-DASOBO-00017784 10.22.docx DOCX document
Addendum 1 to OED RFP S-DASOBO-00017784.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Instructions

Enterprise Service Management solution, Requirements Workbook
Purpose
Oregon Employment Department is seeking an Enterprise Service Management solution. This requirements workbook has three tabs (Tab #1, #2, #3) that the vendor is expected to complete prior to a product demonstration:
1. High-Value Use Cases
2. Requirements Scoring Sheet
3. Qualifications & References
Informational tab
4. Implementation Deliverables

1. High-Value Use Cases

High-Value Use Cases
Organization: Complete column C with high-level use case, column D with features, functions to enable the use case, column F to prioritize requirements (Must Have = Mandatory requirements, Should Have = Requirements that are not vital, but add significant value, Nice To Have = Requirements that will have a small impact if left out).
Vendor: Complete column G to describe how your organization is able to fulfill the use case features listed in column D. Add relevant information in column I if additional context is required.Total to line 135 - change formula if adding more rows beyond 135)
RequirementsVendor Response (fill in column G, I is optional)
Use Case / ModulesUse Case Details/FeaturesPrioritizationHow are you able to support this offering?Vendor Notes
UC-001Improve Customer Support with Self-ServiceSingle-sign on for easy user accessUC-001-01Must Have
Ability to create tickets for incidents and to check their statusUC-001-02Must Have
Ability to see user-specific solution articles onlineUC-001-03Must Have
Service Portal that is ready to use with minimal configurationUC-001-04Must Have
Meets most current WCAG (2.0) accessibility standards.UC-001-05Must Have
Admins easily build forms and use hierarchical organizationUC-001-06Must Have
Ability to search using natural language.UC-001-07Must Have
MS Teams integration for customer serviceUC-001-08Must Have
Request management to manage approvals and service �request fulfillment and reporting.UC-001-09Must Have
Service catalog with approvals, delivery, and ticket creation available through workflows and easy-to-create forms.UC-001-10Must Have
Access (rights) management to facilitate multiple client types, including separation for technical, business, and regional variationsUC-001-11Must Have
Provide the opportunity for customers to obtain services and track their requests through a user-friendly self-service portalUC-001-12Must Have
System captures sufficient information from the user to lead them to resolution, or create and route standard/routine incident requestUC-001-13Must Have
Provide users with feedback options for gauging the customer experienceUC-001-14Must Have
Support recent versions of all common web browsersUC-001-15Must Have
Support spell checking for all free-form text fieldsUC-001-16Must Have
Support mobile accessUC-001-17Must Have
Support SMS notificationsUC-001-18Must Have
Support upload of a variety of attachment typesUC-001-19Must Have
Support search functionality capable of retrieving information from all parts of the databaseUC-001-20Must Have
Maintain audit trails of system activityUC-001-21Must Have
Support a codeless solution for custom form development and configuration.UC-001-22Must Have
Integration with ADSI/LDAP authentication protocolsUC-001-23Must Have
Chatbot with the ability to switch to live chatUC-001-24Should Have
Provide configurable self-service functionality to end-usersUC-001-25Nice To Have
Record/transfer chat into a ticketUC-001-26Nice To Have
Ability to modify look and feel of the site with HTMLUC-001-27Nice To Have
Enable business users to create knowledge articlesUC-001-28Nice To Have
Ability to display system status messages or add announcement banners (may want automation with monitoring tools)UC-001-29Nice To Have
AI-facilitated ticket creationUC-001-30Nice To Have
AI-facilitated self serviceUC-001-31Nice To Have
UC-002Improve Customer and Technician experience with improved Incident Management and IT OperationsAbility to separate incidents and service requests.UC-002-01Must Have
Categorization for multiple incident and service typesUC-002-02Must Have
Ability to create SLAs for individual service requests and reportsUC-002-03Must Have
Ability to use workflows to route tickets between support teamsUC-002-04Must Have
Queue management viewsUC-002-05Must Have
Automated escalations and notifications for SLT breachesUC-002-06Must Have
Ability to publish knowledge articles from ticket informationUC-002-07Must Have
Provides an interface that supports service requests, change enablement, and incident managementUC-002-08Must Have
The system will provide reports for managersUC-002-09Must Have
System must utilize pre-defined workflowsUC-002-10Must Have
System provides metrics on completed IT workflows.UC-002-11Must Have
System must have centralized configuration and administration through a GUI that can be managed by agency staff and that includes functionality for Application Management, System Settings, Monitoring, Backup and Restore, Security.UC-002-12Must Have
Provide accurate, reliable data and a user-friendly reporting interface for measuring and managing service performanceUC-002-13Must Have
System must allow search of data marked inactiveUC-002-14Must Have
System must provide configurable dashboardsUC-002-15Must Have
System must include native email/notification capabilityUC-002-16Must Have
System must be capable of performing mass actions against data, through the user interfaceUC-002-17Must Have
System supports queue management viewsUC-002-18Must Have
Mobile devices supported for field techniciansUC-002-19Must Have
Tracking of internal work assignments and time reportingUC-002-20Must Have
Ability to identify top incidents, perform trend analysisUC-002-21Should Have
UC-003Reduce impacts to the business through Change ManagementMove release information into a change ticket, enable gating for approvalsUC-003-01Must Have
Basic change management solutions should include fields for recording dates, technical details, and assessment notes.UC-003-02Must Have
Facilitate production of change schedules, with change calendar visible for all roles.UC-003-03Must Have
Ability to modify forms to meet unique requirements, using form designers.UC-003-04Must Have
Ability to manage the post-implementation review process within the change module.UC-003-05Must Have
Management of subordinate and related tasks for customer requests and internal work assignmentsUC-003-06Must Have
Ability to manage pre-meeting or virtual assessments.UC-003-07Should Have
Collision detection to identify when a configuration item (CI) or service may be impacted by proposed changesUC-003-08Should Have
UC-004Reduce impacts to the business by eliminating outages and recurring incidents with Problem ManagementParent-child relationships with incident tickets or change tickets.UC-004-01Must Have
Ability to cascade-close all related tickets once problem has been resolvedUC-004-02Must Have
Automated generation of problem tickets once thresholds have been breached, with notification to problem managerUC-004-03Must Have
The system captures and organizes data from previous interactions so that incidents can be used to identify problemsUC-004-04Must Have
The system will provide reports that aid in problem identification and track workflow statusUC-004-05Must Have

UC-005 Provide Asset Management Integration with current asset management system UC-005-01 Must Have

UC-006Provide Knowledgebase FunctionalityAbility to segregate technician, user, and departmental knowledge articles either through access rights or as separately managed databasesUC-006-01Must Have
Technician knowledgebase with tools to help manage the knowledge process, such as expiry dates and workflowsUC-006-02Must Have
Reporting for utilization and effectiveness.UC-006-03Must Have
Reporting to identify and manage aging articles.UC-006-04Must Have
Capable of supporting multiple types of media, including rich text fields, screen captures, and video.UC-006-05Must Have
Capture user feedback on articles.UC-006-06Must Have
System must support industry best practices for knowledge management practice that align with the Knowledge-Centered Service (KCS®) framework.UC-006-07Must Have
System must support cross-referencing of solutions in commonUC-006-08Must Have
Ability to publish knowledge articles from ticket informationUC-006-09Must Have
Searchable by customers and staffUC-006-10Must Have

UC-007 Support Process Automation Integration with current AD system UC-007-01 Must Have

UC-008Support Stakeholders with Development and Project Management capabilitiesNative IT PM capabilities featuresUC-008-01Must Have
Native DevOps source code management and deployment automation, or integration with third party appUC-008-02Must Have
Portfolio management to gain visibility into multiple projects.UC-008-03Should Have
Ability to request projects.UC-008-04Should Have
Out of the box Project approval workflowsUC-008-05Should Have
Resource management to manage capacity of project resources and quickly analyze technician/analyst workload.UC-008-06Should Have
Visual task board (Kanban, Gantt) to quickly assign and update tasks, manage workload, and add status.UC-008-07Should Have
Project worker view to view assigned tasks and update status.UC-008-08Should Have
Supports Agile and Waterfall methodologies.UC-008-09Should Have
Integration options with other ticketing systems (AppDev or other external like DCS)UC-008-10Should Have
Includes dashboards for project analytics.UC-008-11Should Have
Document storage and collaboration.UC-008-12Should Have
Project lifecycle management to manage through all stages of plan, build, test, deploy, and maintain.UC-008-13Should Have
Dynamic roadmap to visually represent dependencies and progress.UC-008-14Should Have
Test management to document user testing criteria and progress.UC-008-15Should Have
Automated testing framework.UC-008-16Should Have
Application portfolio management to manage costs, risks, and health assessment and ensure business alignment.UC-008-17Should Have
Innovation management to collect and evaluate suggestions for development/implementation.UC-008-18Should Have
Link development work to incidents, change requests, and projects.UC-008-19Should Have

2. Technical List

Requirements Workbook
Organization: Complete column C with technical requirements to support the high-level use cases, column D with traceability to the high-level use case, column E to prioritize requirements.
Vendor: Complete column F to describe how your organization is able to fulfill the requirements listed in column C. Add relevant information in column H if additional context is required.
(Totals subtotals of each section. Update if adding new rows to each section.)
Requirements - General FunctionsVendor response (fill in column F, H is optional)
RequirementsHigh Level Use Case SupportedPrioritizationHow are you able to offer this function?Vendor Notes
GF-001Support Microsoft Entra Single Sign-OnUC-001Must Have
GF-002Support email notification functionality from within the service desk software.UC-001Must Have
GF-003Provide ability to create workspace for technician with minimal codingUC-002Must Have
GF-004Security controls to fully or partially lock down workspace screens where appropriate (technician cannot change)UC-002Must Have
GF-005Provide ability to create templates within ticketing system for common issues (quick tickets)UC-001Must Have
GF-006Ability to create dashboards with minimal codingUC-002Must Have
GF-007Ability to codelessly add fields, custom workflows, toolbarsUC-002Must Have
GF-008Ability to keep track of jobs that have passed to another group within the system. "Watch this incident"UC-002Must Have
GF-009Ability to easily create reports and graphs for trending and analysisUC-002Must Have
GF-010Ability to restrict report creation by roleUC-002Must Have
GF-011Ability to accommodate times "off desk" for technicians to step out of ticket rotation for chat and phone coverage.UC-002Must Have
GF-012Mobile app for techniciansUC-001Must Have
GF-013Mobile app for end usersUC-001Must Have
GF-014
GF-015
GF-016
GF-017
GF-018
GF-019
GF-020
GF-021
GF-022
GF-023
GF-024
GF-025
GF-026
GF-027
GF-028
GF-029
Total Score0
Integrations
RequirementsHigh Level Use Case SupportedPrioritizationVendor ScoreVendor Notes
INT-001Integration with native SCCM software delivery toolsUC-008Must Have
INT-002Integration with Cisco phone systemUC-001Must Have
INT-003Integration with MS TeamsUC-001Must Have
INT-004Integration with MS M365 emailUC-001Must Have
INT-005Define development environment integrationsUC-008Must Have
INT-006System must integrate with ADSI/LDAP authentication protocolsUC-001Must Have
INT-007Provide a list of current integrations and APIsUC-008Must Have
INT-008Data ownership and exportabilityUC-008Must Have
INT-009
INT-010
INT-011
INT-012
INT-013
INT-014
INT-015
Total Score0
Security
RequirementsHigh Level Use Case SupportedPrioritizationVendor ScoreVendor Notes
SEC-001System must be SAE16 SOC1 CertifiedUC-008Must Have
SEC-002System must be SOC3 CertifiedUC-008Must Have
SEC-003System must be ISO 27001 CertifiedUC-008Must Have
SEC-004System must be TRUSTe CertifiedUC-008Must Have
SEC-005System must meet or exceed FEDRAMP or STATERAMP requirementsUC-008Must Have
SEC-006AI model must not teach any models external to OEDUC-001Must Have
SEC-007AI model must be identifiedUC-001Must Have
SEC-008Any vendor who uses a 3rd party AI that is listed on the State of Oregon Covered Vendor List would not be eligible.UC-001Must Have
SEC-009
SEC-010
SEC-011
SEC-012
SEC-013
SEC-014
SEC-015
Total Score0
General Non-Functional Requirements
RequirementsPrioritizationVendor ScoreVendor Notes
GNF-001Organizational Change Management documentation and support materials - This could include but is not limited to mitigation strategies, video links for staff to review and learn about the system in advance, PowerPoint presentations and PDF information, job aides and FAQs,UC-001Must Have
GNF-002Training and training materials or documentation this could include but is not limited to video links for staff to review and learn about the system in advance, powerpoints and PDF information, job aides, FAQs and a sandbox enviroment:

Specific User Groups for training materials should be focused around:

System Administrators - to include maintenance, updates, troubleshooting,workflow creation and modification, and configuration management (APIs, security roles and more) Technicians - to include ticket management, reporting, dashboards, and knowledge articles (including but not limited to creating, curation, and linking to tickets) Managers - to include navigation and pulling reports

End Users - to include creating a ticket, finding resources and customizing home pageUC-001Must Have
XX-003
XX-004
XX-005
XX-006
XX-007
XX-008
XX-009
XX-010
XX-011
XX-012
XX-013
XX-014
XX-014
XX-015
Total Score0
Name of Requirements Group #5
RequirementsPrioritizationVendor ScoreVendor Notes
XX-001
XX-002
XX-003
XX-004
XX-005
XX-006
XX-007
XX-008
XX-009
XX-010
XX-011
XX-012
XX-013
XX-014
XX-015
Total Score0
Name of Requirements Group #6
RequirementsPrioritizationVendor ScoreVendor Notes
XX-001
XX-002
XX-003
XX-004
XX-005
XX-006
XX-007
XX-008
XX-009
XX-010
XX-011
XX-012
XX-013
XX-014
XX-015
Total Score0
Name of Requirements Group #7
RequirementsPrioritizationVendor ScoreVendor Notes
XX-001
XX-002
XX-003
XX-004
XX-005
XX-006
XX-007
XX-008
XX-009
XX-010
XX-011
XX-012
XX-013
XX-014
XX-015
Total Score0
Name of Requirements Group #8
RequirementsPrioritizationVendor ScoreVendor Notes
XX-001
XX-002
XX-003
XX-004
XX-005
XX-006
XX-007
XX-008
XX-009
XX-010
XX-011
XX-012
XX-013
XX-014
XX-015
Total Score0
Name of Requirements Group #9
RequirementsPrioritizationVendor ScoreVendor Notes
XX-001
XX-002
XX-003
XX-004
XX-005
XX-006
XX-007
XX-008
XX-009
XX-010
XX-011
XX-012
XX-013
XX-014
XX-015
Total Score0
Name of Requirements Group #10
RequirementsPrioritizationVendor ScoreVendor Notes
XX-001
XX-002
XX-003
XX-004
XX-005
XX-006
XX-007
XX-008
XX-009
XX-010
XX-011
XX-012
XX-013
XX-014
XX-015
Total Score0

&"Calibri"&10&K000000 Restricted&1#_x000D_

3. Qualifications & References

Qualifications & References
Organization: Review and revise column C items to suit your needs. This is a common list of requirements.
Vendor: Complete columns D and E for each line item to provide an overview of your qualifications and ability to provide references.
Do not delete or add cells.
No.DescriptionVendor Able to ProvideExplain when and how this information will be provided (or N/A if unable to provide)
QR1Full legal name of the company, year business was established, number of people currently employed, and income statement and balance sheet for each of the two most recently completed fiscal years certified by a public accountant.
QR2An outline of the product line-up and/or services the vendor currently supports.
QR3An outline of the pricing model for the product line-up and/or services the vendor currently supports.
QR4An outline of its partnerships and relationships to date.
QR5An outline of its current and future strategies in the marketplace.
QR6Information on current clients, including total number of current clients, a list of clients in our industry, and evidence of successful completion of a project of a similar size and complexity.
QR7Description of pilot and/or sandboxing of solution available.
QR8Three to five customer references of a similar industry/geography/size to us.
QR9An outline of the vendor's backup plan should primary systems fail.
QR10Vendor to describe what customer service is available (e.g. 24/7 customer service over the phone).
QR11Vendor can provide a product engineer/technician to join a product demonstration to help answer any technical aspects of our Requirements Workbook.
QR12Vendor can describe how we retrieve data from the service if the usage ends and what happens to that data after 30 days of ending the service (e.g. data is deleted).
QR13Vendor acknowledges ability to provide the implementation deliverables listed in Tab 4 of this Requirements Workbook, when appropriate.
QR14Standard Master Services Agreement and Statement of Work format documenting the services being provided. The vendor’s standard template of governing terms and conditions should be submitted with an Order Form outlining the services custom to us.

4. Implementation Deliverables

Implementation Deliverables
Organization: Review and revise column C and D items to suit your needs. This is a common list of requirements.
Vendor: Please find below a list of expected implementation deliverables. These deliverables are to be provided by the vendor in accordance with further conversation with OED.
Task DescriptionDeliverable Components (including, but not limited to)
IMP-001Contract Work Plan

TASKS:

Perform the implementation themselves and will not use any sub-contractors Provide a single point of contact from start to finish Lead the work to identify the goals of the implementation plan Prepare the schedule Address implementation concerns Verify that OED requirements are aligned against the statement of work to set proper expectations Contract Work Plan Document that defines the goals of technical implementation Document that defines the planned implementation of the tasks Document that defines the schedule Existing vendor-created Organizational Change Management and Training documentation for the system being implemented IMP-002 Planning and Configuration Plan

TASKS:

Review existing OED System Requirements and workflow documentation Plan and Design Agent Service Desk Interface Plan and Design Address Book Plan Single Sign-On Plan and create Development, Test, and Production environments for OED Plan and Design Authentication Method Plan and Design Agent roles Plan and Design of Customer User roles Plan and Design Incident and Service Request Workflow Options Plan and Design Service Desk E-mail Options Plan and Design Searches and Reports Plan and Design External Database and Database Connectors Plan and Design Calendar, Knowledge Base, Customer Surveys, Software and Services Catalog, and other options Planning and Configuration Plan:

Contractor Business Analysis Review Agent Service Desk Interface Address Book Installation of Test, Development, and Production environments Document service capacity needs End-User/Customer Self-Service Interface Authentication Method- Integration with Enterprise SSO Agent users Customer Users Incident Management Workflow Options Service Request Workflow Options Service Desk e-mail Options Searches and Reports External Database and Database Connectors Calendar, Knowledge Base, Customer Surveys, Software and Services Catalog, and other options IMP-003 Provide Incident and Service Request Management Configuration and Implementation

TASKS

Business Analysis Review Configure Agent Interface for Service Requests, Incidents and Problems Configure Incident and Problem Management Relationship Configure Incident and Service Request Management Resolution Workflow Includes Service Desk Request Fulfillment and Applications SDLC workflows Configure Address Book Configure Customer Self-Service Interface Configure Authentication method Configure the Landing page with OED branding and desired “Widgets, Apps, Modules” Configure User roles using role-based access Configure e-mail Options Configure Workflow Options Configure Searches and Reports Configure Ad hoc Report interface/ access Review and Wrap-up UAT completed Provide Incident and Service Request Management Configuration and Implementation Contractor Business Analysis Review Configure Agent Interface for Service Requests, Incidents and Problems Configure Incident and Problem Management Relationship Configure Problem Management Resolution Workflow Configure Address Book Configure Customer Self-Service Interface Configure Authentication method Configure User roles using role-based Access Configure e-mail Options Configure Workflow Options Configure Searches, out of the box reports, and ad-hoc reports Support UAT and defect tracking and resolution Provide user and agent training materials IMP-004 Change Enablement (management) Configuration

TASKS:

In-depth Business Analysis Review System’s Change Enablement (management) Theory System’s Change Control (Management) Configuration Plan and Design Change Management Workflow Configure System’s Workflow Features Plan and Design Change Enablement (management) Approval Process and Phases Configure Change Enablement(management) Approval Process and Phases Review and Wrap-Up UAT support hange Enablement (management) Configuration Contractor Business Analysis Review System’s Change Control Management Core Theory System’s Change Management Configuration Plan and Design Change Management Workflow Configure System’s Workflow Features Plan and Design Change management Approval Process and Phases Configure Change management Approval Processes and Phases Support UAT and defect tracking and resolution Provide user and agent training materials IMP-005 Provide System Problem Management Configuration

TASKS:

In-depth Business Analysis Review Problem Management Theory Problem Management Configuration Plan and Design Change Management Workflow Configure System Workflow Features Plan and Design Problem Management (management) Approval Process and Phases Configure Problem Management Approval Processes and Phases Review and Wrap-Up User Acceptance Testing (UAT) Provide System Problem Management Configuration Contractor Business Analysis Review System Problem Management Core Theory System Problem Management Configuration Plan and Design Problem Management Workflow Configure System Problem Workflow Features Configure Problem Management approval process Support UAT and defect tracking and resolution Provide user and agent training materials IMP-006 Integrations and APIs

TASKS:

In-depth business analysis review of all integrations Work with OED on next steps for enterprise implementation of integrations Work with OED and 3rd Party vendors as needed for integration or APIs Configure Integrations/ APIs Review and Wrap-Up UAT Integrations and APIs Contractor Business Analysis Review System Integrations and APIs created documentation System Integration and APIs Configuration Plan and Design Change Management Workflow Support UAT and defect tracking and resolution Provide user and agent training materials IMP-007 Review Implementation Readiness, Go Live, and Postproduction Support Implementation Readiness:

TASKS:

Review the enterprise implementation with OED Work with OED to identify any gaps in the implementation and determine if in scope for the project Provide cutover plan for a smooth transition to the ESM System Provide user training and materials Provide Organizational Change Management materials to ensure adoption of the new system Go Live:

Contractor will conduct a go – no go meeting prior to implementation Contractor will execute cutover plan for go-live Contractor will provide virtual meeting room for contractors and OED technicians to consult on issues found at go live and during the go live period Contractor project team will provide 90 days of post go live support Contractor will resolve remaining defects Contractor will provide the final configuration settings to OED post go live Review Implementation Readiness, Go Live, and Postproduction Support Implementation Readiness User training and materials Organizational Change Management Materials Document that defines the next steps Provide cutover plan for the transition Document that defines the operational support for the ESM System support Document that contains the Snapshot of final configuration settings to OED post go-live (outside of the system) Document that contains any additional “As Built” information for the system and information on all APIs and integrations post go-live Business Continuity Management and Disaster Recovery Plan and Procedures

&"Calibri"&10&K000000 Confidential&1#_x000D_

Hide-dropdowns

Yes
No
N/A
5Included in default offering5
4Vendor Provided at extra cost/service4
3Provided as third-party integration at extra cost3
2Available through customization2
1Future offering1
0Not supported0
Must Have
Should Have
Nice To Have

image1.jpeg

File details come from the government source that posted it. Updated .