KCDME062.pdf
PDF 155 KB Posted
- Solicitation number
- NWWP4000-19-00072MWH
About this file
Mechanical prints for the two locations
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CRP_WFO_Mech_dwgs.pdf | ||
| KCCOM041.pdf | ||
| KCCOM051.pdf | ||
| KCDME042.pdf | ||
| KCDME032.pdf | ||
| KCCOM062.pdf | ||
| KCCOM031.pdf | ||
| KCDME051.pdf | ||
| BMX_WFO_Mech_dwgs.pdf | ||
| 19-00072_-_SF_18_Quote_Form.doc | DOC document | |
| 19-00072_-_SOW-CRP_HVAC_Controls_Replacement_Updated_Rev_4Mar19_-_FBO.pdf | ||
| 19-00072_-_SOW-BMX_HVAC_Controls_November_1,_2018_Rev_4Mar19_-_FBO.pdf | ||
| Calera_AL_SCLS.pdf | ||
| Corpus_Christi_TX_SCLS.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE DWG E04
4"C, FOR CONTINUATION
LOCATION OF TRANSFORMER
SEE DWG E04 FOR
TO UTILITY TRANSFORMER,
FOR CONTINUATION
G-1, SEE DWG E09
U-1
18" AFF
PLUGMOLD
M
DP-9
3/4"C 4#10, 1#10G, GFCI
7' 0"
10'-0"
PANEL (GFE)
UPS STATUS
FOR CONTINUATION
BLDG, SEE DWG E04
DP-14 TO UPPER AIR
GFCIGFCI
9 11
PPB-
SOFTENER
FUTURE WATER
PPB-
SHOWN ON DRAWING.
FLOOR) AND LEFT APPROXIMATELY IN POSITION
CONDUIT UNDER ACCESS FLOOR (NOT ATTACHED TO
RECEPTACLE AND BOX WITH 20'-0" OF FLEXIBLE
SHOWN IS TYPICAL FOR EACH UNIT.
AHU-2 DISCONNECT SHALL BE 4'-6" AFF. WIRING
AHU-1 DISCONNECT SHALL BE 6'-6" AFF AND TOP OF
MOUNTED DIRECTLY ABOVE ONE ANOTHER. TOP OF
DISCONNECT SWITCHES FOR AHU-1 & AHU-2 ARE
ON DRAWING.
FLOOR) AND LEFT APPROXIMATELY IN POSITION SHOWN
CONDUIT UNDER ACCESS FLOOR (NOT ATTACHED TO
RECEPTACLE AND BOX WITH 10'-0" OF FLEXIBLE
FLOOR UNDER ACCESS FLOOR.
MOUNT 10"x10"x6" JUNCTION BOX ON UNISTRUT TO
AND CONDUIT ROUTING.
SEE ELECTRICAL RISER DIAGRAM, DWG E03 FOR WIRE
SEE DETAIL 1, ON DWG E03.
TERMINAL BOX, LOCATED BELOW ACCESS FLOOR.
AFF
+42"
PPC- 7
J
J
PPB-
35 35
DP- DP-
PPB-
30A,2P
M
PPB-
MOD (2EA)
MOD
M M
F
E
D
C
B
A
6 5 4 3 2 1
PPA-
SCALE: 1/4"=1'-0"
MECHANICAL EQUIPMENT SPACE PLAN
DETAIL
SCALE:
-NONE
PPA-
WP
GFCI
COATS
THIS DWG
SEE DETAIL 1,
SPACE ABOVE,
UP TO MECH
2"C
PPB-
EF-1
PPB-
EWH
GFCI
PPA-
EWC
JAN
WOMEN112
MEN
VESTIBULE
STRIKE
DOOR
PPA-
PPA- EDH-7
PPA-
EDH-4
EDH-3
PPA-
8PPA-11
PPB- 29
PPB-
ABOVE CEILING
BELL XFMR
PPA-5
DP-
PPC-
PPB-
8 8
60A, 3PDP-560A, 3P
DP-7
60A, 3PPPA-2
PPA-4
PPB-
(ABOVE CEILING)
XFMR
DOOR ENTRY
(GFE)
C-1C-2
EDH-1
EDH-6
EDH-5
EDH-8
EDH-9
EDH-10
(GFE) ACU-3 ACU-1ACU-2
TF-2
PPB-
J
PPB-
6 8
PPB-
8 6
33331
PPB-
1 3
PPC-2
PPC-4
PPC- 5
PPB-
PPB-
PPA-
19 21
PPB-
PPB-
PPB-
PPB-
1 18
PPC-
PPA-
7 7
PPC-
DP
SWITCH
AUTO TRANSFER
DISCONNECT SWITCH
WFO SERVICE ENTRANCE SUPPRESSOR
SURGE
PPC
PPB
PPA
2"C
L21-30R
J
J
L21-20R
4 PLACES)
GRADE (TYPICAL
ABOVE FINISH
MOUNT 2'-0"
GFCI
WP
BOX (GFE)
CONTROL
REMOTE
BOX #3
TERMINAL
DOORBELL
PANEL
GEN STATUS
E10
GFCI
WP
WP
GFCI
1BOX #1
TERMINAL
BOX #2
TERMINAL
JJ
J J
LOCATION, SEE DWG E07
BOX SUITABLE FOR WET
MULTI-SERVICE FLOOR
FLUSH MOUNTED
AFF
+24"
AFF
+24"
+24"
AFF AFF
+24"
CUH-1
CUH-2
NOTES
STORAGE
VEST
SERV
NORTH
BUILDING
SCALE: 1/4"=1'-0"
POWER PLAN
0 2' 4' 8' 12'
SCALE: 1/4"=1'-0"
PAC-2 (GFE) PAC-1 (GFE)
ELEC TECH
119 READY ROOM
CORRIDOR
106A
EQUIPMENT
COMM
ELEC
OPERATIONS
MULTI-PURPOSE
CORRIDOR
MIC
OFFICE
RCPTN
4"C TO ROHN TOWER,
SEE DWG E04,
FOR CONTINUATION
UNIT FURNISHED WITH DISCONNECT SWITCH AND/OR
MAGNETIC STARTER (IF REQUIRED) BY MANUFACTURER.
POWER WIRING CONNECTIONS BY CONTRACTOR. SEE
DWG M06 FOR EQUIPMENT SCHEDULE.8
DP-
EDH-2
L21-20R
J
SEE DWG E03
FOR CONT
J 6"x6"x4"
J-BOX
J J
J-BOX
6"x6"x4"
J 4"x4"x2"
J-BOX
OU DO
ASK
VERY
IRST WITH
LWAYS BE
AFETY SHOULD
Y T E F A S
N
OI
T A
R T
SI
NI
M
DA
A
A CIREHPSOMTDN
CI
NA
E
CO
LA
N
OI
T A N
EC
I
FF
O
MA
RGO
RPGNIREENIGNE
LAI
CE
P S
DRAWN
CHECKED
SUP'V. ENGR.
ENGR/PROJ. MGR.
ACOTR./COTR.
SIZE DWG. NO. CLIN. REV.
SPECIAL ENGINEERING PROGRAM OFFICE (SEPO)
NO. DATE PREPARED
BY
CHECKED
BY
ACTR/COTR
APPROVEDAPPROVED
FDI DESCRIPTION OF REVISION
WFO / NEXRAD PROGRAM
PROJECT NO.
PROGRAM MANAGEMENT
SERVICES CONTRACTOR
GOULD EVANS
ARCHITECTS, P.A.
U.S.A.
KANSAS CITY, MO.
FD
SP
K C D M E0
E06 DM 2
CORPUS, CHRISTI, TEXAS
WEATHER FORECAST OFFICE
ELECTRICAL POWER
PLAN
L J FOSTER
L J FOSTER
T M SUPER
MJM/TLS
JTS
044131-
DM01
:0
A N J
SUPPRESSOR
SURGE
METER
CABINET
3/4"C
FACP
PPB-
FOR CONTINUATION
TYP 4 PLACES)
NETWORK TEMP
CONTROL COMPONENT
(MOUNT 5'-6" AFF,
AHU-3 TEMP CONTROL
COMPONENT
COMPONENT
AHU-2 TEMP CONTROL
30A/3P
COMPONENT
AHU-1 TEMP CONTROL
PPC-
FOR CONTINUATION
F2
AHU-3
SD
D
HU-1
DP-
F2
SD
I
13SD
D
DP-8
S5
SEE DWG E08
DP-6 (AHU-2)
DP-4 (AHU-1)
D
SD
(BOTTOM)
AHU-2
(TOP)
AHU-1
SEE DWG E07
SEE THIS DWG
FOR CONTINUATION
CHAIN HANG (TYP)
8'-0" AFF
SD
D
PPB1
PPB1-10, 4#4,
1#10G, 1 1/4"C
TO DDG/STORAGE
BUILDING, SEE DWG E09
FOR CONTINUATION
MOUNT JUNCTION BOX ON UNISTRUT TO FLOOR UNDER
ACCESS FLOOR.
PROVIDE TEN FURNITURE CONNECTORS, EIGHT AS
SHOWN IN DETAIL 3A AND TWO AS SHOWN IN DETAIL
3B ON DRAWING E10. STORE CONNECTORS IN MIC OFFICE.
SMOKE DETECTOR FOR AHU-1 & AHU-2 ARE IN
SIMILAR LOCATIONS, SEE DWG M04 FOR UNIT LOCATIONS.
CONTRACTOR SHALL SUPPLY AND COORDINATE WITH
UTILITY COMPANY AS TO THE EXACT LOCATION
OF METER CABINET.
SEE DWG E11 FOR RISER DIAGRAM AND GENERAL NOTES.
PAINT LOCKING RECEPTACLE J-BOX RED.
4"C
PROVIDE A 12"x12" HINGED ACCESS DOOR FOR THE
(2) 4" CONDUITS THROUGH WALL. EACH 4"C SHALL
BE CAPPED ON THE EXTERIOR AND MADE WEATHERPROOF.
THE EXTERIOR CAPS SHALL BE PERMANENTLY AFFIXED
TO THE BUILDING EXTERIOR VIA A CORROSION
RESISTANT CHAIN.
SOO
(NWR RM)
FILE/COPY
(SOO TRANSITION)
(GFE)BATT
UPS
XFMR
75 KVA
HUNG
CEILING
SHALL BE PER LOCAL CODE REQUIRMENTS. MOUNT
BRACING AND SUPPORT OF CEILING HUNG TRANSFORMERS
BOTTOM OF TRANSFORMERS 10'-0" AFF.
3#10, 1#12, 3/4"CPPB-
IRRIGATION CONTROL
PANEL
400A 4-POLE
DOUBLE THROW
DISC SWITCH
(2 PLACES)
4"C TO ROHN TOWER,
SEE DWG E04,
FOR CONTINUATION
4"C TO RAIN GAGE,
SEE DWG E04,
FOR CONTINUATION
1 8/11/94 ANJ CHANGED GFE TO CFEGCL MJM/RRW FGR/JTS
FGR/JABERP/RRWTMS REVISED PER AS-BUILT CONDITIONSMCK6/6/962
LOCATION OF TRANSFORMER
SEE DWG E04 FOR
TO UTILITY TRANSFORMER,
FOR CONTINUATION
G-1, SEE DWG E09
U-1
18" AFF
PLUGMOLD
2 37
PPB-
PPA-4
PPB-
TF-2
PPC- 5
PPB-
7 7
PPC-
DP
DISCONNECT SWITCH
WFO SERVICE ENTRANCE SUPPRESSOR
SURGE
PPC
PPB
PPA
COMM
ELEC
117 8
J
J
OU DO
ASK
VERY
IRST WITH
LWAYS BE
AFETY SHOULD
Y T E F A S
N
OI
T A
R T
SI
NI
M
DA
A
A CIREHPSOMTDN
CI
NA
E
CO
LA
N
OI
T A N
EC
I
FF
O
MA
RGO
RPGNIREENIGNE
LAI
CE
P S
DRAWN
CHECKED
SUP'V. ENGR.
ENGR/PROJ. MGR.
ACOTR./COTR.
SIZE DWG. NO. CLIN. REV.
SPECIAL ENGINEERING PROGRAM OFFICE (SEPO)
NO. DATE PREPARED
BY
CHECKED
BY
ACTR/COTR
APPROVEDAPPROVED
FDI DESCRIPTION OF REVISION
WFO / NEXRAD PROGRAM
PROJECT NO.
PROGRAM MANAGEMENT
SERVICES CONTRACTOR
GOULD EVANS
ARCHITECTS, P.A.
U.S.A.
KANSAS CITY, MO.
FD
SP
K C D M E0
E06 DM 2
CORPUS, CHRISTI, TEXAS
WEATHER FORECAST OFFICE
ELECTRICAL POWER
PLAN
L J FOSTER
L J FOSTER
T M SUPER
MJM/TLS
JTS
044131-
DM01
:0
A N J
SUPPRESSOR
SURGE
METER
CABINET
PPB1
(GFE)BATT
UPS
XFMR
75 KVA
HUNG
CEILING15
PC NO.
BY
CHECKED
SITE
DATE
FD
SP
PC-07-DM-E06-0
05/18/95
CORPUS CHRISTI, TEXAS
| Model |
| Layout1 |
File details come from the government source that posted it.