About this file

Mechanical prints for the two locations

View the file

Other files

File Type Posted
CRP_WFO_Mech_dwgs.pdf PDF
KCCOM041.pdf PDF
KCCOM051.pdf PDF
KCDME042.pdf PDF
KCDME032.pdf PDF
KCCOM062.pdf PDF
KCCOM031.pdf PDF
KCDME051.pdf PDF
BMX_WFO_Mech_dwgs.pdf PDF
19-00072_-_SF_18_Quote_Form.doc DOC document
19-00072_-_SOW-CRP_HVAC_Controls_Replacement_Updated_Rev_4Mar19_-_FBO.pdf PDF
19-00072_-_SOW-BMX_HVAC_Controls_November_1,_2018_Rev_4Mar19_-_FBO.pdf PDF
Calera_AL_SCLS.pdf PDF
Corpus_Christi_TX_SCLS.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE DWG E04

4"C, FOR CONTINUATION

LOCATION OF TRANSFORMER

SEE DWG E04 FOR

TO UTILITY TRANSFORMER,

FOR CONTINUATION

G-1, SEE DWG E09

U-1

18" AFF

PLUGMOLD

M

DP-9

3/4"C 4#10, 1#10G, GFCI

7' 0"

10'-0"

PANEL (GFE)

UPS STATUS

FOR CONTINUATION

BLDG, SEE DWG E04

DP-14 TO UPPER AIR

GFCIGFCI

9 11

PPB-

SOFTENER

FUTURE WATER

PPB-

SHOWN ON DRAWING.

FLOOR) AND LEFT APPROXIMATELY IN POSITION

CONDUIT UNDER ACCESS FLOOR (NOT ATTACHED TO

RECEPTACLE AND BOX WITH 20'-0" OF FLEXIBLE

SHOWN IS TYPICAL FOR EACH UNIT.

AHU-2 DISCONNECT SHALL BE 4'-6" AFF. WIRING

AHU-1 DISCONNECT SHALL BE 6'-6" AFF AND TOP OF

MOUNTED DIRECTLY ABOVE ONE ANOTHER. TOP OF

DISCONNECT SWITCHES FOR AHU-1 & AHU-2 ARE

ON DRAWING.

FLOOR) AND LEFT APPROXIMATELY IN POSITION SHOWN

CONDUIT UNDER ACCESS FLOOR (NOT ATTACHED TO

RECEPTACLE AND BOX WITH 10'-0" OF FLEXIBLE

FLOOR UNDER ACCESS FLOOR.

MOUNT 10"x10"x6" JUNCTION BOX ON UNISTRUT TO

AND CONDUIT ROUTING.

SEE ELECTRICAL RISER DIAGRAM, DWG E03 FOR WIRE

SEE DETAIL 1, ON DWG E03.

TERMINAL BOX, LOCATED BELOW ACCESS FLOOR.

AFF

+42"

PPC- 7

J

J

PPB-

35 35

DP- DP-

PPB-

30A,2P

M

PPB-

MOD (2EA)

MOD

M M

F

E

D

C

B

A

6 5 4 3 2 1

PPA-

SCALE: 1/4"=1'-0"

MECHANICAL EQUIPMENT SPACE PLAN

DETAIL

SCALE:

-NONE

PPA-

WP

GFCI

COATS

THIS DWG

SEE DETAIL 1,

SPACE ABOVE,

UP TO MECH

2"C

PPB-

EF-1

PPB-

EWH

GFCI

PPA-

EWC

JAN

WOMEN112

MEN

VESTIBULE

STRIKE

DOOR

PPA-

PPA- EDH-7

PPA-

EDH-4

EDH-3

PPA-

8PPA-11

PPB- 29

PPB-

ABOVE CEILING

BELL XFMR

PPA-5

DP-

PPC-

PPB-

8 8

60A, 3PDP-560A, 3P

DP-7

60A, 3PPPA-2

PPA-4

PPB-

(ABOVE CEILING)

XFMR

DOOR ENTRY

(GFE)

C-1C-2

EDH-1

EDH-6

EDH-5

EDH-8

EDH-9

EDH-10

(GFE) ACU-3 ACU-1ACU-2

TF-2

PPB-

J

PPB-

6 8

PPB-

8 6

33331

PPB-

1 3

PPC-2

PPC-4

PPC- 5

PPB-

PPB-

PPA-

19 21

PPB-

PPB-

PPB-

PPB-

1 18

PPC-

PPA-

7 7

PPC-

DP

SWITCH

AUTO TRANSFER

DISCONNECT SWITCH

WFO SERVICE ENTRANCE SUPPRESSOR

SURGE

PPC

PPB

PPA

2"C

L21-30R

J

J

L21-20R

4 PLACES)

GRADE (TYPICAL

ABOVE FINISH

MOUNT 2'-0"

GFCI

WP

BOX (GFE)

CONTROL

REMOTE

BOX #3

TERMINAL

DOORBELL

PANEL

GEN STATUS

E10

GFCI

WP

WP

GFCI

1BOX #1

TERMINAL

BOX #2

TERMINAL

JJ

J J

LOCATION, SEE DWG E07

BOX SUITABLE FOR WET

MULTI-SERVICE FLOOR

FLUSH MOUNTED

AFF

+24"

AFF

+24"

+24"

AFF AFF

+24"

CUH-1

CUH-2

NOTES

STORAGE

VEST

SERV

NORTH

BUILDING

SCALE: 1/4"=1'-0"

POWER PLAN

0 2' 4' 8' 12'

SCALE: 1/4"=1'-0"

PAC-2 (GFE) PAC-1 (GFE)

ELEC TECH

119 READY ROOM

CORRIDOR

106A

EQUIPMENT

COMM

ELEC

OPERATIONS

MULTI-PURPOSE

CORRIDOR

MIC

OFFICE

RCPTN

4"C TO ROHN TOWER,

SEE DWG E04,

FOR CONTINUATION

UNIT FURNISHED WITH DISCONNECT SWITCH AND/OR

MAGNETIC STARTER (IF REQUIRED) BY MANUFACTURER.

POWER WIRING CONNECTIONS BY CONTRACTOR. SEE

DWG M06 FOR EQUIPMENT SCHEDULE.8

DP-

EDH-2

L21-20R

J

SEE DWG E03

FOR CONT

J 6"x6"x4"

J-BOX

J J

J-BOX

6"x6"x4"

J 4"x4"x2"

J-BOX

OU DO

ASK

VERY

IRST WITH

LWAYS BE

AFETY SHOULD

Y T E F A S

N

OI

T A

R T

SI

NI

M

DA

A

A CIREHPSOMTDN

CI

NA

E

CO

LA

N

OI

T A N

EC

I

FF

O

MA

RGO

RPGNIREENIGNE

LAI

CE

P S

DRAWN

CHECKED

SUP'V. ENGR.

ENGR/PROJ. MGR.

ACOTR./COTR.

SIZE DWG. NO. CLIN. REV.

SPECIAL ENGINEERING PROGRAM OFFICE (SEPO)

NO. DATE PREPARED

BY

CHECKED

BY

ACTR/COTR

APPROVEDAPPROVED

FDI DESCRIPTION OF REVISION

WFO / NEXRAD PROGRAM

PROJECT NO.

PROGRAM MANAGEMENT

SERVICES CONTRACTOR

GOULD EVANS

ARCHITECTS, P.A.

U.S.A.

KANSAS CITY, MO.

FD

SP

K C D M E0

E06 DM 2

CORPUS, CHRISTI, TEXAS

WEATHER FORECAST OFFICE

ELECTRICAL POWER

PLAN

L J FOSTER

L J FOSTER

T M SUPER

MJM/TLS

JTS

044131-

DM01

:0

A N J

SUPPRESSOR

SURGE

METER

CABINET

3/4"C

FACP

PPB-

FOR CONTINUATION

TYP 4 PLACES)

NETWORK TEMP

CONTROL COMPONENT

(MOUNT 5'-6" AFF,

AHU-3 TEMP CONTROL

COMPONENT

COMPONENT

AHU-2 TEMP CONTROL

30A/3P

COMPONENT

AHU-1 TEMP CONTROL

PPC-

FOR CONTINUATION

F2

AHU-3

SD

D

HU-1

DP-

F2

SD

I

13SD

D

DP-8

S5

SEE DWG E08

DP-6 (AHU-2)

DP-4 (AHU-1)

D

SD

(BOTTOM)

AHU-2

(TOP)

AHU-1

SEE DWG E07

SEE THIS DWG

FOR CONTINUATION

CHAIN HANG (TYP)

8'-0" AFF

SD

D

PPB1

PPB1-10, 4#4,

1#10G, 1 1/4"C

TO DDG/STORAGE

BUILDING, SEE DWG E09

FOR CONTINUATION

MOUNT JUNCTION BOX ON UNISTRUT TO FLOOR UNDER

ACCESS FLOOR.

PROVIDE TEN FURNITURE CONNECTORS, EIGHT AS

SHOWN IN DETAIL 3A AND TWO AS SHOWN IN DETAIL

3B ON DRAWING E10. STORE CONNECTORS IN MIC OFFICE.

SMOKE DETECTOR FOR AHU-1 & AHU-2 ARE IN

SIMILAR LOCATIONS, SEE DWG M04 FOR UNIT LOCATIONS.

CONTRACTOR SHALL SUPPLY AND COORDINATE WITH

UTILITY COMPANY AS TO THE EXACT LOCATION

OF METER CABINET.

SEE DWG E11 FOR RISER DIAGRAM AND GENERAL NOTES.

PAINT LOCKING RECEPTACLE J-BOX RED.

4"C

PROVIDE A 12"x12" HINGED ACCESS DOOR FOR THE

(2) 4" CONDUITS THROUGH WALL. EACH 4"C SHALL

BE CAPPED ON THE EXTERIOR AND MADE WEATHERPROOF.

THE EXTERIOR CAPS SHALL BE PERMANENTLY AFFIXED

TO THE BUILDING EXTERIOR VIA A CORROSION

RESISTANT CHAIN.

SOO

(NWR RM)

FILE/COPY

(SOO TRANSITION)

(GFE)BATT

UPS

XFMR

75 KVA

HUNG

CEILING

SHALL BE PER LOCAL CODE REQUIRMENTS. MOUNT

BRACING AND SUPPORT OF CEILING HUNG TRANSFORMERS

BOTTOM OF TRANSFORMERS 10'-0" AFF.

3#10, 1#12, 3/4"CPPB-

IRRIGATION CONTROL

PANEL

400A 4-POLE

DOUBLE THROW

DISC SWITCH

(2 PLACES)

4"C TO ROHN TOWER,

SEE DWG E04,

FOR CONTINUATION

4"C TO RAIN GAGE,

SEE DWG E04,

FOR CONTINUATION

1 8/11/94 ANJ CHANGED GFE TO CFEGCL MJM/RRW FGR/JTS

FGR/JABERP/RRWTMS REVISED PER AS-BUILT CONDITIONSMCK6/6/962

LOCATION OF TRANSFORMER

SEE DWG E04 FOR

TO UTILITY TRANSFORMER,

FOR CONTINUATION

G-1, SEE DWG E09

U-1

18" AFF

PLUGMOLD

2 37

PPB-

PPA-4

PPB-

TF-2

PPC- 5

PPB-

7 7

PPC-

DP

DISCONNECT SWITCH

WFO SERVICE ENTRANCE SUPPRESSOR

SURGE

PPC

PPB

PPA

COMM

ELEC

117 8

J

J

OU DO

ASK

VERY

IRST WITH

LWAYS BE

AFETY SHOULD

Y T E F A S

N

OI

T A

R T

SI

NI

M

DA

A

A CIREHPSOMTDN

CI

NA

E

CO

LA

N

OI

T A N

EC

I

FF

O

MA

RGO

RPGNIREENIGNE

LAI

CE

P S

DRAWN

CHECKED

SUP'V. ENGR.

ENGR/PROJ. MGR.

ACOTR./COTR.

SIZE DWG. NO. CLIN. REV.

SPECIAL ENGINEERING PROGRAM OFFICE (SEPO)

NO. DATE PREPARED

BY

CHECKED

BY

ACTR/COTR

APPROVEDAPPROVED

FDI DESCRIPTION OF REVISION

WFO / NEXRAD PROGRAM

PROJECT NO.

PROGRAM MANAGEMENT

SERVICES CONTRACTOR

GOULD EVANS

ARCHITECTS, P.A.

U.S.A.

KANSAS CITY, MO.

FD

SP

K C D M E0

E06 DM 2

CORPUS, CHRISTI, TEXAS

WEATHER FORECAST OFFICE

ELECTRICAL POWER

PLAN

L J FOSTER

L J FOSTER

T M SUPER

MJM/TLS

JTS

044131-

DM01

:0

A N J

SUPPRESSOR

SURGE

METER

CABINET

PPB1

(GFE)BATT

UPS

XFMR

75 KVA

HUNG

CEILING15

PC NO.

BY

CHECKED

SITE

DATE

FD

SP

PC-07-DM-E06-0

05/18/95

CORPUS CHRISTI, TEXAS

Model
Layout1

File details come from the government source that posted it.