Attachment_4_NRC_187.pdf
PDF 2 MB Posted
- Attached to
- Computational Fluid Dynamics (CFD) Modeling and Simulation Support for Containment and Mixing Studies Federal contract opportunity
- Solicitation number
- NRC-HQ-60-15-R-0005
About this file
Attachment 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_000004.pdf | ||
| Amendment_000003.pdf | ||
| Amendment_000002.pdf | ||
| Amendment_1.pdf | ||
| Attachment_5_TO_1_SOW.pdf | ||
| Attachment_3_Billing_Instructions_FP.pdf | ||
| Attachment_6_Past_Performance_Questionnaire.pdf | ||
| NRC-HQ-60-15-R-0005.pdf | ||
| Attachment_1_Subpart_2009.5.pdf | ||
| Attachment_2_Billing_Instructions_T M.pdf | ||
| Pre-SolicitationNotice_Revised_02.21.15.docx | DOCX document | |
| Pre-SolicitationNotice.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
NRCMD 12
(01-2015)
CONTRACT SECURITY AND/OR
CLASSIFICATION REQUIREMENTS
U.S. NUCLEAR REGULATORY COMMISSION
NRC FORM 187
NRC FORM 187 (01-2015)
Page of
NRC FORM 187
(01-2015)
NRCMD 12
CONTRACT SECURITY AND/OR CLASSIFICATION REQUIREMENTS (Continued)
U.S. NUCLEAR REGULATORY COMMISSION
Page of
NRC FORM 187 (01-2015)
7. Is this contract a follow-on contract?
Yes No
9. Contract Performance Requirements A. Will the contract require access to classified matter (information, systems, and/or material) (i.e., 32 CFR Part 2004 or MD 12.2)?
Yes (continue) No (if no, proceed to Block 9.E.)
B. What is the highest level of classified matter the contractor will need to access to perform contract responsibilities?
C. To carry out requirements of the contract, will the contractor need to possess, generate, or store classified matter at the contractor facility location?
Yes (continue) No (if no, proceed to Block 9.E.)
D. Choose all that apply: In regards to classified matter, the contractor will require:
1) Access to Foreign Intelligence Information
2) Receipt and storage (i.e., safeguarding) of classified matter
3) Access to cryptographic material or other classified COMSEC information
4) Access to classified matter or information processed by another agency
5) Use of a classified information technology processing system
6) Generation of classified at Contractor facility location
7) Generation of classified matter at an NRC facility E. Will the contractor require access to Safeguards Information or Safeguards Information - Modified Handling Information (i.e., 10 CFR 73.21, 73.22, and/or 73.23)?
Yes No F. Will the contractor possess, generate, or store SGI or SGI-M at the contractor facility?
Yes No G. Will the contractor require access to any Sensitive Unclassified Non-Safeguards Information (SUNSI) or sensitive information technology (IT) Systems (i.e., MD 12.6)?
Yes No H. Will the contractor possess, generate, or store SUNSI or have access to NRC sensitive IT systems at the contractor facility?
Yes No I. Was, "Yes" checked to Block 9.A., Block 9.C., Block 9.E., or Block 9.F.?
Yes No (If "Yes", then a Facility Clearance is required to be issued for the contractor and any known sub-contractors by the Facilities Security Branch before final contract award and before work can begin on the contract.)
J. Choose all that apply:
1) Unescorted Access is required to Nuclear Power Plants.
2) Access is required to Unclassified Safeguards Information.
3) Access is required to Sensitive IT Systems and Data.
4) Unescorted Access to NRC Headquarters Building.
5) Require operation of government vehicles or transport passengers for the NRC.
6) Will operate hazardous equipment at NRC facilities.
7) Required to carry firearms.
8) Found to use or admit to use of illegal drugs.
11. Does this contract contain any subcontractors?
Yes No If "No", Leave area blank. (Note: It is the responsibility of the COR to notify FSB if the contractor adds a subcontractor to the contract during the execution of the contract. The sub-contractors may require a facility clearance before work can be allowed).
12. Review of contractor/subcontractor reports, documents for classified, SGI, SGI-M, and/or SUNSI will be reviewed by:
13. Required Distribution of NRC Form 187 for Review (Check all appropriate boxes)
1) Originating NRC office or Division (Item 14A.)
2) Division of Facilities and Security (Item 14B.)
3) Division of Contracts and Property Management (Item 14C.)
14. Approvals Signature Date Signature Date Signature Date
INSTRUCTIONS FOR COMPLETING NRC FORM 187
NRC Form 187, “Contract Security and/or Classification Requirements,” including attachments and supplements, furnishes the basis for providing security and classification requirements to contractors, subcontractors or others (e.g., bidders) who have or may have an NRC contractual relationship which requires access to classified information or matter, for unescorted access to nuclear power plants, access to Unclassified Safeguards Information, access to sensitive unclassified non-Safeguards Information, access to sensitive IT systems or data and/or access to NRC Headquarters buildings.
WHO USES NRC FORM 187: All organizations which have or may have an NRC contractual relationship of the nature set forth above.
WHEN TO USE: Responsibility for initiation of NRC Form 187 rests with the office or division sponsoring a contract, project, or consultant, or requesting that such work be conducted (e.g., at a Department of Energy (DOE) National Laboratory).
Early preparation and submission of this form will help assure that all necessary classification and security actions are initiated and if applicable a facility clearance must be granted prior to contract award. Experience has shown that incomplete information or untimely submission delays both the security and contractual process.
WHERE TO SEND: The form should be routed from the contract initiating office the appropriate contract specialist. Then the form should go to the Division of Facilities and Security. One copy should go to the Facilities Security Branch and another copy should go to the Personnel Security Branch. Once each branch reviews the form, the form will be officially signed off by the Director of Division of Facilities Security or their designee with the appropriate security clauses and/or additional actions. Finally, the form needs to be routed back to the Acquisitions Management Division within the Office of Administration for final signature.
PREPARATION: Items listed below directly correlate to the numbered items on NRC Form 187.
| 1. | Identify the type of submission; is it new, revised or other? (Note: A revision supersedes all previously submitted NRC Form 187s | for the same NRC contract number). | |||
| 2. | Identify the type of contract; is it commercial, commercial-small business, sole source, interagency agreement, or interagency | agreement with a Department of Energy (DOE) Lab? | |||
| 3. | Input the contracting company's full legal name and address. | ||||
| 4. | Enter the contract number, interagency agreement number, or job code for DOE projects. | ||||
| 5. | Enter the start date for the contract. | ||||
| 6. | Enter the end date for the contract. | ||||
| 7. | Indicate whether the contract is a follow-on contract (i.e., is the contract in addition to another "parent" contract). If yes, then input | the contract number, interagency agreement number, or job code that is being followed-on. | |||
| 8. | Enter the Cage Code for the Contractor Facility or DOE Facility Code | ||||
| 9. | Contract Performance Requirements | ||||
| c. | Determine if the contractor requires the ability to possess, generate, or store classified matter at the contractor's facility | location. If no, is selected then proceed to Bock 9.E. | |||
| b. | Determine the highest level of classified matter the contractor will need access to then select the appropriate levels (e.g., | Top Secret Restricted Data [RD] or Secret National Security Information [NSI]). | |||
| a. | Determine if the contract requires access to classified matter (e.g., information, systems, and/or material) then select | the appropriate response. Look at Management Directive 12.2 and/or 32 CFR Part 2004 for guidance. If no is | selected then proceed to Block 9.E. | ||
| f. | Indicate whether the contractor will possess, store and/or generate SGI or SGI-M. | ||||
| e. | Determine if the contractor will require access to SGI or SGI-M as defined in Management Directive 12.7 and 10 CFR | 73.21, 73.22, and 73.23. | |||
| d. | Identify the appropriate types of classified matter the contractor will require access and check all appropriate boxes. | ||||
| h. | Determine if the contractor will need to possess, generate, and/or store SUNSI at the contractor's facility location. | ||||
| g. | Indicate whether the contractor will require access to Sensitive Unclassified Non-Safeguards Information (SUNSI). Look at | Management Directive 12.6 for guidance. | |||
| j. | Identify other performance requirements that may be needed by the contractor. Check all that apply. |
i. If YES, is checked on blocks 9A, 9C, 9E, and/or 9F, then the contractor will require a Facility Clearance issued by the Facilities Security Branch concurrent with the contract award. Without a facility clearance, the contractor cannot conduct sensitive work on the contract.
10. Identify the classification guides that the contractor will be required to abide by while operating under the NRC contract (e.g., Management Directive 12.7, 10 Code of Federal Regulations (CFR) 73.22, and actual classification or designation guides for a specific topic).
INSTRUCTIONS FOR COMPLETING NRC FORM 187 (continued)
| 11. | Indicate whether the contractor is, or will include the use of subcontractors in order to meet the performance requirements of the | contract. If marked yes, then provide the full legal name of the subcontractor company, the address, and the subcontractor's CAGE | code, if any. Input this information in the box directly below item # 10 (Note: It is the COR's responsibility to notify FSB of any | subcontractors added to a contract). |
| 12. | Enter the names of the individuals charged with reviewing the contractors and/or subcontractor's classified SUNSI, and SGI/SGI-M | documents and reports. | ||
| 13. | Check the boxes of those required to be on distribution and signature. | |||
| 14. | Populate the names of the approving authorities in Section 14 and route form through those authorities. Any remarks made by the approving authorities will be included in the “Remarks” section at the bottom of the form. |
9.0.0.2.20120627.2.874785
| CurrentPage: |
| PageCount: |
| Type_Subm: New |
| Type_Contract: Commercial - Small Business |
| Con_Nm_Adr: |
| 4. Contract Number, IAA Number, or Job Code for DOE Projects: |
| 5. Contract Start Date: (MM/DD/YYYY): 07/01/2015 |
| 6. Contract End Date: (MM/DD/YYYY): 06/30/2019 |
| 7. Is this contract a follow-on contract? No : No |
| If Yes, provide previous Contract Number or Job Code: |
| 8. Contractor Cage Code or DOE Facility Code: |
| 9. Contract Performance Requirements - A. Will the contract require access to classified matter (information, systems, and/or material)? No: No |
| B. What is the highest level of classified matter the contractor will need to access to perform contract responsibilities? Select 1st Level of Classification from drop down list (Use keyboard up and down arrows to see choices): Select 1st Level of Classification |
| B. What is the highest level of classified matter the contractor will need to access to perform contract responsibilities? Select 2nd Level of Classification from drop down list (Use keyboard up and down arrows to see choices): Select 2nd Level of Classification |
| 9. Contract Performance Requirements - C. To carry out requirements of the contract, will the contractor need to possess, generate, or store classified matter at the contractor facility location? No: No |
| D. Choose all that apply: In regards to classified matter, the contractor will require: 1) Access to Foreign Intelligence Information: Off |
| D. Choose all that apply: In regards to classified matter, the contractor will require: 2) Receipt and storage (i.e., safeguarding) of classified matter: Off |
| D. Choose all that apply: In regards to classified matter, the contractor will require: 3) Access to cryptographic material or other classified COMSEC information: Off |
| D. Choose all that apply: In regards to classified matter, the contractor will require: 4) Access to classified matter or information processed by another agency: Off |
| D. Choose all that apply: In regards to classified matter, the contractor will require: 5) Use of a classified information technology processing system: Off |
| D. Choose all that apply: In regards to classified matter, the contractor will require: 6) Generation of classified at Contractor facility location : Off |
| D. Choose all that apply: In regards to classified matter, the contractor will require: 7) Generation of classified matter at an NRC facility: Off |
| 9. Contract Performance Requirements - E. Will the contractor require access to Safeguards Information or Safeguards Information - Modified Handling Information? No: No |
| 9. Contract Performance Requirements - F. Will the contractor possess, generate, or store SGI or SGI-M at the contractor facility? No: No |
| 9. Contract Performance Requirements - G. Will the contractor require access to any Sensitive Unclassified Non-Safeguards Information (SUNSI) or sensitive information technology (IT) Systems? No: Yes |
| 9. Contract Performance Requirements - H. Will the contractor possess, generate, or store SUNSI or have access to NRC sensitive IT systems at the contractor facility? No: Yes |
| 9. Contract Performance Requirements - I. Was "Yes" checked to Block 9.A., Block 9.C., Block 9.E., or Block 9.F.? No: No |
| J. Choose all that apply: 8) Found to use or admit to use of illegal drugs.: Off |
| J. Choose all that apply: 8) Found to use or admit to use of illegal drugs.: Off |
| J. Choose all that apply: 8) Found to use or admit to use of illegal drugs.: Off |
| J. Choose all that apply: 8) Found to use or admit to use of illegal drugs.: Off |
| J. Choose all that apply: 8) Found to use or admit to use of illegal drugs.: Off |
| J. Choose all that apply: 8) Found to use or admit to use of illegal drugs.: Off |
| J. Choose all that apply: 8) Found to use or admit to use of illegal drugs.: Off |
| J. Choose all that apply: 8) Found to use or admit to use of illegal drugs.: Off |
| 10. Classification Guidance (to be completed by COR): |
| 11. Does this contract contain any subcontractors? If "No", Leave area blank. (Note: It is the responsibility of the COR to notify FSB if the contractor adds a subcontractor to the contract during the execution of the contract. The sub-contractors may require a facility clearance before work can be allowed).: No |
| Subcontractor Company name, address and Defense Security Service cage code.: |
| Typed or Printed Name and Title of Authorized Classifier: |
| Typed or Printed Name and Title of Authorized Derivative Classifier: |
| Typed or Printed Name and Title of A Qualified Designator for SGI, and SGI-M: |
| 13. Required Distribution of NRC Form 187 for Review (Check all appropriate boxes) 3) Division of Contracts and Property Management: 1) |
| 13. Required Distribution of NRC Form 187 for Review (Check all appropriate boxes) 3) Division of Contracts and Property Management: 2) |
| 13. Required Distribution of NRC Form 187 for Review (Check all appropriate boxes) 3) Division of Contracts and Property Management: 3) |
| Typed or Printed Name of Director, Office or Division: |
| Typed or Printed Name of Director, Division of Facilities and Security: |
| Typed or Printed Name of Director, Acquisitions Management Division: |
| REMARKS: |