This document is a Project Sustainability Checklist for a National Park Service (NPS) housing project. The checklist evaluates the project's sustainability features against the LEED 2009 New Construction rating system as well as other federal requirements.

The project is for a new 1,910 square foot residential building. The checklist tracks sustainability credits and prerequisites across categories such as Sustainable Sites, Water Efficiency, Energy & Atmosphere, Materials & Resources, and Indoor Environmental Quality. It indicates that the project is targeting LEED certification but is currently missing several prerequisites and not on track to achieve a specific LEED certification level. The checklist also notes compliance with federal regulations around energy consumption, renewable energy, water use, materials, and indoor air quality. Overall, the document provides a detailed assessment of the sustainability features planned for this NPS housing project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NPS Project Sustainability Checklist National Park Service (NPS) - Denver Service Center (DSC) | 9-4-18

Building and Non-Building Projects (For New Construction or Renovation) LEED 2009 Edition (Leadership in Energy & Environmental Design)

Project Title: Project Type: New Building Description: Fund Source: Other Gross Project Construction Cost:

Park: Predesign Begin Date: 2018 Gross Building Construction Cost:

Project Management Information System (PMIS) Number: Fiscal Year of Construction Funding: 2020 Gross Non-Building (e.g. Site) Cost:

Architect/Engineer (A/E) Firm: Park: Building Size (Square Feet): 1,910 Date: 8/28/2020 State: Region:

Type of Building: New Building If Renovation, Existing Building Current Replacement Value (CRV):

% Federal Regulations Achieved 0% 0% 0% 76% 0% 0%

Total LEED-NC Credits Missed Prerequisite Missed Prerequisite Missed Prerequisite Missed Prerequisite Missed Prerequisite Missed Prerequisite

LEED Certification Level Not Certified/Missing Prerequisite Not Certified/Missing Prerequisite Not Certified/Missing Prerequisite Not Certified/Missing Prerequisite Not Certified/Missing Prerequisite Not Certified/Missing Prerequisite

Sustainable Sites (SS) Maximum LEED New Construction (NC) 2009 Credits: 26

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

Sustainability Features Y, N, NA (Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

SS Prerequisite 1 Construction Activity Pollution Prevention NA N/A

This will be addressed with the site specific application of the prototype design package.

SS Credit 1 Site Selection NA 0

This will be addressed with the site specific application of the prototype design package.

SS Credit 2 Development Density & Community Connectivity N 0

This will be addressed with the site specific application of the prototype design package.

SS Credit 3 Brownfield Redevelopment N 0

This will be addressed with the site specific application of the prototype design package.

SS Credit 4.1 Alternative Transportation, Public Transportation Access N 0

This will be addressed with the site specific application of the prototype design package.

SS Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms

Y 1

Bike racks outside may be provided, but will be verified with a site specific application of the prototype design package.

SS Credit 4.3 Alternative Transportation, Low- Emitting & Fuel-Efficient Vehicles N 0

This will be addressed with the site specific application of the prototype design package.

SS Credit 4.4 Alternative Transportation, Parking Capacity N 0

This will be addressed with the site specific application of the prototype design package.

Housing Prototype Update Housing Prototype Update (Buildings #8)

WASO

Otak, Inc

NPS Project Sustainability Checklist, 5-25-18 1

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

Sustainability Features Y, N, NA (Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

SS Credit 5.1 Site Development, Protect or Restore Habitat Y 1

Protections to habitat is typical of NPS projects, although will be verified with a site specific application of the prototype design package.

SS Credit 5.2 Site Development, Maximize Open Space Y 1

Two story units minimize the building footprint. Shared parking arrangements would be determined with the site specific application of this prototype design package.

SS Credit 6.1

Stormwater Design, Quantity Control (See Energy Independence & Security Act (EISA) Section 438) (pdf)

N 0

Building size is under 5,000 SF, although some stormwater BMP's are expected to be implemented.

Approach will need to be finalized with a site specific application of this prototype design package.

SS Credit 6.2

Stormwater Design, Quality Control (See Energy Independence & Security Act (EISA) Section 438) (pdf)

Y 1

Vegetated swales for water quality treatment and environmentally sensitive design can be addressed with the site specific application of this prototype design package.

Energy Independence & Security Act (EISA) 2007, Section 438 (pdf)

Stormwater Management (see Guiding Principle III Protect and Conserve Water) (pdf)

NA N/A Building is under 5,000 SF.

SS Credit 7.1 Heat Island Effect, Non-Roof Y 1

High albedo roof being considered. Shade will be determined through a site specific application of this prototype design package.

SS Credit 7.2 Heat Island Effect, Roof Y 1 High albedo roof being considered.

SS Credit 8 Light Pollution Reduction Y 1

Very minimal site lighting or exterior building lighting to be provided with full cutoff fixtures.

2006 NPS Management Policies (Paragraph 4.9) Soundscape Preservation Y N/A

If exterior equipment is part of an HVAC option, the equipment will be placed out of sight and/or screened.

2006 NPS Management Policies (Paragraph 4.10) Dark Sky Preservation Y N/A

Very minimal site lighting or exterior building lighting to be provided with full cutoff fixtures.

LEED-NC Subtotal Missed Prerequisite

Missed Prerequisite

Missed Prerequisite

Missed Prerequisite

Missed Prerequisite

Missed Prerequisite

Water Efficiency (WE) Maximum LEED New Construction (NC) 2009 Credits: 10

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

Sustainability Features Y, N, NA (Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

WE Prerequisite 1 Water Use Reduction, 20% Reduction Y N/A Low volume plumbing fixtures.

NPS Project Sustainability Checklist, 5-25-18 2

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

WE Credit 1 Water Efficient Landscaping, Reduce by 50% Y 2 plantings with no irrigation anticipated.

WE Credit 1 (continued)

Water Efficient Landscaping, No Potable Use or No Irrigation Y 2 o permanent irrigation anticipated.

WE Credit 2 Innovative Wastewater Technologies Y 2 Low volume plumbing fixtures proposed.

Metering of Water and Energy Use - New Construction (pdf)

Water Metering (See Guiding Principle III-Protect and Conserve Water) (pdf)

Y N/A Water meter to be provided to monitor building use.

Energy Policy Act (EPACT) 2005, Section 109 (pdf)

Water Used for Energy Conservation NA N/A No opportunity with this building type.

WE Credit 3 (pdf) Water Use Reduction (30%, 35%, 40%) Y 2 Low volume fixtures proposed.

Guiding Principles for Sustainable Federal Buildings

(pdf)

Indoor Water Use (See Guiding Principle III-Protect and Conserve Water)

Y N/A Low volume Water Sense products being used.

Guiding Principles for Sustainable Federal Buildings

(pdf)

Outdoor Water Use (See Guiding Principle III-Protect and Conserve Water)

Y N/A No permanent irrigation anticipated.

Guiding Principles For Sustainable Federal Buildings

(pdf)

Alternative Water Use (See Guiding Principle III) N N/A

Water conservation strategies such as use of grey water and reclaimed water not anticipated for residential use.

LEED-NC Subtotal Missed Prerequisite

Missed Prerequisite

Missed Prerequisite 8 Missed

Prerequisite Missed

Prerequisite

Energy & Atmosphere (EA) Maximum LEED New Construction (NC) 2009 Credits: 35

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

Sustainability Features Y, N, NA (Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

EA Prerequisite 1

Fundamental Commissioning of the Building Energy Systems (see Guiding Principle I - Employ Integrated Design Principles) (pdf)

Y N/A Appropriate systems will have fundamental commissioning.

EA Prerequisite 2 Minimum Energy Performance Y N/A Energy will have 30% or more improvement.

EA Prerequisite 3

Fundamental Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials) (pdf)

Y N/A No CFC-based refridgerants will be used.

NPS Project Sustainability Checklist, 5-25-18 3

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

EA Credit 1

Optimize Energy Performance:** (Federal Regulations require an energy consumption reduction of 30% for New Construction and 20% for Existing Building Renovation as compared to an ASHRAE 90.1 baseline (American Society of Heating, Refrigerating and Air Conditioning). See Title 10 Code of Federal Regulations (CFR) Part 433)

Y 10 Energy will have 30% or more improvement.

Energy Independence and Security Act (EISA) 2007, Section 433 (pdf)

Reduce Fossil Fuel Derived Energy Y N/A

Fossil fuel requirements will be reduced with certain HVAC options and is dependent on alternative energy electricity options from local power provider.

Executive Order (EO) 13963 (pdf) & Guiding Principles for Sustainable Federal Buildings

Procure Environmentally sustainable electronic products (Predominantly relates to purchases of desktop/laptop computer and peripherals)

Y N/A

New energy efficient electronic products will be procured although limited to appliances for this type of project.

Code of Federal Regulations (CFR) Title 10, Part 436.4

(pdf)

Procure Energy Star or Federal Energy Management Program (FEMP) designated products

Y N/A Energy Star products will be specified as available.

Energy Policy Act (EPACT) 2005, Section 104 (pdf)

Premium Efficiency Electric Motors Y N/A Motors will be premium efficiency.

Energy Independenc and Security Act (EISA) 2007, Section 523 (pdf)

On-Site Renewable Energy*** Solar Thermal for Hot Water (Choose NA if proven not life cycle cost effective.)

N N/A No opportunity with this project.

EA Credit 2 On-Site Renewable Energy*** 1%-13% Renewable Energy N 0

On-site Renewable Energy systems will be determined with a site specific application of this prototype.

EA Credit 3

Enhanced Commissioning (required for large or complex buildings or systems (see Guiding Principle I - Employ Integrated Design Principles) (pdf)

N 0 Enhanced commissioning will be not be provided for this scale building and systems.

Commissioning process has begun during design

EA Credit 4

Enhanced Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials) (pdf)

Y 2 Refrigerant selection minimizes or eliminates ozone depletion.

EA Credit 5 Measurement & Verification Y 3 Meters are anticipated to be provided.

EO 13693 (pdf) & Guiding Principles For Sustainable

Federal Buildings

Measurement & Verification (see Guiding Principle II - Optimize Energy Performance. Install building level meters for electricity, natural gas, and steam) (pdf)

N 0 Meters are anticipated to be provided.

NPS Project Sustainability Checklist, 5-25-18 4

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

EA Credit 6 Green Power Y 2 Green power will be purchased from provided if available.

LEED-NC Subtotal Missed Prerequisite

Missed Prerequisite

Missed Prerequisite 17 Missed

Prerequisite Missed

Prerequisite

Materials & Resources (MR) Maximum LEED New Construction (NC) 2009 Credits: 14

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

Sustainability Features Y, N, NA (Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

MR Prerequisite 1

Storage & Collection of Recyclables (See Guiding Principle V-Waste Diversion and Materials Management) (pdf)

Y N/A Recycle collection locations will be provided if local park has recycling capabilities.

MR Credit 1.1 Building Reuse, Maintain Existing Walls, Floors & Roof N 0 No reuse opportunity since new construction.

MR Credit 1.2 Building Reuse, Maintain Interior Nonstructural Elements N 0 No reuse opportunity since new construction.

MR Credit 2

Construction Waste Management, Divert 50% from Disposal (see Guiding Principle V

- Waste Diversion and Materials Management) (pdf)

Y 1 Waste management plan with minimum 50% diversion will be developed as a baseline.

MR Credit 2 (continued)

Construction Waste Management, Divert 75% from Disposal

N 0

Waste management plan to divert 75% diversion will be explored, but may not be able to be achieved.

MR Credit 3 Materials Reuse N 0 No opportunity with this project.

MR Credit 4 Recycled Content, 10% (post-consumer and half pre-consumer).

Y 1 Recycled content materials will be used where applicable.

MR Credit 4 Recycled Content, 20% (post-consumer and half pre-consumer)

Y 1 Recycled content materials will be used where applicable.

Executive Order (EO) 13693 (pdf) & Guiding Principles for Sustainable Federal Buildings

Recycled Content (See Guiding Principle V - Recycled Content and Comprehensive Procurement Guidelines). Also see Resource Conservation & Recovery Act (RCRA) 6002 for products that meet or exceed \ recycled content recommendations. (pdf)

Y N/A

Regionally obtained lumber will be used upon review and application of prototype design package at a site specific location.

Executive Order (EO) 13693 (pdf) & Guiding Principles for Sustainable Federal Buildings

Biopreferred Products Y N/A Biopreferred products are not currently specified for this project.

NPS Project Sustainability Checklist, 5-25-18 5

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

MR Credit 6 Rapidly Renewable Materials Y 1 Linoleum is an optional material for flooring in this project.

MR Credit 7

Certified Wood (see Environmental Protection Agency's (EPA) Greener Products suggestions)

N 0 Certified Wood is not specified at this time.

LEED-NC Subtotal Missed Prerequisite

Missed Prerequisite

Missed Prerequisite 4 Missed

Prerequisite Missed

Prerequisite

Indoor Environmental Quality (EQ) Maximum LEED New Construction (NC) 2009 Credits: 15

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

Sustainability Features Y, N, NA (Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

EQ Prerequisite 1

Minimum Indoor Air Quality (IAQ) Performance (See Guiding Principle IV, Enhance Indoor Environmental Quality) (pdf)

Y N/A Requirements of ASHRAE

62.1.2007 will be met.

EQ Prerequisite 2

Environmental Tobacco Smoke (ETS) Control (See Guiding Principle IV-Enhance Indoor Environmental Quality) (pdf)

Y N/A Smoking will not be allowed.

EQ Credit 1 Outdoor Air Delivery Monitoring Y 1 Outdoor air will be monitored.

EQ Credit 2 Increased Ventilation Y 1 Building will have increased ventilation.

EQ Credit 3.1

Construction Indoor Air Quality (IAQ) Management Plan, During Construction (See Guiding Principle IV, Enhance Indoor Environmental Quality) (pdf)

Y 1 IAQ Management Plan will be required by construction contractor.

EQ Credit 3.2

Construction Indoor Air Quality (IAQ) Management Plan, Before Occupancy (See Guiding Principle IV, Enhance Indoor Environmental Quality) (pdf)

Y 1 Building will be flushed out.

EQ Credit 4.1

Low-Emitting Materials, Adhesives & Sealants (See Guiding Principle IV, Enhance Indoor Environmental Quality) (pdf)

Y 1 Low VOC materials will be utilized as applicable.

EQ Credit 4.2

Low-Emitting Materials, Paints & Coatings (See Guiding Principle IV, Enhance Indoor Environmental Quality) (pdf)

Y 1 Low VOC materials will be utilized as applicable.

EQ Credit 4.3

Low-Emitting Materials, Flooring Materials (See Guiding Principle IV, Enhance Indoor Environmental Quality) (pdf)

Y 1 Low VOC materials have been specified.

EQ Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products

Y 1 Low emitting materials have been specified.

NPS Project Sustainability Checklist, 5-25-18 6

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

EQ Credit 5 Indoor Chemical & Pollutant Source Control N 0

This building type will not require this type of pollutant source control.

EO 13693 (pdf) & Guiding Principles for Sustainable

Federal Buildings

Moisture Control (See Guiding Principle IV-Enhance Indoor Environmental Quality) (pdf)

Y N/A Building envelope assemblies conform to moisture control standards.

EQ Credit 6.1

Controllability of Systems, Lighting (See Guiding Principle IV, Enhance Indoor Environmental Quality) (pdf)

Y 1 Residential occupants will have ability to control lights.

EQ Credit 6.2 Controllability of Systems, Thermal Comfort Y 1 Some windows expected to be operable.

EQ Credit 7.1

Thermal Comfort, Design (See Guiding Principle IV, Enhance Indoor Environmental Quality) (pdf)

Y 1 Building will meet requirements of ASHRAE 55- 2004.

EQ Credit 7.2

Thermal Comfort, Verification (Please note Office of Personnel Management (OPM) requires approval of all surveys prior to administering.)

N 0 Surveying occupants is not planned.

EQ Credit 8.1 Daylight and Views, Daylight 75% of Spaces (pdf) Y 1

All of the residential occupied spaces will have windows for daylight.

Guiding Principles for Sustainable Federal Buildings

(pdf)

Daylighting and Lighting Controls (See Guiding Principle IV- Enhance Indoor Environmental Quality)

Y N/A All of the residential occupied spaces will have windows for daylight.

EQ Credit 8.2 Daylight and Views-Views (See Guiding Principle III) Y 1 Occupied spaces will have views.

Guiding Principles for Sustainable Federal Buildings

(pdf)

Radon (See Environmental Protection Agency (EPA) Radon- Resistant Construction Basics and Techniques)

Y N/A Radon resistant construction techniques are being included.

Guiding Principles for Sustainable Federal Buildings

(pdf)

Integrated Pest Management (See NPS Integrated Pest Management Program)

Y N/A

Pest management is being considered, but should be further discussed with the site specific application of this prototype design package.

Guiding Principles for Sustainable Federal Buildings

(pdf)

Occupant Health and Wellness (See Whole Building Design Guide (WBDG))

Y N/A

Occupant health and wellness is being addressed with the prototype design, although specific siting of the housing units should consider access to other health and fitness opportunities for NPS staff.

LEED-NC Subtotal Missed Prerequisite

Missed Prerequisite

Missed Prerequisite 13 Missed

Prerequisite Missed

Prerequisite

Innovation & Design Process (ID) Maximum LEED New Construction (NC) 2009 Credits: 6

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

NPS Project Sustainability Checklist, 5-25-18 7

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Sustainability Features Y, N, NA (Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

ID Credit 1.1 Innovation in Design:

Provide Specific Title

ID Credit 1.2 Innovation in Design:

Provide Specific Title

ID Credit 1.3 Innovation in Design:

Provide Specific Title

ID Credit 1.4 Innovation in Design:

Provide Specific Title

ID Credit 1.5 Innovation in Design:

Provide Specific Title

ID Credit 2 LEED® Accredited Professional

LEED-NC Subtotal 0 0 0 0 0 0

Regional Priority (RP) Maximum LEED New Construction (NC) 2009 Credits: 4

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

Sustainability Features Y, N, NA (Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

RP Credit 1.1 Regional Priority Credit:

Region Defined Y 1

Regional design options to fit enviornment have been provided as options.

RP Credit 1.2 Regional Priority Credit:

Region Defined

RP Credit 1.3 Regional Priority Credit:

Region Defined

RP Credit 1.4 Regional Priority Credit:

Region Defined

LEED-NC Subtotal 0 0 0 1 0 0

Non-LEED-New Construction (NC) Federal Requirements Maximum LEED New Construction (NC) 2009 Credits: 26

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

Sustainability Features Y, N, NA (Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Executive Order (EO) 13693 (pdf) & Guiding Principles For Sustainable Federal Buildings

Complete Integrated Design Narrative During Predesign Only (See Guiding Principles I-Employ Integrated Design Principles) (pdf)

N/A N/A

Siting of the building and site improvements to be addressed with the site specific application of this prototype design package.

Guiding Principles for Sustainable Federal Buildings

(pdf)

Mission Criticality (See Guiding Principle VI). (pdf) N N/A

This prototype building package does not include any mission critical infrastructure.

Guiding Principles for Sustainable Federal Buildings

(pdf)

Flood Plain Considerations (See Guiding Principle VI and Executive Order (EO) 13960).

For Mission Critical Buildings, adjust base flood elevation by 3 feet. For Non Critical Buildings, adjust base flood elevation by 2 feet. (pdf)

N/A N/A

Siting of the building and site improvements to be addressed with the site specific application of this prototype design package.

NPS Project Sustainability Checklist, 5-25-18 8

PMIS Submission Predesign (PD) Schematic Design (SD) Design Development (DD) Construction Documents (CD) Construction (Const.)

(Yes, No, Not Applicable)

Points (NA = Not Applicable)

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Y, N, NA Points

Concisely explain how credit/requirement is met at this milestone:

Guiding Principles for Sustainable Federal Buildings

(pdf)

Facility Design. Incorporate resilience measures to mitigate the impacts of climate change and natural hazards as identified on the National Hazard Checklist.

N/A N/A

The prototype building design package assumes a standard set of design criteria with some options to address site specific conditions. During application of the prototype design, natural hazard concerns should be reviewed and necessary modifications to the prototype should be applied.

Guiding Principles for Sustainable Federal Buildings

(pdf)

Facility Adaptation. For existing buildings undergoing modernization, take action to mitigate identified physical risks.

See Natural Hazard Checklist.

N/A N/A These plans are for new building construction.

Fulfillment of Guiding Principles for High Performance in Sustainable Buildings (HPSB) completes 18 LEED NC credits and 6 prerequisites.

LEED Certification Rating System Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ points For more information on LEED Certification and credits, visit www.usgbc.org

*For new buildings 5,000 gross square feet (GSF) or more and major renovations to buildings greater than or equal to 5,000 GSF, contract with an independent Commissioning Authority and comply with ASHRAE 0-2005, "The Commissioning Process".

For smaller projects, comply with requirements of LEED NC 2009, EA Prerequisite 1, "Fundamental Commissioning of the Building Energy Systems" (which allows the commissioning authority to be an employee of the design firm).

**For new building projects of 5,000 GSF or more, perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or International Energy Conservation Code (IECC) 2006 for residential) to show performance at least 30% better (20% for major renovations) than a code compliant similar building.

If it can be shown that meeting the 30% performance standard for new construction (or 20% for major renovations) is not life-cycle cost effective (over 40 years - not 25 years per a recent regulatory change), then the project must incorporate the maximum energy savings that can be shown to be life-cycle cost effective.

For new building projects with a lower net construction value, an alternative method is to meet or exceed the minimum requirements prescribed by the ASHRAE Advanced Energy Design Guide (a much simpler prescriptive method for achieving the target) appropriate for the project's building.

For buildings without an appropriate Advanced Energy Design Guide, perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential).

***The Federal requirement (from Energy Independence and Security Act (EISA) 2007) that relates to these LEED-NC credits is "Where life-cycle cost effective, design systems to provide not less than 30 percent of the hot water demand through the installation and use of solar hot water heaters." The LEED credits for this item

NPS Project Sustainability Checklist, 5-25-18 9