Notice_to_Proceed.docx
DOCX document 16 KB Posted
- Attached to
- Parkview Loop Waterline Replacement
- Solicitation number
- 26-060
- Issued by
- Washington County, Barlow City, Oregon
About this file
This is a Notice to Proceed template document issued by the City of Beaverton, Oregon, for the Parkview Loop Waterline Replacement project (ITB #26-060). The document serves as official authorization for a contractor to commence work on a public works infrastructure improvement project involving the installation of approximately 3,000 linear feet of new 8-inch ductile iron pipe (DIP) water main and 1,500 linear feet of new 6-inch DIP water main throughout SW Parkview Loop and connecting cul-de-sacs, spanning from Greenway to Murphy Lane. Associated deliverables include eight fire hydrant assemblies, approximately 50 water service connections with new meter boxes, air release and blowoff assemblies, gate valves, valve boxes, concrete curbs and gutters (730 feet), concrete walks (2,300 square feet), asphalt concrete paving (3,360 square yards), and landscape restoration. The notice establishes that work must be substantially completed within a specified number of consecutive calendar days following the notice date, with the anticipated Notice to Proceed issued on July 6, 2026, and substantial completion required by October 30, 2026. The non-mandatory pre-bid conference is scheduled for March 31, 2026, at 10:00 a.m. via Zoom, written questions are due by April 14, 2026, at 5:00 p.m., and bids are due electronically by April 21, 2026, at 2:00 p.m.
The estimated project cost ranges between $1,700,000 and $1,800,000, with compensation on a fixed-price basis and monthly payments based on the City Engineer's estimate of completed work, subject to retainage of up to five percent until project completion. The contractor must be duly licensed by the Oregon Construction Contractors Board or State Landscape Contractors Board and must comply with state prevailing wage rates under ORS 279C.800-279C.875 and federal prevailing wage rates under the Davis-Bacon Act. Required bonds include a Faithful Performance Bond equal to a minimum of 100 percent of the estimated contracted cost, a Labor and Material Payment Bond to secure payment obligations to subcontractors and material suppliers, and a Public Works Bond of $30,000 for projects valued at $100,000 or greater. All bidders must comply with the City of Beaverton's Good Faith Effort (GFE) Program, which requires documented contact with COBID-certified firms for identified divisions of work, and must submit a 10 percent bid guaranty, a tentative construction schedule, a Bidder Responsibility Form, a Current Project Information Form, and a First-Tier Subcontractor Disclosure Form by 4:00 p.m. on the bid opening date. The successful contractor must obtain a City of Beaverton business license, maintain specified insurance coverage, submit monthly certified payroll statements, and comply with all applicable federal, state, and local laws, including civil rights protections and the Beaverton Equity Procurement Program. The City reserves the right to reject any or all bids and award to the lowest responsible bidder, and to terminate the contract for breach with seven days' written notice or for convenience with seven days' notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Parkview_Loop_Waterline_Replacement_(Addendum_#2_Revision).pdf | ||
| Parkview_Loop_Waterline_Replacement_(Addendum_#2_Revision).pdf | ||
| Parkview_Loop_Waterline_Replacement_-_Bid_Set_Plans.pdf | ||
| Parkview_Loop_Waterline_Replacement_-_Bid_Set_Plans.pdf | ||
| Construction_Contract_-_Sample.docx | DOCX document | |
| Performance_Bond.docx | DOCX document | |
| Locates.docx | DOCX document | |
| BLANK_Sole_Source_Justification_Form.pdf | ||
| Laws_to_be_Observed.docx | DOCX document | |
| Locates.docx | DOCX document | |
| Notice_to_Proceed.docx | DOCX document | |
| BLANK_Sole_Source_Justification_Form.pdf | ||
| LABOR_AND_MATERIAL_PAYMENT_BOND.docx | DOCX document | |
| Performance_Bond.docx | DOCX document | |
| LABOR_AND_MATERIAL_PAYMENT_BOND.docx | DOCX document | |
| Laws_to_be_Observed.docx | DOCX document | |
| Construction_Contract_-_Sample.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO PROCEED
| Project: _______________________________________________________ | Contract No. _________________ |
| Project Manager Name: __________________________________________ | Contract P.O. No. _____________ |
To: __________________________________________________________
You are hereby given official Notice to Proceed (Notice) to commence Work on _______________, 20__, in accordance with the Contract dated ________________________, 20__. All Work must be Substantially Completed within ___ consecutive Calendar Days following the date of this Notice. Therefore, the date of Substantial Completion for the Work is _____________________, 20__.
The City of Beaverton
By: ______________________________________ Name: ___________________________________ Title: ____________________________________
ACCEPTANCE OF NOTICE TO PROCEED
Receipt of this Notice is hereby acknowledged on __________________, 20__.
Contractor
By: ______________________________________ Name: ___________________________________ Title: ____________________________________
Contractor’s Performance Bond Co.:
Bond No.: ________________________________________ Contact Person: ___________________________________ Address: _________________________________________ Phone No.: _______________________________________
Contractor’s General Liability Ins. Co.:
Policy No.: _______________________________________ Contact Person: ___________________________________ Address: _________________________________________ Phone No.: _______________________________________
NOTIFICATION OF COMMENCEMENT AND COMPLETION DATES FOR CONTRACT
| Project Name: | ________________________________________________________________________ | |||
| Contractor Name: | ________________________________________________________________________ | |||
| Contract No. | __________________________________________ | Fiscal Year: ____________ | ||
| Project Manager Name: | __________________________________________ | Date of Award: | _______ |
FIRST NOTIFICATION
Date: ____________________________ Project Manager: Enter the date when the performance of Contract began.
| __________________________________ | _____________________ | |
| Project Manager Signature | Date |
SECOND NOTIFICATION
Project Manager: Enter the date the time charges stopped, any final trimming and cleanup tasks, equipment to be removed from the Project Site, any minor corrective work not involving additional payment to be completed; and any submittals, including, but not limited to any required certifications, bills, forms, and other documents. See 00180.50(g) for more information.
Date Time Charges Stopped:
Remaining Tasks for Contractor:
All claims for additional compensation must be submitted by: ____________________________, 20______.
(See 00199.30 for additional requirements)
| __________________________________ | _____________________ | |
| Project Manager Signature | Date of Signature |
THIRD NOTIFICATION
| Date: ____________________________ | Project Manager: Enter the date when all Contract Work was completed, | |
| including corrective work, equipment and plant removal, site cleanup, and | ||
| receipt of all certifications, bills, and other documents required under the | ||
| Contract. |
| __________________________________ | _____________________ | |
| Project Manager Signature | Date of Signature |
Distribution
| Prime Contractor: | |
| · 1st Notification: | ______ (Place initials here) _______ Date |
· 2nd Notification: ______ (Place initials here) _______ Date
· 3rd Notification: ______ (Place initials here) _______ Date