Nome Office Remodel Addendum #7.docx

DOCX document 170 KB Posted

Attached to
RFP 18-804-26 | Opacity Monitoring of Cruise Ships & State Ferries
Solicitation number
RFP 18-804-26 | Opacity Monitoring of Cruise Ships & State Ferries
Issued by
Anchorage Municipality, Alaska

About this file

This document is Addendum #7 for the Nome Hangar Remodel Project, issued by the Department of Military and Veterans Affairs FMO Design and Construction located in JBER, Alaska. The addendum provides clarification on specific contract details for a renovation project in Nome, Alaska, including contractor responsibilities for moving connexes and sheds, door installation specifications, and hardware requirements. The addendum specifically addresses scope of work questions, confirming that the contractor is responsible for moving connexes and sheds, and providing details about door installations for specific entryways (100A, 100B, 100C, and 100D).

The addendum offers technical specifications regarding door installations, indicating that the project involves installing doors in four existing entryways, using knock-down (KD) drywall frames and polystyrene core doors. No key system is specified, and only mortise locks are mentioned for hardware. The document is signed by Scott Stewart, a Building Management Specialist, who provides contact information for further inquiries. The addendum is dated September 15, 2025, and serves to modify original project drawings and specifications, with the stipulation that in case of conflicts, this addendum takes precedence over previously issued documents.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Military and Veterans Affairs FMO Design and Construction 57024 Roosevelt Rd PO Box 5169

JBER, AK 99505

Email: scott.stewart@alaska.gov

Issue Date: September 9/15/25 ATTN: Vendors

RE: Project Name: Nome Hangar Remodel Project Number: 02C5025013 Project Location: Nome, Alaska

Addendum #7 This addendum forms a part of the contract documents and modifies the original drawings and/or specifications for the subject work. In case of conflicts between this addendum and previously issued documents, this addendum shall take precedence.

1. Is the contractor responsible for moving the connexes and sheds as shown on the drawings?

Confirm scope: Yes

1. There isn’t a door schedule. From ITB and the addendum there is direction to provide the alcove / enclave / arctic entry doors (100A, 100B, 100C, 100D, 108). We are not replacing doors we are only installing doors on the 4 existing entryways, not the main entry. This includes doors 100A, 100B, 100C & 100D

2. Are doors 101C & 107 to be replaced as well? No

3. Are we quoting KD drywall frames and polystyrene core doors? Yes

1. Addendum mentions mortise locks. No other hardware is described. Key system? No key system

Scott Stewart Building Management Specialist Scott.stewart@alaska.gov (907) 428-7198 image1.jpeg image2.png