This document is Addendum #6 for the Nome Hangar Remodel Project issued by the Alaska Department of Military and Veterans Affairs (DMVA) located in JBER, Alaska. The addendum clarifies several project details for a renovation of a hangar in Nome, Alaska, including specifics about work schedules, equipment replacements, and construction requirements. Contractors will be permitted to work Monday through Sunday from 7am to 7pm, and the project involves specific modifications such as installing new ducting for an exhaust hood over a range and referencing existing kitchen cabinet renderings in the invitation to bid (ITB).
The addendum provides explicit answers to multiple contractor queries, indicating that certain elements will not be replaced, including the bathroom sink, water fountain, emergency lighting units, and exit signs. No sealed architectural, mechanical, or electrical drawings will be provided, and insulation of VTRs will not be added. The document is signed by Scott Stewart, Building Management Specialist, with contact information for further inquiries. While no specific budget or funding details are provided in this addendum, it serves as a critical clarification document for potential contractors bidding on the Nome Hangar Remodel Project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Military and Veterans Affairs FMO Design and Construction 57024 Roosevelt Rd PO Box 5169
JBER, AK 99505
Email: scott.stewart@alaska.gov
Issue Date: September 9/11/25 ATTN: Vendors
RE: Project Name: Nome Hangar Remodel Project Number: 02C5025013 Project Location: Nome, Alaska
Addendum #6 This addendum forms a part of the contract documents and modifies the original drawings and/or specifications for the subject work. In case of conflicts between this addendum and previously issued documents, this addendum shall take precedence.
During the walk through it was determined that the bathroom sink would not be replaced. Please confirm. The bathroom sink will not be replaced.
5. Will contractors be allowed to work Monday- Sunday 7am-7pm? Yes.
6. Will specifications for the drinking fountain/bottle filler be provided? We will not be replacing the water fountain
7. Does the contractor need to install new ducting to outside the building for the exhaust hood over the range? Yes.
8. Will design specifications for the kitchen cabinets and countertop be provided? There is a rendering in the ITB.
9. Six high bay light fixtures within Hangar 100 are noted as being of the emergency type. Are internal batteries or an external central lighting inverter desired as replacement? No.
10. Exit signs are a mix of self-illuminated, externally illuminated and tritium types exit signs. Are exit signs to be replaced as part of the scope of work? No.
11. Are all interior emergency lighting units (bugeyes) to be replaced as part of the scope of work? No.
12. Are Architectural, Mechanical and Electrical sealed drawings anticipated for this project’s design? No.
13. During the walkthrough there was discussion about insulating the VTRs. Will this added. No.
Scott Stewart Building Management Specialist Scott.stewart@alaska.gov (907) 428-7198 image1.jpeg image2.png