Noise_Guideline_.pdf

PDF 34 KB Posted

Attached to
Aerator Tank & Flume Clean and Recoating of Interior and Exterior of Aerator tanks and Flumes
Solicitation number
IFB- 25 - 044
Issued by
Pinellas County, Florida

About this file

The document is a Noise Program guideline for Hillsborough County, Florida, detailing noise standards and measurement regulations. The guideline outlines noise source regulations, including specific decibel limits for different property types and time periods, with measurements taken across residential, commercial, and industrial areas. The document provides comprehensive noise control standards, with time-specific noise limits ranging from 60-70 decibels depending on the property type and time of day, including specific periods such as 7:00am-10:00am and 10:00am-7:00am.

The noise standards are designed to help manage and mitigate noise pollution within Hillsborough County, establishing clear guidelines for noise levels that balance community needs with environmental considerations. The document includes details on how noise is measured, the types of noise sources regulated, and the specific decibel thresholds for different zoning areas, providing a structured approach to managing sound levels to minimize negative impacts on residents and businesses. The guidelines appear to be part of a broader environmental management strategy aimed at maintaining quality of life and preventing excessive noise disruption.

View the file

Other files

File Type Posted
Aerator_Tank_&_Flume_Clean_and_Recoating_of_Interior_and_Exterior_of_Aerator_tanks_and_Flumes_(Addendum_#7_Revision).pdf PDF
Sign_in_Sheet_Pre-bid_site_inspection_2.pdf PDF
Aerator_Roof_Railing.jpeg JPEG file
Aerator_Railing_Roof_Perimeter.jpeg JPEG file
Railing_Stair_Tread.jpeg JPEG file
Aerator_Louver_Screen_System.jpeg JPEG file
Aerator_to_Aerator_Bridge.jpeg JPEG file
Aerator_Interior_Lighting.jpg JPG image
Aerator_Stairs_and_Flume.jpeg JPEG file
Flume_Walkway_2.jpg JPG image
Flume_Walkway_1_and_2.jpg JPG image
Flume_Walkway.jpg JPG image
Interior_4.jpg JPG image
Interior_3.jpg JPG image
Interior_2.jpg JPG image
Interior_1.jpg JPG image
GST_1_Investigative_Exterior.jpg JPG image
12.1999_PROJECT_99406-113_Aerator_repairs.pdf PDF
Aerator_Structural_Details.pdf PDF
Coatings_Part_B_PROJECT#_99406-113_.jpg JPG image
Coatings_Part_A_PROJECT#_99406-113.jpg JPG image
Alternate_Coating:_Tnemec_Approved_Equal_.pdf PDF
Sign_in_Sheet_2_Pre-Bid.pdf PDF
Sign_In_Sheet_1_Pre-bid.pdf PDF
Appendix_H_-_Exterior_Screens.jpeg JPEG file
Appendix_B.2_Drawing_#3088_As_Built_-_Pg20_3.pdf PDF
Appendix_B.1_-Drawing_#3088_As_Built_-_Pg17_2.pdf PDF
Appendix_B_-_Drawing_COSME_WTP_AERATOR_19750419_20181128_(005).pdf PDF
Appendix_A_-_Aerial_Photo.PNG PNG image
Light_Construction_v_04.docx DOCX document
Public_Construction_Bond-Construction_(00525880).docx DOCX document
Bid_Bond_(00525848).docx DOCX document
A-01._Bid_Bond_(00525848).docx DOCX document
COSME_AERATOR_SPEC.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .