This document is a NOAA Standard Specification (S2906) for arc welding procedures on waterborne vessels, issued in June 1982.

The specification establishes mandatory requirements for proper arc welding equipment installation and grounding procedures to prevent corrosion damage to underwater hulls, shafting, and propellers from pitting and deterioration. Key technical requirements include: welding motor-generator sets or rectifiers must connect welding and ground leads only to the vessel being welded, with both leads thoroughly insulated and never submerged; ground cables must have a minimum area of one million circular mills per 1,000 amperes of welding current and be secured by metal-to-metal contact to an integral vessel part; welding shall be conducted on only one ship from a single welding current source; and ground leads cannot be electrically connected to shore objects or other vessels. The specification prohibits common incorrect practices including grounding the negative cable to a repair ship when welding another vessel, grounding the negative side at a pier through crane tracks or pipelines, and using a single generator to weld multiple ships. The document includes seven illustrative figures demonstrating correct and incorrect hookup configurations for various scenarios (ships afloat, ships at pier, multiple ships). Section 4 requires that no welding commence until the Contracting Officer examines and approves the welding equipment hookup. Section 5 mandates comprehensive safety protocols including mandatory fire watch presence, fireproof covering of equipment, gas-free certification for tank work, and permission requirements for confined space entry.

View the file

Other files for this federal contract opportunity

Other files attached to FY27 NOAA Ship Gordon Gunter Drydock REFERENCES, newest first.
File Type Posted
SE_85_085-6233567_RevH_Sht2 OF 2_N_A_GENERAL ARRANGEMENT FORECASTLE DECK AND ABOVE SHT 2.pdf PDF
TAGO_NONE_150-6233562_RevK_Sht1 THRU 9_N_A_MODULE NO. 9A STRL ASSY.pdf PDF
T9555-BC-MMO-010_0_0.PDF PDF
Copy of 5100195_Control-Repeater Panel M 4.3_M_EN_2018_H.pdf PDF
GU_NONE_NONE_RevNONE_Sht1THRU2_N_A_GENERALARRANGEMENTMAINDECK_BELOW.pdf PDF
Copy of 110-6233550.pdf PDF
NOAA Gangway Test.docx DOCX document
AMC-505-1B Valve Overhaul and Test 4 pages.pdf PDF
s0700-3 Dry Dock Certification-1.pdf PDF
8KatoGenerator.pdf PDF
SE_NONE_NONE_RevNONE_Sht1 OF 1_N_A_OS-342-6233813-1.pdf PDF
GU_NONE_GU-KA-568-01_RevNONE_Sht1 THRU 76_N_A_GU-KA-568-01 TUNNEL THRUSTER MODEL S-300-L SERIAL NOS. 86.000.435 AND 86.000.436.pdf PDF
Profile References Modules and Erection Sequence.docx DOCX document
90RMC050-D-610_REV- Carrier Operation and Maintenance Manual.pdf PDF
mk-line-2nd-1-26.pdf PDF
524-6233814 (1).pdf PDF
528-6233824.pdf PDF
6233762_G (1).PDF PDF
620-6233548.pdf PDF
GU_NONE_NONE_RevNONE_Sht1 THRU 2_N_A_GENERAL ARRANGEMENT MAIN DECK _ BELOW.pdf PDF
529-001 Revision A (1).pdf PDF
EconoAir General Arrangement Drawing.pdf PDF
E100 Rev -1 Gunter.pdf PDF
DD GU Reference 1 MOC-300-3_General_Requirements_for_Electrical_Electronic_Items_SEP_2000.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
GU-436-015 37442.03.01 - Connection drawings.pdf PDF
NOAA Standard Specification 0002.0.docx.pdf PDF
NOAA_Weight_Reporting_Spreadsheet.xlsx XLSX spreadsheet
NOAA Standard Specification 0863.0.docx.pdf PDF
SSPC-SP-1-Solvent-Wipe.pdf PDF
233-3 Main Engine Overhaul.pdf PDF
Steyr Motor Marine Engines SE SERIES 4 Cylinders 6 Cylinders Operation Maintenance and Warranty Manual P_N 707245 1st Edition February 2021..pdf PDF
Zodiac Hurricane H638 SOLAS Manual MB10247 Rev 11-8-2016.pdf PDF
GU-436-011Rev - Fire Detection Install_123880286.pdf PDF
529-6233819.pdf PDF
620-6233557.pdf PDF
NOAA Ships General Arrangement with camera locations (1).pdf PDF
GU_NONE_T0965-LP-109-1010_Rev1_Sht1 THRU 158_N_A_GU-KA-437-04 TANK LEVEL INDICATING TLI SYSTEM TYPE NO. 36000.pdf PDF
GU-555-001_-.pdf PDF
SFLC-Std-Spec-6310-(2020) - Requirements for Preservations of Ships Structures.pdf PDF
593-6233812.pdf PDF
1005-01 - NOAA Ship Health Plan (public).docx DOCX document
111-001.pdf PDF
NOAA Standard Specification 0000.1.docx.pdf PDF
437-6233672.pdf PDF
Drager Aerotest Navy Drager Tubes Pamphlet 9046651.pdf PDF
Gordon Gunter FY21 Cable Testing.xlsx XLSX spreadsheet
NOAA Ship Gordon Gunter Drawing Index List.xlsx XLSX spreadsheet
SSPC-SP-11-Power-Tool-To-Bare-Metal.pdf PDF
Show all 50

FY27 NOAA Ship Gordon Gunter Drydock REFERENCES has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 1982 (6/95)

NOAA Standard Specification S2906

ARC WELDING ON WATERBORNE VESSELS

1. PURPOSE

The purpose of this directive is to set out rules that shall be followed in regard to the proper use of arc welding equipment when welding on waterborne vessels in order to reduce damage to the underwater body, shafting and propeller by pitting and deterioration.

2. SCOPE

The continued occurrence of serious pitting of underwater hulls of various vessels makes necessary the strict adherence to the requirements contained herein. The procedures in grounding welding leading leads should be closely followed to avoid damage to underwater hulls and appurtenances.

3. INSTRUCTIONS

A. Welding motor-generator sets or rectifiers shall be so installed that the welding and ground leads from shore to ship or from ship to ship shall be connected only to the vessel on which welding is to be done. The welding lead as well as the ground lead shall be thoroughly insulated and at no time shall be allowed to become submerged in the intervening water. Welding shall be done on but one ship from one source of welding current.

The ground lead shall not be electrically connected to any object ashore or to any other vessel except the one which welding is being done. The ground cables should have an area of at least one million CM per 1000 amperes of welding current and be secured by metal to metal contact to an integral part of the vessel on which the welding is done.

B. Figures 1, 2 and 3 (See Enclosure 1) illustrate CORRECT methods for installing welding generators. In all of these cases, it should be noted that the only ground in the circuit is to the ship where welding is being done so there is no possibility of current flowing from the ship's hull into the water. It is entirely safe to place the welding generator on the pier, or have it installed permanently on a repair ship, provided both positive and negative welding cables to the ship are well insulated from ground and all other grounded structures, and that no welding cables are returned from the vessel to shore or adjacent vessels for welding in either location. Figures 4, 5, 6 and 7 illustrate INCORRECT methods for installing welding generators. Figures 4 and 5 illustrate the condition when a welding generator, placed on a vessel and with the negative cable grounded to that vessel, is used to weld on another vessel. This situation often occurs when a welding generator on a repair ship is used to weld another ship. Obviously the way to correct this situation is to insulate the negative cable of the generator from

Arc Welding on Waterborne Vessels S2906

Ship A and run both positive and negative leads to the ship where the welding is being done, as illustrated in Figure 1. Figure 6 illustrates the condition when the negative side of the generator is grounded at the pier. This might occur if the negative leads are connected to crane tracks, pipe lines, or submerged or buried structures, or if the negative cables are immersed in water at some points. If the positive side of the generator becomes grounded to the vessel, of course the situation would be considerably worse since the entire generator voltage would cause a continuous short circuit to flow from the positive cable to the ship's hull. Figure 7 illustrates conditions when one generator is used to weld on two ships. There seems to be a general impression that if two ships are connected with a cable of reasonable size, say 1,000,000 CM and 100' long, all of the current used on Ship B will return to the generator through the cable. The resistance of the cable is of the same order as the resistance through the water so part of the current flow from Ship B through the water to Ship A, corroding the hull of Ship B.

Measurements show that the resistance of the water path between two vessels alongside each other is about 0.01 ohms. The resistance of the cable would be about 0.001 ohms, hence about one-tenth of the welding current used on Ship B would flow through the water.

4. ACTION REQUIREMENTS

No welding shall be done on a water-borne ship until the hook-up of welding equipment has been examined and approved by the Contracting Officer.

5. SAFETY

No welding or burning shall be undertaken without the presence of a fire watch. All equipment in way of welding or burning shall be covered with a fire proof covering supplied by the Contractor.

Adequate precautions shall be taken by the Contractor before welding or burning to insure that contiguous compartments and tanks are gas-free. No hot work in tanks shall be started before consulting with the Contracting Officer and supplying a gas-free certificate as required by local authorities. No employee shall enter any tank void, cofferdam or closed area without first consulting and obtaining permission of the Officer of the Deck.