NOAA Standard Specification 0000.1.docx.pdf

PDF 323 KB Posted

Attached to
FY27 NOAA Ship Gordon Gunter Drydock REFERENCES Federal contract opportunity
Solicitation number
1305M226Q0144REF
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This document is a NOAA Standard Specification (0000.1) outlining general requirements for ship repair contract work on NOAA vessels, effective 2025.

The specification establishes comprehensive operational, safety, and procedural standards governing all aspects of NOAA ship repair contracts. Key requirements include contractor compliance with referenced standards from the American Bureau of Shipping, U.S. Coast Guard regulations, IEEE electrical standards, OSHA shipyard employment standards, and NFPA fire protection standards. Contractors must submit planned work schedules, conduct condition reports within 24 hours of specified events, perform daily safety and housekeeping inspections, and implement protective coverings to prevent ship damage. Critical safety protocols mandate gas-free certification by certified marine chemists for confined space entry, hot work notifications and fire watch standers for welding operations, lockout-tagout (LOTO) procedures, and hazardous materials management with advance Safety Data Sheets submission. Work hour notifications require four-hour advance notice for unscheduled work and 30-minute to next-business-day notice for weekend/holiday work.

Additional operational requirements address structural and system integrity, including watertight bulkhead and deck maintenance, piping installation per Coast Guard specifications, electrical work per IEEE standards, and welding procedures with proper grounding protocols. Contractors must conduct tests and inspections on all disassembled or installed equipment, with condition reports submitted within 24 hours of completion. The specification mandates removal of all interferences necessary for work completion with proper restoration using new gaskets and fasteners, engine room bilge cleaning at project start and completion, and fuel oil offloading with metered calibrated procedures and lab analysis. Additional requirements for large contracts include submission of supervisor contact lists, project kick-off meetings within seven days of award, and weekly progress meetings with written reports. Government-furnished services include electric and water service at contractor facilities, while contractors maintain responsibility for equipment disposal, hazardous waste characterization, and compliance with local, state, and federal environmental regulations.

View the file

Other files for this federal contract opportunity

Other files attached to FY27 NOAA Ship Gordon Gunter Drydock REFERENCES, newest first.
File Type Posted
Copy of 5100334-01_Salwico Cargo Addressable_Service Maintenance Manual_M_EN_2021_V.pdf PDF
150-6233566_RevJ_Sht1 THRU 6_N_A_MODULE NO. 9C STRL ASSY.pdf PDF
Copy of 5100332-01_Salwico Cargo Addressable_User Guide_M_EN_2021_ADx.pdf PDF
T9555-BA-MMO-010_0_0x.PDF PDF
Copy of TAGO_NONE_150-6233575_RevN_Sht1 THRU 13_N_A_MODULE NO. 10C STRUCTURAL ASSEMBLY.pdf PDF
Copy of m-202-instruction-manual-ocenco-inc.pdf PDF
GG Extinguisher List 5-28-25.xlsx XLSX spreadsheet
Steyr Motor Marine Engines SE SERIES 4 Cylinders 6 Cylinders Operation Maintenance and Warranty Manual P_N 707245 1st Edition February 2021..pdf PDF
Zodiac Hurricane H638 SOLAS Manual MB10247 Rev 11-8-2016.pdf PDF
GU-436-011Rev - Fire Detection Install_123880286.pdf PDF
529-6233819.pdf PDF
620-6233557.pdf PDF
NOAA Ships General Arrangement with camera locations (1).pdf PDF
GU_NONE_T0965-LP-109-1010_Rev1_Sht1 THRU 158_N_A_GU-KA-437-04 TANK LEVEL INDICATING TLI SYSTEM TYPE NO. 36000.pdf PDF
GU-555-001_-.pdf PDF
SFLC-Std-Spec-6310-(2020) - Requirements for Preservations of Ships Structures.pdf PDF
593-6233812.pdf PDF
1005-01 - NOAA Ship Health Plan (public).docx DOCX document
111-001.pdf PDF
437-6233672.pdf PDF
Drager Aerotest Navy Drager Tubes Pamphlet 9046651.pdf PDF
Gordon Gunter FY21 Cable Testing.xlsx XLSX spreadsheet
NOAA Ship Gordon Gunter Drawing Index List.xlsx XLSX spreadsheet
SSPC-SP-11-Power-Tool-To-Bare-Metal.pdf PDF
2 Bottle Vertical Inline Rack - UN_ISO Cylinders.pdf PDF
TECHNICAL PUBLICATIONS INDEX - SM638027 - 2203874.pdf PDF
524-6233951.pdf PDF
s1205.pdf PDF
NOAA Standard Specification AMC-300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
SE_NONE_NONE_RevNONE_Sht1 OF 1_N_A_OS-342-6233813-1.pdf PDF
GU_NONE_GU-KA-568-01_RevNONE_Sht1 THRU 76_N_A_GU-KA-568-01 TUNNEL THRUSTER MODEL S-300-L SERIAL NOS. 86.000.435 AND 86.000.436.pdf PDF
Profile References Modules and Erection Sequence.docx DOCX document
90RMC050-D-610_REV- Carrier Operation and Maintenance Manual.pdf PDF
mk-line-2nd-1-26.pdf PDF
524-6233814 (1).pdf PDF
528-6233824.pdf PDF
6233762_G (1).PDF PDF
620-6233548.pdf PDF
GU_NONE_NONE_RevNONE_Sht1 THRU 2_N_A_GENERAL ARRANGEMENT MAIN DECK _ BELOW.pdf PDF
529-001 Revision A (1).pdf PDF
EconoAir General Arrangement Drawing.pdf PDF
E100 Rev -1 Gunter.pdf PDF
DD GU Reference 1 MOC-300-3_General_Requirements_for_Electrical_Electronic_Items_SEP_2000.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
GU-436-015 37442.03.01 - Connection drawings.pdf PDF
NOAA Standard Specification 0002.0.docx.pdf PDF
NOAA_Weight_Reporting_Spreadsheet.xlsx XLSX spreadsheet
NOAA Standard Specification 0863.0.docx.pdf PDF
SSPC-SP-1-Solvent-Wipe.pdf PDF
Show all 50

FY27 NOAA Ship Gordon Gunter Drydock REFERENCES has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA Standard Specification 0000.1

GENERAL REQUIREMENTS FOR SHIP REPAIR CONTRACT WORK ON NOAA

VESSELS

1.0 SCOPE

1.1 This specification contains the general requirements for contract work on or for NOAA ships.

2.0 REFERENCES

2.1 American Bureau of Shipping “Rules for Building and Classing Steel Vessels”.

2.2 U.S. Coast Guard “Subchapter F – Marine Engineering”, 46 CFR 50 through

46 CFR 64.

2.3 U.S. Coast Guard “Subchapter J – Electrical Engineering”, 46 CFR 110 through 46

CFR 113.

2.4 46 CFR 110.10-1, IEEE Standard 45-2002, “IEEE 45: Recommended Practice for Electric Installations on Shipboard”.

2.5 NOAA Standard Specification 077-1, “Asbestos Containing Materials”.

2.6 29 CFR 1910.1200 “OSHA, Toxic and Hazardous Substances, Hazard Communication”.

2.7 29 CFR 1915, Subpart A, “OSHA Standards for Shipyard Employment, General Provisions, Competent Person”.

2.8 29 CFR 1915, Subpart B, “OSHA Standards for Shipyard Employment, Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment”.

2.9 29 CFR 1915, Subpart P, “Fire Protection in a Shipyard Environment”.

2.10 NFPA 10-2013, Chapter 5, “Standard for Portable Fire Extinguishers, Selection of Portable Fire Extinguishers”.

2.11 ABS Guide for “Shipbuilding and Repair Quality Standard for Hull Structures During Construction”.

2.12 MIL-STD-777 “Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships”.

2.13 NOAA Standard Specification 6310, “Coating Systems for NOAA Ships Structures”.

2.14 NOAA Standard Specification 000-4 “Test Procedures for Validating Ship Repair Contract Work on NOAA Ships”.

3.0 DEFINITIONS

3.1 The following definitions apply to all NOAA specifications and work packages:

3.2 Inspect: Evaluate the specified surface, item, part or component for evidence of contamination, damage, excessive wear, scoring, and other conditions which could interfere with proper operation, functioning, or reliability.

3.3 Install: Place the specified item in position for service and make all connections needed to ensure proper use, service, appearance, and operation. This shall include the following, unless otherwise specified:

3.3.1 Foundations

3.3.2 Provide a new foundation or modify the existing foundation.

3.3.2.1Securely mount equipment and components to the foundation using new fasteners.

3.3.2.2Align connected equipment and components to meet manufacturer’s specifications.

3.3.3 Electrical Connections

3.3.3.1Make all electrical connections.

3.3.3.2Provide new electric cable runs between controllers and motors of new equipment.

3.3.3.3In other applications, existing cables may be reused. If existing cable is too short to make the connection and less than 20 feet long, then the cable may be replaced. If the existing cable is longer than 20 feet, then junction boxes may be used to increase the length of the cable run.

3.3.4 Piping

3.3.4.1Modify new piping to suit the new equipment, as follows:

Re-route existing piping and add new piping to connect new equipment and components. New piping is required only to the extent necessary to accommodate modifications of existing piping. Piping modifications greater than five feet from the equipment are not required. Piping is defined as a system of pipe, fittings, tube, elbows, tees, valves, couplings, and other fittings.

3.4 Rebuild

3.4.1 Restore to a condition of reliability equivalent to new, as follows:

Disassemble, Clean, Inspect for damage, deterioration, or defects that may affect operation of the equipment.

3.4.2 Repair (replace parts as needed)

3.4.3 Re-assemble, using new bearings, gaskets, o-rings, and seals

3.4.4 Calibrate and Test

3.4.5 Meet the manufacturers rebuild specifications for items, components, and parts.

3.5 Reinstall. Return an item which was temporarily removed to its original configuration and location.

3.6 Replace, Renew

3.6.1 Provide and install a new item in place of an existing or previously removed item.

3.6.2 The new item must be comparable in material, performance and configuration to the item removed.

4.0 REQUIREMENTS

4.1 Order of Precedence

4.1.1 The requirements and provisions of this specification are additions to or amplifications of the requirements and provisions in other specifications, solicitation, or procurement documents. In the event a conflict should occur, the requirements of the other documents take precedence.

4.2 Drawings, Specifications, Publications, and Other References

4.2.1 Obtain all references and distribute copies to supervisors, work crew, and sub-contractors as needed to ensure work items meet the referenced requirements. Failure to obtain or properly distribute a reference does not relieve the Contractor's responsibility to comply with the reference.

4.2.2 Each solicitation or specification contains a list of drawings and other references which will be issued to prospective bidders. Except as otherwise indicated, other referenced drawings, specifications, manuals, handbooks, instructions, publications, and standards will not be issued.

4.2.3 Whenever reference is made to a specific edition or revision of a drawing, specification, manual, publication, or other reference document, the specified edition or revision applies. When an edition or revision is not specified, the edition or revision in effect on the date of the solicitation applies.

4.3 Local Policies and Directives

4.3.1 Contractor personnel, including subcontractors, shall comply with all policies and directives issued by the Master, Commanding Officer, and Director while on the ship or in a government facility.

4.4 Restricted Access to Ship Compartments

4.4.1 Access by workers to ship compartments is restricted to those in which work is being performed and to an authorized path to reach the work site. The Contracting Officer’s Representative (COR) will authorize one path through the ship for each work site. All other compartments, including ship toilet facilities, are off-limits.

4.5 Work Hours

4.5.1 Prior to starting contract work, submit a written Planned Regular Work Day Schedule to the COR.

4.5.2 To work outside of the Planned Regular Work Day Schedule, notify the COR at least four hours prior to the end of the work day preceding the unscheduled work.

4.5.2.1If the request is for unscheduled work on a weekend or Federal holiday, notify the COR by 9:00am on the day prior to the unscheduled work.

4.6 Open and Inspect Reporting

4.6.1 In the first 25% of the work performance period, conduct work and submit Condition Reports to the COR for all items involving:

4.6.1.1Disassembling and inspection of equipment, machinery, systems, or components.

4.6.1.2Opening, gas-freeing, and inspection of tanks.

4.6.2 No time extension of the work performance period will be granted for delays caused by failure to comply with this 25% time requirement.

4.7 Daily Clean-up

4.7.1 Remove dirt, debris, scrap, supplies, and other materials incident to work from the ship at the end of each work day. Leave the work site “broom clean”.

4.7.2 If blasting residue or other foreign particles collect on the exterior decks of the ship, remove the residue or particles at the end of the work day. Do not sweep or wash the residue or particles through the ship’s deck drains unless specifically pre-authorized by the COR.

4.8 Daily Safety and Housekeeping Inspection

4.8.1 Conduct a daily safety and housekeeping inspection of all spaces affected by Contractor work.

4.8.2 The inspection shall be conducted by the Contractor’s Safety Officer; they must ensure a representative of the ship’s Commanding Officer has the opportunity to attend each daily inspection. The COR may participate.

4.8.3 Within 4 hours after the inspection, submit a written report to the COR documenting all discrepancies and corrective action to be taken.

4.9 Protective Coverings

4.9.1 Prior to starting work, install protective coverings to prevent damage to the ship, systems, and equipment.

4.9.2 Protect from damage and entry of dust, dirt, grit, sand, and other foreign particles:

4.9.2.1Compartments 4.9.2.2Machinery and Equipment 4.9.2.3Coatings and Deck Coverings 4.9.2.4Furnishings 4.9.2.5Vent Terminals 4.9.2.6Insulation 4.9.2.7Glass 4.9.2.8Cables 4.9.2.9Piping Systems 4.9.2.10Structures and Other Ship Components

4.9.3 Prior to starting work on interior spaces, protect the decks and deck coverings from damage in spaces where work is to be performed and through which workers will traverse, as follows:

4.9.3.1Cover the decks and deck coverings with temporarily fitted heavy vinyl, plywood or particle board. Securely tape all edges and joints of the protective covering to prevent movement and to prevent a tripping hazard. Other materials may be used if pre-approved by the COR.

4.9.3.2For decks over which equipment, valves, piping or other materials will be handled, the plywood or particle board must be of sufficient thickness to protect the deck from damage if the equipment or materials are dropped.

4.9.3.3Maintain the protective coverings in place during the entire contract period. Promptly replace sections which are damaged.

4.9.4 Prior to abrasive blasting, or other work operations which create atmospheric contamination on or near the ship, prevent the entry of airborne contaminants.

4.9.4.1Plug, wrap, blank, cover, or mask openings into the ship as needed.

4.9.4.2Install industrial foam filter material on the intake and exhaust end of all ventilation systems which will be in use during the blasting operations. Monitor the air flow through the filters and replace the filters when air flow becomes restricted.

4.9.4.3Whenever abrasive blasting is performed inside the ship, confine the blast materials to the compartment being blasted.

4.9.5 After completing the work, remove and dispose of the protective coverings.

4.9.6 Re-establish the condition which existed at the start of the work. It is the responsibility of the Contractor to repair and clean all damage and contamination resulting from failure to provide adequate protection.

4.10 Condition Reports

4.10.1 Prepare and submit a written Condition Report to the Contracting Officer’s Representative (COR) within 24 hours, whenever:

4.10.1.1 Measurements, tests, inspections, or checkpoints

required by the specifications or procurement documents are completed.

4.10.1.2 It is determined or noted that additional work, material, or other deviation, is necessary to produce a reliable or complete result.

4.10.1.3 Defects or deficiencies are noted in

Government-furnished Property.

4.10.1.4 Specifically required in the specifications or

procurement documents.

4.10.1.5 Include, at a minimum, the following information:

4.10.1.6 Name of the Ship.

4.10.1.7 The Contract Number and Related work item number.

4.10.1.8 A unique, sequential numerical identification for

the Condition Report.

4.10.1.9 A detailed description of results and conditions

observed, including a record of all measurements, supporting data, and sketches.

4.10.1.10 Recommendations for additional work or materials

needed. Submit pricing information separately to the Contract Officer.

4.10.1.11 An estimated impact on the completion of the contract.

4.11 Safety

4.11.1 Keep hoses, welding leads, and temporary lights clear of the decks on temporary “trees” or brackets to minimize tripping, shock, fire, and other safety hazards.

4.11.2 Keep passageways as clear of obstructions as possible.

4.11.3 Do not store materials or tools on the ship. If needed or required, furnish and use a temporary dockside storage area to store materials or tools.

4.11.4 Limit materials at the work site to those which will be used during the work shift in progress.

4.11.5 Asbestos-Containing Materials (ACM)

4.11.5.1 Accomplish all work involving ACM in accordance

to reference 2.5.

4.11.5.2 Not all NOAA Vessels have ACM. Consult the COR if

unknown.

4.11.5.3 Within 24 hours of arrival of the ship at the Contractor’s facility, review the ship’s most recent Asbestos Survey. Determine where work to be conducted overlaps with survey and perform inspection(s) by an Asbestos Containing Materials Project Manager of work sites that will involve demolition or renovation around known ACM or suspected ACM, as required by reference 2.5, paragraph “Work Site Inspections”.

4.11.5.4 Existing panels, insulation, gaskets, and other materials on NOAA Ships Rainier, Fairweather, and Oregon II may contain asbestos.

4.11.5.5 The Contractor must test any suspected ACM, if not

already identified. They must stop work, collect a sample for testing, and secure the area including ventilation, until results are received. Test results must be shared immediately with the COR.

4.11.5.6 An asbestos Survey has been conducted for each NOAA

ship, unless otherwise indicated. The Survey Report identifies the location of all known ACM on the ship. A copy will be made available by NOAA upon request.

4.11.5.7 Remove, handle, repair, and dispose of all ACM as

indicated in the vessel specific repair package.

4.11.5.8 The removal, handling, repair, or disposal of ACM which is not identified in the other portions of the contract, or in the Survey Report, will be the subject of a contract modification, except as otherwise specified/negotiated with the Contracting Officer.

4.11.6 Gas-Free Certification (Confined Space Entry)

4.11.6.1 Certify that a safe atmosphere exists in and about a compartment prior to the commencement of work in accordance with references 2.7 and 2.8.

4.11.6.2 It is the Contractor’s responsibility to identify

compartments which require certification by a Marine Chemist. Specific requirements for gas free / Marine Chemist certification are not normally included in the detail specifications of work items.

4.11.6.3 When compartments must be gas free / safe for entry to meet local, state or federal regulations, pump down, open, remove sludge, clean, wipe, ventilate and take all other action required to make the space gas free / safe for entry in accordance with Marine Chemist instructions.

4.11.6.4 When requested by the Contractor, and to the extent empty tank space is available, NOAA will shift fuel to facilitate marine chemist’s requirements.

4.11.6.5 If off-loading of fuel oil is necessary because of insufficient empty tank space, the Contractor must off-load the fuel in accordance with “Fuel Oil and Lube Oil Off-loading” requirements below.

4.11.6.6 Post copies of Marine Chemist / gas-free certificates on the ship in accordance with the Marine Chemist requirements and in accordance with COR instruction.

4.11.6.7 The Marine Chemist / gas-free certificates shall be

issued by a Marine Chemist, certified by the National Fire Protection Association.

4.11.6.8 The Contractor must document daily follow-up

inspections & testing by the Contractor’s Competent Person at the same location(s) to maintain Marine Chemist’s certificate(s).

4.11.6.9 Notify Marine Chemist following confined space-related incidents to identify corrective actions and to ensure certificate(s) remain valid.

4.11.7 Fire Prevention

4.11.7.1 Provide Fire Prevention in accordance with reference 2.9.

4.11.7.2 Locate oxygen, acetylene, and gas supply manifold

systems off the ship and install a shutoff valve to the gas supply located on the dock. The shutoff shall be in addition to the master shutoff valve at the inlet to each portable outlet header.

4.11.7.3 Store material brought onto the ship in areas which do not interfere with access to fire-fighting equipment or personnel movement through access routes.

4.11.7.4 Remove and dispose of crating and packing prior to

bringing aboard equipment or material, when possible. If the crating and packing is needed to protect the equipment or material from damage during handling, then remove the crating and packing immediately after it is brought aboard. Promptly dispose of the crating and packing material to reduce the fire hazard.

4.11.8 Hot Work and Fire Watch Standers

4.11.8.1 Perform hot work in accordance with reference 2.9.

4.11.8.2 At minimum, trained fire watch standers must be

used when:

4.11.8.3 Welding, flame cutting, grinding or other hot work is performed where combustible materials are present within 35 feet or when wall or deck openings within a 35-foot radius expose combustible materials in adjacent areas.

4.11.8.4 Combustible materials are adjacent to the opposite side of the metal partition exposed to hot work, and could be ignited by conduction or radiation. A fire watch stander shall be located on each side of the partition.

4.11.8.5 Each fire watch stander must be trained and outfitted with a fire extinguisher as defined and required by reference 2.9 and 2.10.

4.11.8.6 Remove and restore insulation, sheathing, or other

materials which limit access to either side of a partition or structure on which hot work is being performed in accordance to “Interferences and Restorations” below.

4.11.8.7 Stop hot work whenever loss of firefighting

capabilities occurs on the ship. Do not commence hot work until the firefighting capabilities have been restored.

4.11.8.8 Stop hot work whenever there is a change to conditions per safe for hot work / Marine Chemist certificate; the existing certificate is no longer in effect and a new Certificate may be required before commencing hot work.

4.11.8.9 Notify Marine Chemist following hot work-related

incidents (i.e. small fires, etc.) to identify corrective actions and to ensure certificate(s) remain valid.

4.11.9 Written Hot Work Notice

4.11.9.1 Route Hot Work Notice the day before starting hot work on a job or separate area of the ship, when possible. Hot work notice may be routed not less than 30 minutes prior to starting work at the discretion of the COR and Ship Commanding Officer. Ships personnel shall be notified of all areas where hot work is being performed at the daily meeting.

4.11.9.2 Contractors are encouraged to use NOAA Hot Work Permit (NF 57-17-09) for approval of hot work aboard a NOAA ship.

4.11.9.3 The contractor may use their own form if it is equivalent to the NOAA form in content or the contractor must demonstrate a clear benefit to their form. It must have a field for a ship representative to sign off on each Hot Work Notification. The contractor must brief the Ship Commanding Officer, COR and CME on their form and confirm they agree to its use.

4.11.9.4 The Hot Work notice shall be signed by a Contractor

supervisor specifically designated as responsible for the coordination of hot work and fire watch stander requirements.

4.11.9.5 The contractor must brief the COR, CO and CME on the contractor’s Hot Work procedure, at the arrival conference.

4.11.9.6 For ships in extended repair periods with minimal officers and crew aboard, contractor representative, ship command, and shipyard must have an agreement on how to proceed.

4.11.10 Lockout Tagout (LOTO)

4.11.10.1 LOTO remains the full responsibility of the contractor.

4.11.10.2 The COR may designate special LOTO conditions for

scientific equipment.

4.11.10.3 NOAA employees are prohibited from placing locks or tags for contractors.

4.11.10.4 Before beginning work, contractors must provide a

written or verbal summary of their procedure to the CME; contractor’s procedure must comply with 29 CFR 1915.

4.11.10.5 The CME may elect to ‘group lock’ in addition to the contractor’s lock(s) to help protect sensitive equipment, complex systems, safety-critical systems, or for any reasons deemed necessary by the CME and COR.

4.11.10.6 Contractor and CME must sign the Outside

Contractor Lockout/Tagout Form before any work commences.

4.11.11 Hazardous Materials

4.11.11.1 Comply with all local, state, and federal regulations, laws, and ordinances regarding handling, use, and disposal of hazardous material.

4.11.11.2 Submit to the COR a full inventory and Safety Data Sheets (SDS) for all hazardous materials that will be brought onto the ship during the repair period. The list and SDS must be submitted at least 24 hours in advance of bringing hazardous materials aboard.

4.11.11.3 Remove hazardous material brought onboard the ship once it is no longer required to perform work.

4.11.11.4 Contractors are required to properly characterize and dispose of all hazardous and other wastes produced during the performance of contract work in compliance with applicable local, state, and federal regulations and ordinances, whether the ship is located at the Contractor’s facility or otherwise.

4.11.11.5 Each NOAA ship maintains a current inventory and

Safety Data Sheets (SDS) for all hazardous chemicals carried onboard the ship. A copy of the inventory and SDSs will be provided by the COR within two work days after receipt of a written request from the contractor.

4.11.11.6 Contractors should minimize use of chlorinated

solvents and remove all residuals.

4.11.12 Incident / Accident Reporting & Investigations

4.11.12.1 Incidents or accidents must be reported to OSHA with required timeframes (24 hours for hospitalization, loss of eye, amputation; 8 hours for fatality).

4.11.12.2 Contractor must notify NOAA following report to

OSHA as described above.

4.11.12.3 Contractor must make incident investigations available to NOAA upon request.

4.11.12.4 Contractors shall ensure all pertinent facts relating to any incidents, accidents, injuries, or illnesses involving contract employees pertaining to the project are promptly reported to the COR.

4.12 Interferences and Restorations

4.12.1 Contractor must identify all interferences involved in accomplishing required work. Prospective bidders are encouraged to perform a detailed site inspection whenever possible before submitting a bid. Interferences are not normally identified in the detail specifications of the work item.

4.12.2 Prior to removing interferences, meet with the COR at the work site to discuss the nature, condition and extent of interferences to be removed.

4.12.3 Submit a Condition Report to the COR with a record of existing damage or deterioration.

4.12.4 Remove all interferences and obstructions necessary to complete the required work. This includes the disassembly and removal of machinery, piping, ducts, cable, wiring, insulation, structures, and anything else which interferes with the proper accomplishment of work. This does not include relocations made necessary by new installations which physically prevent an interference from being returned to its existing location, unless otherwise specified.

4.12.4.1 All removed insulation shall be discarded.

4.12.4.2 If a removed interference involves a structural

strength member, provide temporary supports.

4.12.4.3 If watertight integrity is affected by a removed interference, provide a temporary means of maintaining watertight integrity.

4.12.4.4 Place tags on removed interferences to indicate

the nomenclature of the item, ship, and location to enable proper reinstallation.

4.12.4.5 Treat all removed interferences as government-furnished property. Store interferences to protect from damage, loss, and contamination.

4.12.5 Reinstall interferences to their original configuration and condition.

4.12.5.1 Use new gaskets, fasteners, and insulation, including removable blankets.

4.12.5.2 In place of material or items rendered unsuitable for reinstallation during removal or storage, provide and install new materials which are equal in composition, strength, design, type, functionality, reliability, and size.

4.12.6 Test the reinstalled interfaces for alignment, strength, tightness, and operation to ensure that they properly and safely perform their normal functions.

Notify the COR in writing at least four (4) hours in advance of the tests. Submit a written Condition Report containing the test results to the COR within twenty four

(24) hours after the completion of the tests.

4.12.7 Handle and replace asbestos containing materials removed as an interference in accordance with reference 2.5. Do not reinstall material containing asbestos.

4.12.8 Do not remove the components of the following systems as interferences, unless specifically authorized in other documents:

4.12.8.1 Steering system piping.

4.12.8.2 Hydraulic systems or High pressure air systems.

4.12.8.3 Electric cable which requires cutting to be removed.

4.12.8.4 Spring hangers.

4.12.8.5 Fire main piping and equipment.

4.13 Disruption of Ship’s Systems

4.13.1 Maintain all of the ship’s fire main, electrical, steam, heating, potable water, drainage, or other systems vital to crew safety or comfort, unless a disruption to these system(s) is authorized.

4.13.2 For the purposes of this specification, a “disruption” occurs when a large section of a system vital to crew safety or comfort is unusable. If portions of the system remain operational, except for the section on which work is being actively performed, then a “disruption” has not occurred and the requirements of this paragraph do not apply.

4.13.3 If a disruption is necessary to perform contract work, submit a written Condition Report to the COR requesting authorization to shut-off or disrupt systems. The COR must receive the Condition Report at least four hours in advance of the desired disruption. Do not proceed without the CORs authorization.

4.13.3.1 Schedule disruptions between the hours of 10:00pm

and 06:00 am.

4.13.3.2 Limit disruptions to four hour intervals.

4.13.3.3 If a longer interval is required, install temporary bypass hoses, blank flanges, piping, or other items to keep the system operational.

4.14 Watertight Integrity

4.14.1 Maintain or restore watertight integrity of the ship’s watertight bulkheads, decks, and hull by installing stuffing tubes, welded bulkhead and deck penetrations, multi-cable transits, couplings, and kick pipes as needed. Contractor must notify COR if there is a change or compromise to watertight integrity.

4.14.2 Use the same materials and installation details as the nearest similar existing penetrations.

4.15 Removals

4.15.1 Whenever removal of equipment or machinery is specified, but reinstallation is not specified, remove all related electric cables, brackets, foundations, and piping, as follows:

4.15.1.1 Remove related cables that are not used by other

equipment or machinery to the nearest circuit breaker or terminal.

4.15.1.2 Remove related piping that is not used by other systems or equipment. Install pipe caps to maintain pipe system tightness.

4.15.1.3 Whenever removal of piping or cables involves penetration through bulkheads, decks, hull plating or other watertight boundaries, crop out the penetration and install an insert plate of the same thickness and material as the adjacent plating. The insert shall be performed in accordance with ABS/USCG requirements, requirements of the specification and as specified by the COR. Where these regulations/specifications differ, submit a CFR to the COR immediately.

4.16 Fuel Oil and Lube Oil Offloading

4.16.1 Offload fuel oil or lube oil from the ship, as follows:

4.16.1.1 Meter the oil with a calibrated meter.

4.16.1.2 Pump oil into clean moisture-free storage tanks.

4.16.1.3 Take test samples and have them analyzed by a lab for water and impurities.

4.16.1.4 Submit a Condition Report to the COR with a copy of the lab report.

4.16.2 After all work which necessitated the oil’s removal has been completed, return the oil as follows:

4.16.2.1 Meter the oil onload with a calibrated meter and filter as specified by the COR.

4.16.2.2 Pump the oil back into the ship tank(s) as specified by the

COR.

4.16.2.3 Take test samples, from inline with the flow of oil to the ship, and have them analyzed by a lab for water and impurities to ensure the oil was not contaminated while in the Contractor’s possession.

4.16.2.4 Submit a Condition Report to the COR with a copy of the lab report.

4.16.3 In lieu of storing the oil, the Contractor may accept title and responsibility for disposal of the oil and provide an equal amount of new, clean oil of the same type.

4.16.3.1 Take test samples of the new oil and have them analyzed by a lab for water and impurities.

4.16.3.2 Submit a Condition Report to the COR with a copy of the lab report.

4.17 Structural Access Openings

4.17.1 The Contractor may, with prior approval from the COR, cut access openings in the ship’s structure. Such openings shall be limited to those which are essential for access to otherwise inaccessible areas or which greatly improve accessibility for removals or installations.

4.17.2 Provide generous radii at all corners in accordance to Reference 2.11, Table 33.

4.17.3 Prior to making an access opening in the ship’s structure, submit a sketch and a description of the proposed opening to the COR, showing:

4.17.3.1 The location and dimensions of the proposed access

cut, adjacent framing members, nearby penetrations, and scantlings of the structure.

4.17.3.2 Description of the eventual restoration configuration, with material and welding details.

4.17.3.3 Narrative justification for cutting the opening.

4.17.4 Submission of the sketch does not ensure that the COR will authorize the cut as proposed. Proceed with the access cut only after the COR returns a signed copy of the sketch.

4.17.5 Restore access openings to the original configuration and condition.

4.17.6 Conduct a liquid-penetrant or magnetic particle inspection of the root pass and final pass of all welds in the watertight structure, including decks, bulkheads, shell plate, and frames, at or below the main deck level, in accordance with ABS/USCG/specification requirements, or as dictated by the COR.

4.17.6.1 The inspections shall be witnessed by the COR.

4.18 Tests, Inspections, and Checkpoints

4.18.1 Conduct tests in accordance with reference 2.14, applicable regulatory bodies, and manufacturer’s documentation. In the event of conflicting requirements, the more stringent or restrictive applies.

4.18.2 Tests and inspections are required on all systems, equipment, machinery, surfaces, items, and components that are disassembled, installed, repaired, overhauled, relocated, modified, or removed and replaced as an interference.

4.18.2.1 Conduct a structural tightness test on all new, repaired, and modified ship's tanks, cofferdams, void spaces, and structures designated as oiltight, watertight, airtight, or fumetight.

4.18.2.2 Conduct a structural tightness test on all new weather decks and interior steel decks, coamings, and deck connections of steel bulkheads, in way of toilets, washrooms, wet labs, and other wet spaces to ensure tightness before installing deck or bulkhead covering.

4.18.2.3 Any operational device that is to be impacted by work conducted shall be operationally tested prior too commencement of work.

4.18.2.4 Conduct an operational test of equipment, material, machinery, or system after it has been:

● Disassembled

● Installed

● Repaired

● Overhauled

● Relocated

● Modified

● Replaced

● Removed and replaced as an interference

4.18.2.5 Conduct weight and operational tests on deck machinery whenever an associated mechanical load bearing component or mechanical power transmission component is disassembled, repaired, replaced, modified, overhauled, removed and replaced as an interference, or in any other way disturbed.

4.18.2.6 Non-Destructive Tests (NDT) are required only to the extent specified in other specifications, work items, or other procurement documents.

4.18.3 At least 4 hours, but not more than 24 hours, in advance of each scheduled test, inspection, or checkpoint notify the COR of the time and location. The purpose is to allow the COR to witness, or to arrange for another NOAA representative to witness, the test, inspection, or checkpoint.

4.18.3.1 Proceed if the COR or other NOAA representative is

not present at the scheduled time and the required four hour advance notification was provided.

4.18.4 All tests, inspections, and checkpoints shall first be witnessed by the Contractor’s supervisor responsible for the work to ensure the test, inspection, or checkpoint can be satisfactorily and fully completed as scheduled.

4.18.5 Within 24 hours, submit a written Condition Report to the COR to document the results of each test, inspection, and checkpoint in accordance with the “Condition Report” requirements.

4.18.6 Schedule tests, inspections, and checkpoints during normal weekday work shifts.

4.18.6.1 Tests, inspections, and checkpoints may be scheduled during other times only when necessary to avoid a delay in contract completion. In this case, notify the COR at least four hours before the end of the last preceding regular work shift.

4.18.7 In the event that all the work required for a test, inspection, or checkpoint cannot be completed (such as late delivery of material, or interfacing of related work items), and work progress would be delayed waiting for total completion, the COR may, upon request by the Contractor, conduct a partial inspection of the work or item. Notify the COR when the work or item is completed and ready for the remainder of the test, inspection, or checkpoint.

4.18.8 If a required test, inspection, or checkpoint will be performed at a site other than the ship or the Contractor’s facility, provide round-trip transportation for the COR to and from the site. For locations outside a 50 mile radius of the Contractor’s facility, notify the COR at least 48 hours in advance.

4.18.9 Tests, Inspection, and Checkpoints involving a sub-contractor

4.18.9.1 For tests, inspections, or checkpoints involving a

subcontractor, invoke the test, inspection, and checkpoint requirements in the purchase order.

4.18.9.2 Submit one copy of the technical specification portion of the purchase order which invokes the test, inspection, or checkpoint to the COR prior to commencement of work by the sub-contractor.

4.18.9.3 The contractor may only delegate responsibility to

subcontractors to witness and sign for specific tests, inspections, or checkpoints if they are performed at subcontractor facilities located outside of a 50 mile radius of the contractor’s facility. In this case, the contractor is still responsible to provide the required minimum 48 hour advance notice to the COR.

4.19 Piping

4.19.1 Install piping in accordance with the requirements and recommendations of References 2.2 and 2.12. In the event of a conflict between the references, the more specific and restrictive shall take precedence.

4.19.2 When replacing existing piping, the new piping shall be:

4.19.2.1 The same material, thickness and size unless dictated by other portions of this specification.

4.19.2.2 Installed in the same configuration.

4.19.2.3 Installed using the same methods and details as the

existing piping, unless otherwise specified.

4.20 Brackets and Supports

4.20.1 Bracket, support, and secure all pipe, cables, ducts, furniture, equipment, and machinery installed during contract work to carry the weight, prevent vibration, and withstand inertia forces resulting from machinery or the regular movement of the vessel in compliance with applicable regulations, or industry best practices.

4.21 Gaskets, Packing, and Seals

4.21.1 Replace gaskets, packing, and seals which are disturbed during work with new gaskets, packing, and seals of the same material.

4.21.1.1 Except, for fuel oil tank manhole covers and fuel oil service piping, use 3/16-inch thick cork rubber impregnated gasket material conforming to MIL-C-6183, Type I, Class 1, Grade C.

4.22 Disposal of Water

4.22.1 Whenever work requires that equipment, machinery, piping or tanks be drained of water, drain and properly dispose of the water according to applicable local, state, and federal requirements and regulations.

4.22.2 If the Contractor drains water into the ship’s bilges, the Contractor must pump all the water from the affected bilges until the bilges are dry and properly dispose of the oily bilge water in accordance with applicable local, state, and federal requirements and regulations.

4.22.2.1 This includes all water that:

4.22.2.2 Existed prior to the Contractor draining water into

the bilge.

4.22.2.3 The water the Contractor drained into the bilge.

4.22.2.4 Accumulates between the time the Contractor drains

water into the bilge and the time the Contractor pumps the bilges dry.

4.23 Painting

4.23.1 Prepare the surface and apply paint in accordance with reference 2.13 and the paint manufacturer’s written recommendations and instructions. In the event a conflict should occur, the paint manufacturer’s instructions shall take precedence.

4.23.1.1 Prior to applying paint or coatings, arrange for the COR to inspect surfaces to validate they have been properly prepared and that weather conditions are suitable for painting.

4.23.2 Restore all coatings which are damaged during the performance of contract work using the same coating system.

4.23.3 Paint new materials only if specified in the detail specifications or other procurement documents.

4.23.4 Paint the shell plating and frames below the Load Waterline only while the ship is in dry-dock, unless specifically authorized.

4.24 Electrical

4.24.1 Install electrical cables, equipment, and machinery in accordance with the requirements and recommendations of references 2.3 and 2.4. In the event of a conflict between the references, the more specific and restrictive shall take precedence.

4.25 Welding and Allied Processes

4.25.1 Perform welding, brazing, and allied processes in accordance with the requirements and recommendations of references 2.1 and 2.2.

4.25.2 While the ship is water-borne, welding shall be permitted only when welding leads are properly grounded, as follows:

4.25.2.1 Connect the cables of the welding machines and other welding power sources to the ship where the welding is to be performed.

4.25.2.2 All welding cables shall be fully insulated.

4.25.2.3 Welding cables shall not be permitted to drop overboard into the water.

4.25.2.4 The total cross-sectional area of the return cable shall be at least one million circular mils per 1,000 amperes per 100 feet, but not less than 85,000 mils.

4.25.2.5 The return ground cable shall never be grounded to

anything but the ship it is servicing.

4.25.2.6 The ground cable shall be securely fastened to grounding plates, or to an integral part of the ship, with contact areas thoroughly cleaned to bare metal.

4.25.3 When welding on equipment, machinery, pressure vessels, or piping, connect the welding machine return ground cable in the immediate vicinity (as close as practical) to the work to ensure that current does not flow through bearings, pipe hangers or other areas where arcing or high resistance paths exist.

4.26 Work at Government Facilities

4.26.1 The following requirements apply only when the Contractor performs work at a Government facility.

4.27 Restrictions:

4.27.1 The Contractor is not permitted to use the Government facility waste disposal containers for disposal of scrap, waste or other materials.

4.27.2 If the Contractor desires to bring a waste disposal container into the facility, the container shall not be larger than eight cubic yards capacity. Only one container will be permitted.

4.27.3 Hazardous or ‘suspected hazardous’ waste generated by contractor work at the government facility must be managed by the contractor according to contractor’s procedures.

4.27.4 Contract work on more than one ship may be in progress concurrently at the facility. Therefore, pier space and parking space may be scarce. Ample pier space will be provided for the Contractor to perform the required contract work.

However, the Government reserves the right to prohibit or limit the number of vehicles permitted onto the facility and to specify the permitted parking locations.

All vehicles being brought onto the facility will be required to apply for a vehicle pass.

4.28 Government-Furnished Services

4.28.1 Electric Service

4.28.1.1 The Government will provide adequate electric

service either on the ship or on the pier/dock for the Contractor to operate equipment and tools necessary to accomplish the required work.

4.28.1.2 The Contractor is responsible for making all

electrical connections and for providing all cables, plug, adapters, and other materials for making the connections.

4.28.2 Water Service

4.28.2.1 The Government will provide water service to the

Contractor for use in performing the required work. The service will be limited to what can be provided by the Government's installed equipment and does not include providing hoses or fittings.

4.28.3 Crane Service

4.28.3.1 During the first 3 days of the contract performance period, if the ship on which the work is being performed has operable installed cranes, the ship will provide crane service to assist the Contractor in lifting materials to and from the ship. The service provided will be limited to the capacity and reach of the ship's crane(s) in its existing condition.

The crane will be operated by ship's personnel. Crane service will be limited to the handling of materials which exceed 100 pounds and which cannot be easily carried by the workers.

4.28.3.2 The Contractor shall coordinate and schedule the crane service to minimize the number of lifts required.

4.28.3.3 Provide at least four hours advance notice to the COR of the need for crane service.

4.29 Additional Requirements for Large Contracts

4.29.1 Facility Supervisor Contact List

4.29.1.1 Prior to starting contract work, submit a written contact list of supervisors, including shop supervisors, to the COR.

4.29.1.2 The contact list shall include each supervisors: Name, Title, Office Location, Telephone Number, and an Emergency Telephone Number where they can be reached during non-work hours.

4.30 Project Kick-Off and Initial Meeting / Arrival Conference

4.30.1 Contractor shall hold an post-award kick-off meeting with the COR seven

(7) days after contract award.

4.30.2 Contractor shall assign a Project Manager who will be the primary point of contact for the contract seven (7) days prior to start date to the COR or at the project Kick-off meeting.

4.30.3 In addition to the project kick off meeting, the Contractor shall host and the COR must facilitate an Initial Meeting/Arrival Conference with 24 Hours of the project start date.

4.30.4 Topics at these meeting’s may include but are not limited to: introduction of contractor’s safety POC; Hot Work Notification routing; required elements of fire prevention conference; yard’s confined space rescue plan; identification of Marine Chemists; daily housekeeping / safety inspection; LOTO procedures and hot work procedures; Daily production schedule; ect.

4.31 Weekly Progress Meetings

4.31.1 Hold Weekly Progress meetings at a time and place mutually agreeable to the COR and Contractor. The meetings shall be attended by the COR and a Contractor management official who has authority to make binding commitments.

Other interested parties may attend.

4.31.2 Submit a written Progress Report to the COR by 3:00pm the day before the Progress Meeting with the following information:

4.31.2.1 Percent complete of each contract item and additional work items authorized by the Contracting Officer.

4.31.2.2 Any problems which could impact timely completion, including material delays. Include a problem description, schedule impact estimate, and mitigation plan.

4.31.2.3 Safety concerns identified by the Contractor/Ships

Crew/COR.

4.32 Engine Room Bilge Cleaning

4.32.1 Clean the engine room bilge at the beginning and end of repair period work, as follows:

4.32.1.1 In the first three days of the repair period, pump the engine room bilges dry and dispose of the oily water.

4.32.1.2 At the completion of all repair work, remove all debris from the engine room bilges, flush with cold fresh water, pump dry, and dispose of the oily water.

4.33 Safety Plan

4.33.1 30 days prior to starting contract work, unless designated emergent work, contractor must submit a copy of a Safety Plan to the COR that complies with 29 CFR 1915 and contains, as a minimum, the following:

4.33.1.1 Procedures to be followed should a disruption occur to a temporary service or ship’s system which affects the safety of the ship or personnel.

4.33.1.2 Confined / enclosed space procedures, including confined space rescue plans or agreements with nearest fire station.

4.33.1.3 A copy of the OSHA roster containing names of persons designated as a “Shipyard Competent Person”, as defined and required in reference 2.8.

4.33.1.4 Description of the Contractor’s training program for fire watch standers.

4.33.1.5 Description of the procedures to be followed prior to performing hot work, including the procedures to be followed to ensure the presence of a properly outfitted and trained fire watch stander.

4.33.1.6 Methods of rigging hoses, welding leads, and

temporary lighting to avoid restricting escape passages and to minimize tripping, shock, fire, and other safety hazards.

4.33.1.7 A copy of LOTO procedure

4.33.1.8 Incident investigation process.

4.33.1.9 If work is being performed at the Contractor’s facility, include a detailed description of the fire protection system which will be in effect during the contract work, including:

4.33.1.10 Method for reporting fires.

4.33.1.11 Shipyard fire-fighting facilities, equipment, and organization.

4.33.1.12 Procedures for maintaining clear fire lanes in the

shipyard and on the piers.

4.33.1.13 Nearest municipal fire-fighting organization.

4.33.1.14 For all shifts, the shipyard organizational responsibilities and assignments for reporting to the scene of a fire to move equipment, cut access holes, operate fire pumps, and secure or provide temporary services.

4.33.1.15 Location of Safety Data Sheets (SDS) for all hazardous chemicals covered by reference 2.6 which will be brought onto the ship or to which government personnel may be exposed under normal conditions or in a foreseeable emergency.

4.33.1.16 Procedures to be followed to clean up a hazardous

chemical spill.

4.33.2 Fire Fighting and Prevention Conference

4.33.2.1 If work is to be performed at the Contractor’s facility, hold a fire fighting and prevention conference within 3 days of the arrival of the ship. The time and location of the conference shall be established at the mutual agreement of the Ship’s Commanding Officer, the COR, and the Contractor.

4.33.2.2 The purpose of the Firefighting and Prevention Conference is to familiarize the ship’s crew with the Contractor’s procedures for fire-fighting and prevention and with the procedures that will be in use by municipal fire-fighting organizations. The conference will also familiarize the Contractor and the municipal fire-fighting organizations with the ship arrangement, shipboard fire prevention, fire-fighting systems, equipment, and organization.

4.33.2.3 Prepare an attendee list and agenda which specifically addresses the following:

4.33.2.4 Fire alarm and response procedures.

4.33.2.5 Contractor fire-fighting capability and procedures.

4.33.2.6 Municipal fire-fighting capability and procedures.

4.33.2.7 Communication system for fire reporting and for command and control of fire-fighting efforts.

4.33.2.8 Shipboard arrangement, including access routes.

4.33.2.9 Shipboard availability of fire-fighting systems

and communications.

4.33.2.10 Shipboard fire-fighting organization, drills, systems, and equipment.

4.33.2.11 Compatibility of ship, Contractor, and municipal fire-fighting equipment.

4.34 Manufacturer’s Representative

4.34.1 The services of a manufacturer’s representative is required only when specified in other specifications or procurement documents.

4.34.2 The services of the representative shall be provided by the Contractor unless otherwise stated in the other specifications or procurement documents.

4.34.3 Whenever the manufacturer’s representative is required to be “on-site”, the representative shall be at the work site during all times that work is being performed.

4.34.4 The manufacturer’s representative shall be specially trained by the manufacturer of the equipment or material and shall be certified by the manufacturer as authorized to represent the manufacturer in performing the prescribed tasks.

4.34.4.1 If requested by the COR, provide written documentation from the manufacturer attesting that the representative is authorized to represent the manufacturer.

4.34.5 The representative shall be considered to be an on-site technical consultant to provide technical advice to the Contractor and the COR. When specified, the representative is also required to take measurements and conduct inspections. However, nothing shall be construed as relieving the Contractor of the responsibility to satisfactorily perform all required work.

4.34.6 Unless other specifications or procurement documents specifically state that work is to be performed “as directed by the manufacturer’s representative”, the representative will be considered to be an advisor. The Contractor may deviate from the representative’s guidance whenever necessary to achieve satisfactory work, provided that the COR accepts the proposed deviation.

4.34.7 Prior to proceeding with work which deviates from the representative’s guidance, submit a Condition Report to the COR which outlines the guidance provided and the reasons for the proposed deviation. Proceed with the deviation only after the COR has reviewed the Condition Report and accepted the proposed deviation.

4.34.7.1 Whenever the Contractor deviates from the representative’s guidance, all increased costs resulting from the deviation shall be borne by the Contractor.

4.34.8 If the COR refuses to allow the proposed deviation, the Contractor must proceed as recommended by the representative. But in this instance only, the Contractor will be relieved of responsibility for all subsequent rework which can be conclusively shown to have been caused by following the representative’s guidance.

4.34.9 The Contractor shall obtain from each manufacturer’s representative a detail service report which outlines all inspections, observations, and recommendations provided by the representative.

4.34.9.1 If measurements were taken by the representative, a record of the measurements shall be included in the report.

4.34.10 Submit a copy of the service report to the COR prior to completion of the contract.

4.35 Government Property

4.35.1 Prior to starting contract work, provide a written list of names and signatures of all persons authorized to receive and account for Government- Furnished Materials (GFM) to the COR.

4.35.2 Receiving

4.35.2.1 Inspect…