About this file

This is a Standard Specification document issued by NOAA's Marine Operations Center that establishes general requirements for electrical and electronic work performed on ships.

The specification mandates that all work comply with IEEE STD 45-1988 (Recommended Practice for Electric Installations on Shipboard) and U.S. Coast Guard 46 CFR 110-113 (Electrical Engineering regulations), utilizing best marine and shipbuilding practices. Materials must be suitable for marine service and match existing or damaged materials in shape, color, and finish. All new cabling must be low smoke-rated and properly sized for intended use. Contractors must replace or repair any machinery, piping, cabling, ducts, insulation, paint, deck tile, paneling, and other items removed, disturbed, or damaged during work, with damaged paneling renewed to original condition and broken flanges or joints remade using new gaskets of proper size and material. Electronic racks must be securely fastened to structural members to prevent movement. Electrical cabling extensions must route through junction boxes, and all cabling installed must run behind paneling in existing cableways or through newly established cableways, with secure banding to hangers. Cabling must be identified at each end with embossed metal tags, using nonconductive labels within junction boxes and numbering systems matching those on the ship. Contractors must assign all manufacturer's standard warranties in writing to the Government and deliver three copies of technical manuals, prints, and drawings to the Contracting Officer's Technical Representative (COTR), along with spare parts and surplus materials. Quality assurance requires all items disturbed and devices installed be demonstrated fully operational upon work completion. Disturbed painted or varnished surfaces must be cleaned and refinished with original paint or varnish type and color.

View the file

Other files for this federal contract opportunity

Other files attached to FY27 NOAA Ship Gordon Gunter Drydock REFERENCES, newest first.
File Type Posted
Copy of 5100334-01_Salwico Cargo Addressable_Service Maintenance Manual_M_EN_2021_V.pdf PDF
150-6233566_RevJ_Sht1 THRU 6_N_A_MODULE NO. 9C STRL ASSY.pdf PDF
Copy of 5100332-01_Salwico Cargo Addressable_User Guide_M_EN_2021_ADx.pdf PDF
T9555-BA-MMO-010_0_0x.PDF PDF
Copy of TAGO_NONE_150-6233575_RevN_Sht1 THRU 13_N_A_MODULE NO. 10C STRUCTURAL ASSEMBLY.pdf PDF
Copy of m-202-instruction-manual-ocenco-inc.pdf PDF
GG Extinguisher List 5-28-25.xlsx XLSX spreadsheet
Steyr Motor Marine Engines SE SERIES 4 Cylinders 6 Cylinders Operation Maintenance and Warranty Manual P_N 707245 1st Edition February 2021..pdf PDF
Zodiac Hurricane H638 SOLAS Manual MB10247 Rev 11-8-2016.pdf PDF
GU-436-011Rev - Fire Detection Install_123880286.pdf PDF
529-6233819.pdf PDF
620-6233557.pdf PDF
NOAA Ships General Arrangement with camera locations (1).pdf PDF
GU_NONE_T0965-LP-109-1010_Rev1_Sht1 THRU 158_N_A_GU-KA-437-04 TANK LEVEL INDICATING TLI SYSTEM TYPE NO. 36000.pdf PDF
GU-555-001_-.pdf PDF
SFLC-Std-Spec-6310-(2020) - Requirements for Preservations of Ships Structures.pdf PDF
593-6233812.pdf PDF
1005-01 - NOAA Ship Health Plan (public).docx DOCX document
111-001.pdf PDF
NOAA Standard Specification 0000.1.docx.pdf PDF
437-6233672.pdf PDF
Drager Aerotest Navy Drager Tubes Pamphlet 9046651.pdf PDF
Gordon Gunter FY21 Cable Testing.xlsx XLSX spreadsheet
NOAA Ship Gordon Gunter Drawing Index List.xlsx XLSX spreadsheet
SSPC-SP-11-Power-Tool-To-Bare-Metal.pdf PDF
2 Bottle Vertical Inline Rack - UN_ISO Cylinders.pdf PDF
TECHNICAL PUBLICATIONS INDEX - SM638027 - 2203874.pdf PDF
524-6233951.pdf PDF
s1205.pdf PDF
NOAA Standard Specification AMC-300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
SE_NONE_NONE_RevNONE_Sht1 OF 1_N_A_OS-342-6233813-1.pdf PDF
GU_NONE_GU-KA-568-01_RevNONE_Sht1 THRU 76_N_A_GU-KA-568-01 TUNNEL THRUSTER MODEL S-300-L SERIAL NOS. 86.000.435 AND 86.000.436.pdf PDF
Profile References Modules and Erection Sequence.docx DOCX document
90RMC050-D-610_REV- Carrier Operation and Maintenance Manual.pdf PDF
mk-line-2nd-1-26.pdf PDF
524-6233814 (1).pdf PDF
528-6233824.pdf PDF
6233762_G (1).PDF PDF
620-6233548.pdf PDF
GU_NONE_NONE_RevNONE_Sht1 THRU 2_N_A_GENERAL ARRANGEMENT MAIN DECK _ BELOW.pdf PDF
529-001 Revision A (1).pdf PDF
EconoAir General Arrangement Drawing.pdf PDF
E100 Rev -1 Gunter.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
GU-436-015 37442.03.01 - Connection drawings.pdf PDF
NOAA Standard Specification 0002.0.docx.pdf PDF
NOAA_Weight_Reporting_Spreadsheet.xlsx XLSX spreadsheet
NOAA Standard Specification 0863.0.docx.pdf PDF
SSPC-SP-1-Solvent-Wipe.pdf PDF
Show all 50

FY27 NOAA Ship Gordon Gunter Drydock REFERENCES has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-300-3

September 2000

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATIONS CENTER

STANDARD SPECIFICATION MOC-300-3

GENERAL REQUIREMENTS FOR ELECTRICAL/ELECTRONIC ITEMS

1. SCOPE. This specification provides general requirements for work performed on electrical and electronic systems.

2. REFERENCES.

2.1 IEEE STD 45-1988, Recommended Practice for Electric

Installations on Shipboard (series)

2.2 U. S. Coast Guard 46 CFR 110 through 113, “Subchapter J - Electrical Engineering”

3. REQUIREMENTS.

3.1 The contractor shall accomplish all work in these

specifications in accordance with the requirements of References

2.1 and 2.2, and using the best marine and shipbuilding practices.

3.2 The quality of all materials provided by the contractor

shall be in accordance with References 2.1 and 2.2, suitable for marine service, and have the same shape, color, and finish as the existing or damaged materials when they were new.

3.3 All new cabling shall be low smoke and sized for the cable’s intended use.

3.4 All machinery, piping, cabling, ducts, insulation, paint

work, deck tile, or any other article removed, disturbed, or damaged in the process of accomplishing the work required by these specifications shall be replaced, renewed, or repaired.

All paneling removed shall be replaced, including any required alterations. Paneling damaged by the contractor shall be renewed equal to the original when new. All flanges and joints broken or loosened shall be properly remade using new gaskets of the proper size and material.

3.5 All electronic racks installed shall be securely fastened to overhead and deck structural or steel members to prevent movement.

3.6 Any disturbed painted or varnished surfaces shall be

cleaned, painted, and/or varnished with original type and color of paint or varnish.

MOC-300-3

September 2000

3.7 Any extension of electrical cabling shall be through a

junction box. Any removal of electrical cabling shall be to the nearest junction box.

3.8 All electrical junction boxes, receptacles, hangers, and

miscellaneous electrical fittings shall be in accordance with References 2.1 and 2.2.

3.9 All electrical cabling installed by the contractor shall be run behind paneling in existing cableways and shall be securely banded to the hangers. If existing cableways are not available, new cableways shall be established.

3.10 All electrical cabling installed by the contractor shall be identified at each end with embossed metal tags. Where cables are marked within a junction or terminal box, nonconductive labels shall be used. The contractor shall number cabling with a marking system similar to that used on the ship.

3.11 All manufacturer's or supplier's standard warranties on

equipment installed on the ship shall be assigned in writing by the contractor to the Government.

3.12 Three copies all manufacturer's technical manuals, prints, and drawings shall be delivered to the COTR. Spare parts and surplus installation materials shall be delivered to the COTR.

4. QUALITY ASSURANCE.

4.1 All items disturbed and all devices used, repaired, altered, furnished, or installed by the contractor shall be demonstrated to be fully operational upon completion of work.

END OF SPECIFICATION