NOAA DOCKING REPORT FORM S0700.pdf

PDF 79 KB Posted

Attached to
NOAA Ship REUBEN LASKER Unscheduled Dry Docking
Solicitation number
1305M223QNMAN0180
Issued by

About this file

This document is a NOAA docking report form used to record inspections and recommended repairs for the NOAA Ship REUBEN LASKER. The form collects information on the ship's hull condition, recommended repairs and their cost estimates. It also documents inspections of the ship's bearings, propellers, shafting, shaft coverings, zinc anodes, cathodic protection anodes, and sea chests. Repair recommendations and cost estimates are provided for each system. Space is allotted to record any repairs actually performed. The related federal contract opportunity is for an unscheduled dry docking of the NOAA Ship REUBEN LASKER, issued by the Department of Commerce National Oceanic and Atmospheric Administration under solicitation number 1305M223QNMAN0180. The dry docking will allow repairs to be completed based on deficiencies identified in the docking report form.

View the file

Other files

File Type Posted
SF 30 AMENDMENT 0002.doc DOC document
SF 30 AMENDMENT 0001.doc DOC document
Attachment IV - Pricing Schedule.xlsx XLSX spreadsheet
RFQ 1305M223QNMAN0180 LASKER RFQ Amendment Two.docx DOCX document
Attachment III Past Performance Questionnaire.docx DOCX document
RFQ 1305M223QNMAN0180 LASKER RFQ Amendment One.docx DOCX document
009-32_FY23_pkg.pdf PDF
FSV6-610-01 Rev K.pdf PDF
AMC-000-1F Ship Repair Contract Work.pdf PDF
FSV6-801-08_B Bossing Void.pdf PDF
FSV6-997-01 Rev B Docking Plan.pdf PDF
Attachment I LASKER Unscheduled Drydock SOW v1.1.docx DOCX document
Attachment V - AIR Process.pdf PDF
631-2D Steel Coating Systems.pdf PDF
FSV6-436-01 Rev B Fire Alarm System Wiring.pdf PDF
FSV6-551-01 Rev_D.pdf PDF
Attachment III Past Performance Questionnaire.docx DOCX document
RFQ 1305M223QNMAN0180 LASKER RFQ.docx DOCX document
FSV6-610-03 Rev (C).pdf PDF
FSV6-601-01 Rev (G) General Arrangements.pdf PDF
000-2C Contractor Facility Temp Services.pdf PDF
s0700-1 Drydocking.pdf PDF
631-3B Hull Ablative Coating System.pdf PDF
Attachment II Past Performance Information Form.pdf PDF
997-1A Drydocking.pdf PDF
FSV6-631-01_REV(B) Paint Schedule.pdf PDF
RL BOSSING VOID LEAK.pptx PPTX presentation
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA DOCKING REPORT

S0700/SWBS997 (06/01) Page 1 of 2

SHIP’S NAME: DATE:

CONTRACT NO.: CONTRACTOR:

TYPE OF DOCK: DOCKING PLAN NO.: POSITION: DOCK DATE:

TIME:

REMARKS:

HULL 9 STEEL 9 WOOD

Condition as Found:

Indicate Conditions: D = Strucural R = Loose/Leaking Rivits Z = Deteriorated/Missing Zinc Damage:

P = Areas of Pitting F = Loose Fasteners C = Damaged Paint Coating Loose Fastenings

W = Deteriorated Welding S = Leaking Seams

Brief Description:

Recommended Repairs: Cost Estimate:

Repairs/Alterations Made:

Brief Description:

PAINTING BOOT

TOP

UNDER

BODY

RECOM’D HAND

SCRAP

WIRE

BRUSH

SAND

BLAST

REPAINT SQUARE FEET

PRIMER AC AF REMARKS

N U

M B

E R

O F

S Q

F T

F A

IR

E

D

PRIMER BOOT TOP

ANTI-CORROSIVE UNDER

BODY

ANTI FOULING

PROPOSED PAINTING MANUFACTURER FORMULA NO. COATS @ DFT SPECIFICATION COLOR

B O

O T

T O

P

PRIMER

ANTI-CORROSIVE

ANTI FOULING

U N

D E

R B

O D

Y

PRIMER

ANTI-CORROSIVE

ANTI FOULING

REMARKS:

NOAA DOCKING REPORT

S0700/SWBS997 (06/01) Page 2 of 2

SHIP’S NAME: DATE:

Bearings (Enter AS FOUND clearances)

PORT SIDE STARBOARD SIDE

BEARING TOP BOTTOM INBOARD OUTBOARD FWD AFT TOP BOTTOM INBOARD OUTBOARD FWD AFT

STERN

TUBE

FWD

AFT

INTER'MD

STRUT

FWD

AFT

AFT

STRUT

FWD

AFT

RUDDER

PINTEL

Recommendations:

Bearings: (Enter AS LEFT clearances as appropriate)

PORT SIDE STARBOARD SIDE

BEARING TOP BOTTOM INBOARD OUTBOARD FWD AFT TOP BOTTOM INBOARD OUTBOARD FWD AFT

STERN

TUBE

FWD

AFT

INTER'MD

STRUT

FWD

AFT

AFT

STRUT

FWD

AFT

RUDDER

PINTEL

Brief Description of Repairs/Replacements:

Propellers: Condition: Recommendation:

Estimated Cost: Repairs Accomplished:

Shafting: Condition: Recommendation:

Estimated Cost: Repairs Accomplished:

Shaft Covering: Condition: Recommendation:

Estimated Cost: Repairs Accomplished:

Zinc Anodes: Condition: Recommendation:

Estimated Cost: Repairs Accomplished:

Cathodic Protection Anodes: Condition: Recommendation:

Estimated Cost: Repairs Accomplished:

Sea Chests: Condition: Recommendation:

Estimated Cost: Repairs Accomplished:

Signed Typed/Printed Name: Title: Date: