No_Parking_Sign_Log.pdf
PDF 124 KB Posted
- Solicitation number
- HC-26-02 / HC-0916
- Issued by
- Hamilton County, Indiana
About this file
The No_Parking_Sign_Log.pdf is a supporting document for Contract Resurface 26-02 in Indiana, which involves asphalt milling and resurfacing of roads in Jackson and Noblesville Townships. The project encompasses 3.28 total miles of roadway across seven distinct locations, including 211th Street (0.66 miles), Mill Creek Road (0.18 miles), Point Lane (1.38 miles), Cherry Tree Road (0.43 miles), Bays Drive (0.48 miles), Susan Court (0.09 miles), and Angela Court (0.06 miles). Milling specifications vary by location, ranging from 1.5 inches to 2 inches of surface milling, with asphalt resurfacing utilizing either 9.5mm Type B or 12.5mm Type C materials. Additional project components include 8-inch deep patching on three roadways, crack sealing of transverse cracks on Point Lane, installation of Petromat Enviro Pavement Fabric along Point Lane, four pipe replacements along Point Lane, curb and casting replacements in the Cherry Tree Farms subdivision, and inlet cleaning within the subdivision.
The No_Parking_Sign_Log document serves as a reference tool for tracking parking restrictions and access considerations during project implementation across the specified roadways and subdivisions. This supporting document assists contractors and project managers in understanding site-specific constraints that may affect project scheduling, equipment placement, and traffic management during the milling and resurfacing operations in both Jackson and Noblesville Townships.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No Parking Sign Log
Road Name
# Signs Posted
Date
Time
By
Whom
HCHD FORM 8065 – NO PARKING SIGN LOG Rev. 07-02-97
File details come from the government source that posted it. Updated .