The purpose of this amendment is to: 1 - Disseminate the Pre-Bid Conference/Site Visit Presentation Slides and Registration Sign-in Sheet; 2 - Post "Questions & Answers" associated with the subject solicitation (as well as the previous contract's bid abstract in response to Question #10); 3 - Revise Exhibit B to reflect the correct acreage for Maintenance Level III mowing and square yardage for Mulch Plant Beds, as there was an inconsistency between Exhibit B and the maps in Exhibit F. Exhibit B has been.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
000002
Ryan D. Bradley
NASA Langley Research Center 5 Langley Blvd Hampton, VA 23681-2199
4200629705
NNL17608444E
06/27/2017
7/21/2017
The purpose of this amendment is to:
1 - Disseminate the Pre-Bid Conference/Site Visit Presentation Slides and Registration Sign-in Sheet;
2 - Post "Questions & Answers" associated with the subject solicitation (as well as the previous contract's bid abstract in response to Question #10);
3 - Revise Exhibit B to reflect the correct acreage for Maintenance Level III mowing and square yardage for Mulch Plant Beds, as there was an inconsistency between Exhibit B and the maps in Exhibit F. Exhibit B has been updated and is attached to this amendment. Exhibit F remains unchanged.
All other terms and conditions remain unchanged, please see attachments below:
GROUNDS MAINTENANCE AND PEST
CONTROL SUPPORT SERVICES
INVITATION FOR BID (IFB)
NNL17608444E
PRE BID CONFERENCE AND SITE VISIT
NASA Langley Research Center
July 11, 2017 1:00 – 3:00 pm
GOVERNMENT TEAM MEMBERS
Sharon Hare, Office of Procurement, Contract Specialist Ryan Bradley, Office of Procurement, Contracting Officer Randy Manning, Small Business/Industry Assistance Office Connie Buffin, Center Operations Directorate, Contracting
Officer’s Representative (COR) Frank Johnson, Center Operations Directorate, Alternate
Contracting Officer’s Representative (Alt. COR) Peter Van Dyke, Center Operations Directorate, Standard Practice and Environmental Engineering Branch
PRE-BID CONFERENCE
FAR 14.207 Pre-Bid Conference Purpose is to explain specifications and requirements as soon as possible after
IFB is issued and before bid opening Not to be used as substitute for amending a defective or ambiguous invitation
FAR 15.201 Exchange With Industry Before Receipt of Proposals Establishes procedures for information exchange Encourages exchange of information consistent with procurement integrity requirements
Any discussions, comments, etc., made by Government personnel during this Pre- Bid Conference / Site Visit are considered unofficial until incorporated into the IFB through an Amendment.
The IFB, and any Amendments made thereafter, take precedence over all responses and exchanges made during this Pre-Bid Conference and Site Visit.
AGENDA
Opening Remarks
Procurement Overview
Technical Aspects
IFB Overview
Site Tour
OPENING REMARKS
All questions must be submitted in writing not later July 18, 2017. Potential bidders’ questions posed orally during the pre-bid conference/site visit must be reduced to writing and provided to the Contracting Officer prior to the completion of the event.
Questions submitted and responses to such questions, or any additional information deemed necessary by the Government will be posted as an amendment to the IFB.
The Government reserves the right to post all questions received during this conference as an amendment to the IFB.
Potential bidders are responsible to check the electronic posting for amendments issued prior to the bid opening date. No oral understanding or agreement shall be binding on either party.
NASA CENTERS
LANGLEY RESEARCH CENTER
Founded in 1917
• 1st civil aeronautical research laboratory
Infrastructure/Facilities
• 764 acres, ~189 Buildings/Structures
• $3.7B Replacement Value
Budget
• ~$880M
Workforce
• ~1,800 Civil Servants
• ~1,600 Contractors
PROCUREMENT OVERVIEW
Competitive 8(a) Set-Aside (See IFB Section I, Clause I.10 (52.219-18))
Meets the requirements of Section I clause 52.219-14 “Limitations on Subcontracting (January 2017)”
8(a) eligibility will be verified with SBA
Incumbent Contractor – Knight Solutions Awarded Value: $4.4M Current Value: $4.4M Period of Performance ends September 30, 2017
Invitation For Bids (IFB) – Sealed Bid Award to Responsible, Responsive, Low Bidder
PROCUREMENT OVERVIEW
Period of Performance: 10/01/2017 – 09/30/2022 Base Period and four 1-Year Options
Procurement Schedule:
Bids Due (See SF 33, Block 9) 08/01/2017
Award 08/07/2017 Post Award Conference 08/30/2017 Transition/Phase-In 09/04/2017 Begin Base Contract Performance 10/01/2017*
Notes: * Subject to change by Amendment only. Other dates are provided for planning purposes only.
Connie Buffin Center Operations Directorate
TECHNICAL ASPECTS
TECHNICAL ASPECTS
STATEMENT OF WORK
General Scope
The Contractor shall furnish all supervision, qualified personnel, administrative services, equipment, materials, supplies, and transportation necessary to provide the ground maintenance and pest control support as defined in the SOW for facilities located at NASA Langley Research Center and NASA buildings located on the adjacent Langley Air Force Base, Hampton, Virginia.
CLIN 1 - Basic Ground Maintenance and Pest Control Services (SOW Section 3) include but are not limited to:
Sustaining Services Performance Requirements – Miscellaneous; Normal Workload Fluctuations; Business Management; Government-Furnished Property/Facilities and Services (SOW Sec 3.1)
Ground Maintenance (SOW Sec 3.2) Refuse and Trash Removal (SOW Secs 3.3) Cleaning Services (SOW Sec 3.4) Pest Control Services (SOW Sec 3.5)
BASIC GROUND MAINTENANCE AND
PEST CONTROL SERVICES
INDEFINITE DELIVERY/INDEFINITE QUANTITY
CLIN 2 - Indefinite Delivery/Indefinite Quantity (IDIQ) Services (SOW Section 3.6) are unscheduled, nonrecurring services and supplies provided on as needed basis, over-and-above CLIN 1 Basic Grounds Maintenance and Pest Control Services.
Services ordered by Firm-Fixed Price Task Orders or P-Card purchases Potential areas include, but are not limited to:
Other services to include special events, supplemental waste removal, and other miscellaneous supplies and services
Emergency Grounds Maintenance and Pest Control Services Exploratory Excavation Topsoil Placement Transplanting Trees, Shrubs and Ground Cover Tree and Stump Removal Lawn Repair Under Brushing Tree and Shrub Establishment
GOVERNMENT FURNISHED PROPERTY,
SERVICES AND SUPPLIES
Government provides:
LaRC Buildings 1285 and 1286 for use as the Contractor Facility (SOW Sec 3.1.7(A))
Janitorial services for Buildings 1285 and 1286 (SOW Sec 3.1.7(A))
One desktop computer and service to manage, integrate, control and record all work preformed under this contract. Computer shall only be used for this contract. (SOW Sec 3.1.7(B))
Phase 1: Building 2101 COMPLETED
Phase 2: Building 2102 COMPLETED
Phase 3: Building 2103 Building Construction: April 2015 to September 2017 Move-in Period: September 2017 to October2017 Building Occupied: October 2017
Phase 4: Anticipated FY17 Project (Building 2104) Building Construction: April 2017 to April 2019 Move-in Period: September 2019 Building Occupied: September 2019
NEW TOWN SCHEDULE
GEOGRAPHIC INFORMATION
SYSTEM (GIS)
GEOGRAPHIC INFORMATION
SYSTEM (GIS)
Peter Van Dyke Center Operations Directorate
ENVIRONMENTAL REQUIREMENTS
The Center operates under numerous laws, regulations and permits. NASA Environmental is here to help ensure compliance.
– Please feel free to contact us at any time with questions. If you aren’t sure, ask!
The Grounds contract accomplishes a lot of work that affects the environment.
– Keep ditches clear and flowing;
– Clean out catch basins;
– Collect leaves for composting;
– Perform Center-wide street sweeping;
– Beautify the Center; and
– Deal with wildlife issues.
Environmental will provide periodic training to the staff on this contract. Some items covered include reminders such as:
– Do not blow clippings into a storm drain. This is prohibited. Blow clippings back into the grass.
– We will provide periodic training to the staff on this contract.
– Never pour used oil, gasoline, or other product on the ground or into a drain.
– Report any spills immediately, no matter how minor. You aren’t in trouble for an accidental spill – but not reporting a spill that is deemed “reportable” can lead to issues. There are regulatory requirements for reporting and clean measures that must be taken.
– Properly dispose of used oil and other products through our Waste Management System.
INVITATION FOR BID
IFB Section B – Supplies or Services and Prices Transition/Phase-In –
• Completed prior to the performance start date for the Base Period
• Contractor will be required to be fully operational on the effective date of the contract.
• A CLIN for Transition/Phase-in will not be used or separately priced.
Firm Fixed Price (FFP) CLIN X001 for Grounds Maintenance and Pest Control Support Services
• Subsequent New Town Building may be incorporated in accordance with the Changes clause of the contract
Indefinite Delivery/Indefinite Quantity (IDIQ Task Orders) CLIN 0002 for services “Over and Above” FFP Basic Grounds Maintenance and Pest Control Support Services
• Utilizing the schedule of rates and labor categories established under Pre-priced Services in Section B, Clause B.5.
• Includes FFP P-card purchases up to $3.5K •The successful offeror will be required to accept the Government’s P-card Terms & Conditions
INVITATION FOR BID
IFB Section B – Supplies or Services and Prices (continued)
Section B, Clause B.4 Pricing Schedule
• Offerors should refer to PWS Exhibit A when calculating its proposed unit prices and total bid. The total pricing for each year in Contract Exhibit B must equal the amount bid for the corresponding CLIN in Section B, Clause B.4.
• The FFP amounts in Section B.4 will take precedence over the offeror’s calculations that are disclosed in Contract Exhibit B.
• Ensure bid amounts are correct and no mistakes are made when inserting amounts for each CLIN in Pricing Schedule
• Reference IFB Section M, Provision M.3 “Evaluation of Price”
INVITATION FOR BID (continued)
Section L - Instructions, Conditions, and Notices to Bidders Contract Type: Firm-Fixed Price Pre-Bid Conference Instructions Communications Regarding this Solicitation Proposal Submissions Guidelines
• Bid Dates, Times, Locations Documentation to submit with Bid Package as stated in Section L.10:
• Original and 2 hard copies
• SF 33 complete “OFFER” Blocks 12 – 18 (Sign and Date)
• Section B Contract Clauses B.4 (Part I, Section B, Pricing Schedule); and
B.5 (Pre-Priced Schedule of Service Categories & Labor Rates for IDIQ Support)
• Section K, complete Provisions
• Exhibit B, Pricing Schedule
INVITATION FOR BID (continued)
Section M – Instructions, Conditions, and Notices to Bidders
M.3 - Evaluation of Bids based on Total Overall Evaluated Price
• Amount proposed in Section B, Clause B.4 (Pricing Schedule)
• Any bid may be rejected if determined to be unreasonable as to price.
Unreasonableness of price includes not only the total price of the bid, but individual line items as well any bid may be rejected if prices for any line items or sub-line items are materially unbalanced.
Ensure bid amounts are correct and no mistakes are made when inserting amounts for each CLIN in Pricing Schedule.
Award will be made to responsible bidder whose bid, conforming to the invitation, will be most advantageous to the Government, considering only price and the price-related factors (see 14.201-8) included in the invitation. Award shall not be made until all required approvals have been obtained and the award otherwise conforms with 14.103-2.
Award is to be made in the aggregate (all-or-none basis)
Determination of Responsibility will be made prior to award IAW FAR 9.1:
Adequate financial resources, or ability to obtain them Comply with proposed performance schedule Satisfactory performance record (We define satisfactory performance as the following: Performance that meet contractual requirement. The contractual performance of the sub-elements contains some minor problems for which corrective action taken by the contractor appear or were satisfactory.)
INVITATION FOR BIDS (continued) https://www.acquisition.gov/far/current/html/Subpart%2014_2.html#wp1096719 https://www.acquisition.gov/far/current/html/Subpart%2014_1.html#wp1091064
Satisfactory record of integrity and business ethics Organization, experience, accounting, operations controls, technical skills, or ability to obtain them Otherwise qualified and eligible to receive an award under applicable laws and regulations
INVITATION FOR BIDS (continued)
INVITATION FOR BIDS (continued)
Wage Determination (WD) is effective during entire period of performance of contract. Currently there is no Collective Bargaining Agreement (CBA) associated with this contract.
Contract award can only be made to the small business concerns expressly certified by the Small Business Administration in the SBA 8(a) program.
(See Section I.10 clause “Notification of Competition Limited to Eligible 8(a) Concerns (52.219-18) (January 2017).
The apparent successful offeror will submit a Safety and Health Plan.
CLOSING REMARKS
LaRC Site Visit Window bus tour of Center (excludes Langley Air Force Base)
Return to 2102 Submit any questions in writing to the CO before the site visit is complete.
The IFB and any amendment made hereafter takes precedence over all responses received during this Pre-Bid Conference / Site Visit.
IFB NNL17608444E
QUESTIONS & ANSWERS
# Reference Question Government Response 1 PWS 3.5 Could you elaborate on requirements for pest control?
What percentage was performed in the last contract?
PWS Section 3.5 discusses Pest Control Services as well as Attachment 1 of the PWS. No further elaboration will be provided.
The incumbent contractor performed 100% of the pest control on the last contract, and the requirements for pest control under this contract are essentially unchanged.
2 Are we able to re-visit the site after this meeting?
The pre-bid conference/site visit was the only time to visit the site.
3 Will you provide a copy of the sign in sheet?
Yes, a copy of the sign-in sheet as well as the pre-bid conference charts have been posted on FBO under Amendment 2.
4 Can pest control or any other services be subcontracted?
Yes, services under this contract may be subcontracted, as long as it complies with the limitations set forth in FAR Clause 52.219-14 Limitations on Subcontracting.
5 PWS 3.2.15,
PWS
Attachment 1
Are weather and storm support covered under the IDIQ portion of this contract?
PWS Section 3.2.15 Weather and Storm Support and PWS Attachment 1 discuss what the contractor is required to provide as part of the sustaining services FFP CLIN. Any services required above and beyond the estimated quantities/occurrences listed in Exhibit B will be covered under the IDIQ portion of the contract.
6 Exhibit A – Attachment 1
On Page 23 of Exhibit A, Attachment 1 - (GMP), there are hours listed for specific tasks.
- Are the costs for those hours to be included in the FFP portion of this contract?
- How will they be measured?
- Yes the items listed in the GMP are to be included in the CLIN X001 FFP (sustaining services) of the contract.
- The Contractor will be responsible for tracking the hours spent on specific tasks.
This shall be included in the monthly report.
7 Exhibit B Also Exhibit B shows quantities, are they accurate?
The quantities listed in Exhibit B are Annual Estimated Quantities.
Are those the same quantities used in the past?
Those quantities are based on historical data.
8 PWS 3.3.6 Will all Non-Burnable trash/litter debris have to be disposed of off-site at the expense of the Contractor?
Per PWS Section 3.3.6, Non- Burnable Refuse shall be collected on Center until a full truck load and then disposed of off Center.
9 Is there a minimum amount of personnel required to be assigned specifically to this contract?
There is no minimum amount of personnel required. It is at the discretion of the contractor to determine what level of personnel is needed complete the requirements in the PWS.
Attachment 4 of the IFB package lists the historical number of Work Year Equivalents (WYE’s) of the last two contracts.
10 Can you provide the last bid tabulation?
Yes, the previous contract’s bid abstract has been provided in Amendment 2. Please note, though, that the previous contract value changed from the original award because of modifications to the scope.
11 Is the current contractor meeting the expectations of this contract?
Yes.
12 Why is the contract out for bid? Because the period of performance of the current contract will expire on 30 September 2017.
13 PWS
Attachment 1
What is the frequency of mowing on the calendar?
The frequency of mowing is established in PWS Attachment 1
(GMP).
14 PWS 3.3.1 3.3.1 Trash Removal General Requirements, does the contractor collect trash from individual office throughout the NASA property?
Per PWS 3.3.1, the Custodial contractor collects trash from individual offices and takes them to various collection sites throughout NASA LaRC. The Grounds contractor will be responsible to coordinate with the Custodial contractor for picking up that trash from those individual locations.
15 PWS
Attachment 1
Substations, fenced in areas along testing sites with rock foundation is that included in the weed control sections?
Attachment 1 of the PWS, states Center-wide Herbicide Application (also includes Back River Substation on Langley AFB); this includes all substations on Center as well as the substation on Langley AFB.
16 Contractor construction areas do we maintain inside?
Grayed out areas on the map are under warranty/construction areas which are not maintained; however at a set time these areas will become maintained when the warranty expires and/or construction ends. These will be added into the contract via a modification.
17 How would you like contractors to provide information to determine responsibility? (Re: para 5 of solicitation cover letter)
The Government will request those items from the apparent low bidder after bid opening. This information will consist of, but not be limited to, financial proof to be able to satisfy the contract requirements, past performance and eligibility certificates.
18 Will the contractor be subject to State of Virginia annual gross sales tax based on the annual value of the contract?
Yes
19 PWS 3.3.6 Non Burnable trash is shown to have a workload of 75 times per year. What volume is each of the 75?
Section 3.3.6 states non-burnable refuse shall be stored at an on-site location and transported to the landfill in full truckloads only. The truck currently being used has a capacity of 19 cubic yards.
20 What is the total acreage of the 765 Catch Basins?
Catch basins on Center are typically box-like components located under a storm drain designed to trap debris before it enters the conveyance pipes. These are all outside and primarily along roadways. Acres would not be an accurate unit of measurement for catch basins. The catch basins vary in size, but the typical catch basin on Center is approximately 2’ x 2’ x 4’ (Length, width, depth) or 16 cubic feet. Debris (dirt, leaves, etc.)
is typically trapped on the bottom few inches of the catch basins.
Capacity would equal to approximately 12,240 cubic feet;
however, catch basin debris would not reach that capacity.
21 What volume of materials to be removed from Catch Basins is there annually?
This will vary from year to year depending on environmental factors. Over the past four years, the average weight removed per year was 21,000 pounds.
22 Will the Ditches and Catch Basins be in contract compliance at contract start date? This would mean the inclusion of drain lines to and from them.
Yes, ditches and catch basins will be in contract compliance at contract start date. The maintenance for conveyance piping discharging into/out of the ditches and catch basins is not part of this contract.
23 PWS 3.2.11 Sweeping of pavements. Does this include full width road sweeping and a requirement for a road sweeper vehicle?
Sweeping of paved roads does not include the full width of the road. It is up to the contractor to determine its equipment and personnel needs to meet the requirements of the PWS relating to the sweeping of pavement. See the PWS, PWS Attachments 1 and 2, and Exhibit B
24 PWS
Attachment 1, Exhibit B, and Maps
Exhibit B states that there are
735.7 annual acres of Level III to be mowed however there are
105.8 total acres of this area on the map. That would equate to
6.953 total annual services of this area. Can the government please confirm these values?
The acreage listed on the map for Level III mowing, of 105.8 is correct. As stated in PWS Attachment 1, Level III mowing is done 7 times a year. Therefore, the correct acreage that should have been listed in Exhibit B is 740.6.
As seen in Amendment 2, Exhibit B has been updated to reflect this corrected number.
25 PWS 3.2.4,
Exhibit B, and Maps
Can the government explain where the 9,600 SY of Plant Bed Cultivation on Exhibit B is on the maps or what are this entails? The total mulched areas total 16,456 SY or 3.4 acres on the map.
Section 3.2.4 of the PWS discusses cultivating of plant beds. Although there are 3.4 acres of mulched plant beds not all areas require cultivating before mulching.
According to historical data 2,400 (.5 acres) SY are cultivated 4 times a year, thus, resulting in the 9,600 SY annually.
26 Can the government explain where the 33,880 SY of Plant Bed Mulching on Exhibit B is on the maps or what area this
The acreage on the map of 3.4 acres (or 16,456 SY) is correct.
The Plant Bed Mulching is done 2 times a year, as stated in PWS encompasses? The 3.4 acres of mulch on the map does not equate to this value.
Attachment 1, which should equate to 32,912 SY annually. The 33,880 SY listed in Exhibit B was an outdated number, and has been updated in Exhibit under Amendment 2 to reflect 32,912 SY.
27 PWS 3.3.6 In regards to the 75 occurrences of non-burnable refuse collection, can the government please provide more detail on the 75 occurrences. Does this reflect 75 full truckloads or each occurrence that a battery or other non-burnable piece of refuse is disposed of
Please refer to the answer to Question 19 above.
28 PWS 3.2.8
and 3.1.6
The PWS states that following raking and leaf gathering, debris collected shall be disposed of off site however other sections of the PWS mention the use of a recycling site or composting material on site. Can the government please clarify.
Section 3.2.8 of the PWS states the contractor shall dispose of all debris off the Center on the same day of collection for raking and leaf gathering.
The comment on recycling is the use of recycled materials in section 3.1.6.
29 Can the government please confirm that all items listed under Exhibit B fall under Firm Fixed Price work and not IDIQ work? Is this the same schedule that was used for the previous contract?
All items listed under Exhibit B fall under FFP work. However, as stated in contract clause B.6, IDIQ task orders may be issued utilizing the prices in Exhibit B. Essentially, as stated in the answer to Question 5 above, any services required above and beyond the estimated quantities/occurrences listed in Exhibit B will be covered under the IDIQ portion of the contract.
Minor changes were made in this schedule from the previous contract.
30 PWS 3.3.3 Can the government please confirm the pick-up locations for Burnable Refuse and Building Boxed Trash Pick-up? Are these location inside buildings? Outside? On loading docks?
Burnable Refuse are picked up from outside of buildings.
Building Boxed Trash (excluding privacy act material), as stated in PWS Section 3.3.3., are picked up at pick-up points as coordinated with NASA LaRC’s Custodial Support Services Contractor.
31 Contract Clause B.6 and PWS 3.6.1.F
Do the tree removal prices under IDIQ include removal of stumps?
Yes, the Tree Removal services listed in contract clause B.6 “Pre- Priced Schedule of Service Categories and Labor Rates for IDIQ Support” are to be done in accordance with PWS Section 3.6.1.F. “Tree and Stump Removal.”
32 PWS 3.3.2 Is the Trash incinerator located on LaRC property? If not, can you please provide an address for it?
As stated in the PWS Section 3.3.2 the trash incinerator is located on Wythe Creek Road, Hampton, Virginia (not on Center; however, next to the Center). The address is 50 Wythe Creek Road, Hampton, VA 23681
33 Does the contractor do the actual burning of the boxes?
No
34 Is trash to be collected from each individual office of the approx. 189 buildings on the base?
No
35 How large are the catch basins?
Is any special equipment required to access them?
Please refer to the answer to question 20 above, for the size of the catch basins.
No special equipment is required to access them.
36 Are the catch basins inside the buildings or outside?
Please refer to the answer to question 20 above.
37 The solicitation number for this project in FBO is:
NNL117608444E. The solicitation number listed on all the documents is:
NNL17608444E. There is just one “1” missing…which is correct?
The correct Solicitation number is NNL17608444E. The FBO posting inadvertently included an extra “1,” and the system does not allow us to change this.
38 What is planted on the Green Roof? Is there water available on the roof for watering?
Seedums are planted on the green roof. Water is available on the roof.
39 On the FBO site it states, “3 - Attachment 3 - Bid Delivery Map is hereby canceled, and
As noted in Amendment 1, Block 9 of the SF33 (Bid Depository Location) was updated to 1 Langley Blvd., Hampton VA shall not be used for hand-delivered bids.
Is there another way to provide a hand-delivered bid or are you only accepting Mailed in Bids?
(NASA Langley Badge & Pass Office). This is the location to deliver hand-delivered bids. As noted in Amendment 1, this is also the location where the bid opening will take place.
40 Can you please provide if the incumbent is using any subcontractors and if so the names of those subcontractor companies?
Subcontractors are used on the current contract, and are allowed to be used as long as they are used in accordance with the FAR Clause 52.219-14 Limitations on Subcontracting. We cannot provide the names of the current subcontractors.
41 PWS
Reference:
3.1.6 Work
Management, F. Vehicles
How are the contractor provided above ground fuel storage tanks filled by the current contractor? Will the government allow a commercial fuel truck to service these tanks?
Above ground fuel storage tanks are filled by commercial fuel truck.
42 PWS
Reference:
3.3 Refuse
and Trash Removal -
CLIN X001
FFP,
paragraph,
3.3.5. Trash
Collection from Buildings
Can you please provide Contract Clause H.4 trash pick-up inside buildings? Also why would there be trash deposited inside buildings? Is there not enough dumpsters.
Please refer to the IFB solicitation package, specifically the document
“IFB NNL17608444E –
Sections B-M Final,” as this is where all contract clauses are located. Trash is not to be removed from inside the buildings. As stated in the PWS, you will need to coordinate with the custodial contractor to determine the pick-up points and times.
43 PWS
Reference: 3.
3 Refuse and Trash Removal -
CLIN X001
FFP, 3.3.1.
General Requirements
a. Can you please provide the distance in miles to the Incinerator and the local Landfill?
b. Can you provide the frequency of Refuse and Trash Removal, i.e. Daily, twice Weekly, as directed?
a. The address of the incinerator is 50 Wythe Creek Road, Hampton, VA. 23681. There are multiple landfills located throughout the area, it is up to the contractor to determine which landfill to use.
b. The frequencies are listed in Attachment 1 of the PWS.
c. Can you please provide the average distance and time required for the Refuse and Trash removal requirement?
c. The Government does not have this information, this is the responsibility of the contractor to figure out.
EXHIBIT B
CONTRACT RATE SCHEDULES
The following tables list the rates to be utilized during the performance of the Basic Grounds Maintenance and Pest Control Services for CLINs 0001 through 4001 in accordance with the terms and conditions of this contract.
Contract Section Description
Estimated Quantity
(Annually) Unit Unit
Price Total
3.2, 3.3.14 A Maintenance Level I Mowing 3,270 Acre 3.2, 3.3.14 B Maintenance Level II Mowing 509.6 Acre 3.2, 3.3.14 C Maintenance Level III Mowing 740.6 Acre
3.2.3 Edging 1,622,544 Linear Foot
3.2.4 Cultivate Plant Bed 9,600 Square Yard
3.2.5 Mulch Plant Bed 32,912 Square Yard
3.2.6 Hedge Pruning 19,800 Linear Foot
3.2.6 Shrub/Plant Pruning 2,001 Each
3.2.7 Ground Cover Maintenance 9,600 Square Yard
3.2.8 Raking and Leaf Gathering 378 Acre
3.2.11 Sweeping Pavement 124 Hour
3.2.11 Sweeping of Gumballs 80 Hour
3.3.2, 3.3.4 Burnable Refuse (includes burnable boxed trash pick-up; box size not to exceed 18” x 12” x 10”)
13,000 Box
3.3.4 Trash & Litter Collection – Grounds 16,320 Acre
3.3.5 Trash Collection – Buildings 768 Hour
3.5.5 A Pest Preventive Maintenance (Cafeteria
& Reid Conference Center) 472,290 Square Foot
3.5.5 B Pest Preventive Maintenance (Building
2101) 39,384 Square Foot
3.2.9, 3.2.12, 3.2.15
Maintain Prestige Grounds, Perimeter Fence Line, Weather and Storm Support 2,500 Hour
3.2.9 Replace bedding plants in Prestige
Grounds (not to exceed $1,000 per year) 2 Times per year
3.3.6 Non-Burnable Refuse 75 Times per year
3.5.6, 3.5.8, 3.5.9
Pest Control (General Calls/Animal & Bird Control) 450 Hour
3.5.7 Pest Control (Wood Infesting Insects) 30 Hour
3.2.8 Limb Removal 50 Times per year
3.2.6 Tree Pruning 25 Times per year
3.1.6 H, 3.2.13
Center-wide Herbicide Application (also includes Back River Substation on Langley AFB)
150,000 Square Yard
3.4.2 Ditch Cleaning – Paved 3,251 Linear Foot
3.4.2 Ditch Cleaning – Non-Paved 261,788 Linear Foot
3.4.3 Catch Basin Cleaning 1,530 Basin
CLIN 0001 Total – Base Period svhare Highlight svhare Highlight
Contract Section Description Estimated Quantity
(Annually) Unit Unit Price Total
3.2, 3.3.14 A Maintenance Level I Mowing 3,270 Acre 3.2, 3.3.14 B Maintenance Level II Mowing 509.6 Acre 3.2, 3.3.14 C Maintenance Level III Mowing 740.6 Acre
3.2.3 Edging 1,622,544 Linear Foot
3.2.4 Cultivate Plant Bed 9,600 Square Yard
3.2.5 Mulch Plant Bed 32,912 Square Yard
3.2.6 Hedge Pruning 19,800 Linear Foot
3.2.6 Shrub/Plant Pruning 2,001 Each
3.2.7 Ground Cover Maintenance 9,600 Square Yard
3.2.8 Raking and Leaf Gathering 378 Acre
3.2.11 Sweeping Pavement 124 Hour
3.2.11 Sweeping of Gumballs 80 Hour
3.3.2, 3.3.4 Burnable Refuse (includes burnable boxed trash pick-up 13,000 Box
3.3.4 Trash & Litter Collection – Grounds 16,320 Acre
3.3.5 Trash Collection – Buildings 768 Hour
3.5.5 A Pest Preventive Maintenance (Cafeteria
& Reid Conference Center) 472,290 Square Foot
3.5.5 B Pest Preventive Maintenance (Building
2101) 39,384 Square Foot
3.2.9, 3.2.12, 3.2.15
Maintain Prestige Grounds, Perimeter Fence Line, Weather and Storm Support 2,500 Hour
3.2.9 Replace bedding plants in Prestige
Grounds (not to exceed $1,000 per year)
2 Times per year
3.3.6 Non-Burnable Refuse 75 Times per
year
3.5.6, 3.5.8, 3.5.9
Pest Control (General Calls/Animal & Bird Control) 450 Hour
3.5.7 Pest Control (Wood Infesting Insects) 30 Hour
3.2.8 Limb Removal 50 Times per
year
3.2.6 Tree Pruning 25 Times per
year
3.1.6 H, 3.2.13
Center-wide Herbicide Application (also includes Back River Substation on Langley AFB)
150,000 Square Yard
3.4.2 Ditch Cleaning – Paved 3,251 Linear Foot
3.4.2 Ditch Cleaning – Non-Paved 261,788 Linear Foot
3.4.3 Catch Basin Cleaning 1,530 Basin
CLIN 1001 Total – Option Period 1 svhare Highlight
Contract Section Description Estimated Quantity
(Annually) Unit Unit Price Total
3.2, 3.3.14 A Maintenance Level I Mowing 3,270 Acre 3.2, 3.3.14 B Maintenance Level II Mowing 509.6 Acre 3.2, 3.3.14 C Maintenance Level III Mowing 740.6 Acre
3.2.3 Edging 1,622,544 Linear Foot
3.2.4 Cultivate Plant Bed 9,600 Square Yard
3.2.5 Mulch Plant Bed 32,912 Square Yard
3.2.6 Hedge Pruning 19,800 Linear Foot
3.2.6 Shrub/Plant Pruning 2,001 Each
3.2.7 Ground Cover Maintenance 9,600 Square Yard
3.2.8 Raking and Leaf Gathering 378 Acre
3.2.11 Sweeping Pavement 124 Hour
3.2.11 Sweeping of Gumballs 80 Hour
3.3.2, 3.3.4 Burnable Refuse (includes burnable boxed trash pick-up 13,000 Box
3.3.4 Trash & Litter Collection – Grounds 16,320 Acre
3.3.5 Trash Collection – Buildings 768 Hour
3.5.5 A Pest Preventive Maintenance (Cafeteria
& Reid Conference Center) 472,290 Square Foot
3.5.5 B Pest Preventive Maintenance (Building
2101) 39,384 Square Foot
3.2.9, 3.2.12, 3.2.15
Maintain Prestige Grounds, Perimeter Fence Line, Weather and Storm Support 2,500 Hour
3.2.9 Replace bedding plants in Prestige
Grounds (not to exceed $1,000 per year)
2 Times per year
3.3.6 Non-Burnable Refuse 75 Times per
year
3.5.6, 3.5.8, 3.5.9
Pest Control (General Calls/Animal & Bird Control) 450 Hour
3.5.7 Pest Control (Wood Infesting Insects) 30 Hour
3.2.8 Limb Removal 50 Times per
year
3.2.6 Tree Pruning 25 Times per
year
3.1.6 H, 3.2.13
Center-wide Herbicide Application (also includes Back River Substation on Langley AFB)
150,000 Square Yard
3.4.2 Ditch Cleaning – Paved 3,251 Linear Foot
3.4.2 Ditch Cleaning – Non-Paved 261,788 Linear Foot
3.4.3 Catch Basin Cleaning 1,530 Basin
CLIN 2001 Total – Option Period 2 svhare Highlight
Contract Section Description Estimated Quantity
(Annually) Unit Unit Price Total
3.2, 3.3.14 A Maintenance Level I Mowing 3,270 Acre 3.2, 3.3.14 B Maintenance Level II Mowing 509.6 Acre 3.2, 3.3.14 C Maintenance Level III Mowing 740.6 Acre
3.2.3 Edging 1,622,544 Linear Foot
3.2.4 Cultivate Plant Bed 9,600 Square Yard
3.2.5 Mulch Plant Bed 32,912 Square Yard
3.2.6 Hedge Pruning 19,800 Linear Foot
3.2.6 Shrub/Plant Pruning 2,001 Each
3.2.7 Ground Cover Maintenance 9,600 Square Yard
3.2.8 Raking and Leaf Gathering 378 Acre
3.2.11 Sweeping Pavement 124 Hour
3.2.11 Sweeping of Gumballs 80 Hour
3.3.2, 3.3.4 Burnable Refuse (includes burnable boxed trash pick-up 13,000 Box
3.3.4 Trash & Litter Collection – Grounds 16,320 Acre
3.3.5 Trash Collection – Buildings 768 Hour
3.5.5 A Pest Preventive Maintenance (Cafeteria
& Reid Conference Center) 472,290 Square Foot
3.5.5 B Pest Preventive Maintenance (Building
2101) 39,384 Square Foot
3.2.9, 3.2.12, 3.2.15
Maintain Prestige Grounds, Perimeter Fence Line, Weather and Storm Support 2,500 Hour
3.2.9 Replace bedding plants in Prestige
Grounds (not to exceed $1,000 per year)
2 Times per year
3.3.6 Non-Burnable Refuse 75 Times per
year
3.5.6, 3.5.8, 3.5.9
Pest Control (General Calls/Animal & Bird Control) 450 Hour
3.5.7 Pest Control (Wood Infesting Insects) 30 Hour
3.2.8 Limb Removal 50 Times per
year
3.2.6 Tree Pruning 25 Times per
year
3.1.6 H, 3.2.13
Center-wide Herbicide Application (also includes Back River Substation on Langley AFB)
150,000 Square Yard
3.4.2 Ditch Cleaning – Paved 3,251 Linear Foot
3.4.2 Ditch Cleaning – Non-Paved 261,788 Linear Foot
3.4.3 Catch Basin Cleaning 1,530 Basin
CLIN 3001 Total – Option Period 3 svhare Highlight
* Denotes rounded to the nearest whole dollar
Contract Section Description Estimated Quantity
(Annually) Unit Unit Price Total
3.2, 3.3.14 A Maintenance Level I Mowing 3,270 Acre 3.2, 3.3.14 B Maintenance Level II Mowing 509.6 Acre 3.2, 3.3.14 C Maintenance Level III Mowing 740.6 Acre
3.2.3 Edging 1,622,544 Linear Foot
3.2.4 Cultivate Plant Bed 9,600 Square Yard
3.2.5 Mulch Plant Bed 32,912 Square Yard
3.2.6 Hedge Pruning 19,800 Linear Foot
3.2.6 Shrub/Plant Pruning 2,001 Each
3.2.7 Ground Cover Maintenance 9,600 Square Yard
3.2.8 Raking and Leaf Gathering 378 Acre
3.2.11 Sweeping Pavement 124 Hour
3.2.11 Sweeping of Gumballs 80 Hour
3.3.2, 3.3.4 Burnable Refuse (includes burnable boxed trash pick-up 13,000 Box
3.3.4 Trash & Litter Collection – Grounds 16,320 Acre
3.3.5 Trash Collection – Buildings 768 Hour
3.5.5 A Pest Preventive Maintenance (Cafeteria
& Reid Conference Center) 472,290 Square Foot
3.5.5 B Pest Preventive Maintenance (Building
2101) 39,384 Square Foot
3.2.9, 3.2.12, 3.2.15
Maintain Prestige Grounds, Perimeter Fence Line, Weather and Storm Support 2,500 Hour
3.2.9 Replace bedding plants in Prestige
Grounds (Not to Exceed $1,000 per year)
2 Times per year
3.3.6 Non-Burnable Refuse 75 Times per
year
3.5.6, 3.5.8, 3.5.9
Pest Control (General Calls/Animal & Bird Control) 450 Hour
3.5.7 Pest Control (Wood Infesting Insects) 30 Hour
3.2.8 Limb Removal 50 Times per
year
3.2.6 Tree Pruning 25 Times per
year
3.1.6 H, 3.2.13
Center-wide Herbicide Application (also includes Back River Substation on Langley AFB)
150,000 Square Yard
3.4.2 Ditch Cleaning – Paved 3,251 Linear Foot
3.4.2 Ditch Cleaning – Non-Paved 261,788 Linear Foot
3.4.3 Catch Basin Cleaning 1,530 Basin
CLIN 4001 Total – Option Period 4 svhare Highlight
| Pre-Bid Conference and Site Visit (prv) 8.pdf |
| �GROUNDS MAINTENANCE AND PEST CONTROL SUPPORT SERVICES�Invitation for Bid (IFB)�nnl17608444E |
| GOVERNMENT TEAM MEMBERS |
| Pre-Bid Conference� |
| AGENDA |
| Opening Remarks |
| NASA CENTERS |
| Slide Number 7 |
| Procurement OVERVIEW |
| Procurement overview |
| Technical Aspects |
| TECHNICAL ASPECTS�STATEMENT OF WORK |
| BASIC GROUND MAINTENANCE AND �PEST CONTROL SERVICES |
| INDEFINITE DELIVERY/INDEFINITE QUANTITY |
| GOVERNMENT FURNISHED PROPERTY, �SERVICES AND SUPPLIES |
| NEW TOWN SCHEDULE |
| GEOGRAPHIC INFORMATION �SYSTEM (GIS) |
| GEOGRAPHIC INFORMATION �SYSTEM (GIS) |
| ENVIRONMENTAL REQUIREMENTS |
| ENVIRONMENTAL REQUIREMENTS |
| ENVIRONMENTAL REQUIREMENTS |
| INVITATION FOR BID |
| INVITATION FOR BID |
| INVITATION FOR BID (continued) |
| INVITATION FOR BID (continued) |
| Invitation for Bids (continued)� |
| Invitation for Bids (continued)� |
| Invitation for Bids (continued)� |
| Closing Remarks |
File details come from the government source that posted it. Updated .