NNK16552269R J-7 Tech Reference 003 Shop Drawing Approval Cover Sheet
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHOP DRAWING FOR APPROVAL
contract no.:
| pcn: |
| «PCN» |
| date: |
| project name: |
| «ProjectTitle» |
| name |
| mailcode |
| phone |
| fax |
| construction tech rep: |
| «CM» |
| «CMmailcode» |
| lead design engineer: |
| «LDE» |
| «LDEmailcode» |
prime contractor:
to be submitted in copies transmittal # resubmittal # specification # section #
| description of material |
| place of mfg. |
| para. |
s.d.
design org.
recom-mendation
GOV’T
disposi-tion
I certify that I have reviewed the materials being proposed and they comply with all contract, specification, and drawing provisions including the Buy American Act requirements of FAR clause 52.225-11 (MAY 2014) or its predecessor (52.225-5, June 1997). I have submitted a ‘Deviation/Waiver’ request and/or a ‘Request for Determination of Inapplicability of the Buy American Act’ for each non-compliant submittal item.
Subcontractor Name :
by:
date:
Prime Contractor Name :
by:
date:
requested in house due date:
construction due date to contractor:
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
FORMCHECKBOX
A: APPROVED
FORMCHECKBOX
NA: NOT APPROVED (RESUBMITTAL REQUIRED)
FORMCHECKBOX
RC: RETURN FOR CORRECTION (RESUBMITTAL REQUIRED)
FORMCHECKBOX
AN: APPROVED AS NOTED
FORMCHECKBOX
MD: MULTIPLE DISPOSITIONS (RESUBMIT ONLY ITEMS NOT APPROVED OR
ITEMS RETURNED FOR CORRECTION)
FORMCHECKBOX
RO: FOR RECORD ONLY
REFER TO SPECIFICATIONS
ARCHITECT ENGINEER DATE
LEAD DESIGN ENGINEER DATE
APPROVAL DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR ERRORS, OMISSIONS, CORRECTNESS
OF DIMENSIONS, ADEQUACY OF DETAILS, AND COMPLIANCE
WITH SPECIFICATIONS.
by:
date:
contracting officer’s technical representative: returned herewith
File details come from the government source that posted it. Updated .