NNK16552269R_J-6_Tech_Reference_002_SABER_Cost_Proposal_Example.xls

XLS spreadsheet 105 KB Posted

Attached to
SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS Federal contract opportunity
Solicitation number
NNK16552269R
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

NNK16552269R J-6 Reference 002 SABER Cost Proposal Example

View the file

Other files for this federal contract opportunity

Other files attached to SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS, newest first.
File Type Posted
RESPONSE_TO_BIDDER_QUESTIONS_2-22.docx DOCX document
NNK16552269R_A2.pdf PDF
NNK16552269R_A1.pdf PDF
JOFOC_-_R_S_Means_Costworks.docx DOCX document
RESPONSE_TO_BIDDER_QUESTIONS_2-4.docx DOCX document
NNK16552269R_J-9_Tech_Reference_005_Environmental_Checklist.pdf PDF
NNK16552269R_SF1442.pdf PDF
NNK16552269R_J-2_General_Decision_Number.docx DOCX document
NNK16552269R_J-7_Tech_Reference_003_Shop_Dwg_Approval_Cover_Sheet.doc DOC document
NNK16552269R_J-8_Tech_Reference_004_RFI_KSC_Form_8-268.pdf PDF
NNK16552269R_Section_B-M.docx DOCX document
NNK1655269R_J-3_SABER_Specifications.docx DOCX document
NNK16552269R_J-1_Section_C.docx DOCX document
NNK16552269R_J-5_Tech_Reference_001_Status_Report_Template.doc DOC document
NNK16552269R_J-4_Tech_Exhibit_001.xlsx XLSX spreadsheet
NNK16552269R_J-11_Tech_Reference_007_Deviation_Waiver_Form_KSC50-314.pdf PDF
NNK16552269R_J-10_Tech_Reference_006_Utility_Locate_Excavation_Permit_KSC26-312.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Sheet

COST ESTIMATE
Date Completed:Sheet:1of
Project:Replace Exit Lights (SABER Example)Dwg:
Location:KSCPCN:PD/CCBD:
Engineer:Task Order No:
Estimator:Checker:Approved:
QUANTITYLABORMATERIALTOTAL
BASE BID SUMMARYNo.UnitUnitTotal$/UnitTotalCOST
Prepriced Items$ 4,791$ 9,300$14,091
(From Estimates of Pre-Priced Items Tab)
EscalationmonthsAnnual
Bare Cost Estimate$14,091
SABER Coefficienet10%$1,409
Subtotal$15,500
Non-Prepriced Items$ 180$ 180.40
(From Estimates of Non-Prepriced Items Tab
Subtotal$ 180.40
Design Items$0
(From Design Items (Type 3 Work Tab)
Subtotal$0
Misc. (GFE, etc)$0
Subtotal$0
Current Cost Estimate$15,681
Costs obtained from R.S. Means Costworks, Cost Guides and Vendor Quotes

Estimates of Non-Prepriced Item

NON PRE-PRICEED ITEM PROPOSAL
Project Title
REPLACE EXIT LIGHTING
Task Order Control Number
SABER 001
Date Prepared
Cost Estimate Description
LaborMaterial and/or Equipment
Task DescriptionTask HoursCrew SizeLabor HoursLbr_IDLabor TypeLabor Rate ($/hr.)Labor Line TotalDescription of Material and/or EquipmentQtyUOMUnit CostLine TotalPricing Source
0$ - 0
Non-Priced Items: Mischallaneous Wall Patching & Painting515$ 32.80$ 164$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
0$ - 0$ - 0
Labor Hours5Raw Labor Total$ 164Raw Material Total$ - 0Percent
10.0%1 Labor Overhead$ 162 Mat'l Mark-Up*$ - 06.0%
$ 180Mat & Equip Total$ - 0
Notes:
1Labor Mark-Up includes overhead
2Material Mark-Up includes sales taxes

Estimates of Prepriced Items

CW 2015 Facility Seminar Version - SABER Project Example
QtyCSI NumberDescriptionCrewDaily OutputLabor HoursUnitBare Mat.Bare LaborBare Equip.TotalTotal Incl. O&PZip Code PrefixTypeReleaseNote
60.00026531 310 0240Exit lighting, LED w/ battery unit, single face, ceiling or wall mount1 Elec4.41.818Ea.9,300.004,050.000.0013,350.0016,500.00329R and R2015U893632
60.00026050 550 5310Exit light, electrical demolition, remove1 Elec240.333Ea.0.00741.000.00741.001,140.00329R and R2015U1021862
Totals[$$]9,300.00[$$]4,791.00[$$]0.00[$$]14,091.00[$$]17,640.00

Design Items (Type 3 Work)

DESIGN COST PROPOSAL BREAKDOWN
Control Number: TBD
Tasker Description:
Project Engineer:
Date:
Estimator:Hide Columns When Printed
Subtask 1Subtask 2Subtask 3Subtask 4Subtask 5Subtask 6Subtask 7 (if requried by SOW)Subtask 8 (if requried by SOW)Subtask 9 (if requried by SOW)Subtask 10 (if requried by SOW)
Labor CategoryCompanyContract Labor
Rates per HourTasker Management and AdministrationDetermine Scope, Design Estimate, Initial Site Visit, Find As-builtsSite InvestigationPermittingDesign Ph I 30%/45% Effort30%/45% Review Mtg, Constructability Rev, Cost Estimate, Resolution of Review ConcernsDesign Ph II 60%/90% Design Effort*60%/90% Review Meeting, Constructability Review, Cost Estimate, Resolution of Review ConcernsDesign Phase III (100%)* Final SubmittalProject Closeout, As-Built DrawingTotal HoursTotal
Principal/Project DirectorOTIE0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Engineering ManagerAllen0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Sr. Mechanical EngineerAlpha MRC0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Mid. Mechanical EngineerOTIE0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Sr. Electrical EngineerAlpha MRC0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Mid. Electrical EngineerOTIE0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Sr. Structural EngineerAlpha MRC0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Mid. Structural EngineerOTIE0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Sr. Civil EngineerAllen0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Mid. Civil EngineerOTIE0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Sr. Environmental EngineerOTIE0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Mid. Environmental EngineerOTIE0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Sr. ArchitectAlpha MRC0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Mid. ArchitectAlpha MRC0.00.00.00.00.00.00.00.00.00.00.0$ - 0
CADD DraftsmanOTIE0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Administrative AssistantOTIE0.00.00.00.00.00.00.00.00.00.00.0$ - 0
Sub-Total0.00.00.00.00.00.00.00.00.00.00.0
Total (Hide when printed)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0
Other Direct Costs (ODCs)
Reproduction Costs# of SheetsCopiesSub-total$ - 0
Reproduction - Drawings$ - 0
Reproduction - Specifications$ - 0
Siting request$ - 0
Draft Permit Package$ - 0
Environmental Permit Package$ - 0
ERC Dispositions$ - 0
Miscellaneous Costs$ - 0
TravelPeopleTripsR/T MilesCost/MiSub-total$ - 0
0.0
Sub-Total$ - 0
Overhead%$ - 0
Subtotal$ - 0
Profit%$ - 0
Design Total$ - 0

&COneida Total Integrated Enterprises

FA2521-13-D-0005

&CCONFIDENTIAL

File details come from the government source that posted it. Updated .