RFP NNG17611358R
TABLE OF CONTENTS
Contents
B.1 NFS 1852.216-74 ESTIMATED COST AND FIXED FEE (DEC 1991)
B.2 NFS 1852.216-78 FIRM FIXED PRICE (DEC 1988)
B.3 NFS 1852.232-81 CONTRACT FUNDING (JUN 1990)
B.4 RESERVED
B.5 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (JAN 2017)
B.6 GSFC 52.216-96 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR SERVICES (COST
REIMBURSEMENT AND FIXED PRICE) (MAR 2015)
B.7 GSFC 52.216-97 SUPPLEMENTAL TASK ORDERING PROCEDURES (COST
REIMBURSEMENT AND FIXED PRICE) (MAR 2015)
B.8 GSFC 52.232-94 ESTIMATED COST INCREASES (DEC 2005)
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER SOFTWARE (MAR
2008)
C.3 GSFC 52.235-90 REPORTS OF WORK (IDIQ/BPA) (AUG 2013)
C.4 GSFC 52.211-92 SCOPE OF WORK ADDITIONAL REQUIREMENTS
D.1 NFS 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEPT 2005)
D.2 NFS 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT
(JAN 2011)
E.1 FAR 52.246-5 INSPECTION OF SERVICES – COST-REIMBURSEMENT (APR 1984)
E.2 FAR 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
E.3 NFS 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)
E.4 GSFC 52.246-92 ACCEPTANCE—SERVICES (SEP 2013)
E.5 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT NOT REQUIRED (APR
1989)
E.6 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
E.7 FAR 52.246-2 INSPECTION OF SUPPLIES – FIXED-PRICE (AUG 1996)
E.8 FAR 52.246-3 INSPECTION OF SUPPLIES – COST-REIMBURSEMENT (MAY 2001)
E.9 GSFC 52.246-93 ACCEPTANCE—LOCATION(S) (SEP 2013)
E.10 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
F.1 FAR 52.242-15 STOP-WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984)
F.2 FAR 52.247-34 F.O.B. DESTINATION (NOV 1991)
F.3 GSFC 52.217-92 PERIOD OF PERFORMANCE/EFFECTIVE ORDERING PERIOD
(JAN 2014)
F.4 GSFC 52.237-92 PLACE OF PERFORMANCE – SERVICES (NOV 2013)
F.5 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB 2016)
F.6 CLAUSES INCORPORATED BY REFERENCE – SECTION F
G.1 FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
G.2 NFS 1852.216-75 PAYMENT OF FIXED FEE (DECEMBER 1988)
G.3 NFS 1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE (APR 2015)
G.4 NFS 1852.227-70 NEW TECHNOLOGY—OTHER THAN A SMALL BUSINESS FIRM OR
NONPROFIT ORGANIZATION (APR 2015)
G.5 NFS 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT
REPRESENTATIVE (APR 2015)
G.6 NFS 1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)
G.7 NFS 1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)
G.8 NFS 1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING
(NOV 2004)
G.9 NFS 1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED EQUIPMENT
(AUG 2015)
G.10 NFS 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
G.11 NFS 1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY (AUG 2015)
G.12 NFS 1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT (SEP 2016)
G.13 NFS 1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY (JAN 2011) –
ALTERNATE I (JAN 2011)
G.14 NFS 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF
CONTRACTORS (JAN 2017)
G.15 NFS 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR
52.245-1 (JAN 2011)
G.16 NFS 1852.245–82 OCCUPANY MANAGEMENT REQUIREMENTS (JANUARY 2011)
G.17 GSFC 52.216-100 INDIVIDUALS AUTHORIZED TO ISSUE ORDERS (DEC 2014)
G.18 GSFC 52.242-90 FINANCIAL MANAGEMENT REPORTING (JUN 2014)
G.19 GSFC 52.245-91 GOVERNMENT PROVIDED MOTOR VEHICLES (FEB 2016)
G.20 GSFC 52.245-93 REPORTS OF CONTRACTOR ACQUIRED GOVERNMENT PROPERTY (MAR
2014)
G.21 GSFC 52.245-96 PROPERTY CLAUSE APPLICABILITY - ON-SITE AND OFF-SITE
(APR 2016)
G.22 GSFC 52.245-99 SUPPLEMENTAL FINANCIAL REPORTING OF NASA PROPERTY IN THE
CUSTODY OF CONTRACTS (MAR 2017)
G.23 RESERVED
G.24 52.227-13 PATENT RIGHTS – OWNERSHIP BY THE GOVERNMENT (DEC 2007)
G.25 GSFC 52.232-95 INVOICES – SUBMISSION OF (AUG 2016)
G.26 GSFC 52.245-94 INVENTORY OF GOVERNMENT OWNED PROPERTY--SPECIAL
PROCEDURES FOR FLIGHT QUALIFIED INVENTORY (DEC 2007)
G.27 CLAUSES INCORPORATED BY REFERENCE – SECTION G
H.1 NFS 1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOVEMBER 2004)
H.2 NFS 1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING (DEC 2015)
H.3 NFS 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)
H.4 NFS 1852.228-71 AIRCRAFT FLIGHT RISKS (DEC 1988)
H.5 NFS 1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)
H.6 NFS 1852.223-76 FEDERAL AUTOMOTIVE STATISTICAL TOOL REPORTING (JUL 2003)
H.7 NFS 1852.235-73 FINAL SCIENTIFIC AND TECHNICAL REPORTS (DECEMBER 2006)—
ALTERNATE II (DECEMBER 2005)
H.8 NFS 1852.209-71 LIMITATION OF FUTURE CONTRACTING (DECEMBER 1988)
H.9 NFS 1852.225-70 EXPORT LICENSES (FEBRUARY 2000) ALT I (FEBRUARY 2000)
H.10 GSFC 52.204-99 CONTRACTOR PERSONNEL-IDENTIFICATION, ONSITE REPORTING, AND
CHECKOUT PROCEDURES (APR 2013)
H.11 GSFC 52.211-95 GOVERNMENT PREMISES – PHYSICAL ACCESS AND COMPLIANCE
WITH PROCEDURES (FEB 2016)
H.12 GSFC 52.211-100 CONTRACTOR PROPOSED ENHANCEMENTS (SEP 2013)
H.13 GSFC 52.223-91 SAFETY AND HEALTH – ADDITIONAL REQUIREMENTS. (JUN 2016)
H.14 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS (MAR 2008)
H.15 GSFC 52.227-99 RIGHTS IN DATA (JUN 2012)
H.16 GSFC 52.251-90 REPORT OF NASA-GSFC VEHICLES (JUL 2006)
H.17 GSFC 52.219-90 SMALL BUSINESS SUBCONTRACTING PLAN AND REPORTS (NOV 2016)
H.18 1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989)
H.19 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (MAR 1989)
H.20 FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991) – ALTENATE I (NOVEMBER 1991) ...37
H.21 GSFC 52.243-90 ADDITIONAL LAUNCH SUPPORT (OCT 1988)
H.22 DISCLOSURE OF ORGANIZATIONAL CONFLICT OF INTEREST AFTER CONTRACT
AWARD
H.23 CLAUSES INCORPORATED BY REFERENCE – SECTION H
I.1 FAR 52.202-1 DEFINITIONS (NOV 2013)
I.2 FAR 52.203-3 GRATUITIES (APR 1984)
I.3 FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.4 FAR 52.203-6 RESTRICTION ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP
2006)
I.5 FAR 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
I.6 FAR 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
I.7 FAR 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY
2014)
I.8 FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (OCT 2010)
I.9 FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)
I.10 FAR 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)
I.11 FAR 52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST (DEC 2011)
I.12 FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
I.13 FAR 52.204-2 SECURITY REQUIREMENTS (AUG 1996)
I.14 FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT
PAPER (MAY 2011)
I.15 FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN
2011)
I.16 FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (OCT 2016)
I.17 FAR 52.204-12 UNIQUE ENTITY IDENTIFIER MAINTENANCE (OCT 2016)
I.18 FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
I.19 FAR 52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-
DELIVERY CONTRACTS (OCT 2016)
I.20 FAR 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL
2016)
I.21 FAR 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING
WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)
I.22 FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (JUL 2013)
I.23 FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
I.24 FAR 52.215-2 AUDIT AND RECORDS - NEGOTIATION (OCT 2010)
I.25 FAR 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997)
I.26 FAR 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA -
MODIFICATIONS (AUG 2011)
I.27 FAR 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA - MODIFICATIONS
(OCT 2010)
I.28 FAR 52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)
I.29 FAR 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
I.30 FAR 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT
BENEFITS (PRB) OTHER THAN PENSIONS (JUL 2005)
I.31 FAR 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
I.32 FAR 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA
OTHER THAN CERTIFIED COST OR PRICING DATA - MODIFICATIONS (OCT 2010)
I.33 FAR 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009)
I.34 FAR 52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013)
I.35 FAR 52.216-8 FIXED FEE (JUN 2011)
I.36 FAR 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)
I.37 FAR 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2017) -ALTERNATE II
(NOV 2016)
I.38 FAR 52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN (JAN 1999)
I.39 FAR 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL
2013)
I.40 FAR 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
I.41 FAR 52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JULY 1990)
I.42 FAR 52.222-3 CONVICT LABOR (JUN 2003)
I.43 FAR 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS - OVERTIME
COMPENSATION (MAY 2014)
I.44 FAR 52.222-17 NONDISPLACEMENT OF QUALIFIED WORKERS (MAY 2014)
I.45 FAR 52.222-19 CHILD LABOR—COOPERATION WITH AUTHORITIES AND REMEDIES (OCT
2016)
I.46 FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
I.47 FAR 52.222-26 EQUAL OPPORTUNITY (SEP 2016)
I.48 FAR 52.222-29 NOTIFICATION OF VISA DENIAL (APR 2015)
I.49 FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
I.50 FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
I.51 FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
I.52 FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
I.53 FAR 52.222-41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014)
I.54 FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
I.55 FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
I.56 FAR 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)
I.57 RESERVED
I.58 FAR 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017)
I.59 FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE
AND CONSTRUCTION CONTRACTS (SEP 2013)
I.60 FAR 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
(JAN 1997)--ALTERNATE I (JUL 1995)
I.61 FAR 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY
2011) – ALTERNATE I (MAY 2011) AND ALTERNATE II (MAY 2011)
I.62 FAR 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I.63 FAR 52.223-10 WASTE REDUCTION PROGRAM (MAY 2011)
I.64 FAR 52.223-12 MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF REFRIGERATION
EQUIPMENT AND AIR CONDITIONERS (JUN 2016)
I.65 FAR 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)
I.66 FAR 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE
AND CONSTRUCTION CONTRACTS (MAY 2008)
I.67 FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING (AUG 2011)
I.68 FAR 52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (MAY
2011)
I.69 FAR 52.225-1 BUY AMERICAN - SUPPLIES (MAY 2014)
I.70 FAR 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
I.71 FAR 52.226-1 UTILIZATION OF INDIAN ORGANIZATIONS AND INDIAN-OWNED
ECONOMIC ENTERPRISES (JUN 2000)
I.72 FAR 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
I.73 FAR 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (DEC 2007)
I.74 FAR 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014)—ALTERNATE II (DEC 2007) AND
ALTERNATE III (DEC 2007) AS MODIFIED BY NASA FAR SUPPLEMENT 1852.227-14 (APR 2015)
I.75 FAR 52.227-17 RIGHTS IN DATA—SPECIAL WORKS (DEC 2007) – AS MODIFIED BY NFS
1852.227-17 (JUL 1997)
I.76 FAR 52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)
I.77 FAR 52.227-11 PATENT RIGHTS—OWNERSHIP BY CONTRACTOR (MAY 2014) AS
MODIFIED BY NASA FAR SUPPLEMENT 1852.227-11 (APR 2015)
I.78 FAR 52.228-7 INSURANCE - LIABILITY TO THIRD PERSONS (MAR 1996)
I.79 FAR 52.230-2 COST ACCOUNTING STANDARDS (OCT 2015)
I.80 FAR 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS (JUN 2010)
I.81 FAR 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)
I.82 FAR 52.232-17 INTEREST (MAY 2014)
I.83 FAR 52.232-22 LIMITATION OF FUNDS (APR 1984)
I.84 FAR 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.85 FAR 52.232-25 PROMPT PAYMENT (JAN 2017) – ALTERNATE I (FEB 2002)
I.86 FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD
MANAGEMENT (JUL 2013)
I.87 FAR 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
I.88 FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
I.89 FAR 52.233-1 DISPUTES (MAY 2014) - ALTERNATE I (DEC 1991)
I.90 FAR 52.233-3 PROTEST AFTER AWARD (AUG 1996) - ALTERNATE I (JUN 1985)
I.91 FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
I.92 FAR 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND
VEGETATION (APR 1984)
I.93 FAR 52.237-3 CONTINUITY OF SERVICES (JAN 1991)
I.94 FAR 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)
I.95 FAR 52.242-3 PENALTIES FOR UNALLOWABLE COSTS (MAY 2014)
I.96 FAR 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)
I.97 FAR 52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
I.98 FAR 52.242-13 BANKRUPTCY (JUL 1995)
I.99 FAR 52.243-2 CHANGES - COST REIMBURSEMENT (AUG 1987) - ALTERNATE II (APR 1984)
I.100 FAR 52.244-2 SUBCONTRACTS (OCT 2010)
I.101 FAR 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)
I.102 FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2017)
I.103 FAR 52.245-1 GOVERNMENT PROPERTY (JAN 2017)
I.104 FAR 52.245-9 USE AND CHARGES (APR 2012)
I.105 FAR 52.246-25 LIMITATION OF LIABILITY - SERVICES (FEB 1997)
I.106 FAR 52.247-1 COMMERCIAL BILL OF LADING NOTATIONS (FEB 2006)
I.107 FAR 52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS (JUN 2003)
I.108 FAR 52.247-64 PREFERENCE FOR PRIVATELY OWNED U.S.-FLAG COMMERCIAL
VESSELS (FEB 2006)
I.109 FAR 52.248-1 VALUE ENGINEERING (OCT 2010)
I.110 FAR 52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004)
I.111 FAR 52.249-14 EXCUSABLE DELAYS (APR 1984)
I.112 FAR 52.251-1 GOVERNMENT SUPPLY SOURCES (APR 2012)
I.113 FAR 52.251-2 INTERAGENCY FLEET MANAGEMENT SYSTEM (IFMS) VEHICLES AND
RELATED SERVICES (JAN 1991)
I.114 FAR 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
I.115 FAR 52.204-1 APPROVAL OF CONTRACT (52.204-1) (DEC 1989)
I.116 FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION
SYSTEMS (JUN 2016)
I.117 FAR 52.216-18 ORDERING (OCT 1995)
I.118 FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)
I.119 FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995)
I.120 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) 57
I.121 RESERVED
I.122 FAR 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR
EPA-DESIGNATED ITEMS (MAY 2008)
I.123 FAR 52.223-11 OZONE-DEPLETING SUBSTANCES (JUN 2016)
I.124 FAR 52.247-67 SUBMISSION OF TRANSPORTATION DOCUMENTS FOR AUDIT (FEB 2006)
I.125 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.126 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
I.127 NFS 1852.203-71 REQUIREMENTS TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS (AUG 2014)
I.128 NFS 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION
TECHNOLOGY RESOURCES (JAN 2011)
I.129 NFS 1852.216-89 ASSIGNMENT AND RELEASE FORMS (AUG 2016)
I.130 NFS 1852.219-75 INDIVIDUAL SUBCONTRACTING REPORTS (APR 2015)
I.131 NFS 1852.219-77 NASA MENTOR-PROTEGE PROGRAM (APR 2015)
I.132 NFS 1852.219-79 MENTOR REQUIREMENTS AND EVALUATION (APR 2015)
I.133 NFS 1852.223-74 DRUG-AND ALCOHOL-FREE WORKFORCE (NOV 2015)
I.134 NFS 1852.227-88 GOVERNMENT-FURNISHED COMPUTER SOFTWARE AND RELATED
TECHNICAL DATA (APR 2015)
I.135 NFS 1852.228-75 MINIMUM INSURANCE COVERAGE (OCT 1988)
I.136 NFS 1852.237-70 EMERGENCY EVACUATION PROCEDURES (DEC 1988)
I.137 NFS 1852.237-72 ACCESS TO SENSITIVE INFORMATION (JUN 2005)
I.138 NFS 1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)
I.139 NFS 1852.242-78 EMERGENCY MEDICAL SERVICES AND EVACUATION (APRIL 2001)
I.140 NFS 1852.243-71 SHARED SAVINGS (MAR 1997)
I.141 NFS 1852.204-75 SECURITY CLASSIFICATION REQUIREMENTS (SEP 1989)
I.142 NFS 1852.216-80 TASK ORDERING PROCEDURE (OCT 1996)
(END OF CLAUSE)
I.143 NFS 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (FEB 2012)
(DEVIATION)
I.144 NFS 1852.239-74 INFORMATION TECHNOLOGY SYSTEM SUPPLY CHAIN RISK
ASSESSMENT (APR 2016) (DEVIATION)
I.145 NFS 1852.215-84 OMBUDSMAN (NOV 2011) – ALTERNATE I (JUNE 2000)
I.146 NFS 1852.235-70 CENTER FOR AEROSPACE INFORMATION (DEC 2006)
I.147 NFS 1852.236-73 HURRICANE PLAN (DEC 1988)
I.148 FAR 52.227-16 ADDITIONAL REQUIREMENTS (JUN 1987)
I.149 FAR 52.223-20 AEROSOLS (JUN 2016)
I.150 FAR 52.223-21 FOAMS (JUN 2016)
I.151 RESERVED
I.152 FAR 52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)
I.153 FAR 52.224-2 PRIVACY ACT (APR 1984)
I.154 FAR 52.223-16 ACQUISITION OF EPEAT® -REGISTERED PERSONAL COMPUTER
PRODUCTS. (OCT 2015)
I.155 FAR 52.210-1 MARKET RESEARCH (APR 2011)
I.156 FAR 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.157 FAR 52.232-1 PAYMENTS (APR 1984)
I.158 FAR 52.243-7 NOTIFICATION OF CHANGES
I.159 FAR 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)
(APR 2012)
I.160 CLAUSES INCORPORATED BY REFERENCE – SECTION I
J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016)
K.1 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)
K.2 FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
K.3 52.209-12 CERTIFICATION REGARDING TAX MATTERS (FEB 2016)
K.4 FAR 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (OCT
2015)
K.5 52.230-7 PROPOSAL DISCLOSURE—COST ACCOUNTING PRACTICE CHANGES (APR 2005)
K.6 NFS 1852.225-72 RESTRICTION ON FUNDING ACTIVITY WITH CHINA REPRESENTATION
(FEB 2012) (DEVIATION)
K.7 NFS 1852.239-73 REVIEW OF THE OFFEROR’S INFORMATION TECHNOLOGY
SYSTEMS SUPPLY CHAIN (APR 2016) (DEVIATION)
L.1 SECTION L PROVISIONS INCORPORATED BY REFERENCE
L.2 FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
L.3 FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE
PLAN (MAR 2015)
L.4 FAR 52.233-2 SERVICE OF PROTEST (SEPT 2006)
L.5 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) ...79
L.6 FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
L.7 NFS 1852.231-71 DETERMINATION OF COMPENSATION REASONABLENESS (APR 2015) ...80
L.8 NFS 1852.245-80 GOVERNMENT PROPERTY MANAGEMENT INFORMATION (JAN 2011)
L.9 NFS 1852.245-81 LIST OF AVAILABLE GOVERNMENT PROPERTY (JAN 2011)
L.10 GSFC 52.215-200 COMMUNICATIONS REGARDING THIS SOLICITATION (JAN 2014)
L.11 GSFC 52.215-201 PROPOSAL PREPARATION—GENERAL INSTRUCTIONS. (APR 2016)
L.12 GSFC 52.215-203 OFFER VOLUME (MAR 2017)
L.13 GSFC 52.215-205 PROPOSAL MARKING AND DELIVERY. (SEPT 2014)
L.14 GSFC 52.215-210 MISSION SUITABILITY VOLUME INSTRUCTIONS (COMPETITIVE). (AUG
2016)
L.15 GSFC 52.215-222 COST VOLUME INSTRUCTIONS. (SEPT 2016)
L.16 GSFC 52.215-230 PAST PERFORMANCE VOLUME. (JUN 2014)
L.17 FAR 52.211-4 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS NOT LISTED IN
THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM
DESCRIPTIONS (JUN 1988)
L.18 NFS 1852.228-80 INSURANCE -- IMMUNITY FROM TORT LIABILITY (SEPTEMBER 2000)
L.20 ORGANIZATIONAL CONFLICTS OF INTEREST DISCLOSURE STATEMENT AND
MITIGATION/AVOIDANCE PLAN
L.21 EXHIBITS AND ENCLOSURES
M.1 GSFC 52.209-300 PROSPECTIVE CONTRACTOR RESPONSIBILITY (JAN 2014)
M.2 GSFC 52.215-310 MISSION SUITABILITY FACTOR. (SEPT 2016)
M.3 GSFC 52.215-322 COST EVALUATION FACTOR. (JUN 2014)
M.4 GSFC 52.215-330 PAST PERFORMANCE EVALUATION FACTOR. (JUN 2014)
M.5 GSFC 52.215-300 SOURCE SELECTION AND EVALUATION FACTORS—GENERAL. (JAN
2014)
SECTION B – SUPPLIES OR SERVICES AND PRICES/COST
B.1 NFS 1852.216-74 ESTIMATED COST AND FIXED FEE (DEC 1991)
The estimated cost is $[To Be Negotiated (TBN) on each individual task order], exclusive of the fixed fee of $(TBN on each individual task order). The total estimated cost and fixed fee is $(TBN on each individual task order).
(End of text)
B.2 NFS 1852.216-78 FIRM FIXED PRICE (DEC 1988)
The total firm fixed price of this contract is $(TBN on each individual task order).
(End of clause)
B.3 NFS 1852.232-81 CONTRACT FUNDING (JUN 1990)
(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $_*_. This allotment is for _*_ and covers the following estimated period of performance: _ *_.
(b) An additional amount of $_*_ is obligated under this contract for payment of fee.
(c) The cumulative amount of funding obligated for payment of cost and fee under this contract is $_*_.
(d) This clause only covers the funding for Cost Reimbursement task orders issued under this contract.
*Funds are currently committed for this award. Initial funds for this award will be obligated via the issuance of the first modification to this contract. Contract performance shall not begin until such time as these funds are obligated.
B.4 RESERVED
B.5 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (JAN 2017)
The Contractor shall provide all resources (except as may be expressly stated in the contract or order as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Statement of Work (SOW), incorporated as Attachment A, and Task Orders issued hereunder.
Item Description Reference Schedule Delivery Method/Addressee(s)
Services and Deliverables in accordance with Attachment A, SOW
As Defined in Attachment A, SOW
As Defined in Attachment A, SOW
As Defined in Attachment A, SOW
Services and Deliverables in accordance with Task Orders Issued and the
SOW
As Defined in Individual Task Orders Issued
As Specified in Individual Task Orders Issued
As Specified in Individual Task Orders Issued
3 Task Plans
Section B
GSFC 52.216-97
Section I
NFS 1852.216-80
As Required in Clause NFS 1852.216-80 Electronic Format
4 Reports of Work
Section C
GSFC 52.235-90
Section H
NFS 1852.235-73
As Required in Clause
GSFC 52.235-90
As specified in Clause
5 Contract Historical Data Section C
GSFC 52.211-91
Attachment M
Within 30 Days after Contracting Officer Request
Electronic Format/CO
6 NASA Financial Management Reports
Section G
GSFC 52.242-90
Section G
NFS 1852.242-73
Attachment H
Monthly and Quarterly in accordance with Attachment H
Electronic Format/ Contracting Officer (CO), Contracting Officer’s Representative (COR), Resource Analyst (RA) & Regional Finance Office
Material Inspection and Receiving Reports
(MIRR)
(DD Form 250)
Section E
NFS 1852.246-72
Section E
GSFC 52.246-94
At Time of Delivery Hard Copy/CO, COR, and Receiving & Inspection
Foreign Travel Requests and Foreign Travel Reports
Section G
NFS 1852.242-71
Foreign Travel Requests–30 days in Advance of Travel Foreign Travel Reports–14 days after Conclusion of Travel
As specified in CO’s travel approval
9 Requests for Government Property
Section G
NFS 1852.245-70
30 Days Prior to Acquisition Date Electronic Format/CO
Financial Report of NASA Property in the Custody of Contractors
(NF 1018)
Section G
NFS 1852.245-73
Annual Report by October 15th and Final Report
NF 1018 Electronic Submission System (NESS)
Supplemental Financial Report of NASA Property in the Custody of Contractors
Section G
GSFC 52.245-99
Monthly By the 21st of each Month and Final Report
Contractor-Held Asset Tracking System (CHATS) at https://chats nasa.gov
Physical Inventory of Capital Personal Property Reporting
Section G
NFS 1852.245-78
Within 10 Days after Annual Physical Inventory
Property Administrator
Contractor Acquired Government Property Reporting
Section G
GSFC 52.245-93
Quarterly by Jan 30, Apr 30, July 30, and Oct 30
Electronic and Hard Copy Format/CO and SEMO, Code 273
14 Reporting of Inventions
Section G
NFS 1852.227-72
Section G
NFS 1852.227-70
Section I
FAR 52.227-11
Interim Reports Every 12 Months (or sooner to preserve Patent Rights) and Final Report within 3 Months after Contract Completion
Electronic or Hard Copy Format/New Technology Representative or Patent Representative
15 Personnel Authorized to Use Motor Pool Vehicles
Section G
GSFC 52.245-91
20 Days in Advance of Use Electronic Format/CO
Small Business Subcontracting Plan Reporting
Section H
GSFC 52.219-90
Section I
NFS 1852.219-75
ISR–Semi-Annual (April 30th and October 30th) and Final SSR–Annual
(October 30th)
Electronic Format/ Electronic Subcontract Reporting System (eSRS) http://www.esrs.gov
17 Safety & Health Reporting
Section H
NFS 1852.223-70
Section H
NFS 1852.223-75
Section H
GSFC 52.223-91
Monthly/Quarterly Reports and As Required
NASA Mishap Information System
(NMIS)
18 NASA Vehicle Reports (GSFC Form 26-5)
Section H
GSFC 52.251-90
Monthly By the 15th of each Month
Electronic Format/CO and Code
19 Federal Automotive Statistical Tool
Section H NFS 1852.223-76 Annually by Oct 15th http://fastweb.inel.gov
Personal Identity Verification (PIV) Documentation and Reporting
Section H
GSFC 52.204-99
Attachment Q
10th Day of the Month and As Required
Electronic Format and Hard Copy/COR & Code 240
21 Reserved
22 Equal Opportunity Reports
Section I
FAR 52.222-26
As Specified by FAR 52.222-26 Electronic Format/CO & Code 120
23 Certificate of Insurance
Section I
FAR 52.228-7
Section I
NFS 1852.228-75
As Specified by NFS 1852.228-75 Electronic Format/CO
24 Subcontract Notification Section I
FAR 52.244-2
30 Days Prior to Subcontract Award Date
Electronic or Hard Copy Format/CO
25 IT Security Management Plan
Section I
NFS 1852.204-76
Within 30 Days after Contract Effective Date & Annual Updates As Required
Electronic Format/CO
26 Service Contract Reporting
Section I
FAR 52.204-15
Annually by October 31 and Revisions, if needed, by November https://www.sam.gov
27 Affirmative Procurement of Biobased Products
Section I
FAR 52.223-2
Annually by October 31 and Final Report https://www.sam.gov and copy to the CO
28 Estimate of Recovered Material Content
Section I
FAR 52.223-9
Upon Contract Completion Electronic Format/CO and COR
29 Reserved
30 Quality Assurance Plan SOW Section 3 Within 60 Days after Contract Effective Date
Electronic Format/CO and COR
31 Reserved
32 Management Plan to cover Multiple Similar Systems
SOW Section 3.3.2 Within 90 Days after Contract Effective Date
Electronic Format/CO and COR
33 Reserved
NOTE: Unless otherwise specified, “day” means “calendar day”.
NOTE: Transportation Classification: Transportation Classifications designations, in accordance with Clause D.1, for deliverables under Item 2 will be specified in each individual task order at the time of task order issuance. Deliverables under Items 3-33, unless specified (electronic format, etc.), are considered Class IV and shall be shipped via the most advantageous commercial transportation means considered to be in the best interest of the Government.
B.6 GSFC 52.216-96 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR SERVICES (COST
REIMBURSEMENT AND FIXED PRICE) (MAR 2015)
(a) The minimum amount of supplies or services that shall be ordered during the effective period of this contract is $2,000,000. The maximum amount of supplies or services that may be ordered during the effective period of this contract is $200,000,000. All orders placed under this contract will be applied to the minimum and maximum specified in this paragraph.
(b) The minimum amount is reached when the sum of all negotiated firm fixed price orders issued for supplies or services together with the dollar amounts of all cost reimbursement orders issued for supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals or exceeds the minimum amount stated in paragraph (a).
(c) The maximum amount is reached when the sum of all negotiated firm fixed price orders issued for supplies or services together with the dollar amounts of all cost reimbursement orders issued for supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals the maximum amount stated in paragraph (a).
(d) The maximum amount, if reached, precludes the issuance of further orders for supplies or services under this contract. However, reaching the maximum amount does not preclude adjustments to the dollar amounts of existing placed orders, for actions that are within the scope of the placed orders, and which are made pursuant to existing contract authority, such as the Changes clause.
(e) The maximum amount may be adjusted unilaterally by the Government on an as needed basis. Historic, current, and/or projected workload requirements will be used to determine the amount of upward adjustment. In no event will the adjusted maximum amount exceed 25% of the original maximum amount.
B.7 GSFC 52.216-97 SUPPLEMENTAL TASK ORDERING PROCEDURES (COST
REIMBURSEMENT AND FIXED PRICE) (MAR 2015)
(a) When the Government issues a request for a “task plan” to the Contractor in accordance with the Clause entitled “Task Ordering Procedure” of this contract, the Contractor shall prepare its estimate of the labor hours, labor categories, indirect costs, and other direct costs required to perform the task order requirements. The Contractor shall use only those appropriate labor and indirect cost rates, which may be less than but shall not exceed the rates found in Attachment C, to calculate the proposed estimated costs for all cost-type task orders and the proposed price for all fixed-price type task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.
(b) The Contractor’s proposed approach/pricing of the representative tasks set forth in its proposal for award of this contract shall be used as reference by the Contracting Officer in negotiating tasks with the Contractor which are issued under this contract, but only to the extent portions of a representative task are relevant to portions of a task actually issued.
(c) The Government and Contractor agree that the fixed fee percentage specified in Attachment C shall be used to calculate the fixed fee dollars on all cost-plus-fixed-fee task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.
(d) The Government and Contractor agree that the profit percentage specified in Attachment C shall be used to calculate the profit dollars on all firm fixed price task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.
B.8 GSFC 52.232-94 ESTIMATED COST INCREASES (DEC 2005)
(a) The Contractor shall notify the Contracting Officer in writing when the Contractor has reason to believe that the total cost for performance of this contract, or any individual task order, exclusive of any fee, will be either greater or substantially less than the total estimated cost stated in this contract or in the task order.
Notification shall not be delayed pending preparation of a proposal.
(b) A proposal is required to support a request for an increase in the estimated cost of the contract or the task order. The proposal should be submitted as soon as possible after the above notification but no later than 115 days before the incurred costs are expected to exceed the estimated cost. This will allow adequate time for the Government to evaluate the proposal and to mutually establish any increase in estimated cost with the Contractor.
(c)(1) The proposal shall be submitted in the following format unless some other format is directed or approved by the Contracting Officer:
Incurred costs to date Projected cost to completion Total cost at completion Current negotiated estimated cost Requested increase in estimated cost
(2) The “projected cost to completion” shall consist of the following “other than cost or pricing data” unless the Contracting Officer requests or approves the submittal of a greater or lesser amount of information:
(i) Elements of cost with supporting detail for estimated direct labor hours, direct and indirect rates, materials and subcontracts, and other elements.
(ii) Supporting explanation for the increases and projections, sufficient for the Government to understand the reasons for the increased estimated cost.
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the Supplies and/or Services To Be Provided clause of this contract in accordance with the Statement of Work, Attachment A; Program Management Plan, Attachment B; Safety and Health Plan, Attachment E; Contract Historical Data, Attachment M; Risk Management Plan, Attachment N; and task orders issued hereunder.
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER SOFTWARE
(MAR 2008)
In accordance with the delivery requirements of this contract, all software data rights shall be delivered in accordance with the Rights in Data – General clause, specified elsewhere in this contract, except for the following: NONE
(End of clause)
C.3 GSFC 52.235-90 REPORTS OF WORK (IDIQ/BPA) (AUG 2013)
(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished covering all Task Orders active during each month of contract performance. Reports shall address the accomplishments and progress of all work performed under each Task Order for the month being reported. Each Task Order shall be a separate report. The report shall be in narrative form and brief in content. The report shall include a description of overall Task Order progress to include technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.
(b) Final Task Order Report. The Contractor shall submit a Final Task Order Report for each completed
Task Order that summarizes the results of the entire Task Order, including recommendations and conclusions based on the experience and results obtained. The Final Task Order Report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to comprehensively explain the results achieved under the Task Order. The final report shall also include the final incurred cost for the Task Order.
(c) Submission. The Contractor shall submit the reports required by this clause as follows:
Copies Report Type Addressee Mail Code 1 M,F Contracting Officer (CO) 210.I 1 M,F Contracting Officer's Representative (COR) 840 1 M,F Task Monitor See Task Order
[M=Monthly Report, F=Final Report]
(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the Task Order is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report for each Task Order shall be submitted within 30 days after completion of the Task Order.
C.4 GSFC 52.211-92 SCOPE OF WORK ADDITIONAL REQUIREMENTS
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
The Contractor shall comply with the following additional requirements:
Internet Protocol version 6 (IPv6)
The Contractor shall ensure that products and services that use the Internet Protocol provide full feature functionality in both dual stack (IPv4 and IPv6) and IPv6-only environments in compliance with National Institute of Standards and Technology (NIST) Special Publication 500-267 (USGv6-V1.0) - A Profile for IPv6 in the U.S. Government – Version 1.0, see http://www-x.antd.nist.gov/usgv6/docs/usgv6-v1.pdf. The Contractor must notify the Contracting Officer of all contract specifications that do not conform with providing full feature functionality for IPv6 and act in accordance with the instructions of the Contracting Officer.
The Contractor shall notify the Contracting Officer if any contract specifications herein do not comply with providing full feature functionality for IPv6.
(End of Text)
SECTION D – PACKAGING AND MARKING
D.1 NFS 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEPT 2005)
(a) The Contractor shall comply with NASA Procedural Requirements (NPR) 6000.1, “Requirements for Packaging, Handling, and Transportation for Aeronautical and Space Systems, Equipment, and Associated Components”, as may be supplemented by the statement of work or specifications of this contract, for all items designated as Class I, II, or III.
(b) The Contractor's packaging, handling, and transportation procedures may be used, in whole or in part, subject to the written approval of the Contracting Officer, provided (1) the Contractor's procedures are not in conflict with any requirements of this contract, and (2) the requirements of this contract shall take precedence in the event of any conflict with the Contractor's procedures.
(c) The Contractor must place the requirements of this clause in all subcontracts for items that will become components of deliverable Class I, II, or III items.
D.2 NFS 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT
(JAN 2011)
a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
SECTION D – PACKAGING AND MARKING
GSFC/Wallops Flight Facility Building 19, Code 200C
Wallops Island, VA 23337
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
SECTION E – INSPECTION AND ACCEPTANCE
E.1 FAR 52.246-5 INSPECTION OF SERVICES – COST-REIMBURSEMENT (APR 1984)
(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or used in performing services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all places and times during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If any of the services performed do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, for no additional fee. When the defects in services cannot be corrected by reperformance, the Government may --
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce any fee payable under the contract to reflect the reduced value of the services performed.
(e) If the Contractor fails to promptly perform the services again or take the action necessary to ensure future performance in conformity with contract requirements, the Government may --
(1) By contract or otherwise, perform the services and reduce any fee payable by an amount that is equitable under the circumstances; or
(2) Terminate the contract for default.
(End of Clause)
E.2 FAR 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
• ANSI/ISO/ASQ Q9001-2000 Quality Management System (QMS) requirements
• CMMI Level II
• 14 CFR Part 135 Operating requirements: Commuter and on demand operations and rules governing persons on board such aircraft
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require—
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
E.3 NFS 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT
(APR 2015)
(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows:
(1) Via mail and marked "Advance Copy", one copy each to the Contracting Officer, the Contracting Officer's Representative (if designated in the contract), and to the cognizant Administrative Contracting Officer, if any.
(2) Via mail, the original and 1 copy (unfolded) to the shipment address (delivery point) specified in Section F of this contract. Mark the exterior of the envelope "CONTAINS DD FORM 250". This must arrive prior to the shipment.
(3) With shipment in waterproof envelope (one copy) for the consignee.
(4) If the shipment address is not directly to the Goddard Space Flight Center (Greenbelt) or Goddard Space Flight Center (Wallops) central receiving areas, then one copy of the DD Form 250 must be provided (via mail) to one on the following addresses depending upon whether this contract is with GSFC Greenbelt or GSFC Wallops:
Receiving and Inspection (Code 279), Goddard Space Flight Center, Greenbelt, MD 20771.
Receiving and Inspection (Bldg. F16), Wallops Flight Facility, Wallops Island VA 23337.
(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement 1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.
(c) When more than one package is involved in a shipment, the Contractor shall list on the DD Form 250, as additional information, the quantity of packages and the package numbers. The Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words “CONTAINS DD FORM 250” on the package.
(End of clause)
E.4 GSFC 52.246-92 ACCEPTANCE—SERVICES (SEP 2013)
The Contracting Officer or authorized representative will accomplish acceptance at the NASA Goddard Space Flight Center’s Wallops Flight Facility or other locations as specified in individual Task Orders issued. For the purpose of this clause, the Contracting Officer's Representative delegated on this contract is the authorized representative. The Contracting Officer reserves the right to unilaterally designate a different Government agent as the authorized representative. The Contractor will be notified by a written notice or by a copy of the delegation of authority if different representative is designated.
E.5 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT NOT REQUIRED
(APR 1989)
NASA FAR Supplement clause 1852.246-72 of this contract requires the furnishing of a Material Inspection and Receiving Report (MIRR) (DD Form 250 series) at the time of each delivery under this contract. However, a MIRR is not required for the following deliverable items:
All technical reports, plans, manuals, progress and financial reports, documents, and lists.
E.6 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.
E.7 FAR 52.246-2 INSPECTION OF SUPPLIES – FIXED-PRICE (AUG 1996)
(a) Definition. Supplies, as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor's or subcontractor's premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.
(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.
(f) The Government has the right either to reject or to require correction of nonconforming supplies.
Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.
(i)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time (i) when Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract and (ii) when the supplies will be ready for Government inspection.
(2) The Governments request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances.
(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract.