Enclosure_5_-_Representative_Task_Order_3.pdf

PDF 37 KB Posted

Attached to
Range Operations Contract II
Solicitation number
NNG17611358R
Issued by

About this file

Enclosure 5 - Representative Task Order 3

View the file

Other files

File Type Posted
ROC_II_Source_Selection_Statement.pdf PDF
NNG17611358R_-_Amendment_1.pdf PDF
ROC_II_RFP_-_Questions_89_through_107.pdf PDF
ROC_II_DRFP_-_Questions_87_through_88.pdf PDF
Enclosure_4_-_Representative_Task_Order_2.pdf PDF
Attachment_O_-_IT_Security_Applicable_Documents_List.pdf PDF
Attachment_S_-_Key_Personnel_and_Qualifications.pdf PDF
Attachment_D_-_IAGP.pdf PDF
Attachment_I_-_Wage_Determinations.pdf PDF
Attachment_M_-_Contract_Historical_Data.pdf PDF
Attachment_A_-_Statement_of_Work.pdf PDF
SF33-14a.pdf PDF
Attachment_Q_-_PIV_Card_Issuance_Procedures.pdf PDF
Enclosure_1_-_IT_Security_Management_Plan_Template.pdf PDF
Attachment_N_-_Risk_Management_Plan.pdf PDF
Attachment_P_-_Contractor_Proposed_Enhancements.pdf PDF
Exhibits_1-16.pdf PDF
Attachment_L_-_OCI_Avoidance_Plan.pdf PDF
Attachment_C_-_Direct_Labor_Rates,_Indirect_Rates_and_Fee_Profit_Matrices.pdf PDF
Enclosure_3_-_Representative_Task_Order_1.pdf PDF
Attachment_B_-_Program_Management_Plan.pdf PDF
Attachment_K_-_DD254.pdf PDF
Enclosure_2_-_ROC_II_QA_Surveillance_Plan.pdf PDF
Attachment_E_-_Safety_and_Health_Plan.pdf PDF
Attachment_J_-_Quality_Assurance_Plan.pdf PDF
RFP_Cover_Letter.pdf PDF
Attachment_H_-_Financial_Management_Reporting_Requirements.pdf PDF
Attachment_R_-_GFP.pdf PDF
Sections_B-M.pdf PDF
Attachment_F_-_Small_Business_Subcontracting_Plan.pdf PDF
Attachment_G_-_IT_Security_Management_Plan.pdf PDF
ROC_II_Site_Visit_Questions_20170828.pdf PDF
ROC_II_Site_Visit_Attendee_List_08282017.pdf PDF
ROC_II_DRFP_-_Questions_74_through_86.pdf PDF
ROC_II_-_Site_Visit_Itinerary_(20170822).pdf PDF
NNG17611358R_-_Site_Visit_Registration_and_Instructions.pdf PDF
NNG17611358R_DRFP_Q59-73.pdf PDF
NNG17611358R_DRFP_Q2-58.pdf PDF
NNG17611358R_DRFP_Q1.pdf PDF
Attachment_G_-_IT_Security_Management_Plan.pdf PDF
Attachment_S_-_Key_Personnel_and_Qualifications.pdf PDF
Sections_B-M.pdf PDF
Attachment_B_-_Program_Management_Plan.pdf PDF
Attachment_H_-_Financial_Management_Reporting_Requirements.pdf PDF
Enclosure_5_-_Representative_Task_Order_3.pdf PDF
Attachment_R_-_GFP.pdf PDF
DRFP_Cover_Letter.pdf PDF
Attachment_N_-_Risk_Management_Plan.pdf PDF
Attachment_J_-_Quality_Assurance_Plan.pdf PDF
Enclosure_2_-_ROC_II_QA_Surveillance_Plan.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure 5

Representative Task Order 3

Wallops Range Operations

Background

The Wallops Research Range routinely supports simultaneous projects. In some cases, these simultaneous projects can strain the existing resources required to meet customer requirements. History has shown that simultaneous demanding projects may require support from the Wallops Research Range in the same time period. This creates the need for creative and innovative staffing approaches, and increases the need for higher quality program and range projects management due to the added risk associated with limited resources.

RTO 3

Under this RTO, the contractor shall provide range systems operations; systems maintenance, personnel training, process improvements and process control services during operations periods; command, control, communications, wide area network communications services, information and computer systems operations; testing, modifying, and installing communications and electronic systems, launch control centers and test facilities required to meet the mission set and deliverables defined in this RTO.

The contractor shall also provide qualified personnel, equipment, tools, materials, vehicles, supervision, and other services to meet the mission set and associated requirements detailed or referenced in this RTO and required to meet the performance metrics defined in the Statement of Work (SOW).

The Period of Performance of this Task is one year with this single year’s support requirements defined in this RTO. It shall be assumed that the mission set below is repeated in each contract year for cost estimation purposes. Below is the Mission Set for the flight projects and systems to be supported and flight/launch/test dates. Note that some missions have multiple dates indicating they occur multiple times within the year period.

Mission Set

Mission: Unmanned Aircraft System (UAS) Missions

July 15, 2019 October 15, 2019 March 15, 2020 May 15, 2020 June 15, 2020

The BAT 4 UAS platform will conduct First Flight testing and Operational Test/ Evaluation Flights originating from Wallops Island (WAL) Airport. The platform will then proceed to R6604 to conduct general and Beyond Visual Range (BVR) operations and testing. Upon completion of testing, the BAT-4 will return to WAL and land.

UAS Flight Operations requirements are as follows:

REQUIREMENT NEED

MOVE communications system Required

Hand-held LMR radios Required

CNE/Guest Wi-Fi access (N-159 and Mobile Operation Station)

Required

Meteorological Balloon Required at 60 minutes prior to take-off for each flight.

Weather brief Required. Weather brief provided at end of day debrief (normal business hours) for next day mission.

Hanger space for UAS Required

Ramp operations area for Mobile Operation Station Required

Access to Runway 04/22 Required

Control Tower Operator Required

Automated Surface Observation System (ASOS) Desired

WFF Crash, Fire, Rescue Required

SureTrak/STING Required

ASR 8 Required

Still Photography Only one day’s worth of photos required. Date picked by ROC Optics department for most feasible/supportive light and weather conditions

Video Required

Projector and screen Required

Printer access Required

R-6604 Airspace Required

Table 1. UAS Flight Operations Requirements

Mission: Patuxent River Naval Air Station Aircraft Operations Support (daily operations)

Patuxent River NAS (Pax River) Atlantic Test Range (ATR) uses airspace and surface target areas for test and evaluation of aircraft and for warfighter training missions. In addition to radar and optical tracking systems, fixed and mobile assets provide the necessary capabilities for diverse testing and training scenarios. ATR has real-time connectivity to NASA Wallops Flight Facility.

For daily Pax River operations support, the following are required:

• 1 telemetry antenna (at minimum) to track aircraft flying offshore of Wallops Island

• Optical tracking systems

• NASCOM support

• Arresting gear (The contractor is not responsible for arresting gear requirements)

• Aircraft fueling services (The contractor is not responsible for Aircraft fueling services)

For special Pax River mission events occurring one per month, the following are required in addition to daily operations requirements:

• 1 radar system (at minimum) to track aircraft

• Optical tracking systems

• Meteorological balloon releases as needed

Mission: Navy Target Operations

January 25, 2020 September 25, 2020

The Fleet Tracking Exercise Aegis Readiness Assessment Vehicle-A mission will test the updated capabilities of the U.S. Navy Aegis Ballistic Missile Defense Program using three Terrier-Orion target vehicles launched nearly simultaneously from the NASA Wallops Flight Facility. The launches will be conducted from the MRL, ARC, and Super HAD launchers on Pad 2 on Wallops Island. During the operation, U.S. Navy vessels will simulate track and intercept for completion of system testing.

Navy Target Operational Requirements are as follows:

• 3 C-band Radars

• 3 Telemetry Antennas

• 2 lift-off Cameras

• 2 tracking Cameras

• Range Communications (MOVE, LMR radios, frequencies for surveillance operations)

• Range Control Center Systems

• RADAC System DQCA or DQCB

• Range Timing

• Frequency Monitoring

• Meteorological Operations (Met balloon launches, forecasts, weather monitoring)

• Launchers on Pad 2 – MRL, ARC, and Super HAD

• Blockhouse 2 firing console

• Test Rocket build-up, loading onto launcher, and launch operation

• Surveillance Systems and Operations (surveillance vessels and aircraft, ASR-8, WISSRDS, STING, Ship Surveillance System)

Note: See SOW Sections 5 through 11 for more information on systems listed above.

Mission: National Weather Service Balloon Soundings (daily operations)

The contractor shall release balloons from Wallops twice daily and acquire data and forward to National Weather Service. Balloons are launched every day at 0000Z and 1200Z. The data acquisition system exists at Wallops.

RTO 3 Task Requirements

The contractor shall develop a task plan to address support of the mission requirements defined in this RTO. The contractor shall use the SOW to aid in development of the task plan.

The task plan shall clearly define risks associated with the operations schedule and mission requirements.

The task plan shall include details of mission support implementation approaches required for these complex missions including management and logistics services required to provide comprehensive range operations services for the entire task.

The task plan shall detail how requirements will be managed and controlled from the identification phase to the implementation phase along with detailed systems support architecture, testing approach, identification and management of issues and risks, and detailed implementation, test, and operations schedules given the launch/flight dates defined in this RTO.

The task plan shall define how maintenance and sustainment of systems will be managed, contingency plans implemented, and how personnel proficiency training and process improvements will be implemented during time periods between mission operations.

The task plan shall include a staffing approach with mitigations as necessary (including subtask leads, roles and responsibilities, reporting structure, and formal reporting process).

The task plan shall include optional approaches based on cost, risk, and other factors.

The task plan shall define how the contractor will meet the quality assurance requirements as defined in SOW Section 3.

The list of required reports, plans, procedures, and other deliverables in support of the RTO requirements is included in the table below. These deliverables are further detailed in the SOW to provide information related to content and purpose. The task plan shall account for the development, review, and approval of below deliverables.

Assumptions:

Travel: $1,000 Materials/ODCs: $100,000

RTO 3 Deliverables:

Deliverable Schedule/Due Format Notes

Range Readiness Review Package For Every Mission (except daily operations)

MS PowerPoint All at L – 2 Weeks

Weekly Activity Report Weekly MSWord Noon on Thursdays

Monthly Status Report and Data Monthly MS PowerPoint By 5th of each month

Post Mission Services Report Two weeks post mission MSWord

Preventative Maintenance Procedures and Data

Upon Request MSWord

Mission Quick Look Data One hour after mission Varies

File details come from the government source that posted it. Updated .