This document is the New Mexico State University (NMSU) Construction Terms and Conditions document, version 3.5.24, which provides comprehensive guidelines for construction and related services contracts. The 30-page document outlines detailed requirements for contractors, including definitions, project management responsibilities, performance expectations, payment processes, safety protocols, bonding and insurance requirements, and specifications for proprietary equipment and materials. The terms apply to construction projects across NMSU's campuses, including the main Las Cruces campus, DACC Community College, and NMSU Satellite Campuses.

The document establishes specific requirements for contractor performance, including mandatory insurance coverage with minimum limits (e.g., $750,000 for bodily injury, $300,000 for medical expenses), performance and payment bonding for contracts exceeding $25,000, and strict guidelines for change orders, work quality, and project completion. Notably, the document includes a detailed list of proprietary items that cannot be substituted, such as specific builders hardware (Yale locks, Von Duprin exit devices), power door operators, fire alarm control panels, and facilities management systems. The terms also mandate compliance with various regulations, including the New Mexico Public Works Minimum Wage Act, Davis-Bacon Act for federally funded projects, and environmental and safety requirements.

View the file

Other versions and copies of TC 3-19

File Revision Posted Attached to
Clean version UGC RL 10.28.25 NMSU-Construction-TC-3-19-24-UGC-Clean-Copy.pdf Oct 28, 2025 5408 Corbett Center HVAC Upgrades
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf Same revision and size as this file Revision not stated Rebid - 4585 Rohovec Building Renovations
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf Same revision and size as this file Revision not stated 5235 Cole Village Demolition
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf Same revision and size as this file Revision not stated 4585 Rohovec Building Renovations
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf Same revision and size as this file Revision not stated 4700 Thomas & Brown Building Replacement
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf Same revision and size as this file Revision not stated 4750 NMDA New Building
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf Same revision and size as this file Revision not stated 4842 Engineering Complex 1 Addition
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf Same revision and size as this file Revision not stated Design Services for Arrowhead Drive Multi-Use Trail
NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf Same revision and size as this file Revision not stated NMSU On-Call Architectural/Engineering Services

Who attaches TC 3-19

State Files
New Mexico 9

Other files

File Type Posted
Evaluation Criteria Updated.pdf PDF
BID Form rev 2.1.2024.pdf PDF
1236533-event.pdf PDF
ADDENDUM 3.pdf PDF
ADDENDUM 2.pdf PDF
Listing+of+Subcontractors rev 1.29.2024.pdf PDF
Addendum 4 Link.html HTML file
ADDENDUM 1.pdf PDF
Addendum 5.pdf PDF
Wage Rates.pdf PDF
NMSU Standard Terms and Conditions UGC 2.21.24.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Terms and Conditions Page 1 of 30 UGCv.3.5.24

NEW MEXICO STATE UNIVERSITY TERMS AND CONDITIONS

FOR CONSTRUCTION AND RELATED SERVICES

1. Applicability. These terms and conditions (Construction Terms and Conditions) apply only to purchases of construction and related services. Terms and conditions that are applicable to all NMSU purchases are in a separate document entitled: New Mexico State University Standard Terms and Conditions. That document is incorporated by reference into these Construction Terms and Conditions.

2. General Provisions:

(a). Definitions:

(1). Addendum or Addenda. A change or changes to the Proposal Requirements issued by the Project Architect prior to proposal due date.

(2). Approved and Directed. Approved and directed by the Project Architect.

(3). “As-Built” Drawings. A set of drawings and specifications that are marked-up by the Contractor to reflect all the changes made to the Work during the term of the Project.

(4). Best, Good, and Proper. The best possible and most workmanlike manner and using the best materials known to the trade.

(5). Change Order. A written order from the Project Architect or RCM to the Contractor issued after execution of the Contract authorizing a change in the Work or an adjustment in the Contract Sum or the Contract Time. In order for a Change Order to be fully executed, it must be signed by Contractor, RCM and the Project Architect, if retained for the Project.

(6). Contract. An Agreement between NMSU and Contractor regarding the Work including Purchase Orders.

(7). Contract Documents. The Purchase Order, all additional documents included by reference therein, and all Addenda and Change Orders. The additional documents may include, but are not limited to: the Contract, Standard Terms and Conditions, these Construction Terms and Conditions, completed Bid Form or Proposal Form, Notice to Proceed, Drawings, and Specifications.

(8). Contract Sum. The dollar amount stated in the Contract, Purchase Order, or that amount as modified by Change Order(s), including the Base Proposal, awarded Proposal Lots, Additive Alternates, and applicable Unit Prices.

Construction Terms and Conditions Page 2 of 30

(9). Contract Time. Unless otherwise provided, the period of time allotted in the Contract Documents from date of Notice to Proceed to Substantial Completion of the Work, including authorized adjustments thereto.

(10). Contractor. The Seller whose proposal is accepted by NMSU and with whom a Contract is entered.

(11). Drawings. All plans, details, sections, elevations, and other drawings under title of this Project.

(12). Furnish. To supply and deliver to the Project site, ready for installation.

(13). Install. To place in position, ready for service or use.

(14). New Mexico Gross Receipts Tax (NMGRT). New Mexico Gross Receipts Tax includes all other applicable local options taxes.

(15). NMSU or Owner. The Regents of New Mexico State University and their agents, representatives and assigns. The term "Owner" may be used in the technical specifications sections of the Contract Documents to mean NMSU.

(16). Notice to Proceed. Written notice to Contractor from the RCM to begin performance of the Work required by the Contract Documents.

(17). Product Data. Illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by Contractor to illustrate materials, product or system for some portion of the Work.

(18). Proposal Documents. Invitation to Bid or Request for Proposals, Advertisement for Bids or Proposals, completed Bid Form or Proposal Form, the Bid or Proposal, and other information that may be provided to facilitate the Invitation to Bid or Request for Proposals.

(19). The Project. Total construction effort related to the Work. The Work may be all or a part of the Project.

(20). Project Architect. A person licensed to practice architecture in New Mexico, or an entity lawfully practicing architecture in New Mexico who is engaged by NMSU as its representative for management of the work. The University Architect may be designated as the Project Architect.

(A). Architect or Engineer. When used alone and without further modification, the term "Architect" means the Project Architect.

Construction Terms and Conditions Page 3 of 30

Frequently in the technical specifications the Architect is referred to as the Engineer. For purpose of project management, the term “Engineer” may also mean the Project Architect.

(21). Provide. To furnish and install, complete and ready for intended use.

(22). RCM. NMSU Representative for Contract Management who is NMSU’s designated representative for management of the Work if no project architect is retained. The RCM will oversee the project architect if a project architect is retained for management of the work. For purposes of these terms and conditions the term Project Architect will mean RCM if a Project Architect is not retained.

(23). Record Documents. Documents compiled by the Architect or other design professional which conform to information furnished to the Architect or other design professional by the Contractor(s) consisting of specifications, drawings, and other data showing field changes and selections made during the term of the Project.

(24). Samples. Physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged.

(25). Shop Drawings. Drawings, diagrams, schedules and other data specially prepared for the Work by Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

(26). Specifications. The written, qualitative requirements for products, materials, and workmanship, as well as written procedural and administrative requirements of the Work. All Sections of the applicable Project Specifications using the Construction Specifications Institute’s MasterFormat (Divisions 1 through Division 49) are Specifications.

(27). Subcontractor. A person or entity that has a direct or indirect contractual relationship with Contractor to perform any of the Work.

(28). Substantial Completion. When the Work, or designated portion thereof, is certified in writing by the Project Architect or RCM as sufficiently complete, in accordance with the Contract Documents, so NMSU can occupy or utilize the Work or designated portion thereof for the intended use.

(29). Substantial Completion Date. The date when Substantial Completion is achieved.

Construction Terms and Conditions Page 4 of 30

(30). University Architect. The person licensed to practice architecture in New Mexico and employed by NMSU as its immediate representative for planning, design, construction and related projects. The University Architect may function as the Project Architect for in-house and other projects.

(31). The Work. The construction and services required by the Contract Documents, whether fully or partially completed and includes all necessary labor, materials, equipment, and services provided or to be provided by the Contractor to fulfill the Contractor’s obligations. The Work may constitute the whole or a part of the Project.

(32). Work Site. The location at which the Work will be delivered.

(b). Miscellaneous

(1). Incorporation of Documents. Notice to Proceed, and the Technical Specification Sections of Divisions 2 through 49, are incorporated herein.

(2). Contradiction with Terms and Conditions. In the event any Contract Document contradicts these Construction Terms and Conditions, these Construction Terms and Conditions will control.

(3). Headings for Convenience. Headings to divisions and paragraphs in the Contract Documents are used solely for convenience and will not be deemed to define or limit the provisions of the Contract Documents.

No responsibility is assumed by NMSU or Project Architect for the omission or duplication made by Contractor or Subcontractors

(4). Drawings and Specifications Complementary and Binding. The Drawings and Specifications complement each other; what is called for by one is as binding as if called for by both. Where conflicting, Specifications take precedence over Drawings and large scale Drawings and Details take precedence over small scale Drawings.

(5). Errors, Omissions, or Inconsistencies. If any error, omission or inconsistency in the Drawings or Specifications is discovered, it must be brought to the attention of the Project Architect immediately for interpretation. In general, in case of any discrepancy, the better quality and larger quantity will be required.

3. Project Architect Responsibilities. The project management will be the responsibility of the Project Architect or the RCM if no project architect is designated.

(a). Project Architect Responsible for Contract Administration. The Project Architect will administer the Contract as described below.

Construction Terms and Conditions Page 5 of 30

(b). Limitations on Project Architect’s Responsibilities. The Project Architect will not be responsible for and will not have control or charge of construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work.

(c). Access to the Work by the Project Architect. The Project Architect must at all times have access to the Work and Work Site.

(d). Certificates for Payment. Based on the Project Architect's observations and an evaluation of Contractor's applications for payment, the Project Architect will make recommendations to the RCM for determination of the amounts owing to Contractor. The RCM will make final determinations of the amount owing and will submit signed Certificates for Payment in the determined amount owing.

(e). Authority of the Project Architect. The Project Architect has the following authority, without limitation:

(1). To interpret the construction requirements;

(2). To reject work which does not conform to the Contract Documents;

(3). To require inspections and tests of the Work; and

(4). To review and approve or take other appropriate action upon Contractor's submittals, such as shop drawings, product data and samples. The Project Architect’s approval only indicates conformance with the design concept of the Work and with the information given in the Contract Documents. The Project Architect's approval of a specific item does not indicate approval of an assembly of which the item is a component.

(f). Change Orders. The Project Architect or RCM will prepare Change Orders in accordance with NMSU policy, and as provided in Section 13 of these Terms and Conditions.

(g). Completion of the Work. The Project Architect will:

(1). Conduct inspections to determine the Substantial Completion Date and the date of final completion;

(2). Receive and forward to the University Architect or RCM, for review, all written warranties and related documents required by the Contract Documents and assembled by Contractor; and

(3). Advise the RCM regarding the issuance of a final Certificate for Payment upon compliance with the requirements as specified in Section 10(e) of these Terms and Conditions.

Construction Terms and Conditions Page 6 of 30

4. NMSU Rights and Responsibilities.

(a). Information and Services Required of NMSU. Information or services under NMSU’s control will be furnished by NMSU with reasonable promptness to avoid delay in the orderly progress of the Work. Unless otherwise provided in the Contract Documents, Contractor will be furnished, free of charge, digital copies of Drawings and Specifications reasonably necessary for the execution of the Work. Normally, NMSU will forward instructions to Contractor through the Project Architect.

(b). NMSU’s Right to Stop the Work. NMSU may, at its sole discretion, by written order direct Contractor to stop the Work, or any portion thereof, if Contractor (1) fails to correct defective Work or, (2) fails to carry out the Work in accordance with the Contract Documents. NMSU is not responsible for stopping the Work under any circumstances.

(c). NMSU’s Right to Carry Out the Work. Within seven (7) days of written notice from NMSU, Contractor must commence correction of any failure to carry out the Work in accordance with the Contract Documents. Contractor will be responsible for the cost of correcting the deficiencies, including but not limited to additional project management cost and the Project Architect's additional services made necessary by the deficiencies.

5. Contractor Responsibilities.

(a). Contractor’s Familiarity with Work Site. Contractor represents he is familiar with the Work Site and local conditions under which the Work is to be performed. Contractor also agrees that the Work Site and local conditions are consistent with the representations in the Contract Documents.

(b). Review of Contract Documents. Contractor must carefully study and compare the Contract Documents and must immediately report to the Project Architect any error, inconsistency or omission it may discover. Contractor will be liable to NMSU for any damage resulting from Contractor’s failure to report any such errors, inconsistencies or omissions in the Contract Documents.

(c). Supervision and Construction Procedures. Contractor will be solely responsible for all construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work. Contractor will be responsible to NMSU for the acts and omissions of its employees, Subcontractors and their agents and employees, and other persons performing any of the Work under a contract with Contractor or with a Subcontractor or supplier. Contractor must have a superintendent on site at all times when the Work is being performed.

Contractor will at all times enforce strict discipline and good order. Contractor is ultimately responsible for the performance of the Work.

Construction Terms and Conditions Page 7 of 30

(d). Labor and Materials. Contractor must provide and pay for all labor, materials, equipment, construction equipment and machinery, and tools necessary for proper execution and completion of the Work.

(e). Workmanship and Materials Standards. Workmanship must conform to industry standards and must be executed by experienced, skilled and competent craftsmen. Materials must be best grade, new or as specified.

(1). Standards. Materials and equipment specified by manufacturer, name or number, will be considered as establishing standards for the Work. No substitute materials or equipment will be used except with prior written approval from the Project Architect. Proposed substitute materials and equipment must be equal in size, grade and quality. The Project Architect, in his sole discretion, will determine suitability of materials and equipment for use in the Work.

(2). Requests for Substitutions of Materials. All requests for approval of substitutions of material, or equipment must be made no later than 45 days after the Notice to Proceed.

(3). Prompt Submission of Drawings, Product Data, and Samples.

Contractor must submit all shop drawings, product data and samples required by the Contract Documents to the Project Architect for approval with reasonable promptness and in such sequence as to not cause a delay in the Project.

(4). Contractor Warrants Supplier and Subcontractor Drawings, Product Data, and Samples. By submitting suppliers' and Subcontractors' shop drawings, product data, and samples to the Project Architect; Contractor warrants that the submittals comply with the requirements of the Contract Documents.

(5). Contractor Responsibilities for Obtaining Project Architect Approval. The Project Architects’ approval of shop drawings, product data or samples will not relieve Contractor of responsibility for any deviation from or revisions to the requirements of the Contract Documents, unless Contractor has specifically informed the Project Architect, in writing, of the deviation or revision at the time of submission and obtained the Project Architect’s written approval of the deviation. This section does not apply to revisions requested by the Project Architect.

(6). Project Architect Approval Prior to Commencing Work. No portion of the Work requiring submission of a shop drawing, product data or sample will be commenced until the submittal has been approved by the Project Architect.

Construction Terms and Conditions Page 8 of 30

(f). Warrantees and Guarantees.

(1). Workmanship Warranty and Materials Guarantee. The Work will be warranted and guaranteed against faulty materials and workmanship for a period of not less than one year from date of Substantial Completion of the Work. Contractor will require all of its suppliers and Subcontractors to provide to NMSU at least a one-year workmanship warranty and materials guarantee. All other warranty and guarantees required by the Contract Documents are in addition to the workmanship warranty and materials guarantee. No other Contract Document can reduce or eliminate the warranty and guarantee requirements contained in this section.

(2). Equipment. Equipment incorporated into the Work must bear the manufacturer's standard warranty. Upon acceptance of the Work, all brochures, manuals, and operating procedures of equipment incorporated into the Work will be provided to NMSU.

(3). Roofing. Unless specified for a longer time period, roofing must have a no-dollar limit manufacturer's warranty for at least ten (10) years.

Contractor or its roofing Subcontractor must be approved by the manufacturer to install the roofing system.

(4). Carpet. Unless specified for a longer time period, carpet must have at least a ten (10) year manufacturer's warranty.

(g). Manufacturer's Directions. All manufactured articles, materials and equipment must be applied, installed, connected, erected, used, cleaned and conditioned as directed by manufacturer unless otherwise specified, or directed by the Project Architect.

(h). Defective Performance. All Work not conforming to the Contract Documents, including substitutions not properly approved and authorized, may be considered defective.

(i). Permits, Fees and Notices.

(1). Contractor Responsibility for Permits and Fees. Unless otherwise provided in the Contract Documents, Contractor will secure and pay for all permits and governmental fees, licenses and inspections necessary for the proper execution and completion of the Work.

(2). Contractor Compliance. Contractor must give all required notices and otherwise comply with all laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the performance of the Work.

Construction Terms and Conditions Page 9 of 30

(3). Contractor Responsibility for Contract’s Compliance. It is the responsibility of Contractor to make certain that the Contract Documents are in accordance with applicable laws, statutes, building codes and regulations. If Contractor believes the proposed Work would be in violation of any applicable laws, statutes, building codes and regulations, Contractor must promptly notify the Project Architect in writing, and any necessary changes must be accomplished by appropriate modification. If the Project Architect determines that the proposed Work would not violate any applicable laws, statutes, building codes or regulations, Contractor must continue performance of the Work in accordance with the Contract Documents.

(4). Contractor Responsibility for Work Not in Compliance. If Contractor performs any work that violates any applicable laws, ordinances, rules and regulations, Contractor will assume full responsibility therefore and will bear all costs attributable thereto.

(5). Testing and Sampling Fees. The Fees for testing and sampling of concrete, soil and Special Testing required by IBC, Chapter 17, are the responsibility of NMSU.

(j). Wage Rates.

(1). Public Works Minimum Wage Act. For any project exceeding $60,000 in total costs before taxes, including all Change Orders, the New Mexico Public Works Minimum Wage Act, §13-4-10 through §13-4-17 NMSA 1978, requires all contractors and subcontractors to pay wages in compliance with the Act and to be registered with the Labor and Industrial Division of the New Mexico Department of Labor.

(2). Davis-Bacon and Related Acts. For any project that is paid for with federal funds in excess of $2,000 the Davis-Bacon Act, 40 U.S.C. 3141 et seq., requires that contractors and subcontractors pay laborers and mechanics employed on the project no less than the locally prevailing wage and fringe benefits for corresponding work on similar projects in the area, as determined from time to time by the U.S. Department of Labor. Related acts apply these provisions to federally funded or federally assisted construction. These “related acts” include, but are not limited to, the Federal-Aid Highway Acts, the Housing and Community Development Act of 1974, and the Federal Water Pollution Control Act.

(3). United States Executive Order 13658, Minimum Wage. This paragraph j(3) applies if the Project is funded with federal funds.

Executive Order 13658, Minimum Wage, established a minimum wage for Contractors and Subcontractors. The amount of the minimum hourly wage changes annually. The current amount and any exclusions from

Construction Terms and Conditions Page 10 of 30 the applicability of this requirement are available from the U.S.

Department of Labor Wage and Hour Division.

(k). Superintendent. Contractor must employ a competent superintendent and necessary assistants who will be in attendance at the Project site during the progress of the Work. The superintendent will represent Contractor and all communications given to the superintendent will be as binding as if given to Contractor. Contractor must maintain a written log of all substantive communication regarding the Work.

(l). Schedule of Values. Contractor, within ten (10) days of the date of Notice to Proceed, must submit to the Project Architect a schedule of values. The schedule details the amount allocated to each portion of the Work. The Project Architect may specify the format of the schedule and nature of the data used to substantiate its accuracy. An updated schedule must accompany Contractor's applications for payment, with columns showing the following for each portion of the Work: 1) scheduled value, 2) amounts included from prior applications for payment, 3) work in place, 4) stored materials, 5) total stored and completed to date, 6) percentage completed, and 7) balance to finish. The Schedule of Values must also include a line item for Contract closeout requirements.

(m). Contract Closeout Requirements. Unless otherwise agreed between the RCM and Contractor, the Contract closeout requirement line item will be three (3%) percent of the total Contract Sum, excluding taxes. Additionally, NMSU will have the right to add additional items to the schedule of values.

(n). Documents and Samples at the Work Site. Contractor must maintain at the Work Site one copy of all Record Documents, addenda, approved shop drawings, product data, samples, Change Orders, and other modifications in good order and kept current to record all changes made during construction. These records must be available to NMSU during the term of the Work. A legible copy of “As-Built” Drawings must be delivered to the Project Architect upon Substantial Completion.

(o). Use of Work Site. Contractor must confine operations at the Work Site to areas permitted by law, ordinances, permits and the Contract Documents. The Work Site must be maintained in a manner as to facilitate orderly completion of the Work.

(p). Work Site Responsibilities of Contractor. Contractor will hold NMSU harmless from damage from trespassing on property of others.

(q). Damage to NMSU’s Work or Property. Should Contractor cause damage to the Project, any property of NMSU or anyone else’s property, Contractor must promptly remedy such damage at its own expense.

Construction Terms and Conditions Page 11 of 30

(r). Cutting and Patching of Work. Unless otherwise specified, Contractor will be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly. Contractor must receive written approval from Project Architect prior to cutting or patching any NMSU property.

(s). Cleanup. Contractor at all times must keep the Work Site free from accumulation of waste materials or rubbish. Upon completion of the Work Contractor must remove the waste materials, rubbish, tools, construction equipment, machinery and surplus materials from the Work Site. Any waste materials and rubbish defined as hazardous or with specific disposal requirements must be disposed of in accordance with the applicable laws, ordinances or regulations. If Contractor fails to clean up at completion of the Work, NMSU may do so and Contractor will be responsible for the cost of cleanup. Contractor, at its expense, must properly dispose of all clean, uncontaminated soils excavated and not reused for the Work.

(t). Utility Location and Shutoff.

(1). Utility Location. Contractor must comply with the requirements of §62-14-1 et. seq. NMSA 1978; regarding the location, excavation and protection of utilities. Responsibilities for the location of existing utilities, their protection, and repair of damaged utilities will be assigned in accordance with §62-14-1 et. seq. NMSA 1978. The New Mexico One Call number to request location of utilities is 1-800-321-2357 or 811.

(2). Scheduling Disruptive Activities. Contractor must submit to the Project Architect a written request to schedule construction activities which require interruption of any power, water, sewer, natural gas, steam, chilled water, vacuum, compressed air, HVAC, security systems, fire alarms or suppression, or which will impede pedestrian traffic, emergency egress, or vehicle access of any kind (collectively Disruptive Activities). Unless a longer time period for notification of request is required by the Contract Documents, Contractor must submit its written request not less than twenty-one (21) days before any Disruptive Activities. Contractor's request for approval of Disruptive Activities must state the nature of the task, the anticipated duration of the activity, and the impact the Disruptive Activities will have on adjacent facilities and users. Written approval of the Project Architect must be received prior to commencement of any Disruptive Activities.

(3). Utility Shutoff and Resumption by NMSU Personnel. Unless otherwise instructed in writing by the Project Architect, the actual closing and opening of valves and switches for shutoff and reconnection of utilities and services must be performed by NMSU Facilities and

Construction Terms and Conditions Page 12 of 30

Services personnel. Contractor will be solely responsible for all damages associated with unauthorized opening and closing of valves and switches.

(u). Communications. Contractor must forward all communications to NMSU through the Project Architect. Contractor may respond directly to requests from Procurement Services, the University Architect and the RCM.

(v). Royalties and Infringements. Contractor will pay all royalties and license fees. Contractor will indemnify and hold harmless NMSU and its agents and employees from and against all claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from violation of any intellectual property right.

(w). Indemnification. Contractor will indemnify and hold harmless NMSU and its agents and employees from and against all claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from the performance of the Work. Such obligation will not be construed to negate, abridge, or otherwise reduce any other right or obligation of indemnity, which would otherwise exist as to any party or person, described in the Contract Documents. Any and all liability of NMSU arising from the Contract Documents, the Work, or the Project, including any obligation to indemnify Contractor, is subject to the immunities and limitation of the Tort Claims Act, §41-40-1 et. seq.

NMSA 1978, and any amendments thereto.

6. Subcontractor Responsibilities.

(a). Requirement for Written Agreement. All Subcontractors must enter into a written agreement with Contractor providing for the performance of the Work to be performed. That agreement must incorporate by reference the Contract Documents and must require the Subcontractor to comply with the Contract Documents. All Subcontractors must incorporate the Contract Documents and their agreement with Contractor into any further subcontract.

(b). Subcontractors Fair Practices Act. If Contractor wants to perform the Work instead of a listed Subcontractor, to add a Subcontractor, or to replace a listed Subcontractor, NMSU must give prior written consent to the substitution in accordance with the Subcontractors Fair Practices Act, §13-4-31 to §13-4-42 NMSA 1978. Requests for consent of NMSU to substitute Subcontractors, or to perform in-house work of a Subcontractor, or supplement a Subcontractor must be submitted to the NMSU Director of Procurement Services, New Mexico State University, Box 30001, MSC 3890, Las Cruces, New Mexico 88003-0001. All costs, including attorney’s fees, incurred by NMSU because of Contractor's failure to comply with the Subcontractors Fair Practices Act will be paid by Contractor, and may be deducted from any amount due.

7. Work by NMSU or by Other Contractors.

Construction Terms and Conditions Page 13 of 30

(a). NMSU Right To Perform Work And To Award Separate Contracts. NMSU reserves the right to perform work related to the Project with its own forces, or to award separate contracts in connection with other portions of the Project or other work on the site under these or similar conditions of the Contract Documents.

NMSU will provide for the coordination of the work of its own forces and of each other contractor. Contractor must cooperate with NMSU and with all other contractors with whom NMSU may have contracted.

(b). Mutual Responsibility.

(1). Space for Work and for Materials. Contractor will afford NMSU and other contractors reasonable space for the introduction and storage of their materials and equipment and the execution of the Project.

Contractor will connect and coordinate its Work with all other work on the Project. NMSU will not be liable for off-site storage space.

(2). Coordination of Work. If any part of Contractor's Work depends upon proper execution or results of the work of NMSU or of any other contractor, Contractor must, prior to proceeding with the Work, promptly report to the Project Architect or RCM any apparent discrepancies or defects in such other work that render it unsuitable. Failure of Contractor to report discrepancies or defects will constitute an acceptance of NMSU’s or any other contractors' work as fit and proper to receive its work except as to defects which may subsequently become apparent in such work by others.

(3). Improperly Scheduled Work. Any cost caused by improperly scheduled work will be borne by the party that improperly scheduled the work.

(4). Damage to NMSU’s Work or Property. Contractor is responsible for all damage to the Work, and property of NMSU caused by Contractor.

8. Miscellaneous Provisions.

(a). Prompt Payment Act. Contractor and its subcontractors must comply with all applicable provisions of the Prompt Payment Act, §57-28-1 to §57-28-11 NMSA 1978, including without limitation payment provisions therein and must ensure that their construction contracts comport with the provisions of the Act.

(b). New Mexico Gross Receipts Taxes. Contractor will be required to pay applicable New Mexico Gross Receipts Tax. NMSU will reimburse Contractor for New Mexico Gross Receipts Tax on amounts due Contractor pursuant to the Contract Documents. New Mexico Gross Receipts Tax must be shown as a separate amount on each billing or request for payment.

(c). Equal Employment Opportunities. Section A 7 regarding equal employment opportunities applies to Contractor and Subcontractors at any tier.

Construction Terms and Conditions Page 14 of 30

(d). Prohibition of Assignment. Contractor may not assign the Contract in whole or in part. Contractor may not assign any monies due or to become due to it under the Contract Documents.

(e). Written Notice. All notices to NMSU must be given to the RCM in writing and must be sent by certified mail, return receipt requested, postage prepaid, overnight currier, fax, or email.

(f). Default by Contractor. If Contractor defaults or breaches the terms of the Contract Documents, Contractor must commence and continue correction of such default or breach with diligence and promptness, but in no case later than seven

(7) days after written notice from the RCM of the default or breach. Contractor must bear the cost, including architectural fees, of correcting any default or breach. If Contractor fails to remedy breach from the first seven days’ notice from NMSU, NMSU will issue a second seven (7) day notice. If Contractor fails to remedy the default or breach following the second seven day notice the Contractor may be removed from the Work and will be responsible for all cost incurred by NMSU to finish the Work.

(g). Rights and Remedies.

(1). Rights and Remedies Not Limited by Contract Documents. The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder will be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law.

(2). No Waiver of Rights except by Specific Writing. No action or failure to act by NMSU or Project Architect will constitute a waiver of any right or duty afforded them under the Contract Documents.

(3). Attorney Fees in Event of Default or Violation by Contractor. In the event that Contractor is in default of the Contract Documents, Contractor agrees to pay reasonable attorney's fees and expenses so incurred by

NMSU.

(h). Liquidated Damages as a Result of Delay by Contractor. Parties to this Contract acknowledge that it is difficult to determine actual damages, should Contractor fail to perform by the date(s) specified in the Contract Documents.

Parties further agree that the amount specified for liquidated damages is not unreasonable, nor punitive in nature.

(i). Tests and Inspections.

(1). Cost of Tests and Inspections; Notice to Project Architect. If the Contract Documents, the laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any portion of the Work to be inspected, tested or approved, Contractor must give the Project

Construction Terms and Conditions Page 15 of 30

Architect timely notice of its readiness so the Project Architect may observe such inspection, testing or approval. Contractor will bear all costs of such inspections, tests, or approvals.

(2). Right of Project Architect to Require Inspection or Testing. If the Project Architect determines that any work requires special inspection, testing, or approval, he will, upon written authorization from NMSU, instruct Contractor to order such special inspection, testing or approval, and Contractor must give timely notice of the special inspection, testing or approval. If such special inspection or testing reveals a failure of the work to comply with the requirements of the Contract Documents, Contractor will bear all costs of special inspection, testing, or approval and all remedial measures, including Project Architect fees made necessary by such failure; otherwise NMSU will bear such costs of the special inspection, testing, or approval, and an appropriate Change Order will be issued.

(3). Certificates of Inspection or Testing. Required certificates of inspection, testing or approval must be secured by Contractor and promptly delivered to the Project Architect.

(4). Right of Project Architect to Observe. The Project Architect may from time to time observe the inspections, tests or approvals required by the Contract Documents.

9. Commencement and Progress.

(a). Time of the Essence. All time limits stated in the Contract Documents are of the essence.

(b). Date of Commencement. Work must commence not later than ten (10) days after the date of the Notice to Proceed.

(c). Delays and Extensions of Time.

(1). Delay Not Caused by Contractor. If Contractor is delayed by any causes beyond Contractor's control, then the Contract Time may be extended by Change Order for such reasonable time as NMSU may determine. Time to obtain a permit is not considered beyond Contractors control.

(2). Claim for Extension of Time. The Contractor must submit a written claim requesting an extension of the Contract Time to the Project Architect within twenty (20) days of the commencement of the delay.

The claim must include an estimate of the probable effect of the delay on the Work.

Construction Terms and Conditions Page 16 of 30

(3). Recovery of Damages Caused by Delay Not Limited. This Section does not preclude the recovery of damages for delay under any other provisions of the Contract Documents.

10. Payments and Completion.

(a). Contract Sum. The Contract Sum stated in the NMSU Purchase Order, including all Change Orders, is the maximum amount payable by NMSU for the performance of the Work.

(b). Applications for Payment.

(1). Submission of Applications for Payment. Contractor will submit to the Project Architect a notarized application for payment. Each application for payment must be supported by the current schedule of values statement and such other data substantiating Contractor's right to payment as or the Project Architect may require.

(2). Period of Work. The period of work covered by each application for payment is the calendar month within which the application for payment is made. Application for payment should be received on or before the twenty-fifth (25th) day of the period of work, and the progress payment will be made within 21 days thereafter in accordance with the Prompt Payment Act, §57-28-1 to §57-28-11 NMSA 1978.

(3). Payment for Materials or Equipment not yet Incorporated in the Work. With advance written approval of the Project Architect, payment will be made for materials or equipment not yet incorporated in the Work but delivered and suitably stored at the Work Site or other approved location. Payments for materials or equipment stored on the Work Site will be conditioned upon submission by Contractor of manufacture or suppliers’ invoice or such other procedures satisfactory to NMSU to establish NMSU title and access to such materials or equipment or otherwise protect NMSU’s interest. Payments for materials or equipment stored off-site will only be made to Contractor if a Financing Statement and Security Agreement approved by NMSU is properly signed and filed. NMSU may impose other conditions it determines appropriate prior to payment.

(4). Warranty of Clear Title. Contractor must warrant that title to all Work, materials and equipment covered by an application for payment will pass to NMSU, free and clear of all liens, claims, security interests or encumbrances, either by incorporation in the construction or upon the receipt of payment by Contractor, whichever occurs first.

(5). Certificates for Payment. The Project Architect will, after the receipt of Contractor's application for payment, make recommendations

Construction Terms and Conditions Page 17 of 30 to the RCM for determination of the amounts due Contractor. NMSU will either issue a Certificate for Payment, with a copy to Contractor, for the amount the RCM determines is due, or notify Contractor in writing of the reasons for withholding a Certificate for Payment. NMSU’s determination is final. By issuing a Certificate for Payment, NMSU does not represent that the Project Architect has: made exhaustive or continuous on-site inspections, reviewed the construction means, methods, techniques, sequences or procedures, or made any examination to ascertain how or for what purpose Contractor has used the monies previously paid.

(6). Certificates Withheld. The RCM may decline to certify payment or, because of subsequently discovered evidence or subsequent observations, with recommendations of the Project Architect he may nullify the whole or any part of any Certificate for Payment previously issued, to the extent as may be necessary in his opinion to protect NMSU from loss because of: (1) defective work not remedied; (2) third-party claims filed or reasonable evidence indicating probable filing of such claims; (3) failure of Contractor to make payments properly to Subcontractors for labor, materials or equipment; (4) reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum; (5) damage to NMSU or another contractor;

(6) reasonable evidence that the Work will not be completed within the Contract Time, (7) persistent failure to carry out the Work in accordance with the Contract Documents; or (8) any other condition or event which may cause loss to NMSU. NMSU may make partial payment to Contractor.

(7). Timely Payment of Employees and Subcontractors. Contractor must timely pay Subcontractors and laborers. Contractor must, by an appropriate agreement with each Subcontractor, require each Subcontractor to make payments to its laborers, subcontractors at any tier, and suppliers, in similar manner pursuant to Subcontractors Fair Practices Act.

(8). Joint Checks. NMSU, in its sole discretion, may issue joint checks to a governmental agency, the courts, Subcontractors, or suppliers.

(9). NMSU Payment Responsibility Limited to Contractor. NMSU will have no obligation to pay or to see to the payment of any monies to any individuals, laborers, Subcontractors, suppliers, or any entity entitled to payment, except Contractor.

(10). Information to Subcontractors. The Project Architect, RCM or both may, on request and at its discretion, furnish to any Subcontractor, if practicable, information regarding the percentages of completion or the amounts applied for by Contractor and the action taken thereon by the

Construction Terms and Conditions Page 18 of 30

Project Architect on account of work done by such Subcontractor.

(11). Progress Payment Not Acceptance of Work. No certificate for a progress payment, nor any progress payment, nor any partial or entire use or occupancy of the Project by NMSU, will constitute an acceptance of any work not in accordance with Contract Documents.

(c). Substantial Completion.

(1). Inspection by Project Architect Required. When Contractor believes Substantially Complete has been achieved Contractor must call for an inspection by the Project Architect.

(2). Certificate of Substantial Completion. When the Project Architect determines that Substantial Completion has been achieved, the Project Architect will prepare a Certificate of Substantial Completion and a punch list of items to be completed or corrected. The Certificate of Substantial Completion must be submitted to RCM and Contractor for their written acceptance of the responsibilities assigned to them.

Substantial Completion is not effective until accepted in writing from the

RCM.

(3). Omissions by Project Architect. The Project Architect's omission of any items on Substantial Completion punch list will not alter the responsibility of Contractor to complete all work in accordance with the Contract Documents.

(4). Responsibilities at Substantial Completion. At the sole discretion of NMSU the Project Architect may state in writing the responsibilities of NMSU and Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance, and will fix the time within which Contractor must complete or correct the items listed on the punch list.

(5). Effective Date of Warranties. Warranties required by the Contract Documents will commence on the Date of Substantial Completion unless otherwise provided in the Certificate of Substantial Completion or contract change order.

(6). Payment for Substantial Completion. Upon Substantial Completion and upon application by Contractor and certification by the RCM, NMSU will make payment to Contractor.

(d). Application For Final Payment. Contractor must submit a final application for payment upon completion of the Project including all punch list items and delivery of all warranties and closeout documents to NMSU, including: (1) release of liens, (2) warranties, (3) operation and maintenance manuals, (4) release of surety, and (5) as-built or record documents to the Project Architect.

The final application must be reviewed by the Project Architect and must contain

Construction Terms and Conditions Page 19 of 30 a certification of accuracy of the final application. Contractor understands and agrees that NMSU from time to time may require Contractor to furnish additional closeout documents. NMSU will be entitled to hold the final payments until closeout document have been presented to NMSU.

(e). Final Completion and Payment.

(1). Final Inspection by Project Architect Required. Contractor must give written notice to the Project Architect when the Work is ready for final inspection. When the Project Architect finds the Work acceptable under the Contract Documents and the Contract fully performed, the Project Architect will promptly advise the RCM to issue a final Certificate for Payment.

(2). Contractor Requirements to Receive Final Payment. The final payment will not become due until Contractor submits through the Project Architect: (A) an affidavit that all payrolls, bills for materials and equipment, and other indebtedness connected with the Work have been paid or otherwise satisfied, and (B) other data establishing payment or satisfaction of all other contract obligations, such as receipts, release and waivers of liens and release of surety arising out of the Contract, to the extent and in such form as may be designated by NMSU. NMSU at its discretion may require releases of lien or waiver from Subcontractors.

If any Subcontractor refuses to furnish a release or waiver, Contractor may furnish a bond satisfactory to NMSU to indemnify it against any claims by the Subcontractor. If any Subcontractor claims remains unsatisfied after all payments are made by NMSU to the Contractor, Contractor must refund to NMSU all monies that NMSU may be compelled to pay in discharging the Subcontractor’s claim including all costs and reasonable attorneys' fees.

(3). Effect of Final Payment on Contractor Claims. The acceptance of final payment will constitute a waiver of all claims by Contractor except those previously made in writing and identified by Contractor as unsettled at the time of the final application for Payment.

11. Protection of Persons and Property.

(a). Safety Precautions and Safety Education Programs. Contractor will be responsible for initiating, maintaining and supervising all safety precautions and safety education programs in connection with the Work.

(b). Safety of Persons and Property.

(1). Safety Precautions. Contractor must take all reasonable precautions for the safety of, and must provide all reasonable protection to prevent damage, injury or loss to: (A) all employees on the Work and all other

Construction Terms and Conditions Page 20 of 30 persons who may be affected; (B) all work and all materials and equipment to be incorporated therein, whether in storage on or off the site, under the care, custody or control of Contractor or anyone directly contracting with, or indirectly employed by Contractor, and (C) other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction.

(2). Safety Compliance and Notices. Contractor must give all required notices and comply with all applicable laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the safety of persons or property or their protection from damage, injury or loss.

(3). Safeguards and Signage. Contractor must erect and maintain, as required by existing conditions and progress of the Work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations, and notifying NMSU and users of adjacent utilities.

(4). Use of Specialized Equipment. When the use of specialized lifting equipment (aerial lifts, cranes, scaffolds, platforms, etc.), is used for the execution of work and could potentially affect or create a hazard to NMSU property outside the construction zone, Contractor must first notify the NMSU Environmental Health and Safety Officer by contacting the RCM.

(5). Use and Storage of Hazardous Materials. When the use or storage of hazardous materials is necessary for the execution of the Work, Contractor must exercise the utmost care and must carry on such activities under the supervision of properly qualified personnel. When using or storing hazardous materials at jobsite, Contractor must first notify the NMSU Environmental Health and Safety Officer by contacting the RCM.

(6). Site Safety Coordinator. Contractor must designate a responsible member of its organization at the site whose duty will be the prevention of accidents.

(7). Safety in Loading NMSU Property with Materials. Contractor must not load or permit any part of the Work or other NMSU property to be loaded so as to endanger its safety. This includes, but is not limited to, the placement of roofing materials on roofs. All materials must be distributed in such a manner so as to prevent overloading of the designed capacity of the supporting element(s).

(c). Safety and Environmental Requirements.

Construction Terms and Conditions Page 21 of 30

(1). Compliance with Safety Requirements. Contractor will provide for the safety of workers, NMSU personnel, and the public. Contractor must comply with the requirements of regulating agencies for public health and safety, the Occupational Safety and Health Administration's…