Addendum 5.pdf
PDF 669 KB Posted
- Solicitation number
- 2024-RFP-589
- Issued by
- New Mexico
About this file
This document is a Substitution Request Form for the New Mexico State University O'Donnell Hall HSS 590 Additions/Renovations project located in Las Cruces, New Mexico. Southwest Building Resource, represented by Marty Pribble, is requesting to substitute the specified TPO Roofing product with Elevate Ultraply TPO by Holcim, Platinum 80 mil model. The substitution request indicates multiple previous installations of similar roofing materials at NMSU over the past 10+ years.
The substitution request includes certification that the proposed product is equal or superior to the specified product, will maintain the same warranty, has available replacement parts, will not affect project scheduling, and includes complete cost data. The Architect and Construction Manager, Mark Wade, approved the substitution request on 7/16/2024, with instructions to make submittals in accordance with Division 1. No changes to contract time or savings to the owner were noted in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NMSU Construction TC 3-19-24 UGC -- Clean Copy.pdf | ||
| Evaluation Criteria Updated.pdf | ||
| BID Form rev 2.1.2024.pdf | ||
| 1236533-event.pdf | ||
| ADDENDUM 3.pdf | ||
| ADDENDUM 2.pdf | ||
| Listing+of+Subcontractors rev 1.29.2024.pdf | ||
| Addendum 4 Link.html | HTML file | |
| ADDENDUM 1.pdf | ||
| Wage Rates.pdf | ||
| NMSU Standard Terms and Conditions UGC 2.21.24.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .