Total NKAK 17-1101B+1-4)
| AIRFIELD PAVEMENTS SYSTEM IDIQ | |||
| Project: | NKAK 11-1101(1-4) Basic + 4 Option Years | ||
| Project | Section B Total | Pages | |
| Base Year | NKAK 17-1101 | 3 | |
| Option Year 1 | NKAK 17-1101-1 | 3 | |
| Option Year 2 | NKAK 117-1101-2 | 3 | |
| Option Year 3 | NKAK 17-1101-3 | 3 | |
| Option Year 4 | NKAK 17-1101-4 | 3 | |
| TOTAL | 15 |
&C&"Times New Roman,Bold"&11FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104&R
Solicitation No.: FA446019RA004 &LAttachment 2 Schedule B Overall Total 18 Jan 2019
&C&"Times New Roman,Bold"&11
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
Base Year NKAK 17-1101
| AIRFIELD PAVEMENTS SYSTEMS | ||||||
| BASE YEAR | ||||||
| (28 Jun 2019 - 27 Jun 2020) | ||||||
| ALL LINE ITEMS MUST FILLED IN TO BE CONSIDERED RESPONSIVE | ||||||
| PRIMARY | EST | |||||
| ITEM | SUPPLIES/SERVICES | SPEC | QTY | UNIT | UNIT PRICE | AMOUNT |
| 0001 | FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 17-1101 | |||||
| 0001AA | GIS AND AS-BUILT | 01 11 00 & 01 33 00 | 2 | EA | $0.00 | |
| 0001AB | DOWNTIME | 01 14 19 | 5 | HR | $0.00 | |
| 0001AC | ROCK EXCAVATION | 01 50 00 | 30 | CY | $0.00 | |
| 0001AD | ADEQ NOTICE OF INTENT PERMIT FEE | 01 57 23 | 2 | EA | $0.00 | |
| 0001AE | STORMWATER POLLUTION PREVENTION PLAN | 01 57 23 | 2 | EA | $0.00 | |
| 0001AF | SILT FENCE BARRIER | 01 57 23 | 2000 | LF | $0.00 | |
| 0001AG | COARSE ROCK DITCH CHECK | 01 57 23 | 20 | CY | $0.00 | |
| 0001AH | ASPHALT REMOVAL | 02 60 00 | 200 | SY | $0.00 | |
| 0001AI | 2" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 0001AJ | 4" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 0001AK | FRICTION TEST | 32 01 11 | 2 | EA | $0.00 | |
| 0001AL | RUBBER REMOVAL | 32 01 12 | 250000 | SF | $0.00 | |
| 0001AM | PAINT REMOVAL | 32 01 12 | 10000 | SF | $0.00 | |
| 0001AN | CONCRETE REPAIRS, LAYOUT | 32 01 15 | 2 | EA | $0.00 | |
| 0001AO | REMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 15 | 1300 | CY | $0.00 | |
| 0001AP | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 6000 | SF | $0.00 | |
| 0001AQ | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 7000 | SF | $0.00 | |
| 0001AR | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 1500 | SF | $0.00 | |
| 0001AS | NEW 1-1/4” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 0001AT | NEW 1-1/2” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 0001AU | NEW 2” X 24” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 0001AV | REINFORCEMENT / TIE BAR (#5 BAR) | 32 01 15 | 350 | LF | $0.00 | |
| 0001AW | FULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO | 32 01 15 | 200 | SF | $0.00 | |
| 0001AX | CONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR | 32 01 15 | 1800 | SF | $0.00 | |
| 0001AY | CONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL | 32 01 15 | 300 | SF | $0.00 | |
| 0001AZ | COLD MILLING ASPHALT PVMTS | 32 01 16 | 10000 | SY | $0.00 | |
| 0001BA | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS | 32 01 16 | 200 | CY | $0.00 | |
| 0001BB | REMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 17 | 50 | CY | $0.00 | |
| 0001BC | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE | 32 01 17 | 500 | CY | $0.00 | |
| 0001BD | ASPHALT PAVING FABRIC | 32 01 18 | 500 | SY | $0.00 | |
| 0001BE | CRACK ROUTING AND SEALING | 32 01 19 | 2000 | LF | $0.00 | |
| 0001BF | JOINT CLEANING AND SEALING | 32 01 19 | 10531 | LF | $0.00 | |
| 0001BG | HOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR | 32 01 20 | 500 | LF | $0.00 | |
| 0001BH | BITUMINOUS REJUVENATOR | 32 01 22 | 1,000 | GAL | $0.00 | |
| 0001BI | GROOVING FOR AIRFIELD PAVEMENTS | 32 01 26 | 1000 | SY | $0.00 | |
| 0001BJ | GRADED-CRUSHED AGGREGATE BASE COURSE | 32 11 23 | 1000 | TON | $0.00 | |
| 0001BK | LOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING) | 32 11 36 | 1400 | SY | $0.00 | |
| 0001BL | BITUMINOUS PRIME AND TACK COAT | 32 12 10 | 2000 | GAL | $0.00 | |
| 0001BM | HOT MIX ASPHALT GRADATION 1 | 32 12 15 | 230 | TON | $0.00 | |
| 0001BN | HOT MIX ASPHALT GRADATION 2 | 32 12 15 | 700 | TON | $0.00 | |
| 0001BO | HOT MIX ASPHALT GRADATION 3 | 32 12 15 | 200 | TON | $0.00 | |
| 0001BP | TEMPORARY PAVEMENT MARKINGS | 32 17 24 | 5000 | SF | $0.00 | |
| 0001BQ | BARRICADES | 32 17 24 | 45 | EA | $0.00 | |
| 0001BR | CLOTH OR PLYWOOD CROSSES | 32 17 24 | 6 | EA | $0.00 | |
| 0001BS | PAVEMENT MARKINGS | 32 17 24 | 10000 | SF | $0.00 | |
| 0001BT | GRADING | 32 22 00 | 5000 | SY | $0.00 | |
| 0001BU | FILL MATERIAL | 32 22 00 | 500 | CY | $0.00 | |
| 0001BV | FESCUE SOD | 32 92 23 & 32 22 00 | 4000 | SY | $0.00 | |
| 0001BW | FESCUE HYDROSEEDING | 32 92 20 & 32 22 00 | 4000 | SY | $0.00 | |
| 0001BX | 6" PIPE UNDERDRAIN (PIPE ONLY) | 33 46 16 | 4000 | LF | $0.00 | |
| 0001BY | FILTER FABRIC | 33 46 16 | 6000 | SY | $0.00 | |
| 0001BZ | EXCAVATION | 33 46 16 | 4000 | CY | $0.00 | |
| 0001CA | 1.5 INCH MINUS GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 0001CB | 2-3 INCH GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 0001CC | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN EXISTING PAVEMENT | 34 73 13 | 30 | EA | $0.00 | |
| 0001CD | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN NEW PAVEMENT | 34 73 13 | 10 | EA | $0.00 | |
| TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 0001AA THROUGH 0001CD | $0.00 |
&LAttachment 2 Schedule B (BASE YEAR) 18 Jan 2019
&CPage &P of &N
&"Times New Roman,Bold"&11FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
OPTION YR 1 NKAK 17-1101
| AIRFIELD PAVEMENTS SYSTEMS | ||||||
| OPTION YEAR 1 | ||||||
| (28 Jun 2020 - 27 Jun 2021) | ||||||
| ALL LINE ITEMS MUST FILLED IN TO BE CONSIDERED RESPONSIVE | ||||||
| PRIMARY | EST | |||||
| ITEM | SUPPLIES/SERVICES | SPEC | QTY | UNIT | UNIT PRICE | AMOUNT |
| 1001 | FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 17-1101 | |||||
| 1001AA | GIS AND AS-BUILT | 01 11 00 & 01 33 00 | 2 | EA | $0.00 | |
| 1001AB | DOWNTIME | 01 14 19 | 5 | HR | $0.00 | |
| 1001AC | ROCK EXCAVATION | 01 50 00 | 30 | CY | $0.00 | |
| 1001AD | ADEQ NOTICE OF INTENT PERMIT FEE | 01 57 23 | 2 | EA | $0.00 | |
| 1001AE | STORMWATER POLLUTION PREVENTION PLAN | 01 57 23 | 2 | EA | $0.00 | |
| 1001AF | SILT FENCE BARRIER | 01 57 23 | 2000 | LF | $0.00 | |
| 1001AG | COARSE ROCK DITCH CHECK | 01 57 23 | 20 | CY | $0.00 | |
| 1001AH | ASPHALT REMOVAL | 02 60 00 | 200 | SY | $0.00 | |
| 1001AI | 2" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 1001AJ | 4" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 1001AK | FRICTION TEST | 32 01 11 | 2 | EA | $0.00 | |
| 1001AL | RUBBER REMOVAL | 32 01 12 | 250000 | SF | $0.00 | |
| 1001AM | PAINT REMOVAL | 32 01 12 | 10000 | SF | $0.00 | |
| 1001AN | CONCRETE REPAIRS, LAYOUT | 32 01 15 | 2 | EA | $0.00 | |
| 1001AO | REMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 15 | 1300 | CY | $0.00 | |
| 1001AP | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 6000 | SF | $0.00 | |
| 1001AQ | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 7000 | SF | $0.00 | |
| 1001AR | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 1500 | SF | $0.00 | |
| 1001AS | NEW 1-1/4” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 1001AT | NEW 1-1/2” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 1001AU | NEW 2” X 24” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 1001AV | REINFORCEMENT / TIE BAR (#5 BAR) | 32 01 15 | 350 | LF | $0.00 | |
| 1001AW | FULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO | 32 01 15 | 200 | SF | $0.00 | |
| 1001AX | CONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR | 32 01 15 | 1800 | SF | $0.00 | |
| 1001AY | CONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL | 32 01 15 | 300 | SF | $0.00 | |
| 1001AZ | COLD MILLING ASPHALT PVMTS | 32 01 16 | 10000 | SY | $0.00 | |
| 1001BA | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS | 32 01 16 | 200 | CY | $0.00 | |
| 1001BB | REMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 17 | 50 | CY | $0.00 | |
| 1001BC | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE | 32 01 17 | 500 | CY | $0.00 | |
| 1001BD | ASPHALT PAVING FABRIC | 32 01 18 | 500 | SY | $0.00 | |
| 1001BE | CRACK ROUTING AND SEALING | 32 01 19 | 2000 | LF | $0.00 | |
| 1001BF | JOINT CLEANING AND SEALING | 32 01 19 | 10531 | LF | $0.00 | |
| 1001BG | HOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR | 32 01 20 | 500 | LF | $0.00 | |
| 1001BH | BITUMINOUS REJUVENATOR | 32 01 22 | 1,000 | GAL | $0.00 | |
| 1001BI | GROOVING FOR AIRFIELD PAVEMENTS | 32 01 26 | 1000 | SY | $0.00 | |
| 1001BJ | GRADED-CRUSHED AGGREGATE BASE COURSE | 32 11 23 | 1000 | TON | $0.00 | |
| 1001BK | LOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING) | 32 11 36 | 1400 | SY | $0.00 | |
| 1001BL | BITUMINOUS PRIME AND TACK COAT | 32 12 10 | 2000 | GAL | $0.00 | |
| 1001BM | HOT MIX ASPHALT GRADATION 1 | 32 12 15 | 230 | TON | $0.00 | |
| 1001BN | HOT MIX ASPHALT GRADATION 2 | 32 12 15 | 700 | TON | $0.00 | |
| 1001BO | HOT MIX ASPHALT GRADATION 3 | 32 12 15 | 200 | TON | $0.00 | |
| 1001BP | TEMPORARY PAVEMENT MARKINGS | 32 17 24 | 5000 | SF | $0.00 | |
| 1001BQ | BARRICADES | 32 17 24 | 45 | EA | $0.00 | |
| 1001BR | CLOTH OR PLYWOOD CROSSES | 32 17 24 | 6 | EA | $0.00 | |
| 1001BS | PAVEMENT MARKINGS | 32 17 24 | 10000 | SF | $0.00 | |
| 1001BT | GRADING | 32 22 00 | 5000 | SY | $0.00 | |
| 1001BU | FILL MATERIAL | 32 22 00 | 500 | CY | $0.00 | |
| 1001BV | FESCUE SOD | 32 92 23 & 32 22 00 | 4000 | SY | $0.00 | |
| 1001BW | FESCUE HYDROSEEDING | 32 92 20 & 32 22 00 | 4000 | SY | $0.00 | |
| 1001BX | 6" PIPE UNDERDRAIN (PIPE ONLY) | 33 46 16 | 4000 | LF | $0.00 | |
| 1001BY | FILTER FABRIC | 33 46 16 | 6000 | SY | $0.00 | |
| 1001BZ | EXCAVATION | 33 46 16 | 4000 | CY | $0.00 | |
| 1001CA | 1.5 INCH MINUS GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 1001CB | 2-3 INCH GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 1001CC | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN EXISTING PAVEMENT | 34 73 13 | 30 | EA | $0.00 | |
| 1001CD | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN NEW PAVEMENT | 34 73 13 | 10 | EA | $0.00 | |
| TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 1001AA THROUGH 1001CD | $0.00 |
&LAttachment 2 Schedule B (OPTION YEAR 1)
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
OPTION YR 2 NKAK 17-1101
| AIRFIELD PAVEMENTS SYSTEMS | ||||||
| OPTION YEAR 2 | ||||||
| (28 Jun 2021 - 27 Jun 2022) | ||||||
| ALL LINE ITEMS MUST FILLED IN TO BE CONSIDERED RESPONSIVE | ||||||
| PRIMARY | EST | |||||
| ITEM | SUPPLIES/SERVICES | SPEC | QTY | UNIT | UNIT PRICE | AMOUNT |
| 2001 | FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 17-1101 | |||||
| 2001AA | GIS AND AS-BUILT | 01 11 00 & 01 33 00 | 2.0 | EA | $0.00 | |
| 2001AB | DOWNTIME | 01 14 19 | 5 | HR | $0.00 | |
| 2001AC | ROCK EXCAVATION | 01 50 00 | 30 | CY | $0.00 | |
| 2001AD | ADEQ NOTICE OF INTENT PERMIT FEE | 01 57 23 | 2 | EA | $0.00 | |
| 2001AE | STORMWATER POLLUTION PREVENTION PLAN | 01 57 23 | 2 | EA | $0.00 | |
| 2001AF | SILT FENCE BARRIER | 01 57 23 | 2000 | LF | $0.00 | |
| 2001AG | COARSE ROCK DITCH CHECK | 01 57 23 | 20 | CY | $0.00 | |
| 2001AH | ASPHALT REMOVAL | 02 60 00 | 200 | SY | $0.00 | |
| 2001AI | 2" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 2001AJ | 4" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 2001AK | FRICTION TEST | 32 01 11 | 2 | EA | $0.00 | |
| 2001AL | RUBBER REMOVAL | 32 01 12 | 250000 | SF | $0.00 | |
| 2001AM | PAINT REMOVAL | 32 01 12 | 10000 | SF | $0.00 | |
| 2001AN | CONCRETE REPAIRS, LAYOUT | 32 01 15 | 2 | EA | $0.00 | |
| 2001AO | REMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 15 | 1300 | CY | $0.00 | |
| 2001AP | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 6000 | SF | $0.00 | |
| 2001AQ | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 7000 | SF | $0.00 | |
| 2001AR | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 1500 | SF | $0.00 | |
| 2001AS | NEW 1-1/4” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 2001AT | NEW 1-1/2” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 2001AU | NEW 2” X 24” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 2001AV | REINFORCEMENT / TIE BAR (#5 BAR) | 32 01 15 | 350 | LF | $0.00 | |
| 2001AW | FULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO | 32 01 15 | 200 | SF | $0.00 | |
| 2001AX | CONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR | 32 01 15 | 1800 | SF | $0.00 | |
| 2001AY | CONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL | 32 01 15 | 300 | SF | $0.00 | |
| 2001AZ | COLD MILLING ASPHALT PVMTS | 32 01 16 | 10000 | SY | $0.00 | |
| 2001BA | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS | 32 01 16 | 200 | CY | $0.00 | |
| 2001BB | REMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 17 | 50 | CY | $0.00 | |
| 2001BC | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE | 32 01 17 | 500 | CY | $0.00 | |
| 2001BD | ASPHALT PAVING FABRIC | 32 01 18 | 500 | SY | $0.00 | |
| 2001BE | CRACK ROUTING AND SEALING | 32 01 19 | 2000 | LF | $0.00 | |
| 2001BF | JOINT CLEANING AND SEALING | 32 01 19 | 10531 | LF | $0.00 | |
| 2001BG | HOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR | 32 01 20 | 500 | LF | $0.00 | |
| 2001BH | BITUMINOUS REJUVENATOR | 32 01 22 | 1,000 | GAL | $0.00 | |
| 2001BI | GROOVING FOR AIRFIELD PAVEMENTS | 32 01 26 | 1000 | SY | $0.00 | |
| 2001BJ | GRADED-CRUSHED AGGREGATE BASE COURSE | 32 11 23 | 1000 | TON | $0.00 | |
| 2001BK | LOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING) | 32 11 36 | 1400 | SY | $0.00 | |
| 2001BL | BITUMINOUS PRIME AND TACK COAT | 32 12 10 | 2000 | GAL | $0.00 | |
| 2001BM | HOT MIX ASPHALT GRADATION 1 | 32 12 15 | 230 | TON | $0.00 | |
| 2001BN | HOT MIX ASPHALT GRADATION 2 | 32 12 15 | 700 | TON | $0.00 | |
| 2001BO | HOT MIX ASPHALT GRADATION 3 | 32 12 15 | 200 | TON | $0.00 | |
| 2001BP | TEMPORARY PAVEMENT MARKINGS | 32 17 24 | 5000 | SF | $0.00 | |
| 2001BQ | BARRICADES | 32 17 24 | 45 | EA | $0.00 | |
| 2001BR | CLOTH OR PLYWOOD CROSSES | 32 17 24 | 6 | EA | $0.00 | |
| 2001BS | PAVEMENT MARKINGS | 32 17 24 | 10000 | SF | $0.00 | |
| 2001BT | GRADING | 32 22 00 | 5000 | SY | $0.00 | |
| 2001BU | FILL MATERIAL | 32 22 00 | 500 | CY | $0.00 | |
| 2001BV | FESCUE SOD | 32 92 23 & 32 22 00 | 4000 | SY | $0.00 | |
| 2001BW | FESCUE HYDROSEEDING | 32 92 20 & 32 22 00 | 4000 | SY | $0.00 | |
| 2001BX | 6" PIPE UNDERDRAIN (PIPE ONLY) | 33 46 16 | 4000 | LF | $0.00 | |
| 2001BY | FILTER FABRIC | 33 46 16 | 6000 | SY | $0.00 | |
| 2001BZ | EXCAVATION | 33 46 16 | 4000 | CY | $0.00 | |
| 2001CA | 1.5 INCH MINUS GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 2001CB | 2-3 INCH GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 2001CC | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN EXISTING PAVEMENT | 34 73 13 | 30 | EA | $0.00 | |
| 2001CD | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN NEW PAVEMENT | 34 73 13 | 10 | EA | $0.00 | |
| TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 2001AA THROUGH 2001CD | $0.00 |
&LAttachment 2 Schedule B (OPTION YEAR 2)
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
OPTION YR 3 NKAK 17-1101
| AIRFIELD PAVEMENTS SYSTEMS | ||||||
| OPTION YEAR 3 | ||||||
| (28 Jun 2022 - 27 Jun 2023) | ||||||
| ALL LINE ITEMS MUST FILLED IN TO BE CONSIDERED RESPONSIVE | ||||||
| PRIMARY | EST | |||||
| ITEM | SUPPLIES/SERVICES | SPEC | QTY | UNIT | UNIT PRICE | AMOUNT |
| 3001 | FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 17-1101 | |||||
| 3001AA | GIS AND AS-BUILT | 01 11 00 & 01 33 00 | 2 | EA | $0.00 | |
| 3001AB | DOWNTIME | 01 14 19 | 5 | HR | $0.00 | |
| 3001AC | ROCK EXCAVATION | 01 50 00 | 30 | CY | $0.00 | |
| 3001AD | ADEQ NOTICE OF INTENT PERMIT FEE | 01 57 23 | 2 | EA | $0.00 | |
| 3001AE | STORMWATER POLLUTION PREVENTION PLAN | 01 57 23 | 2 | EA | $0.00 | |
| 3001AF | SILT FENCE BARRIER | 01 57 23 | 2000 | LF | $0.00 | |
| 3001AG | COARSE ROCK DITCH CHECK | 01 57 23 | 20 | CY | $0.00 | |
| 3001AH | ASPHALT REMOVAL | 02 60 00 | 200 | SY | $0.00 | |
| 3001AI | 2" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 3001AJ | 4" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 3001AK | FRICTION TEST | 32 01 11 | 2 | EA | $0.00 | |
| 3001AL | RUBBER REMOVAL | 32 01 12 | 250000 | SF | $0.00 | |
| 3001AM | PAINT REMOVAL | 32 01 12 | 10000 | SF | $0.00 | |
| 3001AN | CONCRETE REPAIRS, LAYOUT | 32 01 15 | 2 | EA | $0.00 | |
| 3001AO | REMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 15 | 1300 | CY | $0.00 | |
| 3001AP | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 6000 | SF | $0.00 | |
| 3001AQ | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 7000 | SF | $0.00 | |
| 3001AR | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 1500 | SF | $0.00 | |
| 3001AS | NEW 1-1/4” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 3001AT | NEW 1-1/2” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 3001AU | NEW 2” X 24” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 3001AV | REINFORCEMENT / TIE BAR (#5 BAR) | 32 01 15 | 350 | LF | $0.00 | |
| 3001AW | FULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO | 32 01 15 | 200 | SF | $0.00 | |
| 3001AX | CONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR | 32 01 15 | 1800 | SF | $0.00 | |
| 3001AY | CONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL | 32 01 15 | 300 | SF | $0.00 | |
| 3001AZ | COLD MILLING ASPHALT PVMTS | 32 01 16 | 10000 | SY | $0.00 | |
| 3001BA | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS | 32 01 16 | 200 | CY | $0.00 | |
| 3001BB | REMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 17 | 50 | CY | $0.00 | |
| 3001BC | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE | 32 01 17 | 500 | CY | $0.00 | |
| 3001BD | ASPHALT PAVING FABRIC | 32 01 18 | 500 | SY | $0.00 | |
| 3001BE | CRACK ROUTING AND SEALING | 32 01 19 | 2000 | LF | $0.00 | |
| 3001BF | JOINT CLEANING AND SEALING | 32 01 19 | 10531 | LF | $0.00 | |
| 3001BG | HOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR | 32 01 20 | 500 | LF | $0.00 | |
| 3001BH | BITUMINOUS REJUVENATOR | 32 01 22 | 1,000 | GAL | $0.00 | |
| 3001BI | GROOVING FOR AIRFIELD PAVEMENTS | 32 01 26 | 1000 | SY | $0.00 | |
| 3001BJ | GRADED-CRUSHED AGGREGATE BASE COURSE | 32 11 23 | 1000 | TON | $0.00 | |
| 3001BK | LOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING) | 32 11 36 | 1400 | SY | $0.00 | |
| 3001BL | BITUMINOUS PRIME AND TACK COAT | 32 12 10 | 2000 | GAL | $0.00 | |
| 3001BM | HOT MIX ASPHALT GRADATION 1 | 32 12 15 | 230 | TON | $0.00 | |
| 3001BN | HOT MIX ASPHALT GRADATION 2 | 32 12 15 | 700 | TON | $0.00 | |
| 3001BO | HOT MIX ASPHALT GRADATION 3 | 32 12 15 | 200 | TON | $0.00 | |
| 3001BP | TEMPORARY PAVEMENT MARKINGS | 32 17 24 | 5000 | SF | $0.00 | |
| 3001BQ | BARRICADES | 32 17 24 | 45 | EA | $0.00 | |
| 3001BR | CLOTH OR PLYWOOD CROSSES | 32 17 24 | 6 | EA | $0.00 | |
| 3001BS | PAVEMENT MARKINGS | 32 17 24 | 10000 | SF | $0.00 | |
| 3001BT | GRADING | 32 22 00 | 5000 | SY | $0.00 | |
| 3001BU | FILL MATERIAL | 32 22 00 | 500 | CY | $0.00 | |
| 3001BV | FESCUE SOD | 32 92 23 & 32 22 00 | 4000 | SY | $0.00 | |
| 3001BW | FESCUE HYDROSEEDING | 32 92 20 & 32 22 00 | 4000 | SY | $0.00 | |
| 3001BX | 6" PIPE UNDERDRAIN (PIPE ONLY) | 33 46 16 | 4000 | LF | $0.00 | |
| 3001BY | FILTER FABRIC | 33 46 16 | 6000 | SY | $0.00 | |
| 3001BZ | EXCAVATION | 33 46 16 | 4000 | CY | $0.00 | |
| 3001CA | 1.5 INCH MINUS GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 3001CB | 2-3 INCH GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 3001CC | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN EXISTING PAVEMENT | 34 73 13 | 30 | EA | $0.00 | |
| 3001CD | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN NEW PAVEMENT | 34 73 13 | 10 | EA | $0.00 | |
| TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 3001AA THROUGH 3001CD | $0.00 |
&LAttachment 2 Schedule B (OPTION YEAR 3)
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
OPTION YR 4 NKAK 17-1101
| AIRFIELD PAVEMENTS SYSTEMS | ||||||
| OPTION YEAR 4 | ||||||
| (28 Jun 2023 - 27 Jun 2024) | ||||||
| ALL LINE ITEMS MUST FILLED IN TO BE CONSIDERED RESPONSIVE | ||||||
| PRIMARY | EST | |||||
| ITEM | SUPPLIES/SERVICES | SPEC | QTY | UNIT | UNIT PRICE | AMOUNT |
| 4001 | FURNISH ALL PLANT, LABOR, MATERIAL NECESSARY TO PERFORM ALL ALTERATIONS AS OUTLINED IN SPECIFICATIONS AND PLANS NKAK 17-1101 | |||||
| 4001AA | GIS AND AS-BUILT | 01 11 00 & 01 33 00 | 2 | EA | $0.00 | |
| 4001AB | DOWNTIME | 01 14 19 | 5 | HR | $0.00 | |
| 4001AC | ROCK EXCAVATION | 01 50 00 | 30 | CY | $0.00 | |
| 4001AD | ADEQ NOTICE OF INTENT PERMIT FEE | 01 57 23 | 2 | EA | $0.00 | |
| 4001AE | STORMWATER POLLUTION PREVENTION PLAN | 01 57 23 | 2 | EA | $0.00 | |
| 4001AF | SILT FENCE BARRIER | 01 57 23 | 2000 | LF | $0.00 | |
| 4001AG | COARSE ROCK DITCH CHECK | 01 57 23 | 20 | CY | $0.00 | |
| 4001AH | ASPHALT REMOVAL | 02 60 00 | 200 | SY | $0.00 | |
| 4001AI | 2" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 4001AJ | 4" PVC ELECTRICAL CONDUIT (PIPE AND INSTALLATION ONLY, EXCAVATION AND BACKFILL NOT INCLUDED) | 26 56 20 | 500 | LF | $0.00 | |
| 4001AK | FRICTION TEST | 32 01 11 | 2 | EA | $0.00 | |
| 4001AL | RUBBER REMOVAL | 32 01 12 | 250000 | SF | $0.00 | |
| 4001AM | PAINT REMOVAL | 32 01 12 | 10000 | SF | $0.00 | |
| 4001AN | CONCRETE REPAIRS, LAYOUT | 32 01 15 | 2 | EA | $0.00 | |
| 4001AO | REMOVAL AND DISPOSAL OF CONCRETE PAVEMENT AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 15 | 1300 | CY | $0.00 | |
| 4001AP | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 15” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 6000 | SF | $0.00 | |
| 4001AQ | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 17” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 7000 | SF | $0.00 | |
| 4001AR | CONCRETE REPAIR, FULL DEPTH, FULL SLABS AND PARTAL SLABS, 22” THICK NON-REINFORCED CONCRETE PAVEMENT | 32 01 15 | 1500 | SF | $0.00 | |
| 4001AS | NEW 1-1/4” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 4001AT | NEW 1-1/2” X 20” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 4001AU | NEW 2” X 24” DOWELS | 32 01 15 | 350 | EA | $0.00 | |
| 4001AV | REINFORCEMENT / TIE BAR (#5 BAR) | 32 01 15 | 350 | LF | $0.00 | |
| 4001AW | FULL DEPTH, PARTIAL SLAB, EPOXY ON FACE OF CONCRETE SLAB TO BE TIED TO | 32 01 15 | 200 | SF | $0.00 | |
| 4001AX | CONCRETE REPAIR, PARTIAL DEPTH, SPALL REPAIR | 32 01 15 | 1800 | SF | $0.00 | |
| 4001AY | CONCRETE REPAIR, PARTIAL DEPTH, WHEN GOVERNMENT ELECTS TO GO FULL DEPTH AFTER CONCRETE REMOVAL | 32 01 15 | 300 | SF | $0.00 | |
| 4001AZ | COLD MILLING ASPHALT PVMTS | 32 01 16 | 10000 | SY | $0.00 | |
| 4001BA | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED ASPHALT MILLINGS | 32 01 16 | 200 | CY | $0.00 | |
| 4001BB | REMOVAL OF CONCRETE PAVEMENT AND CRUSHED TO SPECIFICATIONS AND EXCAVATION, DISPOSAL, AND PREPARATION OF SUBGRADE | 32 01 17 | 50 | CY | $0.00 | |
| 4001BC | HAULING, PLACING, GRADING, AND COMPACTING GOVERNMENT PROVIDED CRUSHED CONCRETE | 32 01 17 | 500 | CY | $0.00 | |
| 4001BD | ASPHALT PAVING FABRIC | 32 01 18 | 500 | SY | $0.00 | |
| 4001BE | CRACK ROUTING AND SEALING | 32 01 19 | 2000 | LF | $0.00 | |
| 4001BF | JOINT CLEANING AND SEALING | 32 01 19 | 10531 | LF | $0.00 | |
| 4001BG | HOT-APPLIED SEALANT FOR ASPHALT CRACK REPAIR | 32 01 20 | 500 | LF | $0.00 | |
| 4001BH | BITUMINOUS REJUVENATOR | 32 01 22 | 1,000 | GAL | $0.00 | |
| 4001BI | GROOVING FOR AIRFIELD PAVEMENTS | 32 01 26 | 1000 | SY | $0.00 | |
| 4001BJ | GRADED-CRUSHED AGGREGATE BASE COURSE | 32 11 23 | 1000 | TON | $0.00 | |
| 4001BK | LOW COMPRESSION CONCRETE (INCLUDES POLYETHELENE SHEETING) | 32 11 36 | 1400 | SY | $0.00 | |
| 4001BL | BITUMINOUS PRIME AND TACK COAT | 32 12 10 | 2000 | GAL | $0.00 | |
| 4001BM | HOT MIX ASPHALT GRADATION 1 | 32 12 15 | 230 | TON | $0.00 | |
| 4001BN | HOT MIX ASPHALT GRADATION 2 | 32 12 15 | 700 | TON | $0.00 | |
| 4001BO | HOT MIX ASPHALT GRADATION 3 | 32 12 15 | 200 | TON | $0.00 | |
| 4001BP | TEMPORARY PAVEMENT MARKINGS | 32 17 24 | 5000 | SF | $0.00 | |
| 4001BQ | BARRICADES | 32 17 24 | 45 | EA | $0.00 | |
| 4001BR | CLOTH OR PLYWOOD CROSSES | 32 17 24 | 6 | EA | $0.00 | |
| 4001BS | PAVEMENT MARKINGS | 32 17 24 | 10000 | SF | $0.00 | |
| 4001BT | GRADING | 32 22 00 | 5000 | SY | $0.00 | |
| 4001BU | FILL MATERIAL | 32 22 00 | 500 | CY | $0.00 | |
| 4001BV | FESCUE SOD | 32 92 23 & 32 22 00 | 4000 | SY | $0.00 | |
| 4001BW | FESCUE HYDROSEEDING | 32 92 20 & 32 22 00 | 4000 | SY | $0.00 | |
| 4001BX | 6" PIPE UNDERDRAIN (PIPE ONLY) | 33 46 16 | 4000 | LF | $0.00 | |
| 4001BY | FILTER FABRIC | 33 46 16 | 6000 | SY | $0.00 | |
| 4001BZ | EXCAVATION | 33 46 16 | 4000 | CY | $0.00 | |
| 4001CA | 1.5 INCH MINUS GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 4001CB | 2-3 INCH GRADATION POROUS BACKFILL | 33 46 16 | 500 | CY | $0.00 | |
| 4001CC | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN EXISTING PAVEMENT | 34 73 13 | 30 | EA | $0.00 | |
| 4001CD | AIRCRAFT TIEDOWN OR GROUNDING ROD INSTALLED IN NEW PAVEMENT | 34 73 13 | 10 | EA | $0.00 | |
| TOTAL NOT TO EXCEED AMOUNT FOR ITEMS 4001AA THROUGH 4001CD | $0.00 |