About this file

This document provides details for Amendment 1 to Request for Proposal NFU2-7623 for construction services for the National Energy Research Scientific Computing Center Facility Upgrade II project. The University of California Berkeley, on behalf of the Lawrence Berkeley National Laboratory, is seeking proposals for construction of the NFU2 project with an estimated budget of $35-45 million. A mandatory pre-proposal conference and on-site inspection will be held on February 21, 2024. The RFP and sample subcontract were modified to update the statement of work, drawings, and specifications to February 6, 2024. While this is not a small business set-aside, large businesses must complete a small business subcontracting plan if selected. Proposals are due by the response date outlined in the RFP.

View the file

Other files

File Type Posted
Amendment 4 NFU2-7623.pdf PDF
Amendment 3 RFP NFU2-7623 Questions and Responses.pdf PDF
Amendment 3 Questions and Answers.xlsx XLSX spreadsheet
Amendment 3 NFU2-7623.pdf PDF
NFU2 Facility Upgrade Pre-Bid Conf Slides.pdf PDF
Amendment 2 NFU2-7623.pdf PDF
NFU2 GC Pre-Bid sign in sheet.pdf PDF
C Specifications Building 59 NERSC Facility Upgrade II Project Manual dated 2_6_2024.pdf PDF
Pre-Proposal Conference and On-Site Inspection Information.docx DOCX document
F Environmental Specification - Air.pdf PDF
D GPs - Fixed Price Construction (12-22-23).pdf PDF
I Soil Management Plan for Lawrence Berkeley National Laboratory Rev. 1 12_2017.pdf PDF
C EEO Pre-Award Compliance Certification (5-21-09).doc DOC document
J CA20240018 1_26_24.pdf PDF
B NFU2-7623 Price Proposal Form.xlsx XLSX spreadsheet
F NFU2-7623 Sample Oral Presentation.docx DOCX document
RFP No. NFU2-7623.pdf PDF
B Drawings Building 59 NERSC Facility Upgrade II 1_29_2024.pdf PDF
E Draft Stormwater Pollution Prevention Plan 1_2024.pdf PDF
A SOW NFU2 Construction 2_6_2024.pdf PDF
E Insurance Certificate Instructions (5-28-21).pdf PDF
G Environmental Specification - Soils.pdf PDF
C Specifications Building 59 NERSC Facility Upgrade II Project Manual dated 1_29_2024.pdf PDF
G Small Business Subcontracting Plan (8-18-23).docx DOCX document
H Environmental Specification - Water.pdf PDF
D Geotechnical Investigation Report NFU2 Project 2_6_24.pdf PDF
Sample Subcontract.pdf PDF
A NFU2-7623 Reps and Certs Form.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(1/12/22)

February 15, 2024

AMENDMENT 1

REQUEST FOR PROPOSAL (RFP) No.: NFU2-7623 National Energy Research Scientific Computing Center

(NERSC) Facility Upgrade II (NFU2) Project

Amendment 1 is issued to respond to questions and to modify the RFP Documents.

- See attached flyer for Pre-proposal Conference and On-Site Inspection Information

- The Sample Subcontract is modified as follows (changes in bold):

Article 1 – Scope of Work, A. Description is deleted and replaced with the following:

The Subcontractor must perform all work for construction of NERSC Facility Upgrade II Project, in accordance with this Subcontract and the Statement of Work entitled “NERSC Facility Upgrade II (NFU2) Construction,” dated 2/6/2024, Drawings entitled “Building 59 NERSC Facility Upgrade II,” dated 1/29/2024, and Specifications entitled “Building 59 NERSC Facility Upgrade II Project Manual,” dated 2/6/2024 incorporated by reference herein. The worksite is located at One Cyclotron Road, Berkeley CA.

The Subcontractor agrees to perform additional work arising from changes ordered by the University pursuant to the Changes clause of the General Provisions.

Article 19 – Incorporated Documents, number 5 is deleted and replaced with the following:

5 Specifications entitled “Building 59 NERSC Facility Upgrade II Project Manual,”

2/6/2024

See attached Revised Specifications entitled “Building 59 NERSC Facility Upgrade II

Project Manual,” dated 2/6/2024

Question 1 Is this solicitation a small-business set-aside?

Answer 1 No, however, if a large business is selected, they will be required to complete a small-business subcontracting plan which will be incorporated into the awarded subcontract.

Please see the Small Business Subcontracting Plan Model included with the RFP documents for further information.

Question 2 What is the estimated Magnitude of Construction for this project?

Answer 2 $35 to $45 million.

University of California, Manager and Operator of Lawrence Berkeley National Laboratory Request for Proposal No. NFU2-7623

All other terms and conditions remain the same.

Sincerely, Emily Mastronardi emastronardi@lbl.gov

2024-02-15T16:11:48-0500
Emily Mastronardi

File details come from the government source that posted it. Updated .