NAVMWR-25-R-0008-0006.pdf

PDF 843 KB Posted

Attached to
NAS Corpus Christi Splash Pad
Solicitation number
NAVMWR-25-R-0008
Issued by

About this file

This document is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) for the NAVMWR-25-R-0008 solicitation for the Corpus Christi Splash Pad project at NAS Corpus Christi, TX. Amendment 0006 includes a series of clarifications addressing technical and procedural questions from potential contractors, covering topics such as work hours, design specifications, utility voltage sources, excavation requirements, shade structures, and project permitting.

Key clarifications include confirmation that the proposed splash pad design can include more than 20 plumbed water features, the need for a dividing fence between the main pool and splash pad areas, utility voltage details (3-phase, 120/128), and requirements for shade structures (metal with optional fabric cover). The amendment also specifies that the Designer of Record must adhere to Texas professional licensing requirements, a backflow preventer and pre-opening inspection will be needed, and the on-site Quality Control Manager cannot simultaneously serve as the Site Safety & Health Officer.

View the file

Other files

File Type Posted
NAVMWR-25-R-0008 Amendment 0005.pdf PDF
NAVMWR-25-R-0008-0004.pdf PDF
NAVMWR-25-R-0008-0003.pdf PDF
NAVMWR-25-R-0008-0002 Corpus Christi Splash Pad.pdf PDF
NAVMWR-25-R-0008-0001.pdf PDF
NAVMWR-25-R-0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

1 3

0006 25 Apr 2025 R21-22 R21-22 N944

CNIC Facilities and Construction Contracting Alanna Young, Contracting Officer 5720 Integrity Drive, Lassen Building 457 Millington, TN 38055 901-574-0848 / alanna.g.young.naf@us.navy.mil

Nika Maldonado, Contract Specialist 901-930-7728 nika.n.maldonado.naf@us.navy.mil

NAVMWR-25-R-0008

18 February 2025

Corpus Christi Splash Pad NAS Corpus Christi, TX

Continued on page 2.

Alanna Young, Contracting Officer

Block 14 Continued:

A. Clarifications:

Q-42. Can the work hours be extended to 10 hours per day?

A-42. This will be decided after the award is granted, but it is necessary to submit an extension request for work hours to be increased to 10 or 12 hours per day to the COR and base security for their approval.

Q-43. The scope of work includes a dividing fence between existing main pool and splash pad. Should this fence also block access to bldg., 93 on site map from splash pad area and not block access from main pool area?

A-43. We need to separate the swimming pool from the splash pad and the surrounding area.

Q-44. Reference question 27 in Amendment 4. We are wanting to understand the current chemicals used for the main pool to offer the best maintainable solution for the new filtration system to support the splash pad. We can offer a system utilizing liquid chemicals or dry chemicals. It would be best to utilize a similar method for ease of maintenance. Can you please identify the type of chemicals currently being used?

A-44. They are currently using granules and tables to chlorinate the swimming pool.

Q-45. The scope of work (12) specifies plumbing for 20 water features with a minimum of 12 installed. This number seems to conflict with the provided Vortex design concept. Does your reference to features include surface sprays or is it just above-ground features?

A-45. Please refer to the scope of work. A full design still required.

Q-46. Can the proposed design include more than 20 plumbed features (above ground and surface mount) to provide good coverage of the splash pad area?

A-46. Yes.

Q-47. Where is the utility voltage source?

A-47. Behind the building 93.

Q-48. Is this utility source 1 phase or 3 phase?

A-48. 3 phase.

Q-49. Is the source 120/240, 120/208 or 277/480?

A-49. 120/128.

Q-50. What is the make and model of utility overcurrent equipment that we will provide power from?

A-50. We do not have this information; this will be determined upon your site visit.

NAVMWR-25-R-0008 Corpus Christi Splash Pad NAS Corpus Christi, TX

Amendment 0006 Page 2 of 3

Q-51. When trenching from the power source to the splash pad, will mechanical excavation or hydro excavation be required?

A-51. This will be determined by the AE firm and the design.

Q-52. At what depth should the trenching be excavated?

A-52. This will be determined by the AE firm and the design.

Q-53. The existing main pool deck has been coated. C-2 (6) of the Scope of work states

“Provide spray coated non-slip safety surface at play area. Is the surrounding deck of the splash pad to be treated?

A-53. Yes.

Q-54. Typically, projects in Texas must be reviewed and approved through the Texas

Department of Licensing and Regulations for ABA compliance. Would this project be exempt from TDLR review?

A-54. The Designer of Record must adhere to all professional licensing and permitting requirements in the state of Texas.

Q-55. The scope mentions the addition of two 10'x10' shade structures. Is the intent for these to be fabric shade structures or rigid metal roof pavilions (i.e. aluminum)?

A-55. The structure must be made of metal and may feature a fabric shade or cover.

Q-56. Addendum #4 states that no known permitting is necessary by the City of Corpus

Christi for the project. Are projects at the NAS subject to review through the Texas Department of State Health Services for public pools or is this regulated by the NAS?

A-56. It does require a backflow preventer and PREVMED. pre-opening inspection and an inspection on the first day of operation.

Q-57. Can the on-site Quality Control Manager (appointed by the CQC Chief) also serve as the Site Safety & Health Officer (SSHO)?

A-57. Not at this time.

NAVMWR-25-R-0008 Corpus Christi Splash Pad NAS Corpus Christi, TX

Amendment 0006 Page 3 of 3