About this file
This is a bid schedule document for the Navajo State Park Marina Mooring System Repair project. The document presents a detailed cost estimate template outlining the scope of work divided into two primary phases: inspection and evaluation, and construction. The inspection phase includes research of existing data, inspection of the current marina mooring system, preparation of repair recommendations with detailed drawings and specifications, and cost estimation for repair work across four categories. The construction phase encompasses mobilization and demobilization activities, repair of existing components, removal and disposal of mooring balls with installation of replacements (30 units), removal and disposal of mooring cables and chains with replacement installation (4,000 linear feet), and removal and disposal of mooring connection hardware with replacement installation (60 units). The bid schedule also includes provisions for optional items that bidders may propose as necessary for the repair or installation of the new mooring system.
The document functions as a standardized cost estimation template for potential bidders, establishing the line-item structure and unit measurements required for proposal submission. Unit costs and total costs remain blank, indicating that this is a bidding document through which contractors will populate their pricing. The project appears to be a comprehensive rehabilitation effort addressing multiple components of an aging mooring system at a state park facility. No information regarding response dates, award dates, contract term, set-asides, funding sources, or other administrative requirements is contained within this particular document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo State Park – Marina Mooring System Repair Sample Listing of Project Cost Items
Item
Task
| Unit |
| Quantity |
| Unit Cost $ |
| Total Cost $ (Quantity x Unit Cost) |
Inspection/Evaluation:
| 1 |
| Research Existing Data/Info |
| Hours |
| 20 |
| 2 |
| Inspect Existing Marina Mooring system |
| hours |
| 40 |
| 3 |
| Prepare Repair Recommendations, Drawings, Assembly Details, and Product Specifications |
| Hours |
| 40 |
| 4 |
| Prepare Cost Estimate for Repair Work and Unit Costs for Component Repair/Replacement Where Applicable |
| Hours |
| 10 |
Construction:
| 5 |
| Mobilization - Demobilization |
| L.S. |
| 1 |
| 6 |
| Repair of Existing Components not associated with items 7, 8, 9 |
| Each |
| 50 |
| 7 |
| Remove, Dispose of, and Install Replacement Mooring Balls |
| Each |
| 30 |
| 8 |
| Remove, Dispose of, and Install Replacement Mooring Cables/Chains |
| L.F. |
| 4,000 |
| 9 |
| Remove, Dispose of, and Install Replacement Mooring Connection Hardware |
| Each |
| 60 |
Optional Items Bidder Sees Necessary for Repair/Installation of New Mooring System