24Q0020 ANNEX B EVAL FACTORS -0001.docx
DOCX document 26 KB Posted
- Attached to
- KEY WEST INFRASTUCTURE VOIP TRANSITION SOLUTION Federal contract opportunity
- Solicitation number
- N7027224Q0020
About this file
This document is the Evaluation Factors for the KEY WEST INFRASTUCTURE VOIP TRANSITION SOLUTION solicitation. The evaluation factors assess the contractor's ability to provide a comprehensive site survey report, deliver documentation on VoIP non-recurring/recurring costs and implementation timeline, grant the government unlimited rights to all deliverables, and define a practical and cost-effective VoIP solution with required documentation. The proposal must demonstrate the contractor can meet these requirements within 30 days of completing the site survey. The solicitation is being issued by the Department of the Navy Naval Supply Systems Command for a VoIP solution and plan to support the NCTAMS LANT mission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 24Q0020-0004 RFQ.docx | DOCX document | |
| 24Q0020 ANNEX A-INVENTORY NAS KW.xlsx | XLSX spreadsheet | |
| RFC-003 Response.pdf | ||
| 24Q0020-0003 RFQ.docx | DOCX document | |
| 24Q0020 ANNEX A -0001.docx | DOCX document | |
| 24Q0020 ANNEX B EVAL FACTORS -0002.docx | DOCX document | |
| RFC-002 Response.docx | DOCX document | |
| 24Q0020-0002 RFQ.docx | DOCX document | |
| RFC-001 Response.pdf | ||
| Trumbo Point.jpg | JPG image | |
| Boca Chica.jpg | JPG image | |
| Sigsbee Park Annex.jpg | JPG image | |
| Key west area.jpg | JPG image | |
| 24Q0020-0001 RFQ.docx | DOCX document | |
| Truman Annex.jpg | JPG image | |
| 24Q0020 ANNEX A.docx | DOCX document | |
| 24Q0020 RFQ.docx | DOCX document | |
| 24Q0020 ANNEX B EVAL FACTORS.docx | DOCX document | |
| 24Q0020 ANNEX A.docx | DOCX document | |
| Key West_CDRL _A001_Rev3.pdf | ||
| Key West_CDRL _A002_Rev2.pdf | ||
| Key West_CDRL _A003_Rev2.pdf | ||
| RFC.docx | DOCX document | |
| 24Q0020 ANNEX C PRICE BREAKDOWN.xlsx | XLSX spreadsheet | |
| Key West_CDRL _A004_Rev2.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAS Key West TDM-VoIP Site Survey
FAR 12.602
PROPOSAL EVALUATION FACTORS
Contractor’s technical offer will be assessed based on the RFQ PWS/SOW identified technical requirements. The following will be applied for determination of acceptability:
Contractor: _________________________________
| # |
| Requirement |
| 1 |
| Requirement: The vendor’s proposal describes how they would plan to provide a comprehensive site survey report (or equivalent report). The proposal would define the format of deliverable report, e.g., delivered in both Microsoft Word and/or Adobe PDF formats and the proposal would address that the report would include all necessary documentation, such as layout drawings, Inside Plant (ISP) cabling, power drawings/specifications, floor plans, engineering specifications, and proposed external (Outside Cable [OSP]) drawings. |
Pass: The vendor’s proposal demonstrates how they can develop a comprehensive site survey report (or equivalent report) in both Microsoft Word and/or Adobe PDF formats, and address all required documentation (layout drawings, ISP cabling, power drawings/specifications, floor plans, engineering specifications, and OSP drawings).
Fail: The vendor’s proposal doesn’t demonstrate they can develop a site survey report (or equivalent) that meets the definition requirements in PWS guidelines and doesn’t demonstrate that they can deliver the report in required formats, and/or is missing any necessary documentation (ISP or OSP drawings, etc).
| 2 |
| Requirement: The vendor’s proposal demonstrates they can produce the identified VoIP solution non-recurring/recurring costs and Installation/Implementation Timeline reports in both Microsoft Word and Adobe PDF formats to the government within 30 days of the completion of the survey. |
Pass: The vendor’s proposal shows they can deliver documentation providing the VoIP non-recurring/recurring costs and Installation/Implementation Timeline reports in both Microsoft Word and Adobe PDF formats to the government within 30 days of the completion of the survey.
Fail: The vendor’s proposal doesn’t explain that they can deliver the documentation providing VoIP non-recurring/recurring costs and Installation/Implementation Timeline reports in both required formats and/or cannot deliver them within 30 days of the completion of the survey.
| 3 |
| Requirement: The vendor’s proposal confirms they can produce all documentation and records provided to the U.S. Government with unlimited rights to the materials and control over publication and distribution. |
Pass: The vendor’s proposal confirms they can produce all documentation and records, with unlimited rights and when delivered to the U.S. Government, ensure full access and control over publication and distribution.
Fail: The vendor’s proposal confirms they cannot relinquish rights to any documentation or limits the U.S. Government’s access and control over the deliverables.
| 4 |
| Requirement: The vendor’s proposal defines at a high-level their practical and cost-effective VoIP solution for all current Time Division Multiplexing (TDM) telephony users at Naval Air Station Key West. Vendor’s proposal defines if existing OSP infrastructure would be used or defines if their plan includes another (alternative) type of outside communications media. Vendor’s proposal demonstrates they can provide comprehensive deliverable documentation: drawings that depict the overall intended system configuration and network topology, and logical network diagrams within 30 days of the completion of the survey report. |
Pass: The vendor’s proposal defines at a high-level their practical and cost-effective VoIP solution and their plan for OSP infrastructure (or alternative OSP) to reach/support required TDM telephony users. The proposal shows that the vendor can deliver the required comprehensive documentation: drawings that clearly depict the overall system configuration, network topology, and logical network diagrams within 30 days of the completion of the survey report.
Fail: The vendor’s proposal doesn’t define at a high-level a practical and cost-effective VoIP solution and/or their plan for OSP infrastructure (or alternative OSP) to reach/support required TDM telephony users. The proposal doesn’t show how they would meet providing the comprehensive documentation within 30 days of survey report.