N6945023Q0003_PWS_ATT_J020000006_ELINS.xlsx

XLSX spreadsheet 423 KB Posted

Attached to
Pool Maintenance Services at Naval Air Station (NAS) Pensacola, Florida
Solicitation number
N6945023Q0003
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0001 - Recurring Work - Base Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs A001
CustomerELINSub-ELINAnnex/Sub-annex
CategorySpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
CNIC (NASQ)A001A001AA1503040Other (Training/Swimming Pools)3Recurring Work, Bldg. 3828 Survival Training Pool12MO
CNIC (NASQ)A001A001AB1503040Other (Training Pools)3Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool12MO
CNIC (MWR)A001A001AC1503040Other (Training Pools)3Recurring Work, Bldg. 1817 Mustin Beach Lap Pool12MO
CNIC (MWR)A001A001AD1503040Other (Training Pools)3Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool12MO
CNIC (MWR)A001A001AE1503040Other (Training Pools)3Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park12MO
CNIC (NMOTC)A001A001AF1503040Other (Training Pools)3Recurring Work, Bldg. 3944 Air Crew Survival School12MO

&"Times New Roman,Regular"&A Page &P of &N

Base Period - Non-Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0002 - Non-Recurring Work - Base Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN A700 through A701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
A700Composite Labor Hours

MUST BE

NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.

The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.

MUST BE NEGOTIATED BY KO.200LH
A701Material and Equipment

MUST BE

NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.

MUST BE NEGOTIATED BY KO. 5,000 LS

Page &P of &N

Option Period 1 - Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0003 - Recurring Work - 1st Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs B001
CustomerELINSub-ELINAnnex/Sub-annex
CategorySpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
CNIC (NASQ)B001B001AA1503040Other (Training Pools)3Recurring Work, Bldg. 3828 Survival Training Pool12MO
CNIC (NASQ)B001B001AB1503040Other (Training Pools)3Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool12MO
CNIC (MWR)B001B001AC1503040Other (Training Pools)3Recurring Work, Bldg. 1817 Mustin Beach Lap Pool12MO
CNIC (MWR)B001B001AD1503040Other (Training Pools)3Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool12MO
CNIC (MWR)B001B001AE1503040Other (Training Pools)3Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park12MO
CNIC (NMOTC)B001B001AF1503040Other (Training Pools)3Recurring Work, Bldg. Air Crew Survival School12MO

Page &P of &N

Option Period 1 - Non-Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0004 - Non-Recurring Work - 1st Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN B700 through B701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
B700Composite Labor Hours

MUST BE

NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.

The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.

MUST BE NEGOTIATED BY KO.200LH
B701Material and Equipment

MUST BE

NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.

MUST BE NEGOTIATED BY KO. 5,000 LS

Page &P of &N

Option Period 2 - Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0005 - Recurring Work - 2nd Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs C001
CustomerELINSub-ELINAnnex/Sub-annex
CategorySpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
CNIC (NASQ)C001C001AA1503040Other (Training Pools)3Recurring Work, Bldg. 3828 Survival Training Pool12MO
CNIC (NASQ)C001C001AB1503040Other (Training Pools)3Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool12MO
CNIC (MWR)C001C001AC1503040Other (Training Pools)3Recurring Work, Bldg. 1817 Mustin Beach Lap Pool12MO
CNIC (MWR)C001C001AD1503040Other (Training Pools)3Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool12MO
CNIC (MWR)C001C001AE1503040Other (Training Pools)3Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park12MO
CNIC (NMOTC)C001C001AF1503040Other (Training Pools)3Recurring Work, Bldg. Air Crew Survival School12MO

Page &P of &N

Option Period 2 - Non-Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0006 - Non-Recurring Work - 2nd Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN C700 through C701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
C700Composite Labor Hours

MUST BE

NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.

The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.

MUST BE NEGOTIATED BY KO.200LH
C701Material and Equipment

MUST BE

NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.

MUST BE NEGOTIATED BY KO. 5,000 LS

Page &P of &N

Option Period 3 - Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0007 - Recurring Work - 3rd Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs D001
CustomerELINSub-ELINAnnex/Sub-annex
CategorySpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
CNIC (NASQ)D001D001AA1503040Other (Training Pools)3Recurring Work, Bldg. 3828 Survival Training Pool12MO
CNIC (NASQ)D001D001AB1503040Other (Training Pools)3Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool12MO
CNIC (MWR)D001D001AC1503040Other (Training Pools)3Recurring Work, Bldg. 1817 Mustin Beach Lap Pool12MO
CNIC (MWR)D001D001AD1503040Other (Training Pools)3Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool12MO
CNIC (MWR)D001D001AE1503040Other (Training Pools)3Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park12MO
CNIC (NMOTC)D001D001AF1503040Other (Training Pools)3Recurring Work, Bldg. Air Crew Survival School12MO

Page &P of &N

Option Period 3 - Non-Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0008 - Non-Recurring Work - 3rd Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN D700 through D701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
D700Composite Labor Hours

MUST BE

NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.

The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.

MUST BE NEGOTIATED BY KO.200LH
D701Material and Equipment

MUST BE

NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.

MUST BE NEGOTIATED BY KO. 5,000 LS

Page &P of &N

Option Period 4 - Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0009 - Recurring Work - 4th Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs E001
CustomerELINSub-ELINAnnex/Sub-annex
CategorySpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
CNIC (NASQ)E001E001AA1503040Other (Training Pools)3Recurring Work, Bldg. 3828 Survival Training Pool12MO
CNIC (NASQ)E001E001AB1503040Other (Training Pools)3Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool12MO
CNIC (MWR)E001E001AC1503040Other (Training Pools)3Recurring Work, Bldg. 1817 Mustin Beach Lap Pool12MO
CNIC (MWR)E001E001AD1503040Other (Training Pools)3Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool12MO
CNIC (MWR)E001E001AE1503040Other (Training Pools)3Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park12MO
CNIC (NMOTC)E001E001AF1503040Other (Training Pools)3Recurring Work, Bldg. Air Crew Survival School12MO

Page &P of &N

Option Period 4 - Non-Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0010 - Non-Recurring Work - 4th Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN E700 through E701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
E700Composite Labor Hours

MUST BE

NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.

The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.

MUST BE NEGOTIATED BY KO.200LH
E701Material and Equipment

MUST BE

NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.

MUST BE NEGOTIATED BY KO. 5,000 LS

Page &P of &N

52.217-8 Option - Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0011 - Recurring Work - 52.217-8 Option
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs F001
CustomerELINSub-ELINAnnex/Sub-annex
CategorySpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
CNIC (NASQ)F001F001AA1503040Other (Training Pools)3Recurring Work, Bldg. 3828 Survival Training Pool6MO
CNIC (NASQ)F001F001AB1503040Other (Training Pools)3Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool6MO
CNIC (MWR)F001F001AC1503040Other (Training Pools)3Recurring Work, Bldg. 1817 Mustin Beach Lap Pool6MO
CNIC (MWR)F001F001AD1503040Other (Training Pools)3Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool6MO
CNIC (MWR)F001F001AE1503040Other (Training Pools)3Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park6MO
CNIC (NMOTC)F001F001AF1503040Other (Training Pools)3Recurring Work, Bldg. Air Crew Survival School6MO

52.217-8 Option - Non-Recurring

Attachment J-0200000-06
Exhibit Line Item Numbers
Solicitation No.: N6945023Q0003
Line Item 0012 - Non-Recurring Work - 52.217-8 Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN F700 through F701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
F700Composite Labor Hours

MUST BE

NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.

The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.

MUST BE NEGOTIATED BY KO.100LH
F701Material and Equipment

MUST BE

NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.

MUST BE NEGOTIATED BY KO. 2,500 LS

NAVFAC UOM

NAVFAC - Units of Measure
ACAcreFRFramePDPad
AMAmpouleFTFootPGPackage
ATAssortmentFVFivePIPillow
AYAssemblyFYFiftyPMPlate
BABallGGGreat GrossPRPair
BDBundleGIGillPTPint
BEBaleGLGallonPXPellet
BFBoard FootGMGramPZPacket
BGBagGNGrainQTQuart
BKBookGPGroupRARation
BLBarrelGRGrossRDRound
BOBoltHDHundredRLReel
BQBriquetHFHundred FeetRMReam
BRBarHKHankRORoll
BTBottleHPHundred PoundsRXThousand Rounds
BXBoxHRHoursSBSquare Mile
CACartridgeHSHundred Square FeetSCSquare Centimeters
CBCarboyHWHundred WeightSDSkid
CCCubic CentimeterHYHundred YardsSESet
CDCubic YardINInchSFSquare Foot
CEConeJRJarSHSheet
CFCubic FootKGKilogramSISquare Inch
CGCentigramKMKilometerSKSkein
CICubic InchKRCaratSLSpool
CKCakeKTKitSMSquare Meter
CLCoilLBPoundSOShot
CMCentimeterLFLinear FootSPStrip
CNCanLGLengthSQSquare
COContainerLHLabor HoursSXStick
CUCurieLILiterSYSquare Yard
CYCylinderLMLinear MeterTCTruckload
CZCubic MeterLOLotTDTwenty-Four
DADaysLSLump SumTETen
DCDecagramLYLinear YardTFTwenty-Five
DEDecimeterMCThousand Cubic FeetTGGross Ton
DGDecigramMEMealTNTon
DLDeciliterMFThousand FeetTOTroy Ounce
DMDramMGMilligramTSThirty-Six
DODollarsMIMileTTTablet
DRDrumMLMilliliterTUTube
DWPennyweightMMMillimeterUNUnit
DZDozenMOMonthsUSUS U.S.P Unit
EAEachMRMeterVIVial
ENEach CollectionMXThousandWKWeek
EXExposureOTOutfitYDYard
FDFoldOZOunceYRYears

File details come from the government source that posted it. Updated .