Base Period Recurring
| Attachment J-0200000-06 | ||||||||
| Exhibit Line Item Numbers | ||||||||
| Solicitation No.: N6945023Q0003 | ||||||||
| Line Item 0001 - Recurring Work - Base Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs A001 | ||||||||
| Customer | ELIN | Sub-ELIN | Annex/Sub-annex | |||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| CNIC (NASQ) | A001 | A001AA | 1503040 | Other (Training/Swimming Pools) | 3 | Recurring Work, Bldg. 3828 Survival Training Pool | 12 | MO |
| CNIC (NASQ) | A001 | A001AB | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool | 12 | MO |
| CNIC (MWR) | A001 | A001AC | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 1817 Mustin Beach Lap Pool | 12 | MO |
| CNIC (MWR) | A001 | A001AD | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool | 12 | MO |
| CNIC (MWR) | A001 | A001AE | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park | 12 | MO |
| CNIC (NMOTC) | A001 | A001AF | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3944 Air Crew Survival School | 12 | MO |
&"Times New Roman,Regular"&A Page &P of &N
Base Period - Non-Recurring
| Attachment J-0200000-06 | ||||||
| Exhibit Line Item Numbers | ||||||
| Solicitation No.: N6945023Q0003 | ||||||
| Line Item 0002 - Non-Recurring Work - Base Period | ||||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN A700 through A701 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Composite Labor Hours |
MUST BE
NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.
The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.
| MUST BE NEGOTIATED BY KO. | 200 | LH |
| A701 | Material and Equipment |
MUST BE
NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.
MUST BE NEGOTIATED BY KO. 5,000 LS
Page &P of &N
Option Period 1 - Recurring
| Attachment J-0200000-06 | ||||||||
| Exhibit Line Item Numbers | ||||||||
| Solicitation No.: N6945023Q0003 | ||||||||
| Line Item 0003 - Recurring Work - 1st Option Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs B001 | ||||||||
| Customer | ELIN | Sub-ELIN | Annex/Sub-annex | |||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| CNIC (NASQ) | B001 | B001AA | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3828 Survival Training Pool | 12 | MO |
| CNIC (NASQ) | B001 | B001AB | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool | 12 | MO |
| CNIC (MWR) | B001 | B001AC | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 1817 Mustin Beach Lap Pool | 12 | MO |
| CNIC (MWR) | B001 | B001AD | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool | 12 | MO |
| CNIC (MWR) | B001 | B001AE | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park | 12 | MO |
| CNIC (NMOTC) | B001 | B001AF | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. Air Crew Survival School | 12 | MO |
Page &P of &N
Option Period 1 - Non-Recurring
| Attachment J-0200000-06 | ||||||
| Exhibit Line Item Numbers | ||||||
| Solicitation No.: N6945023Q0003 | ||||||
| Line Item 0004 - Non-Recurring Work - 1st Option Period | ||||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN B700 through B701 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Composite Labor Hours |
MUST BE
NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.
The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.
| MUST BE NEGOTIATED BY KO. | 200 | LH |
| B701 | Material and Equipment |
MUST BE
NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.
MUST BE NEGOTIATED BY KO. 5,000 LS
Page &P of &N
Option Period 2 - Recurring
| Attachment J-0200000-06 | ||||||||
| Exhibit Line Item Numbers | ||||||||
| Solicitation No.: N6945023Q0003 | ||||||||
| Line Item 0005 - Recurring Work - 2nd Option Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs C001 | ||||||||
| Customer | ELIN | Sub-ELIN | Annex/Sub-annex | |||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| CNIC (NASQ) | C001 | C001AA | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3828 Survival Training Pool | 12 | MO |
| CNIC (NASQ) | C001 | C001AB | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool | 12 | MO |
| CNIC (MWR) | C001 | C001AC | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 1817 Mustin Beach Lap Pool | 12 | MO |
| CNIC (MWR) | C001 | C001AD | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool | 12 | MO |
| CNIC (MWR) | C001 | C001AE | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park | 12 | MO |
| CNIC (NMOTC) | C001 | C001AF | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. Air Crew Survival School | 12 | MO |
Page &P of &N
Option Period 2 - Non-Recurring
| Attachment J-0200000-06 | ||||||
| Exhibit Line Item Numbers | ||||||
| Solicitation No.: N6945023Q0003 | ||||||
| Line Item 0006 - Non-Recurring Work - 2nd Option Period | ||||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN C700 through C701 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| C700 | Composite Labor Hours |
MUST BE
NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.
The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.
| MUST BE NEGOTIATED BY KO. | 200 | LH |
| C701 | Material and Equipment |
MUST BE
NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.
MUST BE NEGOTIATED BY KO. 5,000 LS
Page &P of &N
Option Period 3 - Recurring
| Attachment J-0200000-06 | ||||||||
| Exhibit Line Item Numbers | ||||||||
| Solicitation No.: N6945023Q0003 | ||||||||
| Line Item 0007 - Recurring Work - 3rd Option Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs D001 | ||||||||
| Customer | ELIN | Sub-ELIN | Annex/Sub-annex | |||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| CNIC (NASQ) | D001 | D001AA | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3828 Survival Training Pool | 12 | MO |
| CNIC (NASQ) | D001 | D001AB | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool | 12 | MO |
| CNIC (MWR) | D001 | D001AC | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 1817 Mustin Beach Lap Pool | 12 | MO |
| CNIC (MWR) | D001 | D001AD | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool | 12 | MO |
| CNIC (MWR) | D001 | D001AE | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park | 12 | MO |
| CNIC (NMOTC) | D001 | D001AF | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. Air Crew Survival School | 12 | MO |
Page &P of &N
Option Period 3 - Non-Recurring
| Attachment J-0200000-06 | ||||||
| Exhibit Line Item Numbers | ||||||
| Solicitation No.: N6945023Q0003 | ||||||
| Line Item 0008 - Non-Recurring Work - 3rd Option Period | ||||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN D700 through D701 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| D700 | Composite Labor Hours |
MUST BE
NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.
The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.
| MUST BE NEGOTIATED BY KO. | 200 | LH |
| D701 | Material and Equipment |
MUST BE
NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.
MUST BE NEGOTIATED BY KO. 5,000 LS
Page &P of &N
Option Period 4 - Recurring
| Attachment J-0200000-06 | ||||||||
| Exhibit Line Item Numbers | ||||||||
| Solicitation No.: N6945023Q0003 | ||||||||
| Line Item 0009 - Recurring Work - 4th Option Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs E001 | ||||||||
| Customer | ELIN | Sub-ELIN | Annex/Sub-annex | |||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| CNIC (NASQ) | E001 | E001AA | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3828 Survival Training Pool | 12 | MO |
| CNIC (NASQ) | E001 | E001AB | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool | 12 | MO |
| CNIC (MWR) | E001 | E001AC | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 1817 Mustin Beach Lap Pool | 12 | MO |
| CNIC (MWR) | E001 | E001AD | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool | 12 | MO |
| CNIC (MWR) | E001 | E001AE | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park | 12 | MO |
| CNIC (NMOTC) | E001 | E001AF | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. Air Crew Survival School | 12 | MO |
Page &P of &N
Option Period 4 - Non-Recurring
| Attachment J-0200000-06 | ||||||
| Exhibit Line Item Numbers | ||||||
| Solicitation No.: N6945023Q0003 | ||||||
| Line Item 0010 - Non-Recurring Work - 4th Option Period | ||||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN E700 through E701 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| E700 | Composite Labor Hours |
MUST BE
NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.
The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.
| MUST BE NEGOTIATED BY KO. | 200 | LH |
| E701 | Material and Equipment |
MUST BE
NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.
MUST BE NEGOTIATED BY KO. 5,000 LS
Page &P of &N
52.217-8 Option - Recurring
| Attachment J-0200000-06 | ||||||||
| Exhibit Line Item Numbers | ||||||||
| Solicitation No.: N6945023Q0003 | ||||||||
| Line Item 0011 - Recurring Work - 52.217-8 Option | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs F001 | ||||||||
| Customer | ELIN | Sub-ELIN | Annex/Sub-annex | |||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| CNIC (NASQ) | F001 | F001AA | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3828 Survival Training Pool | 6 | MO |
| CNIC (NASQ) | F001 | F001AB | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 4142 Rescue Swimmer Training Pool | 6 | MO |
| CNIC (MWR) | F001 | F001AC | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 1817 Mustin Beach Lap Pool | 6 | MO |
| CNIC (MWR) | F001 | F001AD | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3200 Mustin Beach Recreational Pool | 6 | MO |
| CNIC (MWR) | F001 | F001AE | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. 3734 Corry Station Swimming Pool and Spray Park | 6 | MO |
| CNIC (NMOTC) | F001 | F001AF | 1503040 | Other (Training Pools) | 3 | Recurring Work, Bldg. Air Crew Survival School | 6 | MO |
52.217-8 Option - Non-Recurring
| Attachment J-0200000-06 | ||||||
| Exhibit Line Item Numbers | ||||||
| Solicitation No.: N6945023Q0003 | ||||||
| Line Item 0012 - Non-Recurring Work - 52.217-8 Option Period | ||||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN F700 through F701 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| F700 | Composite Labor Hours |
MUST BE
NEGOTIATED BY KO. Provide labor to perform all Unit Priced Labor (UPL) work subject to wages per the scope and delivery schedule specified in the order.
The UPL is fully burden rate shall include all associated costs identified in the UPL definition in Attachment J-0200000-01.
| MUST BE NEGOTIATED BY KO. | 100 | LH |
| F701 | Material and Equipment |
MUST BE
NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1- 8 (Vol. 11) July 03 or latest revision) Chapter 2.
MUST BE NEGOTIATED BY KO. 2,500 LS
NAVFAC UOM
| NAVFAC - Units of Measure | |||||
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |