Attachment 8 - GPI Responses.pdf
PDF 78 KB Posted
- Solicitation number
- N6945020R0085
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - ELIN Pricing Attachment Rev 2.xlsx | XLSX spreadsheet | |
| N6945020R0085-0003.pdf | ||
| DD1155_Amendment 0003.pdf | ||
| DD1155_Amendment 0002.pdf | ||
| N6945020R0085-0002.pdf | ||
| Attachment 3 - ELIN Pricing Attachment Rev 1.xlsx | XLSX spreadsheet | |
| Attachment 7 - Site Visit Documents.pdf | ||
| N6945020R0085_0001.pdf | ||
| DD1155.pdf | ||
| Attachment 6 - Past Performance Questionnaire.docx | DOCX document | |
| N6945020R0085.pdf | ||
| Attachment 5 - SAFETY DATA SHEET.docx | DOCX document | |
| Attachment 4 - CORPORATE EXPERIENCE PROJECT DATA SHEET.docx | DOCX document | |
| Attachment 3 - Exhibit Line Item Number (ELIN) Pricing Attachment.xlsx | XLSX spreadsheet | |
| Attachment 1 - Enclosures to Statement of Work (SOW).pdf | ||
| Attachment 2 - Government Pre-Award Inquiry (GPI) Form.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6945020R0085 IDIQ for NPTU Cranes
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.
1 6/9/2020 Will you be working 8 hours per day or more?
Per RFP page 56 of 76 of the SOW, Spec item 3.4.1.8 Operator Hours: "Normal project shift hours will be determined at the time of executed Task Orders.
Normal work hours will generally be 12 hours in length with various start and stop times. Day and night shifts may be scheduled. A contractor crane operator shall not generally exceed a shift of 12 hours in length. The Code 700 L&H Project Manager will contact the contractor a minimum of 24 hours in advance when multiple shifts or shifts other than the normal scheduled shifts are required."
2 6/9/2020
Do you want the bid quoted 160/176 or 200 hours per month?
Bids (pricing) shall be per requirements in the Solication, Attachment 3 ‐ Exhibit Line Item Number (ELIN).
3 6/9/2020 Any other equipment going on the barge, or just the crane?
RFP page 57 of 76 of the SOW, Spec item 3.4.2.8 Contractor Auxiliary Equipment and Services lists some contractor auxiliary equipment that will be needed to keep the floating crane continuously operational 12 hours a day 7 days a week. Contractor auxiliary equipment shall be included in the bidding process and submitted in writing for incorporation into Task Order.
4 6/17/2020
Will the government provide the spud boat to put the crane on or will we need to supply the spud?
Per RFP page 55 of 76 , spec item 3.4.1.1, "The contractor shall provide one (1) spud barge crane with one (1) primary crane operator and two (2) alternate crane operators.....".
5 6/18/2020
DD1155,
Equipment c
On the DD1155 under the equipment section letter "c" it states the mobile crane shall be a Rough Terrain (RT). Would you allow an All Terrain (AT) telescopic crane to be used as long as it meets or exceeds the crane requirements? The AT is a more economical crane to utilize compared to a RT.
This section has been clarified to include All Terain type as long as it meets or exceeds the crance requirements. Truck crane types will not considered. See Amendment 0002. 0002
Amend No.
REFERENCEQuestion No.
QUESTION GOVERNMENT RESPONSEDate Received
SOURCE SELECTION INFORMATION ‐ SEE FAR 2.101 AND 3.104
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
6 6/18/2020
DD115,
Schedule
Mobilization is listed as 1/18/21 to 1/22/21 (which is to occur away from NPTU) but the contractor on‐site date is listed as 1/18/21. Should the first day on‐ site be a day after 1/22/21?
The shedule has been revised. See revised statement of work provided in Amendment 0002. 0002
7 6/18/2020 75
(4) Factor 4, Past Performanc e (i)
To my knowledge we have never received a CPARS on any job we've completed at NPTU. Can you make these CPARS evulations available to us so we can include them in our proposal?
As stated on page 75 of 76, Section 8 Evaluation Factors, Factor 4: If there is not a completed CPARS evaluation, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1, Corporate Experience.
8 6/18/2020 3 Form 1449
Are we to provide our total price on page 3 of Form 1449 (Volume 1 of the Proposal)?
You can put $12,000,000 for CLIN 0001 of the SF1449. You will put your price for the seed project on CLIN 0001 of the DD1155.
9 6/18/2020 ELIN
Why have you included A712 and A713 (riggers) since the government is supplying all riggers on‐site for the project?
Riggers are contractors choice for mobilization and demobilization phase only.
Government will provide riggers for on site work. This has been clarified in the RFP. Also, he ELIN spreadsheet has been revised. See Exhibit Line Item Number (ELIN) Pricing Attachment Rev 1 provided in Amendment 0002. 0002
10 6/18/2020 DD1155
Under #2 Scope it states (1) 30'x110' spud barge. However, under the equipment section "f" it states Two (2) 30'x110' spud barge. Please clarify if (1) or (2) 30'x110' spud barges are required in the seed project.
Two 30'x110' spud work barges are required by the Task Order. The solicitation has been amended. 0002
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11 6/18/2020 ELIN
In A701 it states "a spudded 30'x110' support barge, transport boat/skiff". Is this spudded 30'x110' support barge the same barge that's listed on A708. Is there (1) or (2) of the 30'x110' support barges? Also, A701 mentions a transport boat/skiff.
Should this tranport boat/skiff be deleted since A707 pusher boat is serving this purpose?
"A spudded 30'x110' support barge, transport boat/skiff" is a solicitation typo.
The ELIN spreadsheet has been amended for clarification. See Exhibit Line Item Number (ELIN) Pricing Attachment Rev 1 provided in Amendment 0002. 0002
12 6/18/2020 ELIN
On A702 and A710, can you let us know how you arrived at the 1024 LH? On A703 and A711, can you let us know how you arrived at the 1088 LH? On A705, can you let us know how you arrived at the 5280 LH? On A706, can you let us know how you arrived at the 5808 LH?
The ELIN spreadsheet has been amended for clarification. See Exhibit Line Item Number (ELIN) Pricing Attachment Rev 1 provided in Amendment 0002. 0002
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
13 6/18/2020 ELIN
In A705 and A706 you have specified the number of LH for each of these. You state under the personnel section of DD1155 that a "mininum of one operator and one deck for each tug". It will be our decision on how to properly staff these tugs to accomplish the scope of work using your mininum crew size as indicated. However, for the 750HP to 1250HP tug boats a larger crew (more than two) will be needed per tug. Therefore how can you specify the total number of LH needed under A705 and A706?
The unit of measure has been revised to ea where ea will represents the cost per hour for the entire tug boat crew for two tug boats. See Exhibit Line Item Number (ELIN) Pricing Attachment Rev 1 provided in Amendment 0002. 0002
14 6/18/2020 ELIN
On A709, should the "support barge, transport boat/skiff" be removed from this ELIN?
The typo "Support barge, transport boat/skiff" has been removed. See Exhibit Line Item Number (ELIN) Pricing Attachment Rev 1 provided in Amendment 0002. 0002
15 6/18/2020 DD1155
On DD1155 there is a list of auxilary equipment (crane fuel cells, toilet facilities, portable pump, portable pole lighting, etc.) to be supplied by the contractor. Do you have a preference of where to include these costs on the ELIN sheets?
An ELIN has been added to allow for auxillary equipment. See Exhibit Line Item Number (ELIN) Pricing Attachment Rev 1 provided in Amendment 0002. 0002
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
16 6/18/2020 ELIN
The ELIN sheet you provided is very confusing. In an effort to simplify the sheet and avoid any price confusions, we respectully suggest that the contractor complete the unit price and extended price columns only (with the quantity column you provided)
See Exhibit Line Item Number (ELIN) Pricing Attachment Rev 1 provided in Amendment 0002 for revisions to the pricing categories. 0002