Attachment 3 - ELIN Pricing Attachment Rev 2.xlsx
XLSX spreadsheet 398 KB Posted
- Solicitation number
- N6945020R0085
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945020R0085-0003.pdf | ||
| DD1155_Amendment 0003.pdf | ||
| DD1155_Amendment 0002.pdf | ||
| N6945020R0085-0002.pdf | ||
| Attachment 3 - ELIN Pricing Attachment Rev 1.xlsx | XLSX spreadsheet | |
| Attachment 8 - GPI Responses.pdf | ||
| Attachment 7 - Site Visit Documents.pdf | ||
| N6945020R0085_0001.pdf | ||
| DD1155.pdf | ||
| Attachment 6 - Past Performance Questionnaire.docx | DOCX document | |
| N6945020R0085.pdf | ||
| Attachment 5 - SAFETY DATA SHEET.docx | DOCX document | |
| Attachment 4 - CORPORATE EXPERIENCE PROJECT DATA SHEET.docx | DOCX document | |
| Attachment 3 - Exhibit Line Item Number (ELIN) Pricing Attachment.xlsx | XLSX spreadsheet | |
| Attachment 1 - Enclosures to Statement of Work (SOW).pdf | ||
| Attachment 2 - Government Pre-Award Inquiry (GPI) Form.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 Seed Project
| Exhibit Line Item Numbers | |||||||
| Solicitation No.: N6945020R0085 | |||||||
| Line Item 0001 - Seed Project | |||||||
| Provide Prices for Performance of Work in accordance with Seed Project | |||||||
| ELIN/Sub-ELINs A700 through A717 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Direct Labor Cost | Direct | |||
| Material Cost | Direct | ||||||
| Equipment Cost | Overhead | G&A | Profit/Fee | Quantity | Unit of Measure | Unit Price | Extended Price |
| A700 | Pre-Performance Kick-off Meetings | Post-award onsite visit and kick-off meeting attendance. |
List Anticipated Attendees and Titles:
| 1 | DA | $ - 0 | ||||||||
| A701 | Mobilization/Demobilization | Mobilization/Demobilization - all costs (including labor (e.g. rigger) and equipment (rental) costs) associated with mobilization and demobilization during the dates provided in the task order SOW | 1 | LS | $ - 0 | |||||
| A702 | Spud Barge Crane | Floating/Spud Barge crane rental (to include Spud Barge for floating crane -60' X 160' max.) - Execution only (138 days); mobilization and demobilization included in ELIN A701 | 138 | DA | $ - 0 | $ - 0 | ||||
| A703 | Spud Barge Crane Operator Labor - Regular Shift | Execution only; mobilization and demobilization included ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. | ||||||||
| Includes 784 hrs (98 weekdays x 8-hour day) for Day Shift and 160 hrs (20 weeknights x 8 hour day) for Night Shift | 944 | LH | $ - 0 | $ - 0 | ||||||
| A704 | Spud Barge Crane Operator Labor - Overtime | Execution only; mobilization and demobilization included in ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. | ||||||||
| Includes 872 hrs (98 weekdays x 4 hours; 20 12-hour Saturday shifts ; and 20 12-hour Sunday Shifts) for Day Shift and 152 hrs (20 weekday nights x 4 hour; 6 weekend nights x 12 hours) for Night Shift | 1,024 | LH | $ - 0 | $ - 0 | ||||||
| A705 | Two Tug Boats | Tug boat rental for two tugboats - Execution only (138 days); mobilization and demobilization included in ELIN A701 | 138 | DA | $ - 0 | $ - 0 | ||||
| A706 | Two Tug Boat Crews - Regular Shift | EA = one hour for two tug boat crews - Execution only; mobilization and demobilization included in ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. The Two Tug Boat Crews shall include a rate for of all operating personnel for the two Tug Boats (i.e. Captain, Helper, Deck Hand, and any other direct staffing on boat) | ||||||||
| Includes 784 hrs (98 weekdays x 8-hour day) for Day Shift and 160 hrs (20 weeknights x 8 hour day) for Night Shift | 944 | EA | $ - 0 | $ - 0 | ||||||
| A707 | Two Tug Boat Crews - Overtime | EA = one hour for two tug boat crews - Execution only; mobilization and demobilization included in ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. The Two Tug Boat Crews shall include a rate for of all operating personnel for the Tug Boats (i.e. Captain, Helper, Deck Hand, and any other direct staffing on boat) | ||||||||
| Includes 872 hrs (98 weekdays x 4 hours; 20 12-hour Saturday shifts ; and 20 12-hour Sunday Shifts) for Day Shift and 152 hrs (20 weekday nights x 4 hour; 6 weekend nights x 12 hours) for Night Shift | 1,024 | EA | $ - 0 | $ - 0 | ||||||
| A708 | Pusher Boat | One Pusher boat rental - Execution only (138 days); mobilization and demobilization included in ELIN A701 | 138 | DA | $ - 0 | $ - 0 | ||||
| A709 | Pusher Boat Crew - Regular Shift | EA = one hour for one pusher boat crew - Execution only; mobilization and demobilization included in ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. The Pusher Boat Crew shall include a rate for of all operating personnel for the pusher boat. | ||||||||
| Includes 784 hrs (98 weekdays x 8-hour day) for Day Shift and 160 hrs (20 weeknights x 8 hour day) for Night Shift | 944 | EA | $ - 0 | $ - 0 | ||||||
| A710 | Pusher Boat Crew - Overtime | EA = one hour for one pusher boat crew - Execution only; mobilization and demobilization included in ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. The Pusher Boat Crew shall include a rate for of all operating personnel for the pusher boat. | ||||||||
| Includes 872 hrs (98 weekdays x 4 hours; 20 12-hour Saturday shifts ; and 20 12-hour Sunday Shifts) for Day Shift and 152 hrs (20 weekday nights x 4 hour; 6 weekend nights x 12 hours) for Night Shift | 1,024 | EA | $ - 0 | $ - 0 | ||||||
| A711 | Two Spud Barges (Open Deck Work Barge) | Spud Barge rental for two spudded 30'x 110' support barges - Execution only (138 days); mobilization and demobilization included in ELIN A701 | 138 | DA | $ - 0 | $ - 0 | ||||
| A712 | Pier side mobile crane | Pier Side Mobile crane rental - Execution only (138 days); mobilization and demobilization included in ELIN A701 | 138 | DA | $ - 0 | $ - 0 | ||||
| A713 | Pier Side Mobile Crane Operators - Regular Shift | Execution only; mobilization and demobilization included ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. | ||||||||
| Includes 784 hrs (98 weekdays x 8-hour day) for Day Shift and 160 hrs (20 weeknights x 8 hour day) for Night Shift | 944 | LH | $ - 0 | $ - 0 | ||||||
| A714 | Pier Side Mobile Crane Operators - Overtime | Execution only; mobilization and demobilization included in ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. | ||||||||
| Includes 872 hrs (98 weekdays x 4 hours; 20 12-hour Saturday shifts ; and 20 12-hour Sunday Shifts) for Day Shift and 152 hrs (20 weekday nights x 4 hour; 6 weekend nights x 12 hours) for Night Shift | 1,024 | LH | $ - 0 | $ - 0 | ||||||
| A715 | Surveyors - Regular Shift | Execution only; mobilization and demobilization included in ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. | ||||||||
| Includes 480 hrs (60 days x 8-hour day) | 480 | LH | $ - 0 | $ - 0 | ||||||
| A716 | Surveyors - Overtime | Execution only; mobilization and demobilization included in ELIN A701. Rate provided shall be a fully burden that includes all associated costs identified in 'Burden Rate' Tab. Includes 240 hrs (60 days x 4-hours) | 240 | LH | $ - 0 | $ - 0 | ||||
| A717 | Contractor Auxiliary Equipment and Services | Contractor Auxiliary Equipment and Services not listed above required to perform the task order including those listed in the task order statement of work. |
Provide List and Price for Item (e.g. 1. Crane Fuel Cells - $X.XX):
| Total for all items (should equal Unit and Extended Price): | 1 | LS | $ - 0 | ||
| TOTAL TASK ORDER PRICE - | $ - 0 |
Burden Rate
| Burden Rate Definitions/Inclusions | |
| Burden Rate for Regular Shift | The unit price bid by the Contractor to perform one regular hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly wage, use of laborers, adjusted to allow for workforce productivity; costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, job (field) overhead (including clerical support, management, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included. |
| Burden Rate for Overtime | The unit price bid by the Contractor to perform one overtime hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly wage, use of laborers, adjusted to allow for workforce productivity; costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, job (field) overhead (including clerical support, management, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included. |
NAVFAC UOM
| NAVFAC - Units of Measure | |||||
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |
File details come from the government source that posted it. Updated .