This solicitation is for a Design-Bid-Build Indefinite Delivery Indefinite Quantity (IDIQ) firm fixed price multiple award construction contract set aside for 8(a) small businesses. The work includes construction projects for Department of Defense activities located in the Fort Worth, Texas area managed by Naval Facilities Engineering Command Southeast. Projects may also be required in other areas managed by NAVFAC Southeast if approved. The North American Industry Classification System code is 236220 for commercial and institutional building construction, with a small business size standard of $39.5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945020R0006 0003.pdf | ||
| N6945020R0006 0002.pdf | ||
| B1428 Drawings v3.pdf | ||
| N6945020R0006 0001.pdf | ||
| N6945020R0006 v2.pdf | ||
| Exhibit F SECNAV 5512 Base Access v2.pdf | ||
| Exhibit D ProjNet How To Guide v2.pdf | ||
| B1428 Entire Building Renovation Design RFP v2.pdf | ||
| Exhibit A Construction and Design Experience Project Data Sheet v2.docx | DOCX document | |
| Exhibit C Past Performance Questionnaire v2.docx | DOCX document | |
| Exhibit G NAS FT Worth JRB Digital Access Request Form v2.pdf | ||
| Exhibit E AMAG Form v2.xls | XLS spreadsheet | |
| B1428 Drawings v2.pdf | ||
| Exhibit B Safety Data Sheet v2.docx | DOCX document | |
| DD1155 v2.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THE PURPOSE OF THIS AMENDMENT IS TO:
1. Provide updates/revsions to the draw ings; and
2. Provide updates to the B1428 Entire Building Renovation Design RFP.
(SEE PAGES 2 THROUGH 7 FOR ADDITIONAL INFORMATION)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Feb-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945020R0006
X 9B. DATED (SEE ITEM 11)
27-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Feb-2020
CODE
NAVFAC SOUTHEAST
MACC CELL
BLDG 903 YORKTOWN AVE
PO BOX 30
JACKSONVILLE FL 32212
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6945020R0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
1) UPDATE B1428 DESIGN RFP - PROJECT TABLE OF CONTENTS (add in BLUE:)
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 33 13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 31 13 ASPHALT SHINGLES
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 72 20 GRAVITY-TYPE ROOF VENTILATORS
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISON 10 – SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTEROR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 92 23 SODDING
DIVISION 33 – UTILITIES
33 30 00 SANITARY SEWERAGE
33 71 02 UNDERGROUND ELECTRIAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
APPENDIX A HAZARDOUS MATERIALS REPORT
2) Design RFP Division 01 – GENERAL REQUIREMENTS, Section 01 11 00.00 25 – Summary of Work (page 5 of 997)
DELETE IN RED:
1.1.1 Project Description
The work includes construction of a new free standing, one story EOD (Explosive Ordinance Disposal) Administration Facility with related site improvements and incidental related work. The administration wing of the facility consists of a single-story structure with masonry walls and standing seam metal roof.
The storage and vehicle bay wing of the facility will is a pre-engineered metal building.
ADD IN BLUE:
1.1.1 Project Description
The work includes a whole building renovation of an existing administration facility and incidental related work. This building is a single-story wood structure. Exterior walls are cladded with existing E.I.F.S. with an asphalt shingle roof.
3) Design RFP Division 08 - OPENINGS, Section 08 71 00 - Door Hardware (page 451 of 997)
DELETE IN RED:
3.6 HARDWARE SETS
HW-04 (108A MAINTENANCE RM & 113 MECH RM) - exterior double door 6 Hinges A5112 4 ½ 4 ½ NRP 630 1 Lockset F07 626 1 Mortise Cylinder 1E-74 STD 626 BE 1 Set Semi-Auto Flsh Blt Type 25 630 2 Overhead Stop C05541 630 AB 1 Dustproof Strike L0421 630 2 Door Silencers L03011 GRE 1 Astragal by DOOR MANUFACTURER 1 coordinator 2 Armor Plate J101 LDW B4E C-Sunk 630
4) Design RFP Division 10 – SPECIALTIES, Section 10 51 13 – METAL LOCKERS (page 558 of 997)
DELETE IN RED:
2.1.1 Singe-tier Lockers
Single-tier lockers must be as follows:
5) Design RFP Division 12 – FURNISHINGS, Section 12 48 13 – ENTRANCE FLOOR MATS AND FRAMES (page 567 of 997)
DELETE IN RED: in its entirety
2.1.1.1 Resilient-Link Mats
Provide vinyl resilient-link mats, 3/8 inch thick with galvanized-spring steel wire link rods. Ensure that nosing is vulcanized and square for recess or mats butted one to another. Provide mats with steel-reinforced end trim that is open-weave with link openings of 1 1/2 inches by 1/2 inch.
6) Design RFP Division 12 – FURNISHINGS, Section 12 48 13 – ENTRANCE FLOOR MATS AND FRAMES (page 568 of 997)
DELETE IN RED:
2.1.1.2 Vinyl Mats
Provide mats 3/8 inches thick with square edges for recessed installations. Provide mats with perforated style, 3/16 inch by 3/4 inch on standard spacing top profile and flat-base bottom surface. Ensure that mats are made of a nonslip prime-quality compound free of calendaring and curing defects, and resistant to weather aging and ozone in normal concentrations.
REPLACE IN BLUE:
2.1.1.2 Vinyl Mats
Provide mats 3/8 inches thick with beveled edges for surface applications. Provide mats with perforated style, 3/16 inch by 3/4 inch on standard spacing top profile and flat-base bottom surface. Ensure that mats are made of a nonslip prime-quality compound free of calendaring and curing defects, and resistant to weather aging and ozone in normal concentrations.
7) Design RFP Division 12 – FURNISHINGS, Section 12 48 13 – ENTRANCE FLOOR MATS AND FRAMES (page 568 of 997)
DELETE IN RED: in its entirety
2.1.1.3 Frames
Provide recessed frames in extruded aluminum Alloy 6061-T6 or Alloy 6063-T5 ASTM B221. Ensure that the frame depth accommodates the mat and system specified. Frame color is clear . Ensure that edge-frame members are fabricated in single lengths or with the fewest pieces possible, with hairline joints equally spaced and pieces spliced together by straight connecting pins. Ensure that any concealed surfaces of aluminum frames that contact cementous material are coated with the manufacturer's standard protective coating. Ensure that frames include accessories and devices required for a complete installation.
8) Design RFP Division 12 – FURNISHINGS, Section 12 48 13 – ENTRANCE FLOOR MATS AND FRAMES (page 568 of 997)
DELETE IN RED:
3.2 INSTALLATION
Submit detail drawings, and custom graphics drawings as required. Provide installation drawings. Provide the manufacturer's protection, maintenance, and repair information. Install floor mats and frames according to manufacturer's instructions. Set mat tops at the height recommended by the manufacturer for the most effective cleaning action. Provide clearance between bottoms of doors and tops of mats. Coordinate recess frame installation with concrete construction to ensure that frame anchorage is correct and that the base is level and flat. Install grout and fill around frames and, if required to set mat tops at proper elevations, in recesses under mats. Finish grout and fill smooth and level.
9) Design RFP Division 22 – PLUMBING, PART 2 – PRODUCTS (page 588 of 997)
DELETE IN RED: in its entirety
2.5.7 Precast Terrazzo Shower Floors
Terrazzo shall be made of marble chips cast in white portland cement to produce 3000 psi minimum compressive strength 7 days after casting. Provide floor or wall outlet copper alloy body drain cast integral with terrazzo, with polished stainless steel strainers.
10) Design RFP Division 28 – ELECTRONIC SAFETY AND SECURITY, PART 1 – GENERAL (page 830 of 997)
DELETE IN RED:
1.1 RELATED SECTIONS
Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS, applies to this section, with the additions and modifications specified herein. In addition, refer to the following sections for related work and coordination:
Section 21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
11) Design RFP Division 28 – ELECTRONIC SAFETY AND SECURITY, PART 2 – PRODUCTS (page 844 of 997)
DELETE IN RED:
Section: 2.10.1 Photoelectric Smoke Sensors
d. Provide twist lock bases with sounder that produces a minimum of 90 dBA at 10 feet for the sensors. The sensors shall maintain contact with their bases without the use of springs. Provide companion mounting base with screw terminals for each conductor. Terminate field wiring on the screw terminals. The sensor shall have a visual indicator to show actuation.
12) Design RFP Division 28 – ELECTRONIC SAFETY AND SECURITY, PART 2 – PRODUCTS (page 847 of
DELETE IN RED:
2.12.1.1 Capacity
Battery size shall be the greater of the following two capacities.
a. Sufficient capacity to operate the fire alarm system under supervisory and trouble conditions, including audible trouble signal devices for 24 hours and audible and visual signal devices under alarm conditions for an additional 15 minutes.
b. Sufficient capacity to operate the mass notification for 60 minutes after loss of AC power.
13) Design RFP Division 28 – ELECTRONIC SAFETY AND SECURITY, PART 2 – PRODUCTS (page 847 of 997)
DELETE IN RED:
2.12.1.2 Battery Power Calculations
a. Verify that battery capacity exceeds supervisory and alarm power requirements.
REPLACE IN BLUE:
2.12.1.2 Battery Power Calculations
a. Battery capacity shall provide 48 minutes of stand by and 15 minutes of alarm.
14) Design RFP Division 28 – ELECTRONIC SAFETY AND SECURITY, PART 3 – EXECUTION (page 884 of
DELETE IN RED:
3.7.2.4 System Acceptance
a. Furnish one set of full size paper as-built drawings and schematics. The drawings shall be prepared on uniform sized mylar sheets not less than 30 by 42 inches with 8 by 4 inch title block similar to contract drawings.
Replace in BLUE:
3.7.2.4 System Acceptance
a. Furnish one set of full size paper as-built drawings and schematics. The drawings shall be prepared on uniform sized plotted paper sheets not less than 30 by 42 inches with 8 by 4 inch title block similar to contract drawings.
15) Design RFP Division 31 – EARTHWORK (pages 884–891 of page 997)
DELETE IN RED: delete in its entirety Section 31 31 16.13 – CHEMICAL TERMITE CONTROL
B1428 Drawings v2 – The following drawings, bearing revision dates of 1/15/2020 – 1/22/2020, supersede drawings bearing the same number and title:
NAVFAC DRAWING NO. TITLE
15128693 C201 SITE PLAN
Description: Added electrical transformer and identified existing communications manhole.
15128699 AD101 FIRST FLOOR & CEILING DEMOLITION PLAN
Description: Revised general note.
15128700 AD102 EXTERIOR DEMOLITION ELEVATIONS
Description: Revised keyed note No. 3.
15128701 A101 FIRST FLOOR & CEILING PLAN
Description: Revised keyed note and revised locations on plan. Add attic access door.
15128703 A201 EXTERIOR ELEVATIONS
Description: Revised Elevations 1 & 4 EFIS Note 8 to Note 9.
15128704 A311 WALL SECTIONS & DETAILS
Description: Revised wall section – R-13 batt insulation
15128705 A401 ENLARGED FLOOR PLANS & INTERIOR ELEVATIONS
Description: Revised Restroom Interior Elevations to reflect wall mounted toilets.
15128706 A521 ROOF DETAILS
Description: Revised roofing felt note to 30# in lieu of 40#. Revised R-13 batt insulation.
15128707 A601 DOOR SCHEDULE & ELEVATIONS & DETAILS
Description: Revised hardware notes.
15128708 A611 WINDOW ELEVATION, DETAILS & LEGEND
Description: Revised details to show R-13 batt insulation.
15128710 A701 FINISH PLANS & SCHEDULES
Description: Revised finish plan keyed notes 3 & 4.
15128711 A721 CASEWORK & MILLWORK DETAILS
Description: Revised cabinet elevations by removing casework lighting.
15129712 A731 SIGNAGE PLANS
Description: Revised signage schedule to remove “NOTE 7” and added note to signage notes no. 7.
15128725 M011 MECHANICAL EQUIPMENT SCHEDULES
Description: Revised Note 1 on Packaged Rooftop Unit Schedule
15128725 E101 POWER & LIGHTING
Description: Moved floor mounted receptacle that was located under the table in Open Office 109 to an adjacent wall. Removed power poles for future office cubicles.
15128726 E102 TELECOMMUNICATIONS & LIGHTNING PROTECTION
Description: Moved floor mounted voice/data outlet that was located under the table in Open Office 109 to an adjacent wall. Removed power poles for future office cubicles.
15128730 E504 ELECTRICAL DETAILS
Description: Modified 3/E504 SURFACE RACEWAY EQUIPMENT INSTALLATION DETAIL.
15128731 E505 ELECTRICAL DETAILS
Description: Removed 4/E505 FLOOR BOX DETAIL.
N/A EXISTING BUILDING SHEET
Description: This sheet is an original building document to answer Inquiry answer No. 1320132
ENCLOSURE:
N6945020R0006 0004 – ENCLOSURE
***Updated/Added parts of B1428 Design RFP are on pages 1 – 25 of the amendment 0004 Enclosure***
***The drawings bearing revision dates are on pages 26 - 44 of the amendment 0004 Enclosure***
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
(End of Summary of Changes)
1428 Entire Building Renovation WON: 1610572 NAS Fort Worth JRB
SECTION 02 81 00
TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
11/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INTERNATIONAL AIR TRANSPORT ASSOCIATION (IATA)
IATA DGR (2018) Dangerous Goods Regulations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 415-1-266 (2000) Resident Engineer Management Guide (REMG) for Hazardous, Toxic, and Radioactive Waste (HTRW) Projects
U.S. DEPARTMENT OF TRANSPORTATION (DOT)
DOT 4500.9R Defense Transportation Regulation, Part 2, Cargo Movement, Chapter 204, Hazardous Material
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities
40 CFR 268 Land Disposal Restrictions
SECTION 02 81 00 Page 1
40 CFR 270 EPA Administered Permit Programs: The Hazardous Waste Permit Program
40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan
40 CFR 302 Designation, Reportable Quantities, and Notification
40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions
49 CFR 107 Hazardous Materials Program Procedures
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
49 CFR 173 Shippers - General Requirements for Shipments and Packagings
49 CFR 178 Specifications for Packagings
1.2 DEFINITIONS
1.2.1 Hazardous Material
A substance or material which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce, and which has been so designated pursuant to the Hazardous Materials Transportation Act, 49 U.S.C. Appendix Section 1801 et seq. The term includes materials designated as hazardous materials under the provisions of 49 CFR 172 , Sections .101 and .102 and materials which meet the defining criteria for hazard classes and divisions in 49 CFR 173 . EPA designated hazardous wastes are also hazardous materials.
1.2.2 Hazardous Waste
A waste which meets criteria established in RCRA or specified by the EPA in 40 CFR 261 or which has been designated as hazardous by a RCRA authorized state program.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Packaging Notifications
Hazardous Waste Management Plan
Onsite Hazardous Waste Management
SECTION 02 81 00 Page 2
Notices of Non-Compliance and Notices of Violation
SD-06 Test Reports
Recordkeeping
Exception Report
Spill Response
SD-07 Certificates
Transportation and Disposal Coordinator
Training
Certification
Shipping Documents and Packagings Certification
Security Plan
Certificates of Disposal
Waste Minimization
1.4 QUALITY ASSURANCE
1.4.1 Transportation and Disposal Coordinator
Designate, by position and title, one person to act as the Transportation and Disposal Coordinator (TDC) for this contract. The TDC must serve as the single point of contact for all environmental regulatory matters and have overall responsibility for total environmental compliance at the site including, but not limited to, accurate identification and classification of hazardous waste and hazardous materials; determination of proper shipping names; identification of marking, labeling, packaging and placarding requirements; completion of waste profiles, hazardous waste manifests, asbestos waste shipment records, PCB manifests, bill of ladings, exception and discrepancy reports; and all other environmental documentation. The TDC must have, at a minimum, one year of specialized experience in the management and transportation of hazardous waste and have been Department of Transportation certified under 49 CFR 172 , Subpart H.
1.4.2 Training
Hazardous materials employees must be trained, tested, and certified to safely and effectively carry out their assigned duties in accordance with Section 01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED SITES and Texas rules . Employees transporting hazardous materials or preparing hazardous materials for transportation, including samples, must be trained, tested, and certified in accordance with 49 CFR 172 , Subpart H, including security awareness and any applicable security plans. Hazardous material employees must also be trained in accordance with IATA DGR when shipping hazardous materials by air.
Employees must be trained, tested, and certified in accordance with 49 CFR 172 , Subpart H to determine that shipments do not constitute DOT
SECTION 02 81 00 Page 3 regulated hazardous materials.
1.4.3 Certification
The hazardous materials transporter must possess a current certificate of registration issued by the Research and Special Programs Administration (RSPA), U.S. Department of Transportation, when required by 49 CFR 107 , Subpart G. Submit copies of the certificates or written statements certifying exemption from these requirements.
1.4.4 Laws and Regulations Requirements
Comply with Federal, state, and local laws and regulations which are applicable. These requirements are amended frequently and compliance with amendments is required as they become effective. Notify the Contracting Officer immediately if compliance exceeds the scope of work or conflicts with specific requirements of the contract.
PART 2 PRODUCTS
2.1 MATERIALS
Provide all the materials required for the packaging, labeling, marking, placarding and transportation of hazardous wastes and hazardous materials in conformance with Department of Transportation standards and IATA DGR and EP 415-1-266 . Details in this specification must not be construed as establishing the limits of the Contractor's responsibility.
2.1.1 Packagings
Provide bulk and non-bulk containers for packaging hazardous materials/wastes consistent with the authorizations referenced in the Hazardous Materials Table in 49 CFR 172 , Section.101, Column 8. Bulk and non-bulk packaging must meet the corresponding specifications in 49 CFR 173 referenced in the Hazardous Materials Table, 49 CFR 172 , Section .101.
Packaging must conform to the general packaging requirements of Subpart B of 49 CFR 173 , to the requirements of 49 CFR 178 at the specified packing group performance level, to the requirements of special provisions of column 7 of the Hazardous Materials Table in 49 CFR 172 , Section .101, and be compatible with the material to be packaged as required by 40 CFR 262 .
Also provide other packaging related materials such as materials used to cushion or fill voids in overpacked containers. The hazardous materials being packaged must not react dangerously with, decompose or ignite the sorbent packaging materials. Additionally, sorbents used to treat free liquids to be disposed of in landfills must be non-biodegradable as specified in 40 CFR 264 , Section .314. In addition, packaging notifications will be provided to the Government in accordance with 49 CFR 172 , Section .178.2(c) regarding type and dimensions of closures, including gaskets, needed to satisfy performance test requirements.
2.1.2 Markings
Provide markings for each hazardous material/waste package, freight container, and transport vehicle consistent with the requirements of 49 CFR 172 , Subpart D and 40 CFR 262 , Section.32 (for hazardous waste) 40 CFR 761 , Section .45 (for PCBs) 40 CFR 61 , Section .149(d) (for asbestos).
Markings must withstanda 180 day exposure to conditions reasonably expected to be encountered during container storage and transportation, without deterioration or substantial color change.
SECTION 02 81 00 Page 4
2.1.3 Labeling
Provide primary and subsidiary labels for hazardous materials/wastes consistent with the requirements in the Hazardous Materials Table in 49 CFR 172 , Section .101, Column 6. Labels must meet design specifications required by 49 CFR 172 , Subpart E including size, shape, color, printing, and symbol requirements. Labels must be durable weather resistant and withstanding a 180 day exposure to conditions reasonably expected to be encountered during container storage and transportation, without deterioration or substantial color change.
2.1.4 Placards
For each offsite shipment of hazardous material/waste, provide primary and subsidiary placards consistent with the requirements of 49 CFR 172 , Subpart F. Provide placards for each side and each end of bulk packaging, freight containers, transport vehicles, and rail cars requiring such placarding. Placards may be plastic, metal, or other material capable of withstanding, without deterioration, a 30 day exposure to open weather conditions and must meet design requirements specified in 49 CFR 172 , Subpart F.
2.1.5 Spill Response Materials
Provide spill response materials including, but not limited to, containers, adsorbent, shovels, and personal protective equipment. Spill response materials must be available at all times when hazardous materials/wastes are being handled or transported. Spill response materials must be compatible with the type of material being handled.
2.2 EQUIPMENT AND TOOLS
Provide miscellaneous equipment and tools necessary to handle hazardous materials and hazardous wastes in a safe and environmentally sound manner.
PART 3 EXECUTION
3.1 HAZARDOUS WASTE MANAGEMENT PLAN
Prepare a Hazardous Waste Management Plan detailing the manner in which hazardous wastes will be managed and describing the types and volumes of hazardous wastes anticipated to be managed. The plan must address both onsite and offsite hazardous waste management. Describe the methods to be used to ensure accurate piece counts or weights of shipments; describe waste minimization methods; identify and describe facilities to be used for treatment, storage, and disposal (TSD); identify areas onsite where hazardous wastes are to be handled; and identify whether transfer facilities are to be used; and if so, how the wastes will be tracked to ultimate disposal. Submit the plan to the Contracting Officer for approval prior to start of work. Submit written documentation of weekly hazardous waste inspections on a monthly basis.
3.2 ONSITE HAZARDOUS WASTE MANAGEMENT
Coordinate the onsite management of all hazardous materials and waste with the installation environmental function and the Contracting Officer.
These paragraphs apply to Government owned waste only. The Contractor is responsible for ensuring compliance with Federal, state, and local
SECTION 02 81 00 Page 5 hazardous waste laws and regulations and verifying those requirements when preparing reports, waste shipment records, hazardous waste manifests, or other documents. Identify hazardous wastes using criteria set forth in 40 CFR 261 or applicable state and local laws, regulations, and ordinances. Comply with generator requirements in 40 CFR 262 and applicable state or local law or regulations when accumulating hazardous waste onsite. Onsite accumulation times must be restricted to applicable time frames referenced in 40 CFR 262 , Section.34 and applicable state or local law or regulation. Accumulation start dates commence when waste container is transferred into a 90 day accumulation site or permitted storage facility. Only use containers in good condition and compatible with the waste to be stored. Ensure containers are closed except when adding or removing waste, and immediately mark all hazardous waste containers with the words "hazardous waste" and other information required by 40 CFR 262 , Section.32 and applicable state or local law or regulation as soon as the waste is containerized. An additional marking must be placed on containers of "unknowns" designating the date sampled, and the suspected hazard. Inspect containers for signs of deterioration and for responding to any spills or leaks. Inspect all hazardous waste areas weekly and provide written documentation of the inspection. Include date and time of inspection, name of individual conducting the inspection, problems noted, and corrective actions taken on the inspection logs.
3.2.1 Hazardous Waste Classification
Identify, in consultation with the Contracting Officerwaste generator, all waste codes applicable to each hazardous waste stream based on requirements in 40 CFR 261 or applicable state or local law or regulation. Also identify applicable treatment standards in 40 CFR 268 and state land disposal restrictions and make a determination as to whether or not the waste meets or exceeds the standards. Submit waste profiles, analyses, classification and treatment standards information to Contracting Officer for review and approval.
3.3 OFFSITE HAZARDOUS WASTE MANAGEMENT
Coordinate the off site transfer of all hazardous materials and waste with the installation environmental function and the Contracting Officer. Use RCRA Subtitle C permitted facilities which meet the requirements of 40 CFR 264 or facilities operating under interim status which meet the requirements of 40 CFR 265 . Do not use offsite treatment, storage, and disposal facilities with significant RCRA violations or compliance problems (such as facilities known to be releasing hazardous constituents into ground water, surface water, soil, or air). Submit Notices of Non-Compliance and Notices of Violation by a Federal, state, or local regulatory agency issued to the Contractor in relation to any work performed under this contract. Immediately provide copies of such notices to the Contracting Officer. Also furnish relevant documents regarding the incident and any information requested by the Contracting Officer, and coordinate its response to the notice with the Contracting Officer or the designated representative prior to submission to the notifying authority.
Also furnish a copy to the Contracting Officer of all documents submitted to the regulatory authority, including the final reply to the notice, and all other materials, until the matter is resolved.
3.3.1 Treatment, Storage, and Disposal Facility and Transporter
Provide the Contracting Officer with EPA ID numbers, names, locations, and telephone numbers of TSD facilities and transporters. This information
SECTION 02 81 00 Page 6 must be contained in the Hazardous Waste Management Plan and be approved by the Contracting Officer prior to waste disposal.
3.3.2 Facility Status Information
Facilities receiving hazardous waste must be permitted in accordance with 40 CFR 270 or operating under interim status in accordance with 40 CFR 265 requirements, or permitted by a state authorized by the Environmental Protection Agency to administer the RCRA permit program. Additionally, prior to using a TSD Facility, contact the EPA Regional Offsite Coordinator specified in 40 CFR 300 , Section .440, to determine the facility's status, and document all information necessary to satisfy the requirements of the EPA Offsite policy and submit this information to the Contracting Officer in the Hazardous Waste Management Plan.
3.3.3 Shipping Documents and Packagings Certification
Prior to shipment of any hazardous material offsite and a minimum of 14 days prior to anticipated pickup, provide for review written certification to the Contracting Officer that hazardous materials have been properly packaged, labeled, and marked in accordance with Department of Transportation and EPA requirements. Furnish designated disposal facility packaging assurances not later than 35 days after acceptance of the shipment. The Contractor's TDC must also provide written certification regarding waste minimization efforts documenting that efforts have been taken to reduce the volume and toxicity of waste to the degree economically practicable and that the method of treatment, storage, or disposal selected minimizes threats to human health and the environment.
3.3.4 Transportation
Prior to conducting hazardous materials activities, the Contractor responsible for pre-transportation activities must either certify to the Government that a Security Plan is in place which meets the requirements of 49 CFR 172 , Subpart I or in the event that the types or amounts of hazardous materials are excluded from the security planning requirements, a written statement to that effect detailing the basis for the exception.
Use manifests for transporting hazardous wastes as required by 40 CFR 263 or applicable state or local law or regulation. Transportation must comply with all requirements in the Department of Transportation referenced regulations in the 49 CFR series. Prepare hazardous waste manifests for each shipment of hazardous waste shipped offsite. Complete manifests using instructions in 40 CFR 262 , Subpart B and applicable state or local law or regulation. Submit manifests and waste profiles to Contracting Officer for review and approval. Prepare land disposal restriction notifications as required by 40 CFR 268 or applicable state or local law or regulation for each shipment of hazardous waste. Submit notifications with the manifest to the Contracting Officer for review and approval. In accordance with DOT 4500.9R , inspect motor vehicles used to transport hazardous materials in accordance the 49 CFR and DOT safety regulations and complete DDForm 626, Motor Vehicle Inspection.
3.3.5 Treatment and Disposal of Hazardous Wastes
Coordinate any off site shipments of hazardous materials or hazardous wastes with the installation environmental function. Initial, or satellite hazardous waste accumulation is limited to 55 gallons (or 1 quart of acutely hazardous waste). Once a waste stream exceeds 55 gallons, it must be transferred to an on-site 90 day (180 day small
SECTION 02 81 00 Page 7 quantity generator) accumulation area, or a permitted hazardous waste treatment, storage or disposal facility within three days. Ship hazardous wastes only to facilities which are properly permitted to accept the hazardous waste or operating under interim status. Ensure wastes are treated to meet land disposal treatment standards in 40 CFR 268 prior to land disposal. Propose TSD facilities via submission of the Hazardous Waste Management Plan, subject to the approval of the Contracting Officer. Submit Certificates of Disposal documenting the ultimate disposal, destruction or placement of hazardous wastes, within 180 days of initial shipment. Receipt of these certificates will be required for final payment.
3.4 SHIPPING DOCUMENTS
Ensure that each shipment of hazardous material sent off site is accompanied by properly completed shipping documents. This includes shipments of samples that may potentially meet the definition of a Department of Transportation regulated hazardous material.
3.4.1 Other Hazardous Material Shipment Documents
Prepare a bill of lading for each shipment of hazardous material which is not accompanied by a hazardous waste manifest or asbestos waste shipment record which fufills the shipping paper requirements. The bill of lading must satisfy the requirements of 49 CFR 172, Subpart C, and applicatble state or local law or regulation, and must be submitted to the Contracting Officer for review and approval. For laboratory samples and trataiblility study samples, prepare bills of lading and other documenttation as necessary to satisfy conditions of the sample exclusions in 40 CFR 261, Section .4(d) and (e) and any applicable state or local law or regulation.
Bill of ladings requireing shipper's certifications must be signed by the Government and Contractor.
3.5 SPECIAL REQUIREMENTS FOR ASBESTOS WASTES
If work involves asbestos containing wastes, manage these wastes in accordance with specification Section 02 82 00 ASBESTOS REMEDIATION.
3.6 WASTE MINIMIZATION
Minimize the generation of hazardous waste to the maximum extent practicable and take all necessary precautions to avoid mixing clean and contaminated wastes. Identify and evaluate recycling and reclamation options as alternatives to land disposal. Requirements of 40 CFR 266 apply to: hazardous wastes recycled in a manner constituting disposal;
hazardous waste burned for energy recovery; lead-acid battery recycling;
and hazardous wastes with economically recoverable precious metals.
Submit written certification that waste minimization efforts have been undertaken to reduce the volume and toxicity of waste to the degree economically practicable and that the method of treatment, storage, or disposal selected minimizes threats to human health and the environment.
3.7 RECORDKEEPING
Maintain adequate records to support information provided to the Contracting Officer regarding exception reports, annual reports, and biennial reports; maintain asbestos waste shipment records for a minimum
SECTION 02 81 00 Page 8 of 3 years from the date of shipment or any longer period required by applicable law or regulation or other provision of this contract; and maintain bill of ladings for a minimum of 375 days from the date of shipment or longer period required by applicable law or regulation or other provision of this contract. Submit information necessary to file state annual or EPA biennial reports for hazardous waste transported, treated, stored, or disposed of under this contract. Do not forward these data directly to the regulatory agency but to the Contracting Officer at the specified time. Submit the information necessary for filing of the formal reports in the form and format required by the governing Federal or state regulatory agency. A cover letter must accompany the data to include the contract number, Contractor name, and project location. In the events that a manifest copy documenting receipt of hazardous waste at the treatment storage and disposal facility is not received within 35 days of shipment initiation, or that a manifest copy documenting receipt of PCB waste at the designated facility is not received within 35 days of shipment initiation, prepare and submit an exception report to the Contracting Officer within 37 days of shipment initiation.
3.8 SPILL RESPONSE
In the event of a spill or release of a hazardous substance (as designated in 40 CFR 302 ), or pollutant or contaminant, or oil (as governed by the Oil Pollution Act (OPA), 33 U.S.C. 2701 et seq.), notify the Contracting Officer immediately. Direction from the Contracting Officer concerning a spill or release is not considered a change under the contract. If the spill exceeds a reporting threshold, follow the pre-established procedures for immediate reporting to the Contracting Officer. Comply with applicable requirements of Federal, state, or local laws or regulations regarding any spill incident.
3.9 EMERGENCY CONTACTS
Comply with the emergency contact provisions in 49 CFR 172 , Section .604.
Whenever the Contractor ships hazardous materials, provide a 24 hr emergency response contact and phone number of a person knowledgeable about the hazardous materials being shipped and who has comprehensive emergency response and incident mitigation information for that material, or has immediate access to a person who possesses such knowledge and information. Monitor the phone on a 24 hour basis at all times when the hazardous materials are in transportation, including during storage incidental to transportation. Ensure that information regarding this emergency contact and phone number are placed on all hazardous material shipping documents. Designate an emergency coordinator and post the following information at areas in which hazardous wastes are managed:
a. The name of the emergency coordinator.
b. Phone number through which the emergency coordinator can be contacted on a 24 hour basis.
c. The telephone number of the local fire department.
d. The location of fire extinguishers and spill control materials.
SECTION 02 81 00 Page 9
Attachment A
SAMPLE OFF-SITE POLICY CERTIFICATION MEMO
Project/Contract #:
Waste Stream:
Primary TSD Facility, EPA ID # and Location:
Alter. TSD Facility, EPA ID # and Location:
EPA Region Contact
I 888-372-7341
II 212-673-4040
III 800-438-2474 or 215-814-5000
IV 800-241-1754 or 404-562-9900
V 312-353-2000
VI 800-887-6063 or 214-665-2210
VII 800-223-0425
VIII 800-424-8802
IX 415-947-8713
X 800-424-4372 or 206-553-4973
EPA representative contacted:
EPA representative phone number:
Date contacted:
Comment:
The above EPA representative was contacted on __________. As of that date the above sites were considered acceptable in accordance with the Off-Site Policy in 40 CFR 300 .440.
Date: Signature:
Phone number:
-- End of Section --
SECTION 02 81 00 Page 10
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
11/11
ASTM INTERNATIONAL (ASTM)
ASTM C665 (2012) Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM E136 (2016) Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C
ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 211 (2016) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
NFPA 31 (2016) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2015) National Fuel Gas Code
NFPA 70 (2017) National Electrical Code
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
1.2 SUBMITTALS
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
Blanket Insulation
Accessories
SECTION 07 21 16 Page 1
SD-08 Manufacturer's Instructions
Insulation
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.3.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.4 SAFETY PRECAUTIONS
1.4.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134 .
1.4.2 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C930.
2.1 BLANKET INSULATION
ASTM C665, Type I, blankets without membrane coverings; Class A, membrane-faced surface with a flame spread of 25 or less, except a flame spread rating of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E84.
2.1.1 Thermal Resistance Value (R-VALUE)
The R-Value as indicated on drawings.
2.1.2 Recycled Materials
Provide Thermal Insulation containing recycled materials to the extent practicable, provided the material meets all other requirements of this section. The minimum required recycled materials content by weight are:
Fiberglass: 20 to 25 percent glass cullet
SECTION 07 21 16 Page 2
2.1.3 Prohibited Materials
Do not provide asbestos-containing materials.
2.2 BLOCKING
Wood, metal, unfaced mineral fiber blankets in accordance with ASTM C665, Type I, or other approved materials. Use only non-combustible materials meeting the requirements of ASTM E136 for blocking around chimneys and heat producing devices.
2.3 ACCESSORIES
2.3.1 Adhesive
As recommended by the insulation manufacturer.
2.3.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
2.3.3 Wire Mesh
Corrosion resistant and as recommended by the insulation manufacturer.
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.
3.2 PREPARATION
3.2.1 Blocking at Attic Vents and Access Doors
Prior to installation of insulation, install permanent blocking to prevent insulation from slipping over, clogging, or restricting air flow through soffit vents at eaves. Install permanent blocking around attic trap doors.
Install permanent blocking to maintain accessibility to equipment or controls that require maintenance or adjustment.
3.2.2 Blocking Around Heat Producing Devices
Install non-combustible blocking around heat producing devices to provide the following clearances:
a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless these are certified by the manufacturer for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if insulation is to be placed above fixture or device, 24 inches above fixture.
SECTION 07 21 16 Page 3
b. Masonry chimneys or masonry enclosing a flue: 2 inches from outside face of masonry. Masonry chimneys for medium and high heat operating appliances: Minimum clearances required by NFPA 211 .
c. Vents and vent connectors used for venting the products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances as required by NFPA 211 .
d. Gas Fired Appliances: Clearances as required in NFPA 54 .
e. Oil Fired Appliances: Clearances as required in NFPA 31 .
Blocking around flues and chimneys is not required when insulation blanket, including any attached vapor retarder, passed ASTM E136, in addition to meeting all other requirements stipulated in Part 2. Blocking is also not required if the chimneys are certified by the manufacturer for use in contact with insulating materials.
3.3 INSTALLATION
3.3.1 Insulation
Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Any materials that show visual evidence of biological growth due to presence of moisture must not be installed on the building project. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.
3.3.1.1 Electrical wiring
Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.
3.3.1.2 Continuity of Insulation
Install blanket insulation to butt tightly against adjoining blankets and to studs, rafters, joists, sill plates, headers and any obstructions.
Where insulation required is thicker than depth of joist, provide full width blankets to cover across top of joists. Provide continuity and integrity of insulation at corners, wall to ceiling joints, roof, and floor. Avoid creating thermal bridges.
3.3.1.3 Installation at Bridging and Cross Bracing
Insulate at bridging and cross bracing by splitting blanket vertically at center and packing one half into each opening. Butt insulation at bridging and cross bracing; fill in bridged area with loose or scrap insulation.
3.3.1.4 Insulation without Affixed Vapor Retarder
Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between trusses, joists, studs and other framing, such as at attic access doors, door and window heads, jambs, and sills, band joists, and headers.
SECTION 07 21 16 Page 4
3.3.1.5 Sizing of Blankets
Provide only full width blankets when insulating between trusses, joists, or studs. Size width of blankets for a snug fit where trusses, joists or studs are irregularly spaced.
3.3.1.6 Special Requirements for Ceilings
Place insulation under electrical wiring occurring across joists. Pack insulation into narrowly spaced framing. Do not block flow of air through soffit vents.
SECTION 07 21 16 Page 5
SECTION 10 11 00
VISUAL DISPLAY UNITS
08/17 extent referenced. The publications are referred to within the text by the basic designation only.
ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM F152 (1995; R 2009) Tension Testing of Nonmetallic Gasket Materials
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 DEFINITIONS OR ADMINISTRATIVE REQUIREMENTS
The term visual display board when used herein includes presentation boards, marker boards, tackboards, board cases, display track system and horizontal sliding units; submit manufacturer's descriptive data and catalog cuts plus manufacturer's installation instructions, and cleaning and maintenance instructions. Visual display boards must be from manufacturer's standard product line. Submit certificate of compliance signed by Contractor attesting that visual display boards conform to the requirements specified.
1.3 SUBMITTALS
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 10 11 00 Page 1
Visual Display Board; G
SD-04 Samples
Aluminum; G
Materials; G
1.4 CERTIFICATIONS
1.4.1 Indoor Air Quality
1.4.1.1 Indoor Air Quality for Visual Display Products
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the building site in the manufacturer's original unopened containers and store them in a clean dry area with temperature maintained above 50 degrees F. Stack materials according to manufacturer's recommendations. Visual display boards must be allowed to acclimate to the building temperature for 24 hours prior to installation.
1.6 WARRANTY
Provide manufacturer's…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .