N6945019R1900_JL7_SiteVisitBrief.pdf
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Welcome to Naval Submarine Base Kings Bay Providing Support to the Fleet, Fighter and Family
Welcome to Naval Submarine Base Kings Bay Providing Support to the Fleet, Fighter and Family
San Diego, CA
SSN
Bangor, WA SSBN, SSGN, SSN New London, CT
SSN
Norfolk, VA
SSN
Pearl Harbor, HI
SSN
Kings Bay, GA
SSBN, SSGN
Guam SSN, Tenders
Portsmouth, NH
SSN
Yokosuka, Japan
COMSUBGRU 7
Naples, Italy
COMSUBGRU 8
Submarines 51 SSNs 14 SSBNs (6 in Kings Bay) 4 SSGNs (2 in Kings Bay)
Diego Garcia SSGN Maintenance
Manpower
Total: ~24,500 Officer: ~2,500 Enlisted: ~18,000 Civilian/Reservists: ~4,000
Highly Leveraged Assets
~6% of Navy personnel ~25% of warships ~15% of Navy budget ~70% of accountable nuclear warheads 100% of survivable warheads
America’s Submarine Force
UNCLASSIFIED
Strategic Deterrence
• 12 SSBNs Replace 14: Survivability;
Geography; Target Coverage
• Efficient: Strategic Weapons System;
D5-LE; SWFTS; Acoustic Superiority
• New: 42-year Reactor
• Value: SBSD ~1% total DoD Budget;
On Patrol Through 2080s; Still ~70%
COLUMBIA Class
• Sea Based Strategic Deterrence
• Only survivable leg of nuclear TRIAD
• ~70% of accountable nuclear warheads
• Preventing major power war for the last 7 decades
OHIO Class
“… foundational to our survival as a nation.” – Navy Design
UNCLASSIFIED
UNCLASSIFIED
Virginia class (SSN) Length: 377 feet, Beam: 34 feet
Displacement: Approximately 7,800 tons submerged Speed: 25+ knots
Seawolf class (SSN) Length: 353 feet, Beam: 40 feet
Displacement: Approximately 9,100 tons submerged Speed: 25+ knots
Los Angeles class (SSN) Length: 360 feet, Beam: 33 feet
Displacement: Approximately 6,900 tons submerged Speed: 25+ knots
Ohio class (SSBN/SSGN) Length: 560 feet, Beam: 42 feet
Displacement: Approximately 18,750 tons submerged
Speed: 25+ knots
Current Submarine Classes
Two-Crews
Blue and Gold Cost Effective and Increases Time
At Sea
224 Day Cycle >Refit > Patrol > Off Crew (Training)
Commander Submarine Group 10
Commander Submarine Group 10
COMSUBRON 20
USS Tennessee (SSBN 734) USS West Virginia (SSBN 736) USS Maryland (SSBN 738) USS Rhode Island (SSBN 740) USS Wyoming (SSBN 742) USS Alaska (SSBN 732)
COMSUBRON 16
USS Florida (SSGN 728) USS Georgia (SSGN 729)
Arrival Date March 1990
September 1991 May 1993 June 1995
August 1997 April 2009
May 2006 March 2008
PPV Housing/Golf Course
Upper Base Controlled Area
Waterfront Restricted Area
Infrastructure Utility Control Center Waste Water Treatment
Electrical Distribution Water Supply
Waste Water Control
• Crane oversight for Kings Bay
• Nuclear repair
• Electronics repair
• Combat system repair
Trident Refit FacilityTrident Refit Facility
• Life cycle planning & engineering support
• Life cycle logistics support
• Hull, mechanical, electrical repair
Trident Training Facility
“Husbandry of the Fleet Ballistic Missile and TLAM”
Waterfront Restricted Area
Economic Impact $1.142 billion annually Payroll $600 million Goods & Services $67.5 million Retired Annuitants $81.4 million Coast Guard MFPU $19.7 million Economic Impact $1.142 billion
County Employers:
NAVSUBASE Kings Bay ~9000 *Camden County Schools ~1200 *Express Scripts ~650
County population 1970 – 11,334 1990 – 30,167 1980 – 13,371 2000 – 43,664 2015 – 52,102
*Information provided by Camden County Chamber of Commerce
Kings Bay Base Operations Support (BOS) I Services
Pre-Proposal Conference and Site Visit Kickoff Briefing
RFP N69450-19-R-1900
11-12 June 2019
Introduction
The purpose of this briefing is to provide instructions for the site visit and a general overview of the solicitation, including:
General Contract Requirements Overview of the PWS and Technical Specifications Evaluation Factors and Basis for Award Proposal Requirements and Considerations RFP/Site Visit Questions and Answers
All attendees must sign in on the site visit log. The sign-in sheet and brief will be posted to NECO/FBO via amendment after the site visit.
Nothing said today shall alter the requirements of the solicitation.
The terms and conditions remain unchanged unless the solicitation is amended in writing via amendment.
No questions will be answered at the sites.
Overview of the Contract
General Description:
This solicitation is for Base Operations Support (BOS) I services at Naval Submarine Base (NSB) Kings Bay, Georgia and outlying areas within the NSB Kings Bay area of responsibility.
The requirement includes all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform: Force Protection, Facility Management, Facility Investment, Other (Swimming Pools), Utilities Management, Electrical, Wastewater, Steam, Water, Compressed Air, SCADA, Telecommunications, Chiller Plant, Base Support Vehicles and Equipment (BSVE), Environmental, and other related services.
The Section C Performance Work Statement (PWS) is provided as an attachment to the RFP
Supports PBSC (Performance Based Service Contracting) Uses Navy-wide templates Standard structure Tabular format 1 standard functional annex
Annex 1 – Contains information relevant to the entire scope of the contract.
Annex 2 – Management and administration requirements relevant to the entire scope of the contract (including mobilization/demobilization).
Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Each of these annexes can contain 1 or more sub-annexes.
PWS General Information
PWS General Information
Spec Item Standard Use
General Information Information unique to the understanding of the technical requirements of this specification.
Management & Administration Management and administrative requirements unique to the planning, execution, management and administration of the performance requirements of this specification. This cost is spread to Spec Item 3 for Recurring Work or Spec Item 4 for 100% Non-Recurring Work.
Recurring Work All Recurring Work technical requirements of this specification.
Non-recurring Work A pre-priced list of unplanned and unscheduled Unit Priced Task (UPT) Work (non-negotiated) and Unit Priced Labor (UPL) Work (negotiated).
SECTION C: Annex Content – Technical Annexes 3 - 18
Technical Specifications
SECTION F: Deliverables Contains a list of data deliverables and reports
SECTION J: Documents, Exhibits, and Other Attachments Recurring Work ELINs Non-recurring Work ELINs
Client ordering of pre-priced line items via task order or FedMall Other attachments
Definitions and Acronyms Wage Determinations Directives, Instructions, and References Inventories and Maps Descriptions, Locations, and Frequencies for Scheduled Work Standard numbering convention
Numbering example: “J-0200000-13”
PWS Structure – KBOS I
Annex 1 (0100000) – General Information Annex 2 (0200000) – Management and Administration Annex 4 (0400000) – Public Safety
0401000 – Force Protection Annex 15 (1500000) – Facilities Support
1501000 – Facility Management 1502000 – Facility Investment 1503040 – Other (Swimming Pools)
Annex 16 (1600000) – Utilities 1601000 – Utilities Management 1602000 – Electrical 1604000 – Wastewater 1605000 – Steam 1606000 – Water 1607000 – Compressed Air
1608000 – SCADA
1609000 – Telecommunications 1610000 – Chiller Plant
Annex 17 (1700000) – Base Support Vehicles and Equipment Annex 18 (1800000) – Environmental
FSC Discussion Topics
Service Orders
Limits of Liability
Systems
Integrated Maintenance Program
Other Considerations
Service Orders
Using current Office of the Secretary of Defense (OSD) Guidance to standardize $5,000 direct labor hours and direct material cost Categories:
Emergency Urgent Routine
Completion times:
Emergency: Responded to within one hour of receipt of call.
Work continues without interruption until emergent condition is arrested.
If follow-on work is required (after the emergency condition is arrested) to complete the repair/restoration and ensure facilities, ground structures, personal property equipment, installed equipment, systems, or other assets are fully functional and in normal working condition, it shall be completed within 5 calendar days
Urgent: Within 5 working days Routine: Within 30 calendar days
Any variations will be specifically identified Service orders will include a wide variety of work.
Service Orders – (cont’d)
Intent is to provide an effective way to execute reactive and unscheduled work Within scope of contract Within service order quantities available
Service Order Payment Change. Service Orders will be:
Unit priced as “Each” in the pricing schedule/ELINs.
A specific Quantity will be provided in the ELINs for pricing/bid The Contractor may invoice for completed service orders. The Contractor shall not invoice for incomplete service orders and service orders not issued.
A modification will be processed at the end of each period of performance and after the final invoice is paid for the period of performance to deduct for service orders not completed. Deductions will be based on the unit prices specified in Attachment J-0200000-15 ELINs for Service Orders.
Limits of Liability
Interpretation and Application of Limits of Liability, example:
Section C, Annex 0200000 Management and Administration, Spec Item 2.14.1 Notification to the Government for Work Above the Recurring Work Limitations:
“The Contractor is fully responsible for work up to the recurring work limits of liability. Recurring work limits of liability are specified in subsequent annexes and sub-annexes. When work is expected to exceed the recurring work limits of liability, the Contractor shall notify the KO and provide a rough order of magnitude (ROM) estimate for the work exceeding the Contractors recurring work limits of liability within two hours of identification. For the portion exceeding the Contractors recurring work limit of liability, the Government may issue a service order in accordance with the recurring work provisions or a non-recurring work task order in accordance with the non-recurring work provisions of the contract detailed below or accomplish the work by means other than this contract.
The Contractor shall provide a detailed scope of work and detailed estimate, within two work days of the notification to the KO, per the non-recurring work procedures in Spec Item 2.15 for any potential task orders resulting from work that exceeded a recurring work limit of liability in the contract. The estimate shall include the full scope of Work and clearly show the deductions for the applicable recurring work limit of liability. The resultant proposed price shall be for the portion of the work exceeding the recurring work limit of liability. Further, the Contractor shall prepare and provide scopes of work and estimates in this manner to the KO when requesting a determination that a recurring work limit of liability has or will be exceeded.”
Limits of Liability – (cont’d)
Section C, Sub-annex 1502000 Facility Investment (SUBASE), Spec Item 3.1 Service Orders:
The Contractor has full responsibility for any work up to the service order limit of liability of $5,000 direct labor hours and direct material cost per service order.
The Government will only pay for the portion of direct labor and/or direct material that exceeds the service order limits of liability. Examples of work exceeding the Service Order limits of liability:
If a service order requires $5,100 direct labor hours and direct material cost, the Government may issue a task order in accordance with the Non-recurring Work portion of the contract for the $100 in direct labor and/or direct material cost that exceeds the service order limit of liability.
Other examples (i.e., PM and IMP) are include in the specs
Ask questions prior to award
Limits of Liability will be applied/enforced post award
Systems
Specifications require maintenance on “Systems” for many spec items. Systems Descriptions do not list every “piece/part” of the system. For Example:
Section J, Sub-annex 1502000 Facility Investment (SUBASE), Attachment J-1502000-11
HVAC and Refrigeration Systems Description:
A HVAC and Refrigeration System is a system that maintains desired environmental conditions within a facility. The system commences at the utility isolation point of connection and terminates at the point of delivery to the building environment and includes all supply and returns, electrical circuits, panels, breakers, switchgear, starters and motor control centers. It includes systems in other facilities or mechanical spaces when they are required to deliver substances required to control environmental conditions within a facility. Examples include chilled water, hot water, and steam. This excludes systems covered under the utilities portion of this contract. HVAC systems encompass all mechanically and electrically interlocked ancillary parts, equipment, and components such as duct work, registers, elements, insulation, devices, parts, chillers, air handlers, unit heaters, pumps, strainers, condensers, cooling towers, dryers, dust collectors, air boxes (VAV and bypass), piping, tanks, heat exchangers, fittings valves, cooling towers, boilers, backflow preventers, water heaters, unfired pressure vessels, fans, bathroom exhaust, electric strip heat, galley exhaust, electronic air/smoke cleaners, blowers, gauges, fuel piping, regulators, electrical circuits, compressors, refrigeration monitors, safety devices, controls, media, filters, high efficiency filters, and etc. needed to ensure proper system operation. HVAC systems can include subsystems that interact to maintain conditions within a facility: chilled water, direct expansion, hot water, steam, air handling, controls, process refrigeration, Variable Frequency Drives (VFDs), ventilation, air compressors and dryers for pneumatic controls and related components.
Systems – (cont’d)
Using this HVAC example, the Contractor shall be responsible for an IMP of the “HVAC System” to include ancillary parts, equipment, and components that may or may not be specifically listed in the J attachment.
Other statements you may see in a spec for “systems” Systems commence at the utility isolation point of connection and terminate at the point of delivery.
The intent with regard to Systems Straightforward – “maintain the system” Consider other relevant information – facility size, industry knowledge, location, etc.
Ask questions pre-award Expect to be responsible for “Systems” requirements post award
Integrated Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service Orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
Plain Talk:
A “breakdown” maintenance approach is unacceptable Don’t waste your page count on theory – be clear about
What you plan to do;
How it’s worked;
Adequate resources to get what you propose done.
Your approach can be high or low tech but should include:
A solid PM Program and monitoring approach Timely reactive repairs – response similar to service orders Minimize downtime and outages
Think “Systems”
Other Considerations
First and Foremost – “Be prepared to perform the work for the price you bid” LOLs will be applied as specified Prices proposed will be used – don’t expect to re-negotiate post award
Price what you propose All the “bells and whistles” in your technical proposal Labor quantities and skill levels/qualifications Management and oversight to ensure quality and safety Insert info from price evaluation factor
Carefully consider non-recurring Unit Priced Labor (UPL) and direct labor, direct material costs, and construction and universal equipment definitions.
Understand what’s included – “fully burdened” UPL applies to “work” - whether performed by prime, sub, or vendor
Additional examples, definitions, etc. are provided in the specification Maximo data entry requirements – update of Government Maximo by direct entry daily
Work order data – for all work performed (Service Orders, PMs, repairs, etc) under this contract. This requires work order creation, maintenance plan input (either up front or with each work order), etc.
Asset data – for facilities/utilities assets maintained under this contract. This includes creation/correction of existing data as necessary and updates to records based upon repairs/replacement performed.
Condition data – for facilities assets maintained under this contract. Condition assessment performed at least once annually.
Solicitation Overview
Solicitation, Attachments, and Amendments:
Posted on the Navy Electronic Commerce Online (NECO) and Federal Business Opportunities (FBO) websites at:
https://www.neco.navy.mil/ https://www.fbo.gov/
Two amendments have been issued to date
It is the offeror’s responsibility to obtain the RFP files, along with any amendments, from NECO/FBO
Vendors are encouraged to register on both sites to receive automatic updates regarding the solicitation
Solicitation Overview
Contract Type: Facilities Support Indefinite-Quantity Combination of recurring work (firm-fixed price (FFP)) and non-recurring work
(indefinite delivery indefinite quantity (IDIQ)) Each period of performance has two Contract Line Item Numbers (CLINs), one for recurring work and one for non-recurring work
Contract Term:
Ten month base period and seven one-year option periods, total of seven years and ten months FAR 52.217-8, Option to Extend Services, provides the authority to extend contract performance up to 6 months (if necessary)
Basis for Award:
Best Value Tradeoff The technical factors (Factors 1, 2, 3, 4, and 5) are of equal importance to each other and, when combined, are equal in importance to the past performance factor (Factor 6). When the proposal is evaluated as a whole, the technical factors and past performance factor combined are significantly more important than price.
Proposal Requirements
Volume I – Responsibility Determination
Volume II – Price Proposal Section B Section J Exhibit Line Item Numbers (ELINs) Pricing Attachment Price Narrative Factor 5 – Small Business Utilization
Volume III – Non-Price/Technical Proposal Factor 1 – Corporate Experience Factor 2 – Management Factor 3 – Technical Approach Factor 4 – Safety Factor 6 – Past Performance
Proposal Considerations
Review the instructions and submittal requirements in Sections L and M of the RFP and ensure you have addressed all requirements
Verify accuracy of SAM registration and compliance with VETS-4212 reporting requirements (if applicable)
Sign and return all solicitation amendments Address every element within each factor Make sure insurance information is up-to-date for the safety factor Utilize the attachments provided in Section J to submit Corporate Experience, Safety, and ELIN pricing data in the format provided Ensure data is consistent throughout the proposal (price and technical) Number proposal pages consecutively and stay within the page limitations provided. Pages exceeding the page limitation will not be evaluated.
Clearly label and separate/tab each factor in your proposal Do not copy and paste from a prior proposal Ask questions if you are uncertain about something
Small Business Lessons Learned
Non-Price Factor 5, Small Business Utilization Achievements
• Narrative describing SB achievements in supporting Govt’s SB policies
• Provide Small Business Subcontracting Record for each project cited under Factor 1, Corporate Experience
• Provide ISRs (or equivalent) for each project cited if subcontracting plan was required, and explanations for any instances of failures to meet goals
• Teaming/JV/Mentor-Proteges – Explain and demonstrate meaningful involvement in the management of the subcontracting program.
Small Business Participation and Commitment
• Submit Small Business Participation and Commitment Strategy attachment.
• Submit supplemental narrative to address specific elements of strategy, such as subcontract binding agreements, post award execution roles, specific initiatives employed to enhance SB participation and future involvement.
• Ensure first tier subcontract participation rate is 20% of the contract value; if not explain how participation rates were established
• Ensure SB Participation and Commitment Strategy and subcontracting plan (if required) are in agreement
RFP/Site Visit Questions and Answers
All questions/pre-award inquiries must be submitted in writing This ensures all potential offerors receive information at the same time.
Follow the instructions in the RFP, Section L.4 PRE-AWARD INQUIRIES, for submission of questions via ProjNet at https://www.projnet.org/projnet Deadline for submission of pre-award inquiries is 2:00 PM EDT, Monday, 17 June 2019
Government responses will be posted in ProjNet
Questions resulting in a change to the solicitation will be addressed in an amendment – note that there is currently 1 amendment pending to revise the Dry Dock requirements
The final report of all inquiries and responses will be posted to NECO and FBO via amendment
** Do not attempt to contact the Government site visit points of contact for additional information **