N6945019R0508_NSBKB_DRY_DOCK_RECAP_INDUSTRY_DAY_26MAR19.pdf
PDF 7 MB Posted
- Solicitation number
- N6945019R0508
About this file
This document provides notice of an industry day for a federal construction contract opportunity. The Naval Facilities Engineering Command Southeast is seeking industry feedback for the Kings Bay Dry Dock Recapitalization project at Naval Submarine Base Kings Bay, Georgia. The project scope includes repairs to the dry dock concrete structure, cover, and mechanical and electrical systems, with an estimated value between $400-600 million. It will be completed over three phases from 2020-2023 due to operational requirements. The industry day on March 26, 2019 will include a presentation on project details and acquisition strategy, as well as breakout sessions for prime contractors to meet one-on-one with the government. The solicitation number is N6945019R0508. Responses are due July 24, 2019 and the contract is expected to be awarded on March 30, 2020. The opportunity is open to firms with NAICS code 237990 and similar construction experience.
N6945019R0508_NSBKB_DRY_DOCK_RECAP_INDUSTRY_DAY_26MAR19.pdf
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTHEAST
N69450-19-R-0508
NSB KINGS BAY DRY DOCK RECAPITALIZATION
INDUSTRY DAY
26 March 2019
FOR OFFICIAL USE ONLY - PREDECISIONAL
Amy Hoffer, PE, NAVFAC SE Dry Dock Project Manager
2 NAVFAC Southeast
Facility Layout
FOUO - PREDECISIONAL
Main
Room
Breakout
Rooms
3 NAVFAC Southeast
Ground Rules
FOUO - PREDECISIONAL
• THESE DISCUSSIONS (BOTH IN THE GROUP SETTING AND DURING INDIVIDUAL ONE-ON-
CONVERSATIONS) ARE INFORMATIONAL AND FOR PLANNING PURPOSES ONLY. THIS IS NOT A
REQUEST FOR PROPOSAL. NOTHING DISCUSSED TODAY WILL BE EVALUATED IN RESPONSE TO
ANY FUTURE REQUESTS FOR PROPOSALS.
• DO NOT PROVIDE THE GOVERNMENT WITH ANY PROPRIETARY INFORMATION, TRADE SECRETS,
OR ANY OTHER INFORMATION DEEMED SOURCE SELECTION SENSITIVE, OR ANY INFORMATION
THAT YOU DO NOT WANT DISSEMINATED TO THE PUBLIC.
• A RECORD OF ALL DISCUSSIONS WILL BE MADE. IF YOU HAVE NOT ALREADY DONE SO, PLEASE
SIGN THE ACKNOWLEDGEMENT / SIGN IN SHEET, INDICATING YOUR UNDERSTANDING AND
CONSENT TO THE GOVERNMENT MAKING PUBLICALLY AVAILABLE A SUMMARY WITHOUT
ATTRIBUTION OF EVERYTHING DISCUSSED TODAY.
4 NAVFAC Southeast
• 0800 - 0900 Registration
• 0900 - 0915 Introductions
• 0915 - 0945 NAVFAC SE Overview
• 0945 - 1015 Kings Bay (KB) Overview
• 1015 - 1030 Break
• 1030 - 1100 Dry Dock (DD) Technical Project Overview
• 1100 - 1130 DD Acquisition Plan and Project Schedule
• 1130 - 1200 Questions
• 1200 - 1300 Lunch
• 1300 - 1700 Breakout Sessions and General Q&A
*** Please Fill Out “Question Forms” and Surveys ***
Industry Day Agenda
FOUO - PREDECISIONAL
5 NAVFAC Southeast
•Notify Industry of the upcoming solicitation for the Submarine
Base Kings Bay, Georgia’s Dry Dock project (FY20-23)
• Inform industry as to the scope, timeline, and possible construction challenges for the SB KB DD Project
•Solicit innovative private sector input to help shape the acquisition strategy, technical solution, and other aspects of the project procurement
•Conduct one on one discussion
•NOTE - everything you see today is a DRAFT and is subject to change
Industry Day Goals
6 NAVFAC Southeast
Presenters
•Captain Mike Monreal, NAVFAC SE, Commanding Officer
•Commander Eric Stein, SUBASE Kings Bay, Executive Officer
•Amy Hoffer, PE, NAVFAC SE, Project Manager
•John McCoy, PE NAVFAC SE, Waterfront Engineer
•Laura Hohbach, NAVFAC SE, Acquisition Division Director
***Any Questions or Comments should be addressed to the
Contracting Officer, Barbara Czinder @ 904-542-6668 /
Barbara.Czinder@navy.mil***
NAVFAC Southeast
Organizational Overview CAPT Mike Monreal, NAVFAC SE Commanding Officer
8 NAVFAC Southeast
• Established in 1842 as Bureau of Yards and Docks
• DoD Construction Agent
• DoNs Shore Facilities/Acquisition SYSCOM
• Plan, build, maintain sustainable facilities
• Deliver environmental, utilities, and other base services
• Navy’s Expeditionary Combat SYSCOM
• Acquire and manage expeditionary combat force systems and equipment
• Facilities IT, Shore Industrial Control Systems, ATFP and other systems within NAVFAC technical authority
• Over $13 Billion funds authorized and executed
• 21,600 Civilian, Military, and Contractor personnel
NAVFAC
9 NAVFAC Southeast
NAVFAC Commands
NAVFAC Field Locations
• 71 Navy PWDs
• 24 USMC FEADs
• 9 USAF ROICCs
2 Theater Engineering Locations
Over 100 Points of Delivery Localized Engineering, Facility Services, and Contracting
NAVFAC HQ
& Washington
NAVFAC
Pacific
& Hawaii
NAVFAC
Marianas &
OICC MC Marianas
NAVFAC
Far East
NAVFAC
Northwest
NAVFAC
Southwest &
EXWC
NAVFAC
Southeast
NAVFAC Atlantic &
Mid-Atlantic
& Crane Center
NAVFAC
EURAFSWA
10 NAVFAC Southeast
National Defense Strategy 2018 Sharpening the American Military’s Competitive Edge
“The surest way to prevent war is to be prepared to win one.” – SECDEF Mattis
Version 2.0
• Back to competition for power
China is pacing threat / Sea lanes
Russian niche capabilities
Keep Sea Lanes open
VEO done by, with, through partners
• Lines of effort to expand competition
Rebuild military readiness & build more lethal force (Infrastructure Readiness
Resilience & Reliability is our NAVFAC domain)
Strengthen alliances & attract new partners
Reform DoD’s business practices for greater performance & affordability
2 + 3
11 NAVFAC Southeast
B il li o n
F u n d s A u th o ri z e d a n d E x e c u te d
2%
13%
30%
20%
35%
NAVFAC’s Supported Commands
12 NAVFAC Southeast
Environmental
Cybersecurity
Energy
Planning
Design & Construction
Sustainment & Recapitalization
Divestiture
Facilities Lifecycle Experts
13 NAVFAC Southeast
NSA Panama City
FEC SE AOR
NAVSTA Mayport
NAS Jacksonville
NAVSUBASE Kings Bay
NSA Orlando
NAVSTA
Guantanamo Bay
NAS Pensacola
NCBC Gulfport
NAS Corpus Christi
NAS Kingsville
NAS Key West
NAS JRB Ft. Worth
NAS Meridian
ROICC Charleston
NAS JRB New Orleans
ROICC
Barksdale
NAS Whiting Field
NSA Mid-South
39 NOSCs and major Special Areas
17 Installations w/PWDs
NSF Beaufort
3 Non-Navy ROICCs
Puerto Rico
Bahama s
Navy Training OPAREA’s/Ranges
El Salvador
SE Region Facts:
- 173 Special Areas
- 174,209 acres
- 25,903 facility count
- $30.7 billion PRV
- 62 Piers & Wharves
- 63 Runways
- 6 Ports
- 11 Air Stations
- 20 OLFs
- 111,713 SC Population
NAVFAC SE Staffing
- Authorized 2,119
- Onboard: 1,890
- #s Include Civilian, Military, & KTR Hires
14 NAVFAC Southeast
Who We Support
Half of Naval
Construction Force
Half of Navy’s Anti-
Submarine Air Platforms Marine Corps
Eastern Logistics
Receiving Port
One-third of the undersea nuclear deterrent force
All Navy, Marine Corp
& USCG aviators in training
5 Air Force Bases
2 Air National Guard
State Headquarters
SOUTHCOM
CCAD – US Army
Depot
15 NAVFAC Southeast
Don Kelley
Comptroller Susan Smallwood
Acquisition CAPT John Anderson
Operations Officer
CDR Tony Conley
Asst. Regional Engineer
Cathy Horan
Counsel
Jack McCarthy
Capital
Improvements
Bill Powers
Environmental
/CNRSE N45
John Goethe
Deputy
Operations
Bub LeNoir
Asset
Management
Luke Guthrie
Public
Works
SCPO Jason Fletcher
Senior Enlisted Advisor
Jeff Killian
Business Director CAPT Mike Monreal
Commanding Officer CAPT Gil Manalo
Executive Officer
Vacant
Inspector General Dale Powell
Safety Director
Sue Brink
PAO
Andrea Freeman
CIO
Cory Iselin
Small Business
NAVFAC Southeast
Command Senior Leadership
COMMAND
LEADERSHIP
TEAM
Don Maconi
Contingency
Engineering
16 NAVFAC Southeast
SE Volume of Business (VOB) (Actual + In-Progress Work, & Forecast)
S ta ffin g
W o rk lo a d
VOB/Staffing Data as of 30NOV2018
Actual
1,747
Forecasted
$2.5B
$2.4B
FTE
VOB
17 NAVFAC Southeast
Upcoming Projects @ KB
• Workload and Work-in Place will remain in the $2B range for the next couple of years
• Staffing continues to grow as we migrate from very large
Construction projects to more numerous and smaller dollar amount Restoration & Modernization type projects (>2X labor effort)
• Restoration & Modernization (RM) projects have over taken
MILCON/MCON in terms of VOB (nearly 2:1)
FOUO - PREDECISIONAL
P617 (2022)
NEW 46K SF PIER
(2020)
DRYDOCK RECAP
P676(2023)
TTF(CLB) 24K SF
18 NAVFAC Southeast
P658 NUCLEAR REGIONAL MAINTENANCE
FACLITY (NRMF)
FOUO - PREDECISIONAL
• Construction Program FY21
• Projected Award Date - 06/2021
• DD1391 Estimated Project Cost -
$138.6M
• NRMF Building - 137,153 SF
• Emergency Vehicle Canopy -
10,386 SF
19 NAVFAC Southeast
• Construction Program - FY22
• Projected Award Date -
06/2022
• DD1391 Estimated Project
Cost - $160M
• New Pier- 46,198 SF
• Access trestle to Piers-
37,969 SF
• Small Craft Pier – 24,301 SF
• Breakwater – 851 LF
P617 Transit Protection Program Facility
20 NAVFAC Southeast
P676 TTF COLUMBIA TRAINER EXPANSION
• Construction Program - FY23
• Projected Award Date - 06/2023
• DD1391 Estimated Project Cost -
$43.3M
• SSP Addition - 23,714 SF
• NAVSEA Addition - 7,550 SF
• Ex Building Renovations - 1,600 SF
SUBASE Kings Bay, GA
Commander Eric Stein, SUBASE Executive Officer
Welcome to Naval Submarine Base Kings Bay Our Mission: Support to the Fleet, Fighter and Family
Economic Impact $1.144 billion annually Payroll $600 million
Goods & Services $67.5 million
Retired Annuitants $81.4 million
Coast Guard MFPU $19.7 million
Economic Impact $1.144 billion
Employment:
NAVSUBASE Kings Bay 8,979
Camden County Schools 1,200
Express Scripts ~650
County population 1970 – 11,334 1990 – 30,167
1980 – 13,371 2000 – 43,664 2015 – 52,102
• ~7% Navy Personnel
• ~25% of Ships
• ~10% Budget
• 70% of warheads
• 100% survivable
• More than 4200 SSBN patrols since 1960 (>1000
Trident patrols)
U.S. Submarine Force
Virginia class (SSN)
Length: 377 feet, Beam: 34 feet
Displacement: Approximately 7,800 tons submerged
Speed: 25+ knots
Seawolf class (SSN)
Length: 353 feet, Beam: 40 feet
Displacement: Approximately 9,100 tons submerged
Speed: 25+ knots
Los Angeles class (SSN)
Length: 360 feet, Beam: 33 feet
Displacement: Approximately 6,900 tons submerged
Speed: 25+ knots
Ohio class (SSBN/SSGN)
Length: 560 feet, Beam: 42 feet
Displacement: Approximately 18,750 tons submerged
Speed: 25+ knots
Current Submarine Classes
“Husbandry of the Fleet Ballistic Missile and TLAM”
Data: MAR 2012
Kings Bay, GA
COMSUBGRU-10
SUBRON-16 (3)
SUBRON-20 (5)
Groton, CT
COMSUBGRU-2 (5)
SUBRON-12 (3)
SUBRON-4 (6)
Bangor, WA
COMSUBGRU-9
SUBDEVRON-5 (3)
SUBRON-17 (7)
SUBRON-19 (3)
Norfolk, VA
COMSUBFOR
SUBRON-6 (8)San Diego, CA
SUBRON-11 (6)
Pearl Harbor, HI
COMSUBPAC
SUBRON-1 (10)
SUBRON-7 (10)
Guam
SUBRON-15 (3)
Submarine Force Today
FORCE STRUCTURE
54 – SSNs
4 – SSGNs
14 – SSBNs
SUBFOR Manpower
Total: ~21,000
Officer: ~2,000
Enlisted: ~17,000
Civilian: ~2,000
PPV Housing/Golf Course
Upper Base Controlled Area
Waterfront Restricted Area
Waterfront Restricted Area
• Crane oversight for
Kings Bay
• Nuclear repair
• Electronics repair
• Combat system repair
Trident Refit Facility
• Life cycle planning & engineering support
• Life cycle logistics support
• Hull, mechanical, electrical repair
32 NAVFAC Southeast
BREAK
3/26/2019
Technical Requirements
John McCoy, PE NAVFAC SE Dry Dock Design Manager
34 NAVFAC Southeast
THE TEAM
YOU
35 NAVFAC Southeast
NSB Kings Bay Overview
36 NAVFAC Southeast
SECURITY ACCESS AREAS
ACCESS AREA GENERAL REQUIREMENT 'LEVEL'
SUBASE
VISIT REQUEST AND FBI(NCIC) BACKGROUND CHECK
HARD DBIDS CARD 1
CHARLIE GATE
VISIT REQUEST AND FBI(NCIC) BACKGROUND CHECK
HARD DBIDS CARD WITH A “12” 1
WRA ESCORTED
VISIT REQUEST(TRF SECURITY APPROVED) AND FBI(NCIC)
BACKGROUND CHECK
HARD DBIDS CARD WITH A “12”
WRA UNESCORTED
VISIT REQUEST(TRF SECURITY APPROVED), FBI(NCIC)
BACKGROUND CHECK, AND OPEN T1 (NACI) INVESTIGATION
HARD DBIDS CARD WITH A WHITE “12” AND “7”
WRA ESCORT PRIVILEGES
NCIC BACKGROUND CHECK, PERMANENT BADGE
APPLICATION, FAVORABLE T1(NACI) INVESTIGATION AND
EMPLOYED DIRECTLY BY PRIME CONTRACTOR
DAY PASS(LAND) (DELIVERIES)
RESTRICTED AREA VEHICLE ACCESS FORM
NA
General Security Access Requirements
FOUO - PREDECISIONAL
Historically, approximately 30% of submitted construction contract personnel submitted to Subase HAVE BEEN
REFUSED A BADGE
37 NAVFAC Southeast
Overall Work Plan
38 NAVFAC Southeast
Project Overview
4/2/2019
FOUO - PREDECISIONAL
• Over all Project Estimated Cost Range $400M - $600M
• Phase A Execution Timeframe: contract award to JUN20
Description of Work (Critical Items):
Staffing, mobilizing, Construction of free zone, steel caisson overhaul, submittal approval, and procurement of critical and long lead materials.
• Phase B Execution Timeframe: JUL21 to JUN22 (24/7 Operations)
Description of Work (Critical Items):
DD Cover replacement, DD Cover superstructure preservation, ASW & CW replacement, sprinkler and fire protection system replacement, utility station replacements, LED lighting upgrades, and bridge crane overhauls.
• Phase C Execution Timeframe: JUL22 to JUL23
Description of Work (Critical Items):
Utility tunnel concrete repair, utility service bldg. equipment replacement, C4I replacement, and support bldgs. electrical, mechanical, and fire protection replacement.
39 NAVFAC Southeast
Phase A Scope
Shift : 12 hours/day, 6 days a week
Schedule : Contract award to June 2020
● Contractor pre-construction tasks (WBS, picking subs, etc.)
● Procure long lead materials and equipment
● Base access and security clearances for contractor and subs
● Contractor mobilization
● Create free zone and water side boundary
● Create material and equipment lay-down area (temperature controlled maybe needed)
● NAVSEA/TRF materials, equipment, and personnel relocation
● Construction submittals (preparation and review)
● Equipment procurement (long-lead items)
● Overhaul Steel Caisson
● Environmental permitting
● Construction material delivery
40 NAVFAC Southeast
Phase A and C – Security Levels
41 NAVFAC Southeast
• Site construction constraints for working with and without a vessel in dock
– 100 foot wide restricted zone directly over dry dock body for time when a vessel is in dock
– No activities allowed that would result in inability to dock/undock/support a vessel in dock
Site Constraints (Phase A & C)
42 NAVFAC Southeast
STRUCTURAL
• Cover Superstructure Connections
• Cover Superstructure Preservation
(~1M SF)
• Concrete repairs to Deck/Cope Level, Gallery, Pump Station, flooding and dewatering conduits
• Bridge Cranes(2) Overhaul
• Replace Dry Dock Cover
• Replace ship guide rails
FOUO - PREDECISIONAL
ARCHITECTURAL
•Replace cover roof and sides
•Correct storm water drainage
•Replace ventilation
MECHANICAL
• Replace discharge piping
• ASW & Chilled Water
• Replace sluice gates
• Replace dewatering pump motors
• Replace pressure relief piping and accessories
• Replace control system
• Replace utility gallery and convenience power stations
• Replace ship overboard sanitary piping
ELECTRICAL
•Replace branch circuits
•New LED Bay lighting
•Replace submarine utility stations
•Replace switchgear
FIRE PROTECTION
•Provide sprinkler protection
•Provide fire alarm/mass notification system
Phase B Scope
Schedule : July 2021 to June 2022 / Shifts : 24/7/360
Allotted Critical Duration for Construction (ACDC)
43 NAVFAC Southeast
Phase B – Security Levels
44 NAVFAC Southeast
Phase C Scope
• Utility tunnels – concrete, expansion joints, trench drain
• CMU wall failure at support buildings
• Auxiliary tunnels and buildings – concrete, expansion joints
• ASW pump station – concrete, steel grating, steel members
• Pump station – concrete, steel members, grating
• Superflooding conduit access shaft
– concrete and steel framing
• Metal wall panels
• Expansion joints
• Downspouts and gutter system
• Support buildings and deficiencies
• Dewatering pump motors
• Primary floor drainage and pressure relief pump motors
• Utility services building original equipment
• Plumbing fixtures and piping
• Lighting upgrades
• Central utility plant electrical upgrades
• Fiber optic and copper cabling for
C4I
• Telecommunications grounding system
• Fire alarm system
• Ancillary Building repairs
45 NAVFAC Southeast
NAVFAC SE’s AREAS OF CONCERN
3/26/2019
GENERAL:
•Availability and retention of appropriate workforce
•Housing of workforce
•Phase transitions and interaction with TRF Operations
PHASE B:
•Schedule and maintaining safe working conditions
•Environmental factors impacting preservation of Cover Superstructure
•Re-skin of Cover
•Coordination of conflicting construction activities
PHASE A:
•Badging and access
•Long Lead Equipment and Materials
•“Free Zone” Development
PHASE C:
•Coordination with TRF and Dry Dock operations
Acquisition Plan
Laura Hohbach, NAVFAC SE, Acquisition Division Director
47 NAVFAC Southeast
Draft Solicitation N69450-19-R-0508
• Solicitation Overview
• CLIN structure
• Overview of Evaluation Factors
• Award Fee
• Suggestions on Solicitation Submission
• Solicitation Schedule
NOTE: Draft Solicitation information and dates are subject to change
48 NAVFAC Southeast
Overview of the Contract
• Firm-fixed Price Award Fee Contract
• Full and Open Competition
• Design-Bid-Build
• Draft RFP
– Comment period open until 30 May 2019
– Not a formal request for proposal
– All information is subject to change
49 NAVFAC Southeast
CLIN Structure
• CLIN 0001: PHASE A
– COMPLETION 365 CALENDAR DAYS
• CLIN 0002: PHASE B
– COMPLETION 360 CALENDAR DAYS
• CLIN 0003: PHASE C
– COMPLETION 365 CALENDAR DAYS
• CLIN 0004: Award Fee
50 NAVFAC Southeast
Best Value Tradeoff Evaluation
•The technical factors are of equal importance to each other respectively
• When the technical factors are combined, they are equal in importance to the past performance evaluation factor
•Technical factors and past performance factor combined are significantly more important than price
51 NAVFAC Southeast
Proposal Requirements
•First Proposal Submission (Due ~24 JUL 2019)
– Factor 1 – Technical Approach
– Factor 2 – Experience
– Factor 3 – Past Performance
– Factor 4 – Safety
•Second Proposal Submission (Due ~14 JAN 2020)
– Factor 5 – Technical Solution
– Factor 6 Small Business Utilization
• 6.A. – Achievements
• 6.B. – Small Business Participation and Commitment
* Price Proposal
Keep proposals separate
52 NAVFAC Southeast
Technical Evaluation Factors
•Factor 1 – Technical Approach
– Describe construction firm and primary subcontractor(s)
– Describe how labor forces will be provided and maintained
• Provide an example project with similar challenges
•Factor 2 – Experience
– Provide a min of 2 and a max of 5 relevant projects > $200M that were completed in the past 10 years
• Submit projects using the provided Project Data Sheet
• Projects must include one or more of the critical elements
–Coating of structure
–Marine Construction or Repair
•Factor 3 – Past Performance
– Evaluate submitted projects from Factor 2
•Factor 4 – Safety
– Provide Experience Modification Rate (EMR), OSHA Days Away from
Work/(DART) and Total Recordable Case Rate (TRC)
– Provide Technical Approach for Safety
53 NAVFAC Southeast
Technical Evaluation Factors
•Factor 5 – Technical Solution
– Describe approach to meeting the technical requirements of the
RFP
• Address Working in the Waterfront Restricted Area (WRA)
• Address Maintaining Operations of the WRA during construction
• Approach to safely and successfully completing the project
• Approach to maintaining a secure perimeter
• Approach to delivering materials to the site
– Provide a Critical Path Method (CPM) Schedule
• Provide a Construction schedule that includes all major construction milestones
• Address significant schedule risk(s) and proposed mitigation(s)
•Factor 6 – Small Business Utilization
– Describe achievements in meeting the Gov Small Business goals
– Provide small business subcontracting information for projects submitted for Factor 2
– Provide most current Individual Subcontracting Report (ISRs)
54 NAVFAC Southeast
Award Fee
•~10% of the Construction Cost will be allocated for Award Fee
•Evaluation Factors
– Schedule Management (80%)
– Management (20%)
•Award Fee Allocation and Schedule
– Phase A
• Can earn up to 30% of the overall available Award Fee
– Phase B
• Can earn up to 60% of the overall available Award Fee
– Phase C
• Can earn up to 10% of the overall available Award Fee
55 NAVFAC Southeast
• Issue Sources Sought – 30 Jan 2019 (complete)
• Draft RFP and 15% Design posted to NECO 19–25 MAR 2019 (complete)
• Industry Day – 26 Mar 2019
• Issue RFP – 24 May 2019
• Project Site Visit – week of 17 JUN 2019
• First Proposal Submission’s Due – 24 JUL 2019 (60 days)
• Issue 100% Design – Sept 2019
• Issue RFP Amendment with Final Drawings/Specifications – 4 Nov 2019
• Project Site Visit – week of 2 Dec 2019
• Second Proposal Submission’s Due – 14 Jan 2020 (45 days)
• Award Construction Contract – 30 MAR 2020
* ALL DATES SUBJECT TO CHANGE
Solicitation Schedule
56 NAVFAC Southeast
Pre-Proposal Comments / Questions
• All pre-proposal comments must be submitted in writing via the “Bidder Inquiry” in ProjNet at www.projnet.org/projnet. The bidder inquiry key for this solicitation is U284F6-2FTZ59. All questions regarding the draft solicitation and 15% drawings must be submitted by 30 MAY
2019 . The Government is not obligated to respond to these comments/questions.
• The solicitation (request for proposal [RFP]) will be posted on FBO (www.fbo.gov) and
NECO (www.neco.navy.mil) .
• All Offerors are encouraged to register on ProjNet for alerts and to stay abreast of bidder inquiries and Government responses that are posted in reference to this solicitation. Only self-registered users on ProjNet can submit and review inquiries. A “how to” guide will be provided via amendment to this special notice on NECO. Those submitting inquiries will receive a system generated e-mail notification when their inquiry has been processed and responded to. It is the Offeror's responsibility to monitor for inquiries and responses.
3/26/2019
904-542-6668 / Barbara.Czinder@navy.mil
Any Questions should be directed to
Barbara Czinder
58 NAVFAC Southeast
59 NAVFAC Southeast
Backup Slides
60 NAVFAC Southeast
Back to
Slideshow
Infrastructure Utility Control Center Waste Water Treatment
Electrical Distribution
Water Supply Waste Water Control
Trident Training Facility
Commander
Submarine Group 10
COMSUBRON 20
USS Tennessee (SSBN 734)
USS West Virginia (SSBN 736)
USS Maryland (SSBN 738)
USS Rhode Island (SSBN 740)
USS Alaska (SSBN 732)
COMSUBRON 16
USS Florida (SSGN 728)
USS Georgia (SSGN 729)
USS Wyoming (SSBN 742)
Arrival Date
March 1990
September 1991
May 1993
June 1995
August 1997
April 2009
May 2006
March 2008
Two-Crews
Blue and Gold Cost Effective and Increases Time
At Sea
224 Day Cycle >Refit > Patrol > Off Crew (Training)
File details come from the government source that posted it. Updated .