N6945019R0508_DWGs_15_1B_1of2.pdf

PDF 5 MB Posted

Attached to
KINGS BAY DRY DOCK RECAPITALIZATION, SUBASE KINGS BAY, GA
Solicitation number
N6945019R0508
Issued by

About this file

This notice announces an Industry Day for the Kings Bay Dry Dock Recapitalization project at Naval Submarine Base Kings Bay, Georgia. The project scope includes repairs to the dry dock concrete body, cover, and mechanical and electrical systems, with an estimated construction value between $400-600 million. It will be completed in three phases due to operational requirements.

The Industry Day will provide an opportunity for contractors to learn more about the project and acquisition strategy. It will be held on March 26, 2019 at the University of North Florida in Jacksonville, Florida, with presentations from 0800-1700. Prime contractors interested in participating in breakout sessions after the presentation must notify Barbara Czinder by March 19 with attendee names and emails. The event is open to all contractors for networking purposes. NAVFAC will not cover travel costs for attendees.

N6945019R0508_DWGs_15_1B_1of2.pdf

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

G-020

C O

V E

R S

H E

E T

MJBPFG PFG

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

/1

NAVAL SUBMARINE

BASE KINGS BAY

PROJECT

LOCATION

VICINITY MAP LOCATION MAP

N N

REPAIR DRY DOCK

SUBBASE KINGS BAY - KINGS BAY, GEORGIA

15% SUBMITTAL

MARCH 18, 2019

NAVAL FACILITIES ENGINEERING COMMAND SOUTHEAST

ACQ CORE

NAVAL STATION JACKSONVILLE,

JACKSONVILLE, FLORIDA

PACKAGE 1B

PACKAGE 1A INCLUDES THE FOLLOWING BUILDINGS:

• 5055-DRYDOCK PROPER (BASIN, GALLERY/UTILITY TUNNEL, COPING, ROOF)

• 5142-PUMP STATION

• 5141-SUBSTATION, WEST

• 5147-SWITCHGEAR

• 5148-UTILITY SERVICES

• 5149-SUBSTATION, EAST

PACKAGE 1B INCLUDES THE FOLLOWING BUILDINGS:

• CIVIL

• CAISSON

• 5055-PAINT BOOTH

• 5055A-STORAGE

• 5055B-STORAGE

• 5145-DRYDOCK SERVICES

• 5146-BERTHING SUPPORT

• 5150-LET STORAGE

• 5156-COVERED STORAGE

• 5190-MEDIUM BLAST

T

FO

R C

O N

ST

R

U C

TI

O

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

AC

Q

C O

R E

N

AV

AL

A

IR

S

TA

TI

O N

JA

C

KS

O N

VI

LL

E, F

L

SU

BB

AS

E

KI

N

G S

BA

Y

KI

N

G S

BA

Y, G

EO

R G

IA

AS NOTED

RE

PA

IR

D

RY

D

OC

K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

PA

CK

AG

E

1B

G-021

IN

DE

X O

F

DR

AW

IN

G S

- P

AC

KA

G

E 1B

MJBPFG PFG

INDEX OF DRAWINGS-P1B

SHEET OF NAVFAC NO. SHEET NO. SHEET TITLE

PLUMBING

0 P-001 LEGEND, ABREVIATIONS AND NOTES

PD100 DEMOLITION BLDG 5055 - PLUMBING FLOOR PLAN

PD131 DEMOLITION BLDG 5145 - PLUMBING FLOOR PLAN - GROUND

PD141 DEMOLITION BLDG 5146 - PLUMBING FLOOR PLAN

PD150 DEMOLITION BLDG 5150 - PLUMBING FLOOR PLAN - GROUND AND

MEZZANINE

PD171 DEMOLITION BLDG 5190 - PLUMBING FLOOR PLAN

PL100 BLDG 5055 - PLUMBING FLOOR PLAN

PL131 BLDG 5145 - PLUMBING FLOOR PLAN - GROUND

PL141 BLDG 5146 - PLUMBING FLOOR PLAN

PP100 BLDG 5055 - PLUMBING FLOOR PLAN

PP140 BLDG 5145 - PLUMBING FLOOR PLAN - GROUND

PP141 BLDG 5146 - GROUND FLOOR PLAN

PP150 BLDG 5150 - PLUMBING FLOOR PLAN - GROUND AND MEZZANINE

PP171 BLDG 5190 - PLUMBING FLOOR PLAN

MECHANICAL

M-001 LEGEND, ABREVIATIONS AND NOTES

MD100 DEMOLITION BLDG 5055 - MECHANICAL FLOOR PLAN

MD131 DEMOLITION BLDG 5145 - MECHANICAL FLOOR PLAN - GROUND

AND MEZZANINE

MD141 DEMOLITION BLDG 5146 - MECHANICAL FLOOR PLAN

MD151 DEMOLITION BLDG 5150 - MECHANICAL FLOOR PLAN - GROUND

AND MEZZANINE

MH100 BLDG 5055 - MECHANICAL FLOOR PLAN

MH131 BLDG 5145 - MECHANICAL FLOOR PLAN - GROUND

MH132 BLDG 5145 - MECHANICAL FLOOR PLAN - MEZZANINE

MH141 BLDG 5146 - MECHANICAL FLOOR PLAN

MH151 BLDG 5150 - MECHANICAL FLOOR PLAN - GROUND AND

MEZZANINE

ELECTRICAL

ED101 BLDG 5055 - DEMOLITION PLAN

ED131 BLDG 5145 - DEMOLITION PLAN - GROUND FLOOR

ED132 BLDG 5145 - DEMOLITION PLAN - MEZZANINE & HIGH BAY

ED141 BLDG 5146 - DEMOLITION PLAN - FLOOR PLAN

ED142 BLDG 5146 - DEMOLITION PLAN - ROOF PLAN

ED151 BLDG 5150 - DEMOLITION PLAN - GROUND AND MEZZANINE

E-101 BLDG 5055 - LIGHTING AND POWER PLAN

E-161 BLDG 5156 - LIGHTING AND POWER PLAN

E-631 BLDG 5145 - RISER DIAGRAMS

INDEX OF DRAWINGS-P1B

SHEET OF NAVFAC NO. SHEET NO. SHEET TITLE

GENERAL

G-020 COVER SHEET

G-021 INDEX OF DRAWINGS - PACKAGE 1B

CIVIL

CD100 EXISTING CONDITIONS AND DEMOLITION PLAN - OVERALL

CS100 SITE PLAN - OVERALL

CU100 UTILITY PLAN - OVERALL

CG100 GRADING AND DRAINAGE PLAN - OVERALL

CE100 EROSION AND SEDIMENT CONTROL PLAN - OVERALL

STRUCTURAL

SB701 DD STEEL CAISSON ELEVATION

SB702 DD STEEL CAISSON OPERATIONS DECK PLAN

SB703 DD STEEL CAISSON OPERATIONS DECK PLAN

S-100 BLDG 5055 - FOUNDATION AND ROOF PLAN

S-110 BLDG 5055A - FOUNDATION AND ROOF PLAN

S-120 BLDG 5055B - FOUNDATION AND ROOF PLAN

S-130 BLDG 5145 - FOUNDATION AND ROOF PLAN

S-131 BLDG 5146 - FOUNDATION AND SLAB PLAN

S-132 BLDG 5146 - ROOF FRAMING PLAN

S-151 BLDG 5150 - FOUNDATION AND ROOF PLAN

S-161 BLDG 5156 - FOUNDATION PLAN

S-162 BLDG 5156 - ROOF FRAMING PLAN

S-171 BLDG 5190 - FOUNDATION AND ROOF PLAN

ARCHITECTURAL

AD132 BLDG 5145 - ROOF PLAN - DEMOLITION

AD141 BLDG 5146 - ROOF PLAN & SOUTH ELEVATION - DEMOLITION

AD151 BLDG 5150 - FLOOR AND ROOF PLAN DEMOLITION

0 A-110 BLDG 5055A - FLOOR PLAN

0 A-120 BLDG 5055B - FLOOR PLAN

A-131 BLDG 5145 - FLOOR PLANS

A-141 BLDG 5146 - FLOOR PLAN & REFLECTED CEILING PLAN

A-142 BLDG 5146 - ROOF PLAN & SOUTH ELEVATION

A-151 BLDG 5150 - FLOOR AND ROOF PLAN

0 A-170 BLDG 5190 - FLOOR PLAN - GROUND

A-331 BLDG 5145 - WALL SECTION

A-341 BLDG 5146, 5147, 5148 5149 - WALL SECTIONS

FIRE PROTECTION

FA101 BLDG 5055 - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND

FA110 BLDG 5055A - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND

FA120 BLDG 5055B - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND

FA130 BLDG 5145 - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND

FA131 BLDG 5145 - FIRE ALARM AND MASS NOTIFICATION PLAN -

MEZZANINE

FA140 BLDG 5146 - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND

FA150 BLDG 5150 - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND & MEZZANINE

FA170 BLDG 5190 - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND & ROOF

FX101 BLDG 5055 - FIRE SUPPRESSION PLAN - GROUND

FX110 BLDG 5055A - FIRE SUPPRESSION PLAN - GROUND

FX120 BLDG 5055B - FIRE SUPPRESSION PLAN - GROUND

FX130 BLDG 5145 - FIRE SUPPRESSION PLAN - GROUND

FX131 BLDG 5145 - FIRE SUPPRESSION PLAN - MEZZANINE

FX140 BLDG 5146 - FIRE SUPPRESSION PLAN - GROUND

FX150 BLDG 5150 - FIRE SUPPRESSION PLAN - GROUND & MEZZANINE

FX170 BLDG 5190 - FIRE SUPPRESSION PLAN - GROUND & ROOF

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

A

S

UB

MI

TT

AL

3/1 8/1 sfredrickson Text Box

PACKAGE 1B

1 2

3 4

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

F I L E

A M

E b m c d d f s C l i e n t s A

N F

U

S N a v y S e T

R F

D

D D

E S

I G

N D e s i g n C i v i l S h e e t s C

D

T

O

C

D d w g

Y O

U T

M

E

C

D

E

X I S

T I N

G

C

O N

D I T

I O

S

D

M

O L I T

I O

N

P

L A

N

O

V E

R A

P

O

T T

E D

S u n d a y

M a r c h p m

E

R b w t u r l e y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

D E

P A

R T

M E

F

T

H

V

Y N

A V

A L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

D R

Y D

O C

K R

E P

A

IR

S

S U

B B

A S

E

K

I N

G

B

Y

K I N

G S

L A

N D

G

E O

R G

I A

1629300

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

U

T H

E A

S T

A C

Q

C

O R

E N

A V

A L

S

T A

T I O

N

J A

C K

S O

N V

I L L E

F

L O

R I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

1 2

3 4

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N O

T

FO

R

CO

N

ST

RU

CT

IO

N

P R

E L

IM

IN

A

R Y

CD100

GENERAL NOTES:

DEMOLITION NOTES:

1. CLEAR WOODED AREA

2. RELOCATE MACHINE GUN PIT

NORTH

SCALE IN FEET

0 300' 600'

KEY PLAN

EXISTING CONDITIONS AND DEMOLITION PLAN - OVERALL

NOT TO SCALE

S

U B

M I T

T A

L A

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

F I

M

E b m c d d f s C l i e n t s A

N F

U

S N a v y S e T

R F

D

D D

E S

I G

N D e s i g n C i v i l S h e e t s C

S

T

O

C

S d

Y O

M

E

C

S

S

I T

E

P

L A

N

O

V E

R A

O

T T

E D

S u n d a y

M a r c h

E

R b w t u r l e y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

D E

P A

R T

M E

T

V

Y N

A V

A L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

D R

Y D

O C

K R

E P

A

IR

S

S U

B B

A S

E

K

I N

Y

K I N

G S

L A

N D

G

E O

R G

I A

1629300

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

U

T H

E A

S T

A C

Q

C

O R

E N

A V

A L

S

T A

T I O

N

J A

C K

S O

N V

I L L E

F

L O

R I

CHIEF ENG/ARCH

FIRE PROTECTION

1 2

3 4

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N O

T

FO

R

CO

N

ST

RU

CT

IO

N

P R

E L

IM

IN

A

R Y

CS100

GENERAL NOTES:

WORK NOTES:

1. POTENTIAL TRF EMPLOYEE TEMPORARY OFFICE TRAILERS

2. TEMPORARY PARKING AREA (APPROX. 400 SPACES)

3. CONTRACTOR LAYDOWN/ TEMPORARY GOVERNMENT OFFICE TRAILERS

AREA

4. POTENTIAL OUTDOOR STORAGE LOCATION

5. UNDERGROUND UTILITY CORRIDOR

6. TEMPORARY FREE ZONE BOUNDARY FENCING

7. TEMPORARY 8' WIDE, ENCLOSED, OVERHEAD PEDESTRIAN BRIDGE

8. COORDINATE PAVEMENT WIDENING WITH FENCE INSTALLATION TO CREATE

MINIMUM 15' TRAVEL LANES ON BOTH SIDES OF THE FREE ZONE BOUNDARY

FENCING

9. POTENTIAL CONTRACTOR LAYDOWN AREAS

10. RELOCATE MACHINE GUN PIT TO THIS LOCATION

KEY PLAN

SCALE IN FEET

0 300' 600'

SITE PLAN - OVERALL

SCALE:1" = 300'

1. BACKGROUND IMAGERY FROM GOOGLE EARTH. IMAGERY DATED 10/30/2017

S

U B

M I T

T A

L A

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

F I

M

E b m c d d f s C l i e n t s A

N F

U

S N a v y S e T

R F

D

D D

E S

I G

N D e s i g n C i v i l S h e e t s C

U

T

O

C

U d

Y O

M

E

C

U

U

T I L I T

Y

P

L A

N

O

V E

R A

O

T T

E D

S u n d a y

M a r c h

E

R b w t u r l e y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

D E

P A

R T

M E

T

V

Y N

A V

A L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

D R

Y D

O C

K R

E P

A

IR

S

S U

B B

A S

E

K

I N

Y

K I N

G S

L A

N D

G

E O

R G

I A

1629300

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

U

T H

E A

S T

A C

Q

C

O R

E N

A V

A L

S

T A

T I O

N

J A

C K

S O

N V

I L L E

F

L O

R I

CHIEF ENG/ARCH

FIRE PROTECTION

1 2

3 4

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N O

T

FO

R

CO

N

ST

RU

CT

IO

N

P R

E L

IM

IN

A

R Y

CU100

GENERAL NOTES:

WORK NOTES:

1. UNDERGROUND UTILITY WORK REQUIRED FOR TEMPORARY OFFICES

2. UNDERGROUND UTILITY WORK REQUIRED FOR PROJECT EXECUTION

3. UTILITY CONNECTIONS REQUIRED FOR RELOCATED MACHINE GUN PIT. IF

PROPER UTILITIES DO NOT EXIST AT THE END OF THE JETTY, UTILITIES WILL

BE ROUTED FROM THE NEAREST LOCATIONS TO THE AREA.

4. UNDERGROUND ELECTRICAL AND COMMUNICATIONS WORK REQUIRED

5. POTENTIAL NEED FOR UNDERGROUND ELECTRICAL WORK FOR TEMPORARY

SITE LIGHTING.

KEY PLAN

SCALE IN FEET

0 300' 600'

UTILITY PLAN - OVERALL

SCALE:1" = 300'

1. BACKGROUND IMAGERY FROM GOOGLE EARTH. IMAGERY DATED 10/30/2017

S

U B

M I T

T A

L A

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

F I

M

E b m c d d f s C l i e n t s A

N F

U

S N a v y S e T

R F

D

D D

E S

I G

N D e s i g n C i v i l S h e e t s C

G

T

O

C

G d

Y O

M

E

C

G

G

R A

D I N

G

A

R A

I N

A G

E

P

L A

N

O

V E

R A

O

T T

E D

S u n d a y

M a r c h

E

R b w t u r l e y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

D E

P A

R T

M E

T

V

Y N

A V

A L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

D R

Y D

O C

K R

E P

A

IR

S

S U

B B

A S

E

K

I N

Y

K I N

G S

L A

N D

G

E O

R G

I A

1629300

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

U

T H

E A

S T

A C

Q

C

O R

E N

A V

A L

S

T A

T I O

N

J A

C K

S O

N V

I L L E

F

L O

R I

CHIEF ENG/ARCH

FIRE PROTECTION

1 2

3 4

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N O

T

FO

R

CO

N

ST

RU

CT

IO

N

P R

E L

IM

IN

A

R Y

CG100

GENERAL NOTES:

WORK NOTES:

1. GRADING AND STORMWATER MANAGEMENT REQUIRED FOR SITE

DEVELOPMENT.

KEY PLAN

SCALE IN FEET

0 300' 600'

GRADING AND DRAINAGE PLAN - OVERALL

SCALE:1" = 300'

1. BACKGROUND IMAGERY FROM GOOGLE EARTH. IMAGERY DATED 10/30/2017

S

U B

M I T

T A

L A

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

F I

M

E b m c d d f s C l i e n t s A

N F

U

S N a v y S e T

R F

D

D D

E S

I G

N D e s i g n C i v i l S h e e t s C

E

T

O

C

E d

Y O

M

E

C

E

E

R O

S I O

N

A

D

I M

E N

T

C

O N

T R

O L

P

L A

N

O

V E

R A

O

T T

E D

S u n d a y

M a r c h

E

R b w t u r l e y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

D E

P A

R T

M E

T

V

Y N

A V

A L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

D R

Y D

O C

K R

E P

A

IR

S

S U

B B

A S

E

K

I N

Y

K I N

G S

L A

N D

G

E O

R G

I A

1629300

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

U

T H

E A

S T

A C

Q

C

O R

E N

A V

A L

S

T A

T I O

N

J A

C K

S O

N V

I L L E

F

L O

R I

CHIEF ENG/ARCH

FIRE PROTECTION

1 2

3 4

75 6

8 9 10

11 12 13

14 15

B

A

C

B

A

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

N O

T

FO

R

CO

N

ST

RU

CT

IO

N

P R

E L

IM

IN

A

R Y

CE100

GENERAL NOTES:

WORK NOTES:

KEY PLAN

1. BACKGROUND IMAGERY FROM GOOGLE EARTH. IMAGERY DATED 10/30/2017

2. EROSION AND SEDIMENT CONTROL PRACTICES MEETING THE GEORGIA SOIL

AND WATER CONSERVATION COMMISSION REQUIREMENTS WILL BE USED

WHEREVER LAND DISTURBANCE OCCURS

SCALE IN FEET

0 300' 600'

EROSION AND SEDIMENT CONTROL PLAN - OVERALL

SCALE:1" = 300'

S

U B

M I T

T A

L A

DD

S

TE

EL

C

AS

SI

ON

E

LE

VA

TI

ON

SB-701

AS NOTED

MP RDM BS

501 E KENNEDY BLVD

# 1910

TAMPA, FL 33602

(813) 258-8818

FI

LE

N

AM

E:

Q

:\T A\

-0 4\ ca dd

Ac tiv e\

_9

6-

\D

RY

DT

RF

-1

-S -7

.d wg L

AY

OU

T

NA

M E:

S B-

DD

S

TE

EL

C

AS

SI

ON

E

LE

VA

TI

ON

P

LO

TT

ED

: M on da y, M ar ch

8,

- 9

:4 5a m U

SE

R:

rm at tin gly

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

DRAWFORM REVISION: 31 JANUARY 2017

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D R

Y D

O C

K R

E P

A

IR

S

SU

BB

AS

E

KI

NG

S

BA

Y

KI

NG

SL

AN

D, G

EO

RG

IA

1629300

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

A C

Q C

O R

E N

A V

A L

S

TA

TI

O

N , J

A C

K S

O N

V

IL

LE

, F

LO

R

ID

CHIEF ENG/ARCH

FIRE PROTECTION

N O

T

FO

R C

O N

S

TR

U C

TI

O

N

P R

E L

IM

IN

A

R Y

1/

1/

1/

8"

117'-6" ML

OP

EN

C

HO

CK

CH

IL

LE

D

W

AT

ER

S

HO

RE

C

ON

NE

CT

IO

N

ST

AT

IO

N

DO

UB

LE

B

IT

T

OP

EN

C

HO

CK

SH

OR

E

PO

W

ER

S

TA

TI

ON

SE

CU

RI

TY

L

IG

HT

OP

EN

C

HO

CK

OP

EN

C

HO

CK

SE

CU

RI

TY

L

IG

HT

DO

UB

LE

B

IT

T

OP

EN

C

HO

CK

OP

EN

C

HO

CK

DO

UB

LE

B

IT

T

SH

OR

E

CO

NN

EC

TI

ON

S

CO

M M

A

LA

RM

S

DECK EDGE FIXTURES ARE SAME ARRANGEMENT AS OPPOSITE FACE, MIRRORED

ROADWAY DECK

AIR INTAKE / VENT

GOOSENECKS

REMOVABLE HANDRAIL

SECTIONS (P&S). SEE DETAILS

ON SHEET TBD

AIR INTAKE / VENT

GOOSENECKS

OPEN CHOCKS AND DOUBLE

BITTS. SEE DETAIL ON SHEET TBD

AIR INTAKE / VENT

GOOSENECKS

SIDEWALK COVER PLATES

(BOLTED) OVER SIDEWALK

VOIDS. 58 TOTAL. SEE DETAILS

ON SHEET TBD

FIXED STEEL RAMP FOR

TRANSITION TO FOLDING ALUMINUM

RAMPS (BOTH ENDS OF ROADWAY).

HATCH TO OPERATIONS DECK.

SEE SHEET TBD

OUTLINE OF CAISSON HULL

BELOW WEATHER DECK

OVERHANG

FOLDING ALUMINUM RAMPS

FOR COVERING GAP BETWEEN

CAISSON AND DRY DOCK SILL

ARE NOT SHOWN. RAMPS ARE

INSTALLED FULL WIDTH OF

ROADWAY END AND AT BOTH

ENDS OF ROADWAY.

EXISTING DRAINAGE HOLES IN

WEATHER DECK AT

OVERHANGS (8 TOTAL)

4'X4' FLUSH BOLTED HATCH TO

OPS DECK. SEE DETAILS ON

SHEET TBD

SIDEWALK CURB

DECK DRAIN TO SHELL OVBD. 6

LOCATIONS SEE DETAILS ON

SHEET TBD

4'X6' FLUSH BOLTED HATCH TO

OPS DECK. SEE DETAILS ON

SHEET TBD

"B SIDE"

"A SIDE"

SCALE: 3/16" = 1'-0"

PLAN - DD STEEL CAISSON DECKA1

SCALE: 3/16" = 1'-0"

ELEVATION - DD STEEL CAISSON DECKC1 0 4' 8' 12'

3/16" = 1'

0 4' 8' 12' 3/16" = 1'

A

S

UB

M

IT

TA

L 3/

/1

501 E KENNEDY BLVD

# 1910

TAMPA, FL 33602

(813) 258-8818

FI

LE

N

AM

E:

Q

:\T A\

-0 4\ ca dd

Ac tiv e\

_9

6-

\D

RY

DT

RF

-1

-S -7

.d wg L

AY

OU

T

NA

M E:

S B-

DD

S

TE

EL

C

AI

SS

ON

O

PE

RA

TI

ON

S

DE

CK

P

LA

N P

LO

TT

ED

: M on da y, M ar ch

8,

- 9

:4 5a m U

SE

R:

rm at tin gly

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

DRAWFORM REVISION: 31 JANUARY 2017

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D R

Y D

O C

K R

E P

A

IR

S

SU

BB

AS

E

KI

NG

S

BA

Y

KI

NG

SL

AN

D, G

EO

RG

IA

1629300

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

A C

Q C

O R

E N

A V

A L

S

TA

TI

O

N , J

A C

K S

O N

V

IL

LE

, F

LO

R

CHIEF ENG/ARCH

FIRE PROTECTION

N O

T

FO

R C

O N

S

TR

U C

TI

O

N

P R

E L

IM

IN

A

R Y

DD

S

TE

EL

C

AI

SS

ON

O

PE

RA

TI

ON

S

DE

CK

P

LA

N

SB-702

AS NOTED

MP RDM BS

32.54FT DRAFT

LS CONDITION

SCALE: 3/16" = 1'-0"

ELEVATION - OUTBOARD PROFILEA1

0 4' 8' 12'

3/16" = 1'

A

S

UB

M

IT

TA

L 3/

DD

TE

EL

C

AI

SS

ON

O

PE

RA

TI

ON

S

DE

CK

P

LA

N

SB-703

AS NOTED

MP RDM BS

501 E KENNEDY BLVD

# 1910

TAMPA, FL 33602

(813) 258-8818

FI

LE

N

AM

E:

Q

:\T A\

-0 4\ ca dd

Ac tiv e\

_9

6-

\D

RY

DT

RF

-1

-S -7

.d wg L

AY

OU

T

NA

M E:

S B-

DD

S

TE

EL

C

AI

SS

ON

O

PE

RA

TI

ON

S

DE

CK

P

LA

N P

LO

TT

ED

: M on da y, M ar ch

8,

- 9

:4 5a m U

SE

R:

rm at tin gly

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

DRAWFORM REVISION: 31 JANUARY 2017

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D R

Y D

O C

K R

E P

A

IR

S

SU

BB

AS

E

KI

NG

S

BA

Y

KI

NG

SL

AN

D, G

EO

RG

IA

1629300

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

A C

Q C

O R

E N

A V

A L

S

TA

TI

O

N , J

A C

K S

O N

V

IL

LE

, F

LO

R

CHIEF ENG/ARCH

FIRE PROTECTION

N O

T

FO

R C

O N

S

TR

U C

TI

O

N

P R

E L

IM

IN

A

R Y

"B" SIDE

"A" SIDE

VENTILATION

DEHUMIDIFIER

CONTROL

CONSOLE

4' 8'0 2' 1/4" = 1'

SCALE: 1/4" = 1'-0"

PLAN - OPERATIONS DECKB1

SAFETY DISCONNECT

FOR HV-193 AND HV-215

SUBMERSIBLE

PUMP P-34

3" VENT/VACUUM

BREAKER LINE

SAFETY CHAINS AT

HATCH (REMOVABLE

CHAINS & STANCHIONS)

VENT FOR BALLAST TANK

36"X42" HATCH, COVER

OPENS TOWARD END

24"X24" HATCH,

COVER OPENS

TOWARD CENER LINE

SAFETY CHAINS AT

HATCH (REMOVABLE

CHAINS & STANCHIONS)

VARIABLE FREQUENCY

DRIVE FOR PUMP P-34

(TOSHIBA, 480VAC, 50HP)

VARIABLE FREQUENCY

DRIVE FOR PUMP P-32

(TOSHIBA, 480VAC, 150HP)

VARIABLE FREQUENCY

DRIVE FOR PUMP P-33

(TOSHIBA, 480VAC, 150HP)

VARIABLE FREQUENCY

DRIVE FOR PUMP P-35

(TOSHIBA, 480VAC, 50HP)

SAFETY DISCONNECT

FOR HV-185 AND HV-187

TRIM TANK NO. 2 EQUALIZING VALVE

CAISSON MONITOR J-BOXES

SUBMERSIBLE

PUMP P-32

6" VENT/VACUUM

BREAKER LINE

6" VENT/VACUUM

BREAKER LINE

SUBMERSIBLE

PUMP P-33

36"X42" HATCH, COVER

OPENS TOWARD END

24"X24" HATCH,

COVER OPENS

TOWARD CENER LINE

SAFETY CHAINS AT

HATCH (REMOVABLE

CHAINS & STANCHIONS)

HV-193

HV-215

HV-209

HV-203

HV-201

HV-214

HV-195

HV-179

HV-185

HV-187

SAFETY DISCONNECT

FOR HV-209

TRIM TANK ICCP RECTIFIER (DEACTIVATED)

TRIM TANK ICCP SYSTEM JUNCTION BOX (DEACTIVATED)

ABOVE - SAFETY DISCONNECT

FOR MAIN TANK ICCP RECTIFIER

(DEACTIVATED)

BELOW - SAFETY DISCONNECT

FOR TRIM TANK ICCP RECTIFIER

(DEACTIVATED)

MCC "B2

SPLIT C

MAIN TANK ICCP RECTIFIER

(DEACTIVATED)

MAIN TANK ICCP

SYSTEM JUNCTION BOX

(DEACTIVATED)

MOTOR

CONTROLLER

FAN SF-2

MCC "B2

SPLIT A & B

CAISSON TELEPHONE BOX

110V DISTRIBUTION PANEL

480V/208V TRANSFORMER

AIR COMPRESSOR SAFETY DISCONNECT

INSTRUMENT AIR COMPRESSOR

TRIM TANK NO. 1 EQUALIZING VALVE

BACKUP AIR BOTTLES (N2)

INSTRUMENT AIR DRYER

SAFETY DISCONNECT FOR HV-179

SUBMERSIBLE

PUMP P-35

3" VENT/VACUUM

BREAKER LINE

MAIN BALLAST TANK VENT LINE

SAFETY DISCONNECT

FOR HV-195 AND HV-214

SAFETY DISCONNECT

FOR HV-203 AND HV-201

CONTROLLER FOR AHU-2A

CONTROLLER FOR AHU-2B

CONDENSATE PUMP

CONDENSATE PUMP

MOTOR CONTROLLER

EXTERIOR HULL ICCP ANODE

DISCONNECT SWITCHES (A-SIDE,

B-SIDE) (DEACTIVATED)

EXTERIOR HULL ICCP

RECTIFIER (DEACTIVATED)

EXTERIOR HULL ICCP SYSTEM

JUNCTION BOX (DEACTIVATED)

EXTERIOR HULL ICCP SYSTEM

JUNCTION BOX (DEACTIVATED)

A

S

UB

M

IT

TA

L 3/

R1

1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES,

ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.

PLAN GENERAL NOTES

FOUNDATION KEY NOTES NX

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-100

B L D

G

F O

U N

D A

T

IO

N A

N D

R O

O F

P L A

N

DTJCBT CBT

1629300

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A 5%

S U

B M

IT

T

A L

/1

8/

1/8" = 1'-0" C1

BLDG 5055 - FOUNDATION AND SLAB PLAN

1/8" = 1'-0" A1

BLDG 5055 - ROOF PLAN

PLAN

NORTH

4' 8' 16'0'

R1 CLEAN AND PAINT ALL PEMB STRUCTURAL FRAMING.

ROOF FRAMING PLAN KEY NOTES RX

1 2 3 4

A

HSS4X4X1/4 HSS4X4X1/4HSS4X4X1/4HSS4X4X1/4

HSS4X4X1/4 HSS4X4X1/4HSS4X4X1/4HSS4X4X1/4

20' - 0" 20' - 0" 20' - 0"

C3

S-110

1 2 3 4

B

A

C3

S-110

H S

S X

X

/4

H S

S X

X

/4

H S

S X

X

/4

H S

S X

X

/4

HSS4X4X1/4 HSS4X4X1/4 HSS4X4X1/4

HSS4X4X1/4 HSS4X4X1/4 HSS4X4X1/4

FIRST FLOOR

100' - 0"

ROOF

115' - 6"

BA

EXISTING PEMB STRUCTURE TO

REMAIN

EXISTING INTERIOR

CONCRETE SLAB

RAISED CONCRETE SLAB

1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES, ABBREVIATIONS,

PLAN LEGEND AND CALLOUT IDENTIFICATION.

PLAN GENERAL NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-110

B L D

G

A

F

O U

N D

A T

IO

N

A N

D R

O O

F P

L A

N

DTJCBT CBT

1629300

PLAN

NORTH

4' 8' 16'0'

1/8" = 1'-0" C1

BLDG 5055A - FOUNDATION AND SLAB PLAN

1/8" = 1'-0" A1

BLDG 5055A - ROOF PLAN

1/4" = 1'-0" C3

TYPICAL FRAME ELEVATION

4' 8' 16'0'

PLAN

NORTH

2' 4' 8'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A 5%

S U

B M

IT

T

A L

/1

8/

A

HSS4X4X1/4 HSS4X4X1/4HSS4X4X1/4HSS4X4X1/4

HSS4X4X1/4 HSS4X4X1/4HSS4X4X1/4HSS4X4X1/4

20' - 0" 20' - 0" 20' - 0"

C3

S-120

1 2 3 4

B

A

C3

S-120

H S

S X

X

/4

H S

S X

X

/4

H S

S X

X

/4

H S

S X

X

/4

HSS4X4X1/4 HSS4X4X1/4 HSS4X4X1/4

HSS4X4X1/4 HSS4X4X1/4 HSS4X4X1/4

FIRST FLOOR

100' - 0"

ROOF

115' - 6"

BA

EXISTING PEMB STRUCTURE TO

REMAIN

EXISTING INTERIOR

CONCRETE SLAB

RAISED CONCRETE SLAB

1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES, ABBREVIATIONS,

PLAN LEGEND AND CALLOUT IDENTIFICATION.

PLAN GENERAL NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-120

B L D

G

B

F

O U

N D

A T

IO

N

A N

D R

O O

F P

L A

N

DTJCBT CBT

1629300

PLAN

NORTH

4' 8' 16'0'

1/8" = 1'-0" C1

BLDG 5055B - FOUNDATION AND SLAB PLAN

1/8" = 1'-0" A1

BLDG 5055B - ROOF PLAN

1/4" = 1'-0" C3

TYPICAL FRAME ELEVATION

4' 8' 16'0'

PLAN

NORTH

2' 4' 8'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A 5%

S U

B M

IT

T

A L

/1

1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES, ABBREVIATIONS,

PLAN LEGEND AND CALLOUT IDENTIFICATION.

FOUNDATION PLAN GENERAL NOTES

FOUNDATION KEY NOTES NX

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-131

B L D

G

F O

U N

D A

T

IO

N A

N D

R O

O F

P L A

N

DTJCBT CBT

1629300PLAN

NORTH

4' 8' 16'0'

1/8" = 1'-0" C1

BLDG 5145 - FOUNDATION AND SLAB PLAN

1/8" = 1'-0" A1

BLDG 5145 - ROOF PLAN

PLAN

NORTH

4' 8' 16'0'

R1 CLEAN AND PAINT ALL ROOF STRUCTURAL STEEL FRAMING. PROVIDE

NEW BOLTS, WASHERS, AND NUTS AS NEEDED.

R1 CLEAN AND PAINT ALL ROOF STRUCTURAL STEEL FRAMING. PROVIDE

NEW BOLTS, WASHERS, AND NUTS AS NEEDED.

ROOF FRAMING PLAN KEY NOTES RX

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A 5%

S U

B M

IT

T

A L

/1

8/

PLAN LEGEND AND CALLOUT IDENTIFICATION.

FOUNDATION PLAN GENERAL NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-131

B L D

G

F O

U N

D A

T

IO

N A

N D

S L A

B P

L A

N

DTJCBT CBT

1629300

PLAN

NORTH

4' 8' 16'0' 1/8" = 1'-0"

B1

BLDG 5146 - FOUNDATION AND SLAB PLAN

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A 5%

S U

B M

IT

T

A L

/1

R1 CLEAN AND PAINT ALL ROOF STRUCTURAL STEEL FRAMING. PROVIDE

NEW BOLTS, WASHERS, AND NUTS AS NEEDED.

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-132

B L D

G

R O

O F

F R

A M

IN

G

P L A

N

DTJCBT CBT

1629300

1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES, ABBREVIATIONS,

PLAN LEGEND AND CALLOUT IDENTIFICATION.

R1 CLEAN AND PAINT ALL ROOF STRUCTURAL STEEL FRAMING. PROVIDE

NEW BOLTS, WASHERS, AND NUTS AS NEEDED.

ROOF FRAMING PLAN GENERAL NOTES

ROOF FRAMING PLAN KEY NOTES RX

PLAN

NORTH

4' 8' 16'0' 1/8" = 1'-0" B1

BLDG 5146 - ROOF PLAN

R1

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A 5%

S U

B M

IT

T

A L

/1

W

X

W X

W X

W X

W X

W X

W X

W12X22

R1

1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES,

ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.

GENERAL NOTES

FOUNDATION KEY NOTES NX

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-151

B L D

G

F O

U N

D A

T

IO

N A

N D

R O

O F

P L A

N

DTJCBT CBT

1629300

PLAN

NORTH

2' 4' 8'0' 1/4" = 1'-0" C1

BLDG 5150 - FOUNDATION AND SLAB PLAN

1/4" = 1'-0" A1

BLDG 5150 - ROOF FRAMING PLAN

PLAN

NORTH

2' 4' 8'0'

R1 CLEAN AND PAINT ALL ROOF STRUCTURAL STEEL FRAMING. PROVIDE

NEW BOLTS, WASHERS, AND NUTS AS NEEDED.

R1 CLEAN AND PAINT ALL ROOF STRUCTURAL STEEL FRAMING. PROVIDE

NEW BOLTS, WASHERS, AND NUTS AS NEEDED.

ROOF FRAMING PLAN KEY NOTES RX

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A 5%

S U

B M

IT

T

A L

/1

A B C

27' - 0" 27' - 0"

1' - 0" 1' - 0"

B3

S-161

S-162

A1

W10X26 W10X26W10X26

W10X26 W10X26W10X26

EXISTING CONCRETE

FOUNDATION

COLUMN; REFER TO PLAN

REFER TO CIVIL

TOC

ADHESIVE ANCHORS,

REFER TO SCHEDULE THIS

SHEET

1 1/2" 1 1/2"

1/

2"

1/ 2"

CL COL

AND BPL

E Q

E Q

EQ EQ

L/

L/

W/2 W/2 1/4

AT WIDE FLANGE COLUMNS

L

W

SEE SCHEDULE

ANCHOR DIAMETER,

TOF, SEE PLAN

BASE PLATE, SEE

SCHEDULE

2"

SECTION AT ADHESIVE ANCHOR

"E

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-161

B

LD

G

F

O U

N D

A T

IO

N

P

LA

N

DTJCBT CBT

1629300

1/8" = 1'-0" B1

BLDG 5156 - FOUNDATION PLAN

3/4" = 1'-0"

B3

SECTION

4' 8' 16'0' 0' 1' 2' 3'

PLAN

NORTH

COLUMN BASE PLATE SCHEDULE

COLUMN SIZE

BASE PLATE ADHESIVE ANCHORS

NOTESW L T

HOLE SIZE H

(DIA) DIAMETER EMBEDMENT E

W10X26 14" 14" 1/2" 1 5/16" 3/4" 6 3/4"

1 1/2" = 1'-0" A1

ANCHOR AND BASE PLATE DETAILS

4"0' 8" 1'-4"

1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES,

ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.

FOUNDATION PLAN GENERAL NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

A B C

0" 13' - 6" 13' - 6" 27' - 0" 0"

W10x12

W10x12

W10x12

W10x12

W10x12 W10x12

W10x12 W10x12

W10x12 W10x12

W x1

W x1

W x1

W8x10

W8x10

S-162

A1

2' - 0"2' - 0"

S L

TYP

R1

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

TOC - FIRST

FLOOR

100' - 0"

TOS-LOW

118' - 0"

1 2

ROOF FRAMING

PLAN

120' - 6"

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-162

B

LD

G

R

O O

F F

R A

M

IN

G P

LA

N

DTJCBT CBT

1629300

1/8" = 1'-0" C1

BLDG 5156 - ROOF FRAMING PLAN

2' 4' 8'0'

4' 8' 16'0'

1/4" = 1'-0" A1

ELEVATION

PLAN

NORTH

1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES, ABBREVIATIONS,

PLAN LEGEND AND CALLOUT IDENTIFICATION.

2. REFER TO FOUNDATION PLANS FOR DIMENSIONS NOT SHOWN.

ROOF FRAMING PLAN GENERAL NOTES

R1 UNLESS OTHERWISE NOTED, ROOF CONSTRUCTION SHALL CONSIST OF

GALV 1.5" x 20 GA; TYPE B METAL ROOF DECK OVER STEEL SUPPORTS

SPACED AT 5'-6" OC MAX. FASTEN DECK TO SUPPORTS WITH 5/8"

DIAMETER PUDDLE WELDS AT 36/7 PATTERN. FASTEN SIDELAPS

TOGETHER WITH (5) #10 SCREWS BETWEEN SUPPORTS ALONG SIDELAPS

AND FASTEN EDGEMOST DECK PANEL TO STEEL FRAMING WITH 5/8"

DIAMETER PUDDLE WELDS.

ROOF FRAMING PLAN KEY NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

PLAN LEGEND AND CALLOUT IDENTIFICATION.

FOUNDATION PLAN GENERAL NOTES

FOUNDATION KEY NOTES NX

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L

A

IR

S T

A T

IO

N

J

A C

K S

O N

V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

S-171

B L D

G

F O

U N

D A

T

IO

N A

N D

R O

O F

P L A

N

DTJCBT CBT

1629300

PLAN

NORTH

4' 8' 16'0'

R1 CLEAN AND PAINT ALL PEMB STRUCTURAL FRAMING.R1 CLEAN AND PAINT ALL PEMB STRUCTURAL FRAMING.

ROOF FRAMING PLAN KEY NOTES RX

1/8" = 1'-0" A1

BLDG 5190 - FOUNDATION AND SLAB PLAN

1/8" = 1'-0"

A3

BLDG 5190 - ROOF PLAN

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A 5%

S U

B M

IT

T

A L

/1

8/

PLAN

NORTH

4' 8' 16'0'

ROOF TO REMAIN

REMOVE MECHANICAL VENTS.

PREPARE SURFACES FOR ROOF

RETROFIT REPAIR

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

AC

Q

C O

R E

N

AV

AL

A

IR

S

TA

TI

O N

JA

C

KS

O N

VI

LL

E, F

L

SU

BB

AS

E

KI

N

G S

BA

Y

KI

N

G S

BA

Y, G

EO

R G

IA

AS NOTED

RE

PA

IR

D

RY

D

OC

K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

PA

CK

AG

E

1B

AD132

BL

DG

- R

O O

F

PL

AN

DE

M

O

LI

TI

O

N

EVBSG AC

1629300

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

A

S

UB

MI

TT

AL

3/1 8/1

1/8" = 1'-0"C1 BLDG 5145 - ROOF PLAN - DEMOLITION

PLAN

NORTH

KEY PLAN

A B C D

PLAN

CONNECTION TO SUPERSTRUCTURE "THIS SIDE"

REMOVE EXIST ROOF SYSTEM; METAL SIDING; ATTACHED

CANOPY, GUTTERS & DOWNSPOUTS. ALL STRUCTURAL

SUPPORTS MASONRY WALL & FRAMING SHALL REMAIN.

PREPARE SURFACE FOR NEW WORK

A1

AD141

FIRST FLOOR

100' - 0"

ROOF

120' - 0"

REMOVE EXIST ROOF SYSTEM; ATTACHED CANOPY,

GUTTERS & DOWNSPOUTS.

REMOVE EXIST METAL SIDING PREPARE SURFACE FOR

NEW WORK

REMOVE & REPLACE DOOR HARDWARE , AS AN OPTION, REMOVE & REPLACE ALL

EXTERIOTR DOORS

AS AN OPTION, REMOVE & REPLACE ALL

COILING DOORS

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

AD141

B

LD

G

R

O O

F P

LA

N

S

O U

TH

E

LE

V

A

TI

O N

D

E M

O

LI

TI

O

N

EVBSG AC

1629300

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

1/8" = 1'-0" C1

BLDG 5146 - ROOF PLAN - DEMOLITION

1/8" = 1'-0" A1

BLDG 5146 ELEVATION - DEMOLITION

PLAN

NORTH

KEY PLAN

A B C D

PLAN

NORTH

4' 8' 16'0'

PLAN

UP

A2

A-201

PIPE PIT

PIPE PIT

WORK AREA

C3

AD151

REMOVE AND REPLACE

DOOR HARDWARE (KNOBS)

WITH EXIT HARDWARE

FIRST FLOOR

100' - 0"

ROOF

127' - 0"

REMOVE AND

REPLACE LADDER

REMOVE & REPLACE

CATWALK

REMOVE & REPLACE

GUTTER &

DOWNSPOUTS

REMOVE & REPLACE SLIDING ROOF

HATCH WITH NEW DOUBLE LEAF

ROOF HATCH (3) UNITS

REMOVE & REPLACE

ROOF METAL PANELS

REMOVE GUARDRAIL

A2

A-201

C3

AD151

REMOVE AND

REPLACE LADDER

REMOVE & REPLACE

CATWALK

REMOVE & REPLACE

GUTTER &

DOWNSPOUTS

REMOVE & REPLACE

SLIDING ROOF HATCH

WITH NEW DOUBLE

LEAF ROOF HATCH (3)

UNITS

REMOVE & REPLACE

ROOF METAL PANELS

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

AD151

B

LD

G

F

LO

O

R A

N D

R O

O F

P

LA

N D

E M

O

LI

TI

O

N

EVBSG AC

1629300

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

/1

1/8" = 1'-0" C1

BLDG 5150 - FLOOR PLAN - GROUND - DEMOLITION

1/8" = 1'-0"

C3

BLDG 5150 - SOUTH ELEVATION - DEMOLITION

1/8" = 1'-0" A1

BLDG 5150 - ROOF PLAN - DEMOLITION

PLAN

NORTH

4' 8' 16'0'

PLAN

NORTH

4' 8' 16'0'

4' 8' 16'0'

PLAN

NORTH

KEY PLAN

A B C D

STORAGE

1 2 3 4

B

A

REMOVE AND REPLACE DOOR HARDWARE AND

LATCHES, PROVIDE NEW LEVER HARDWARE, DOOR

CLOSER AND OTHER CODE COMPLIANT EXIT

HARDWARE.

REMOVE AND REPLACE DOOR HARDWARE AND

LATCHES, PROVIDE NEW LEVER HARDWARE, DOOR

CLOSER AND OTHER CODE COMPLIANT EXIT

HARDWARE.

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

AC

Q

C O

R E

N

AV

AL

A

IR

S

TA

TI

O N

JA

C

KS

O N

VI

LL

E, F

L

SU

BB

AS

E

KI

N

G S

BA

Y

KI

N

G S

BA

Y, G

EO

R G

IA

AS NOTED

RE

PA

IR

D

RY

D

OC

K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

PA

CK

AG

E

1B

A-110

BL

DG

5A

FL

O

O R

PL

AN

EV

BSG PFG

1629300

1/4" = 1'-0"C1 BLDG 5055A - FLOOR PLAN

PLAN

NORTH

2' 4' 8'0'

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

A

S

UB

MI

TT

AL

3/1 8/1

GENERAL NOTES:

1. PATCH AND REPAIR WORK ASSOCIATED WITH MECHANICAL AND

ELECTRICAL WORK.

C2 A-202

A2 A-201

C2 A-201

A2 A-202

1 2 3 4

B

A

REMOVE AND REPLACE DOOR HARDWARE AND

LATCHES, PROVIDE NEW LEVER HARDWARE, DOOR

CLOSER AND OTHER CODE COMPLIANT EXIT

HARDWARE.

REMOVE AND REPLACE DOOR HARDWARE AND

LATCHES, PROVIDE NEW LEVER HARDWARE, DOOR

CLOSER AND OTHER CODE COMPLIANT EXIT

HARDWARE.

STORAGE

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

AC

Q

C O

R E

N

AV

AL

A

IR

S

TA

TI

O N

JA

C

KS

O N

VI

LL

E, F

L

SU

BB

AS

E

KI

N

G S

BA

Y

KI

N

G S

BA

Y, G

EO

R G

IA

AS NOTED

RE

PA

IR

D

RY

D

OC

K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

PA

CK

AG

E

1B

A-120

BL

DG

5B

FL

O

O R

PL

AN

BSG

BSG PFG

1629300

1/4" = 1'-0"C1 BLDG 5055B - FLOOR PLAN

PLAN

NORTH

4' 8' 16'0'

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

A

S

UB

MI

TT

AL

3/1 8/1

GENERAL NOTES:

1. PATCH AND REPAIR WORK ASSOCIATED WITH MECHANICAL AND

UPUP

DN

DN

REMOVE & REPLACE COILING

DOOR "IN KIND". TYPICAL TO ALL

EXISTING COILING DOOR

@ INTERIOR SIDE

PORTION OF INSULATION

NEW STAIRS

NEW STAIRS

MENS

WOMENS

VEST

EXISTING OFFICE

KITCHEN, REF. TO

REMAIN. REPLACE

PLUMBING FIXTURES.

EXISTING WOOD

WORKING SHOP

EXISTING

STORAGE

RELOCATE

LAUNDRY WASH

DRYER UNDER

THE STAIRS

REMOVE GUARDRAIL

REPLACE/PROVIDE 42"

HIGH PIPE METAL

GUARDRAIL 1/2" DIA.

MEZZANINE

BREAK

ROOM

PLATFORM

(MEZZ)

REMOVE GUARDRAIL

REPLACE/PROVIDE 42"

HIGH PIPE METAL

GUARDRAIL 1/2" DIA.

PLATFORM

(MEZZ)

REMOVE EXIST

PARTITION. REPLACE,

PROVIDE GWB STUD

PARTITION WITH BATT

INSULATION

PROVIDE ADDITIONAL

PARTITION FOR

CONTINUOUS FIRE

RATING/BARRIER AS

REQUIRED.

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

AC

Q

C O

R E

N

AV

AL

A

IR

S

TA

TI

O N

JA

C

KS

O N

VI

LL

E, F

L

SU

BB

AS

E

KI

N

G S

BA

Y

KI

N

G S

BA

Y, G

EO

R G

IA

AS NOTED

RE

PA

IR

D

RY

D

OC

K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

PA

CK

AG

E

1B

A-131

BL

DG

- F

LO

O

R

PL

AN

S

EVBSG AC

1629300

1/8" = 1'-0"A1 BLDG. 5145 - FLOOR PLAN - GROUND

1/8" = 1'-0"C1 BLDG. 5145 - FLOOR PLAN - MEZZANINE

PLAN

NORTH

KEY PLAN

A B C D

PLAN

NORTH

4' 8' 16'0'

PLAN

NORTH

4' 8' 16'0'

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

A

S

UB

MI

TT

AL

3/1 8/1

AS AN OPTION, REPLACE ALL

COILING DOORS

STO ELEC

MEN

LOCKERS

WOMEN

4' - 0"

10' - 0"

6'

5'

6'

COPY/ SUPPLY

PILE

5'

REMOVE EXIST.

DEMOUNTABLE

PARTITION. PROVIDE

NEW GWB STUD

WALL PARTITION,

DOOR, ACT CEILING,

FIXTURE,

DIFFUSERS, FF&E

REMOVE EXIST. DEMOUNTABLE WALLS, NEW

OFFICE LAYOUT, GWB STUD WALL

PARTITIONS; INTERIOR DOORS, ACT CEILING

LIGHT FIXTURES, DIFFUSERS WITH FF&E

REMOVE/REPLACE DOOR

HARDWARE (DOOR KNOBS) WITH

CODE COMPLIANT EXIT LEVER

HARDWARE AS AN OPTION.

REPLACE ALL EXIT DOORS

MEN'S HANDICAP

STALL (LOSE 1

EXIST TOILET)

WOMEN'S HANDICAP

STALL (LOSE 1 EXIST

TOILET)

REMOVE EXIST. DEMOUNTABLE WALLS, NEW

OFFICE LAYOUT, GWB STUD WALL

PARTITIONS; INTERIOR DOORS, ACT CEILING

LIGHT FIXTURES, DIFFUSERS WITH FF&E

4' - 0"

4'

SPECIAL HANDLING STORAGESTO

PROVIDE NEW ACT CEILING

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

A-141

B

LD

G

F

LO

O

R P

LA

N

R

E F

LE

C

TE

D

C E

IL

IN

G P

LA

N

EVBSG AC

1629300

1/8" = 1'-0" C1

BLDG. 5146 - FLOOR PLAN

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

/1

1/8" = 1'-0" A1

BLDG 5146 - RELECTED CEILING PLAN

PLAN

NORTH

KEY PLAN

A B C D

PLAN

NORTH

4' 8' 16'0'

PLAN

CONNECTION TO SUPERSTRUCTURE "THIS SIDE"

PROVIDE METAL ROOF SYSTEM, GUTTERS &

DOWNSPOUTS.

A1

A-142

FIRST FLOOR

100' - 0"

ROOF

120' - 0"

PROVIDE METAL ROOF SYSTEM; ATTACHED CANOPY,

GUTTERS & DOWNSPOUTS.

PROVIDE METAL SIDING

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

A-142

B

LD

G

R

O O

F P

LA

N

S

O U

TH

E

LE

V

A

TI

O N

EVBSG AC

1629300

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

1/8" = 1'-0" C1

BLDG 5146 - ROOF PLAN

1/8" = 1'-0" A1

BLDG 5146 ELEVATION

PLAN

NORTH

KEY PLAN

A B C D

PLAN

NORTH

4' 8' 16'0'

PLAN

A2

A-201

PIPE PIT

PIPE PIT

WORK AREA

PROVIDE DOOR HARDWARE

(KNOBS) WITH EXIT

HARDWARE

C3

A-151

PROVIDE LADDER

PROVIDE CATWALK

PROVIDE GUTTER &

DOWNSPOUTS

PROVIDE NEW DOUBLE

LEAF ROOF HATCH (3)

UNITS

PROVIDE ROOF METAL

PANELS

C3

A-151

FIRST FLOOR

100' - 0"

ROOF

127' - 0"

PROVIDE

LADDER

PROVIDE CATWALK

PROVIDE GUTTER

& DOWNSPOUTS

PROVIDE DOUBLE LEAF

ROOF HATCH (3) UNITS

PROVIDE ROOF METAL

PANELS

PROVIDE GUARDRAIL

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

A-151

B

LD

G

F

LO

O

R A

N D

R O

O F

P

LA

N

EVBSG AC

1629300

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

/1

PLAN

NORTH

4' 8' 16'0'

PLAN

NORTH

4' 8' 16'0'

1/8" = 1'-0" (A-151) C1

BLDG 5150 - FLOOR PLAN - GROUND -

1/8" = 1'-0" (A-151) A1

BLDG 5150 - ROOF PLAN

1/8" = 1'-0" (A-151) C3

BLDG 5150 - SOUTH ELEVATION

4' 8' 16'0'

PLAN

NORTH

KEY PLAN

A B C D

ROOM

REMOVE AND REPLACE COILING

DOOR AND PERSONNEL DOOR.

PROVIDE DOOR OPENINGS WITH

CODE COMPLIANT EXIT

HARDWARE

REMOVE AND REPLACE COILING

DOOR AND PERSONNEL DOOR.

PROVIDE DOOR OPENINGS WITH

CODE COMPLIANT EXIT

HARDWARE

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

AC

Q

C O

R E

N

AV

AL

A

IR

S

TA

TI

O N

JA

C

KS

O N

VI

LL

E, F

L

SU

BB

AS

E

KI

N

G S

BA

Y

KI

N

G S

BA

Y, G

EO

R G

IA

AS NOTED

RE

PA

IR

D

RY

D

OC

K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

PA

CK

AG

E

1B

A-170

BL

DG

- F

LO

O

R

PL

AN

G

RO

UN

D

EV

BSG PFG

1629300

1/8" = 1'-0"B1 BLDG 5190 - FLOOR PLAN - GROUND

PLAN

NORTH

4' 8' 16'0'

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

A

S

UB

MI

TT

AL

3/1 8/1

91. PATCH AND REPAIR WORK ASSOCIATED WITH MECHANICAL AND

GENERAL NOTES

PATCH/ REPAIR

DAMAGE BATT

(EXISTING)

INSULATION AS

REQUIRED

EXSITING ROOF , WALL MASONRY, SIDING, GUTTER,

DOWNSPOUT TO REMAIN

NEW FLOOR & BASE

FINISH

NEW GWB ON RIGID

INSULATION & 1 5/8"

STUD FRAMING AT

CONDITIONED OFFICES

A.C.T.

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S O

U

TH

E A

S T

AC

Q

C O

R E

N

AV

AL

A

IR

S

TA

TI

O N

JA

C

KS

O N

VI

LL

E, F

L

SU

BB

AS

E

KI

N

G S

BA

Y

KI

N

G S

BA

Y, G

EO

R G

IA

AS NOTED

RE

PA

IR

D

RY

D

OC

K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

PA

CK

AG

E

1B

A-331

BL

DG

- W

AL

L

SE

CT

IO

N

EVBSG AC

1629300

1 1/2" = 1'-0"B4 WALL SECTION - BLDG. 5145

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

A

S

UB

MI

TT

AL

3/1 8/1

4"0' 8" 1'-4"

NEW RIBBED

METAL SIDING

NEW GUTTER &

DOWNSPOUT

NEW MINERAL BATT

INSULATION R35

WITH ATTACHMENT

CLIPS

RIGID INSULATION

R-7 MIN.

PROVIDE SUB

GIRST TO SUPPORT

METAL SIDING

VAPOR BARRIER

VAPOR BARRIER

NEW METAL

ROOF PANEL

NEW RIBBED

METAL SIDING

NEW GUTTER &

DOWNSPOUT

NEW MINERAL BATT

INSULATION R35

WITH ATTACHMENT

CLIPS

PROVIDE SUB

GIRST TO SUPPORT

METAL SIDING

VAPOR BARRIER

VAPOR BARRIER

NEW METAL

ROOF PANEL

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

A-341

B

LD

G

6, 7, W

A

LL

S E

C

TI

O N

S

EVBSG AC

1629300

1 1/2" = 1'-0" B3

TYPICAL WALL SECTION - BLDG. 5146; 5147; 5158; 5149

1 1/2" = 1'-0"

B1

TYPICAL WALL SECTION - BLDG. 5146; 5147; 5158; 5149

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

4"0' 8" 1'-4"4"0' 8" 1'-4"

PROVIDE WALL MOUNTED SPEAKERS AND CLEAR

STROBES AS REQUIRED TO ACHIEVE DESIGN CRITERIA.

NOTIFICATION APPLIANCES ARE NOT REQUIRED .

PROVIDE WEATHERPROOF WALL MOUNTED SPEAKERS,

AS REQUIRED TO ACHIEVE DESIGN CRITERIA.

FIRE ALARM HATCH LEGEND

NO HATCH

PAINT BOOTH

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FA101

B

LD

G

F

IR

E

A

LA

R M

A N

D M

A S

S N

O

TI

F

IC

A

TI

O N

P

LA

N

G R

O U

N D

APLKMK KPZ

PROVIDE ANCILLARY BUILDING WITH COMBINED FA/MNS SYSTEM NETWORKED

TO THE DRYDOCK. DO NOT MOUNT FIRE ALARM DEVICES WHERE PAINT

PARTICLES MAY COVER THE DEVICES.

GENERAL NOTES

1. REFER TO FA001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS

AND SYMBOLS.

WORK NOTES

1/8" = 1'-0" A1

BLDG 5055 - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

A

STORAGE

1 N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FA110

B

LD

G

5A

F

IR

E

A

LA

R M

A N

D M

A S

S N

O

TI

F

IC

A

TI

O N

P

LA

N

G R

O U

N D

APLKMK KPZ

FIRE ALARM AND MASS NOTIFICATION SYSTEMS ARE NOT REQUIRED FOR

THIS OCCUPANCY. THIS BUILDING IS NOT IN FA/MNS SCOPE.

GENERAL NOTES

1. REFER TO FA001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND

SYMBOLS.

WORK NOTES

1/8" = 1'-0" B2

BLDG 5055A - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

A

Unoccupied Unoccupied

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FA120

B

LD

G

5B

F

IR

E

A

LA

R M

A N

D M

A S

S N

O T

IF

IC

A

TI

O N

P

LA

N

G R

O U

N D

APLKMK KPZ

FIRE ALARM AND MASS NOTIFICATION SYSTEMS ARE NOT REQUIRED FOR THIS

OCCUPANCY. THIS BUILDING IS NOT IN FA/MNS SCOPE.

GENERAL NOTES

1. REFER TO FA001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS

AND SYMBOLS.

WORK NOTES

1/8" = 1'-0" B2

BLDG 5055B - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

PROVIDE CEILING MOUNTED SPEAKERS AND CLEAR

NOTIFICATION APPLIANCES ARE NOT REQUIRED .

FIRE ALARM HATCH LEGEND

NO HATCH

1 2 3 4

B

OFFICE

102 WOMEN'S TOILET/

LKR. RM.

VESTIBULE

JANITOR

MEN'S TOILET/

LKR. RM.

STORAGE

MECH. EQUIP. RM.

WOODWORKING

SHOP

FACU/ACU

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FA130

B

LD

G

F

IR

E

A

LA

R M

A N

D M

A S

S N

O

TI

F

IC

A

TI

O N

P

LA

N

G R

O U

N D

APLKMK KPZ

PROVIDE NEW COMBINATION FIRE ALARM/MASS NOTIFICATION SYSTEM

CONNECTED TO MAIN FACU/ACU.

GENERAL NOTES

1. REFER TO FA001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND

SYMBOLS.

2. WALL MOUNTED NOTIFICATION DEVICES ARE PERMITTED IN UNFINISHED

AREAS WITH CONGESTED CEILINGS SUCH AS A PUMP ROOM OR MECHANICAL

ROOM.

3. DEMOLISH ALL EXISTING FIRE ALARM COMPONENTS AFTER THE NEW FA/MNS

IS INSTALLED, TESTED, AND ACCEPTED.

WORK NOTES

1/8" = 1'-0" A1

BLDG 5145 - FIRE ALARM AND MASS NOTIFICATION PLAN -

GROUND

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

Unoccupied Unoccupied

PROVIDE CEILING MOUNTED SPEAKERS AND CLEAR

STROBES AS REQUIRED TO ACHIEVE DESIGN CRITERIA.

NOTIFICATION APPLIANCES ARE NOT REQUIRED .

FIRE ALARM HATCH LEGEND

NO HATCH

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .