N6945019R0508_DOC020.pdf

PDF 114 KB Posted

Attached to
KINGS BAY DRY DOCK RECAPITALIZATION, SUBASE KINGS BAY, GA
Solicitation number
N6945019R0508
Issued by

About this file

This notice announces an Industry Day for a federal contract opportunity to recapitalize the dry dock at Naval Submarine Base Kings Bay in Georgia. The project scope includes repairs to the dry dock concrete body, cover, and mechanical and electrical systems, with an estimated construction cost between $400-600 million. The dry dock is 700 feet long, 100 feet wide, and 67 feet deep, with an 825 foot long, 270 foot wide metal roof and siding cover supported by a coated steel frame. The project will be conducted in three phases due to operational requirements. The Industry Day on March 26, 2019 in Jacksonville, Florida will provide an overview of the project and acquisition strategy and allow for one-on-one breakout sessions between potential prime contractors and the government. Firms interested in the breakout sessions should respond by March 19 with attendee names and contact information. The contracting office is NAVFAC Southeast, and the primary point of contact is the listed contract specialist.

N6945019R0508_DOC020.pdf

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .