This document provides details for an industry day notice regarding the Kings Bay Dry Dock Recapitalization project at Naval Submarine Base Kings Bay, Georgia. The project scope includes repairs to the dry dock concrete body, cover, and various mechanical and electrical systems to support operations. The estimated construction cost is $400-600 million.
NAVFAC Southeast is seeking industry feedback at an industry day event on March 26, 2019 at the University of North Florida. Specific feedback will be requested concerning project phasing, scheduling, challenges, and acquisition strategy. Breakout sessions will be provided for potential prime contractors to meet one-on-one with the government after the formal presentation. Interested prime contractors should respond by March 19th to schedule a breakout session. This will provide an opportunity for contractors with relevant experience to learn about the project and acquisition approach. The contracting office is NAVFAC Southeast Building 903 in Jacksonville, Florida.
N6945019R0508_DWGs_15_1B_2of2.pdf
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAZARD
CLASSIFICATION
HAZARD SCHEDULE
EXTRA HAZARD
MARK
PAINT BOOTH
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
FX101
B
LD
G
F
IR
E
S U
P P
R E
S S
IO
N
P
LA
N
G R
O U
N D
APLKMK KPZ
SPRINKLER SYSTEM VALVES AND PIPING ARE EXISTING TO REMAIN.
REPLACE ALL SPRINKLERS WITH NEW STANDARD TEMPERATURE
SPRINKLERS.
GENERAL NOTES
WORK NOTES
1/8" = 1'-0" A1
BLDG 5055 - FIRE SUPPRESSION PLAN - GROUND
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS
AND SYMBOLS.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
1 2 3 4
B
A
STORAGE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
FX110
B
LD
G
5A
F
IR
E
S U
P P
R E
S S
IO
N
P
LA
N
G R
O U
N D
APLKMK KPZ
FIRE SUPPRESSION IS NOT REQUIRED IN THIS OCCUPANCY. NOT IN FIRE
SUPPRESSION SCOPE.
GENERAL NOTES
WORK NOTES
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
1/8" = 1'-0" B2
BLDG 5055A - FIRE SUPPRESSION PLAN - GROUND
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS
AND SYMBOLS.
A
Unoccupied Unoccupied
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
FX120
B
LD
G
5B
F
IR
E
S U
P P
R E
S S
IO
N
P
LA
N
G R
O U
N D
APLKMK KPZ
FIRE SUPPRESSION IS NOT REQUIRED IN THIS OCCUPANCY. NOT IN FIRE
SUPPRESSION SCOPE.
GENERAL NOTES
WORK NOTES
1/8" = 1'-0" B2
BLDG 5055B - FIRE SUPPRESSION PLAN - GROUND
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
/1
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS
AND SYMBOLS.
OFFICE
102 WOMEN'S TOILET/
LKR. RM.
VESTIBULE
JANITOR
MEN'S TOILET/
LKR. RM.
STORAGE
MECH. EQUIP. RM.
WOODWORKING
SHOP
EXISTING TO REMAIN
DRY PIPE SYSTEM
EXISTING TO REMAIN
WET PIPE SYSTEM
EXISTING TO REMAIN
WET PIPE SYSTEM
EXISTING TO REMAIN
WET PIPE SYSTEM
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
FX130
B
LD
G
F
IR
E
S U
P P
R E
S S
IO
N
P
LA
N
G R
O U
N D
APLKMK KPZ
LOCATION OF EXISTING DELUGE SYSTEM VALVE FOR THE PROTECTION OF
THE DUST COLLECTION SYSTEM DUCT. RECONFIGURE DELUGE SPRINKLERS
TO PROTECT NEW DUCT COLLECTION DUCT. RETAIN EXISTING DELUGE
VALVE.
GENERAL NOTES
WORK NOTES
1/8" = 1'-0" A1
BLDG 5145 - FIRE SUPPRESSION PLAN - GROUND
1. REFER TO FX001 FOR GENERAL NOTES, DESIGN
CRITERIA, ABBREVIATIONS AND SYMBOLS.
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
/1
Unoccupied Unoccupied
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
FX131
B
LD
G
F
IR
E
S U
P P
R E
S S
IO
N
P
LA
N
M E
Z Z
A N
IN
E
APLKMK KPZ
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
/1
EXISTING TO REMAIN DRY PIPE SYSTEM.1
GENERAL NOTES
WORK NOTES
1. REFER TO FX001 FOR GENERAL NOTES, DESIGN
CRITERIA, ABBREVIATIONS AND SYMBOLS.
1/8" = 1'-0" A1
BLDG 5145 - FIRE SUPPRESSION PLAN - MEZZANINE
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
HAZARD
CLASSIFICATION
HAZARD SCHEDULE
LIGHT HAZARD
ORDINARY HAZARD
MARK
SUBSAFE
STORAGE
ELECTRICAL
EQUIPMENT
SHOWER
DRYING
VESTIBULE
VESTIBULE
LOCKERS
VESTIBULE
JANITOR
NUCLEAR
STORAGE
VESTIBULE
VESTIBULE
WATER HEATER
INTERIM ITEM
STORAGE
Unoccupied Unoccupied
Unoccupied Unoccupied
Unoccupied Unoccupied
Unoccupied Unoccupied
Unoccupied Unoccupied
OFFICE
Unoccupied Unoccupied
Unoccupied Unoccupied
Unoccupied Unoccupied
Unoccupied Unoccupied
SPECIAL
HANDLING AND
STORAGE
Unoccupied Unoccupied
Unoccupied Unoccupied
Unoccupied Unoccupied
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
FX140
B
LD
G
F
IR
E
S U
P P
R E
S S
IO
N
P
LA
N
G R
O U
N D
APLKMK KPZ
LOCATION OF EXISTING TO REMAIN SPRINKLER RISERS.
RECONFIGURE SPRINKLER LOCATIONS AS REQUIRED TO FIT NEW CEILING
AND WALL LAYOUTS.
GENERAL NOTES
WORK NOTES
1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND
SYMBOLS.
2. SPRINKLER SYSTEMS WITHIN BUILDING ARE EXISTING TO REMAIN.
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
1/8" = 1'-0" C1
BLDG 5146 - FIRE SUPPRESSION PLAN - GROUND
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
FX150
B
LD
G
F
IR
E
S U
P P
R E
S S
IO
N
P
LA
N
G R
O U
N D
M
E Z
Z A
N
IN
E
APLKMK KPZ
BUILDING NOT IN SCOPE FOR FIRE SUPPRESSION.1
GENERAL NOTES
WORK NOTES
1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS
AND SYMBOLS.
1/8" = 1'-0" A2
BLDG 5150 - FIRE SUPPRESSION PLAN - GROUND
1/8" = 1'-0" C2
BLDG 5150 - FIRE SUPPRESSION PLAN - MEZZANINE
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
Room
Unoccupied Unoccupied
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
FX170
B
LD
G
F
IR
E
S U
P P
R E
S S
IO
N
P
LA
N
G R
O U
N D
R
O O
F
APLKMK KPZ
REPAIR RUSTED FDC PIPE SUPPORT.1
GENERAL NOTES
WORK NOTES
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
/1
1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND
SYMBOLS.
1/8" = 1'-0" B1
BLDG 5190 - FIRE SUPPRESSION PLAN - GROUND
1/8" = 1'-0"
B3
BLDG 5190 - FIRE SUPPRESSION PLAN - ROOF
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
PLAN
NORTH
SCALE IN FEET
0 4' 8' 16'
PLUMBING SYMBOLS
POINT OF CONNECTION
POINT OF DISCONNECTION
AAV AIR ADMITTANCE VALVE
AC ABOVE CEILING
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AP ACCESS PANEL
BF BELOW FLOOR
BG BELOW GRADE
BFP BACKFLOW PREVENTER
BTUH BRITISH THERMAL UNITS PER HOUR
CO CLEANOUT
CONC CONCRETE
CW DOMESTIC COLD WATER
DN DOWN
DWG DRAWING
DWV DRAINAGE, WASTE, VENT
EA EACH
EL ELEVATION
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
F FARENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FLA FULL LOAD AMPS
FT FEET
G NATURAL GAS
GAL GALLON
GFCI GOVERNMENT FURNISHED, CONTRACTOR
INSTALLED
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIBB
HC HANDICAP ACCESSIBLE
HP HORSEPOWER
HW DOMESTIC HOT WATER
HWR DOMESTIC HOT WATER RECIRC
HZ HERTZ
ICE ICE MAKER
INV INVERT ELEVATION
IWC INCHES OF WATER COLUMN
KS KITCHEN SINK
LAV LAVATORY
PLUMBING ABBREVIATIONS
MAX MAXIMUM
MIN MINIMUM
NIC NOT IN CONTRACT
NO NUMBER, NORMALLY OPEN
PH PHASE
PRS PRESSURE REDUCING STATION
PSI POUNDS PER SQUARE INCH
RL ROOF LEADER
RD ROOF DRAIN
REF REFRIGERATOR
RPM REVOLUTIONS PER MINUTE
SAN SANITARY
SH SHOWER
SIM SIMILAR
SS SERVICE SINK
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
UR URINAL
V VENT
VS VENT STACK
VTR VENT THRU ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WHA WATER HAMMER ARRESTOR
WS WASTE STACK
WSHR WASHING MACHINE
° DEGREE
PLUMBING LEGEND
DOMESTIC HOT WATER PIPNG (HW)
DOMESTIC COLD WATER PIPING (CW)
DOMESTIC HOT WATER RETURN PIPING (HWR)
SOIL, WASTE OR SANITARY SEWER PIPING (W)
NATURAL GAS PIPING (G)
RAIN LEADER
DOWNWARD SLOPE
VENT PIPING
GATE VALVE (HORIZONTAL AND VERTICAL)
TEMPERATURE AND PRESSURE RELIEF VALVE
CHECK VALVE
UNION
EXTERIOR WALL HYDRANT (WH)
HOSE BIBB (HB)
FLOOR DRAIN (FD)
WALL CLEANOUT (WCO)
FLOOR CLEANOUT (FCO)
CLEANOUT TO GRADE (COTG)
WATER HAMMER ARRESTOR
(PDI SIZE FIXTURE UNIT RATING 1-11)
VENT THRU ROOF (VTR)
FLOOR DRAIN MARK
(SEE SCHEDULE ON SHEET P-???)
PLUMBING FIXTURE MARK
(SEE SCHEDULE ON SHEET P-???)
WATER HEATER MARK
(SEE SCHEDULE ON SHEET P-???)
THIN LINE WEIGHT INDICATES EXISTING
ITEM TO REMAIN
PIPE TURNING DOWN
HEAVY LINE WEIGHT INDICATES NEW
WORK TO BE PROVIDED
ROOF DRAIN
HEAVY DASHED LINE WEIGHT INDICATES
EXISTING ITEM TO REMOVE, REFER TO
DEMOLITION NOTES.
G
RL
V
P-1
FD-1
WH-1
PIPE TURNING UP
(A)
RD
ROOM TAG
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL TAG
ROOM NAME
ROOM NUMBER
? INTERIOR ELEVATION
TAG
INTERIOR ELEVATION NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SCALE
SHEET
REFERENCED
FROM
EXTERIOR ELEVATION
TAG
ELEVATION NUMBER
DIRECTION OF VIEW
SHEET WHERE DRAWN
WALL / PARTIAL
BUILDING SECTION
TAG
SECTION NUMBER
SHEET WHERE DRAWN
GENERAL PROJECT SYMBOLS
BUILDING SECTION
TAG
SECTION NUMBER
SHEET WHERE DRAWN
BUILDING
NEW WORK
KEYNOTE TAG
KEYNOTE NUMBER
DEMO
KEYNOTE TAG
KEYNOTE NUMBER
? PHOTOGRAPH TAG
PHOTOGRAPH NUMBER
SHEET WHERE SHOWN
PLAN
NORTH
SCALE
TRUE NORTH
SHEET
REFERENCED
FROM
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
P-001
LE
G
E N
D , A
B R
E V
IA
T
IO
N
S A
N D
N O
TE
S
CWS
BRF BRF
1629300
GENERAL PLUMBING NOTES
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
1. REFER TO DRAWING P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
NOTES.
GENERAL NOTES
DEMOLITION NOTES9
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PD100
D E
M O
LI
TI
O N
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
CWSBRF BRF
1629300
9 DEMOLISH EMERGENCY EYEWASH STATION AND ALL ASSOCIATED PIPING.
10 DEMOLISH EMERGENCY SHOWER AND ALL ASSOCIATED PIPING.
13 DEMOLISH POTABLE WATER PIPING. TYPICAL FOR ALL RESTROOMS. PIPING
NOT SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
14 DEMOLISH SANITARY PIPING. TYPICAL FOR ALL RESTROOMS. PIPING NOT
SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
1/8" = 1'-0" C1
DEMOLITION BLDG 5055 - PLUMBING FLOOR PLAN
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
GENERAL NOTES
DEMOLITION NOTES
(TYP)
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PD131
D E
M O
LI
TI
O N
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
G
R O
U N
D
CWSBRF BRF
1629300
1 DEMOLISH WATER CLOSET, AS WELL AS ASSOCIATED SANITARY AND
WATER PIPING.
2 DEMOLISH URINAL, AS WELL AS ASSOCIATED SANITARY AND WATER PIPING.
3 DEMOLISH LAVATORY SINK, AS WELL AS ASSOCIATED SANITARY AND
WATER PIPING.
4 DEMOLISH SHOWER HEAD, AS WELL AS ASSOCIATED WATER PIPING.
5 DEMOLISH FLOOR DRAIN AND ASSOCIATED SANITARY PIPING.
16 DEMOLISH WATER COOLER. WATER AND SANITARY PIPING NOT SHOWN AT
15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
18 DEMOLISH MOP SINK. WATER AND SANITARY PIPING NOT SHOWN AT 15%
SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
19 DEMOLISH WATER HEATER. WATER AND DRAIN PIPING NOT SHOWN AT 15%
SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
20 DEMOLISH SERVICE AIR PIPING.
21 DEMOLISH SERVICE AIR PIPE CONNECTION TO THE DUST COLLECTOR.
22 DEMOLISH SERVICE AIR CONNECTION TO DRY DOCK MAIN.
1/8" = 1'-0" B1
DEMOLITION BLDG 5145 - PLUMBING FLOOR PLAN - GROUND
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
GENERAL NOTES DEMOLITION NOTES
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PD141
D E
M O
LI
TI
O N
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
CWSBRF BRF
1629300
1 DEMOLISH WATER CLOSET, AS WELL AS ASSOCIATED SANITARY AND
WATER PIPING.
2 DEMOLISH URINAL, AS WELL AS ASSOCIATED SANITARY AND WATER PIPING.
3 DEMOLISH LAVATORY SINK, AS WELL AS ASSOCIATED SANITARY AND
WATER PIPING.
4 DEMOLISH SHOWER HEAD, AS WELL AS ASSOCIATED WATER PIPING.
5 DEMOLISH FLOOR DRAIN AND ASSOCIATED SANITARY PIPING.
13 DEMOLISH POTABLE WATER PIPING. TYPICAL FOR ALL RESTROOMS. PIPING
NOT SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
14 DEMOLISH SANITARY PIPING. TYPICAL FOR ALL RESTROOMS. PIPING NOT
SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
15 DEMOLISH VENT PIPING. TYPICAL FOR ALL RESTROOMS. PIPING NOT
SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
16 DEMOLISH WATER COOLER. WATER AND SANITARY PIPING NOT SHOWN AT
15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
17 DEMOLISH SEWAGE LIFT SYSTEM. EQUIPMENT TO BE DESIGNED AFTER THE
15% SUBMITTAL.
18 DEMOLISH MOP SINK. WATER AND SANITARY PIPING NOT SHOWN AT 15%
SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
20 DEMOLISH SERVICE AIR PIPING.
22 DEMOLISH SERVICE AIR CONNECTION TO DRY DOCK MAIN.
1/8" = 1'-0" C1
DEMOLITION BLDG 5146 - PLUMBING FLOOR PLAN
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
GENERAL NOTES
DEMOLITION NOTES
5 5 5 5
141414
20 20 20
20 20 20
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PD150
D E
M O
LI
TI
O N
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
G
R O
U N
D A
N D
M E
Z Z
A N
IN
E
CWSBRF BRF
1629300
5 DEMOLISH FLOOR DRAIN AND ASSOCIATED SANITARY PIPING.
6 DEMOLISH SUMP PUMP AND ALL ASSOCIATED APPUTENANCES.
13 DEMOLISH POTABLE WATER PIPING. TYPICAL FOR ALL RESTROOMS. PIPING
NOT SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
14 DEMOLISH SANITARY PIPING. TYPICAL FOR ALL RESTROOMS. PIPING NOT
SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
20 DEMOLISH SERVICE AIR PIPING.
22 DEMOLISH SERVICE AIR CONNECTION TO DRY DOCK MAIN.
1/4" = 1'-0" C1
DEMOLITION BLDG 5150 - PLUMBING FLOOR PLAN - GROUND
1/4" = 1'-0" A1
DEMOLITION BLDG 5150 - PLUMBING FLOOR PLAN - MEZZANINE
PLAN
NORTH
PLAN
NORTH
2' 4' 8'0'
2' 4' 8'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
GENERAL NOTES
DEMOLITION NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PD171
D E
M O
LI
TI
O N
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
CWSBRF BRF
1629300
20 DEMOLISH SERVICE AIR PIPING.
22 DEMOLISH SERVICE AIR CONNECTION TO DRY DOCK MAIN.
1/8" = 1'-0" B1
DEMOLITION BLDG 5190 - PLUMBING FLOOR PLAN
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
GENERAL NOTES
WORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PL100
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
CWSBRF BRF
1629300
1 SANITARY PIPING TO BE REPLACED IN KIND. FINAL ROUTING TO OCCUR
AFTER THE 15% SUBMITTAL.
2 POTABLE WATER LINES TO BE REPLACED IN KIND. FINAL ROUTING TO OCCUR
AFTER THE 15% SUBMITTAL.
13 EMERGENCY EYEWASH STATION TO BE REPLACED IN KIND. FINAL
EQUIPMENT SELECTION TO BE DETERMINED AFTER THE 15% SUBMITTAL.
14 EMERGENCY SHOWER TO BE REPLACED IN KIND. FINAL EQUIPMENT
SELECTION TO BE DETERMINED AFTER THE 15% SUBMITTAL.
1/8" = 1'-0" C1
BLDG 5055 - PLUMBING FLOOR PLAN
4' 8' 16'0'
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
GENERAL NOTES
WORK NOTES
2121 1515
(TYP)
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PL131
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
G
R O
U N
D
CWSBRF BRF
1629300
4 FINAL WATER COOLER SELECTION TO BE DETERMINED AFTER THE 15%
SUBMITTAL. SANITARY AND WATER LINES TO BE REPLACED IN KIND.
6 WATER HEATER TO BE REPLACED IN KIND. FINAL SELECTION TO BE
DETERMINED AFTER 15% SUBMITTAL.
15 FLOOR DRAIN TO BE REPLACED IN KIND.
17 MASTER CLEANOUT LOCATION TO BE DETERMINED AFTER THE 15%
SUBMITTAL.
18 WATER CLOSET TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE
DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE
DURABLE FOR NAVY USE.
19 URINAL TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE
DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE
DURABLE FOR NAVY USE.
20 LAVATORY SINK TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE
DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE
DURABLE FOR NAVY USE.
21 SHOWER TO BE REPLACED IN KIND. WATER PIPE ROUTING AND FIXTURE
SELECTION TO BE DETERMINED AFTER THE 15% SUBMITTAL.
22 MOP SINK TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION, AS WELL AS
WATER AND SANITARY PIPE ROUTING TO BE DETERMINED AFTER 15%.
23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE
DETERMINED AFTER THE 15% SUBMITTAL.
24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER
15% DESIGN.
25 SERVICE AIR PIPE CONNECTION TO THE DUST COLLECTOR TO BE REPLACED
IN KIND. FINAL LOCATION AND ROUTING TO BE DETERMINED AFTER THE 15%
SUBMITTAL.
1/8" = 1'-0" B1
BLDG 5145 - PLUMBING FLOOR PLAN - GROUND
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
GENERAL NOTESWORK NOTES
(TYP)
(TYP)
(TYP)
18 19
(TYP) (TYP)
(TYP)
(TYP)
(TYP)
(TYP)
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PL141
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
CWSBRF BRF
1629300
1 SANITARY PIPING TO BE REPLACED IN KIND. FINAL ROUTING TO OCCUR
AFTER THE 15% SUBMITTAL.
2 POTABLE WATER LINES TO BE REPLACED IN KIND. FINAL ROUTING TO
OCCUR AFTER THE 15% SUBMITTAL.
4 FINAL WATER COOLER SELECTION TO BE DETERMINED AFTER THE 15%
SUBMITTAL. SANITARY AND WATER LINES TO BE REPLACED IN KIND.
5 SEWAGE LIFT SYSTEM TO BE REPLACED IN KIND. FINAL SELECTION TO BE
DETERMINED AFTER THE 15% SUBMITTAL.
9 VENT PIPING TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO OCCUR
AFTER THE 15% SUBMITTAL.
15 FLOOR DRAIN TO BE REPLACED IN KIND.
18 WATER CLOSET TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE
DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE
DURABLE FOR NAVY USE.
19 URINAL TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE
DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE
DURABLE FOR NAVY USE.
20 LAVATORY SINK TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE
DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE
DURABLE FOR NAVY USE.
21 SHOWER TO BE REPLACED IN KIND. WATER PIPE ROUTING AND FIXTURE
SELECTION TO BE DETERMINED AFTER THE 15% SUBMITTAL.
22 MOP SINK TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION, AS WELL AS
WATER AND SANITARY PIPE ROUTING TO BE DETERMINED AFTER 15%.
1/8" = 1'-0" C1
BLDG 5146 - PLUMBING FLOOR PLAN
4' 8' 16'0'
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
GENERAL NOTES
WORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PP100
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
CWSBRF BRF
1629300
8 BREATHING AIR LINES TO BE SIZED AND ROUTED AFTER 15% DESIGN. PIPING
NOT SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.
4' 8' 16'0'
PLAN
NORTH
1/8" = 1'-0" C1
BLDG 5055 - PLUMBING FLOOR PLAN
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
GENERAL NOTES
WORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PP141
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
G
R O
U N
D
CWSBRF BRF
1629300
23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE
DETERMINED AFTER THE 15% SUBMITTAL.
24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER
15% DESIGN.
25 SERVICE AIR PIPE CONNECTION TO THE DUST COLLECTOR TO BE REPLACED
IN KIND. FINAL LOCATION AND ROUTING TO BE DETERMINED AFTER THE 15%
SUBMITTAL.
26 TWO ADDITIONAL SERVICE AIR DROPS TO BE ADDED BASED ON
INFORMATION TO BE PROVIDED BY TRF PERSONEL.
PLAN
NORTH
4' 8' 16'0' 1/8" = 1'-0" B1
BLDG 5145 - FLOOR PLAN - GROUND
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
/1
GENERAL NOTESWORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PP141
B
LD
G
G
R O
U N
D F
LO
O
R P
LA
N
CWSBRF BRF
1629300
23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE
DETERMINED AFTER THE 15% SUBMITTAL.
24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER
15% DESIGN.
26 TWO ADDITIONAL SERVICE AIR DROPS TO BE ADDED BASED ON
INFORMATION TO BE PROVIDED BY TRF PERSONEL.
4' 8' 16'0'
PLAN
NORTH
1/8" = 1'-0" C1
BLDG 5146 - GROUND FLOOR PLAN
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
T A
L 3/
GENERAL NOTES
WORK NOTES
15 15 15
7 7 7
7 7 7
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PP150
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
G
R O
U N
D A
N D
M E
Z Z
A N
IN
E
CWSBRF BRF
1629300
2 POTABLE WATER LINES TO BE REPLACED IN KIND. FINAL ROUTING TO
OCCUR AFTER THE 15% SUBMITTAL.
3 FLOOR DRAIN SANITARY PIPING TO BE REPLACED IN KIND. FINAL ROUTING
TO OCCUR AFTER THE 15% SUBMITTAL.
7 SERVICE AIR LINES TO BE REPLACED IN KIND. FINAL ROUTING TO BE
DETERMINED AFTER THE 15% SUBMITTAL.
10 SUMP PUMP DISCHARGE LINE TO BE REPLACED IN KIND. FINAL ROUTING TO
OCCUR AFTER THE 15% SUBMITTAL.
15 FLOOR DRAIN TO BE REPLACED IN KIND.
16 SUMP PUMP TO BE REPLACED IN KIND. FINAL PUMP SELECTION TO BE
DETERMINED AFTER THE 15% SUBMITTAL.
23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE
DETERMINED AFTER THE 15% SUBMITTAL.
24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER
15% DESIGN.
1/4" = 1'-0" C1
BLDG 5150 - PLUMBING FLOOR PLAN - GROUND
1/4" = 1'-0" A1
BLDG 5150 - PLUMBING FLOOR PLAN - MEZZANINE
PLAN
NORTH
PLAN
NORTH
2' 4' 8'0'
2' 4' 8'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
GENERAL NOTES
WORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
PP171
B
LD
G
P
LU
M
B
IN
G F
LO
O
R P
LA
N
CWSBRF BRF
1629300
23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE
DETERMINED AFTER THE 15% SUBMITTAL.
24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER
15% DESIGN.
1/8" = 1'-0" B1
BLDG 5190 - PLUMBING FLOOR PLAN
4' 8' 16'0'
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
1. THESE GENERAL NOTES APPLY TO ALL MECHANICAL DRAWINGS IN THIS SET.
SHEET SPECIFIC NOTES ARE INDICATED ON EACH SHEET UNDER GENERAL
SHEET NOTES.
2. PATCH ALL HOLES FROM REMOVAL OF PIPING, DUCTWORK, OR EQUIPMENT
TO MATCH ADJACENT CONSTRUCTION.
3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERANLE MECHANICAL SYSTEMS AS
INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
4. INSTALL ALL MECHANICAL EQUIPMENT AN APPURTENANCES IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS, THIS CONTRACT'S
DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
5. PROVIDE VIBRATION ISOLATORS FOR ALL MECHANICAL EQUIPMENT TO
PREVENT TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
6. PROVIDE ACCESS PANELS IN WALLS AND CEILINGS, WHERE REQUIRED, TO
SERVE FIRE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER
CONCEALED MECHANICAL EQUIPMENT THAT REQUIRES ROUTINE
MAINTENANCE. ACCESS PANELS MUST BE LARGE ENOUGH TO ALLOW
PROPER CLEARANCE FOR ACCESS DOORS.
7. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC.,
SHALL BE FIRE STOPPED.
8. EXISTING DUCT AND PIPING SIZES INDICATED ARE APPROXIMATE. FIELD
VERIFY ALL DIMENSIONS.
9. LOCATE ALL NEW HORIZONTAL DUCTWORK ABOVE THE SUSPENDED CEILINGS
UNLESS OTHERWISE INDICATED.
10. ALL 90 DEGREE RECTANDULAR MITERED DUCT ELBOWS IN THE SUPPLY AND
RETURN DUCT SHALL HAVE TURNING VANES.
11. PROVIDE PIPE SLEEVES FOR ALL PIPING PENETRATIONS THRU WALLS AND
FLOORS. EACH PIPE SHALL BE SEPARATELY SLEEVED. PROVIDE CONTINUOUS
SEALANT JOINT AROUND PIPE SLEEVE, BOTH SIDES OF WALL, WATERTIGHT.
12. PROVIDE P-TRAPS IN CONDENSATE DRAIN PIPING AT EACH AHU UNLESS THE
AHU IS EQUIPPED WITH AN INTERNAL TRAP.
13. AFTER PRELIMINARY OPERATIONAL TESTING OF ALL BOILERS OR DIRECT
FIRED DOMESTIC WATER HEATERS WITH A CAPACITY GREATER THAN 400,000
BHUH, THE BOILER SHALL BE INSPECTED AND AN OPERATIONAL TEST
PERFORMED BY A NAFVAC FACILITIES ENGINEERING COMMAND BOILER
INSPECTOR. ALLOW 15 DAYS ADVANCE NOTICE FOR SCHEDULING AN
INSPECTOR TO CONDUCT AN ACCEPTANCE OPERATIONAL TEST AND
INSPECTION.
14. MOUNT THERMOSTATS 48 INCHES ABOVE THE FINISHED FLOOR UNLESS
OTHERWISE INDICATED. REFER TO ELECTRICAL DRAWINGS FOR LOCATION
OF LIGHT SWITCHES AND COORDINATE.
15. CONDENSATE DRAIN PIPING SHALL BE PVC. CLEANOUTS SHALL BE INSTALLED
AT EACH CHANGE IN DIRECTION GREATER THAN 45 DEGREES. WHERE MORE
THAN ONE CHANGE OF DIRECTION OCCURS IN A RUN OF PIPING, ONLY ONE
CLEANOUT SHALL BE REQUIRED FOR EACH 45 FEET OF DEVELOPED LENGTH.
COMBINATION WYE AND 1/8 BENDS SHALL BE USED IN LIEU OF TEES.
16. AFTER THE PIPING IS INSULATED, PROVIDE SETON BRAND OR EQUAL
FACTORY-FABRICATED PIPE LABELS, WITH DIRECTION OF FLOW ARROWS,
ON THE FOLLOWING PIPING, AT 10 FOOT ON CENTER ON THE PIPING MAINS
AND 5 FOOT ON CENTER ON THE BRANCH RUNOUTS FROM THE MAINS.
GENERAL MECHANICAL NOTES
° DEGREES
Ø DIAMETER
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AP ACCESS PANEL
APD AIR PRESSURE DROP
AS AIR SEPARATOR
ATFP ANTITERRORISM FORCE PROTECTION
BD BALANCING DAMPER
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BR BASEBOARD RADIATOR
BTUH BRITISH THERMAL UNITS PER HOUR
C COMMON
Cv LOSS COEFFICIENT
CFM CUBIC FEET PER MINUTE
CLG CEILING
CND CONDENSER
COP COEFFICIENT OF PERFORMANCE
CRAHU COMPUTER ROOM AIR HANDLING UNIT
CU CONDENSING UNIT
CHW CHILLED WATER
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DEG DEGREE
DX DIRECT EXPANSION
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICENCY RATIO
EF EXHAUST FAN
EFF EFFECTIVENESS
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
F FARENHEIT
FCU FAN COIL UNIT
FD FIRE DAMPER
FT FEET
FT WG FEET WATER GAUGE
GPM GALLONS PER MINUTE
HGT HEIGHT
HP HEAT PUMP, HORSEPOWER
HR HOUR
HW HOT WATER
HX HEAT EXCHANGER
IAW IN ACCORDANCE WITH
IWG INCHES WATER GAUGE
kW KILOWATT
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LV LOUVER
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM (< 15PSIG)
MAU MAKEUP AIR UNIT
MAX MAXIMUM
MIN MINIMUM
NC NORMALLY CLOSED, NOISE CRITERIA
NO NUMBER, NORMALLY OPEN
OA OUTSIDE AIR
OAU OUTSIDE AIR UNIT
PH PHASE
PSI POUNDS PER SQUARE INCH
PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT
PTHP PACKAGED TERMINAL HEAT PUMP
QTY QUANTITY
RA RETURN AIR
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
SA SUPPLY AIR
SEER SEASONAL ENERGY EFFICIENCY RATIO
SIM SIMILAR
SP STATIC PRESSURE
SQ SQUARE
TYP TYPICAL
UH UNIT HEATER
UOI UNLESS OTHERWISE INDICATED
V VOLTS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
W WIDTH
WB WET BULB
WPD WATER PRESSURE DROP
MECHANICAL ABBREVIATIONS
VOLUME DAMPER
MECHANICAL LEGEND
ACCESS DOOR (AD), ACCESS PANEL (AP)
VERTICAL (WALL) FIRE DAMPER
AD
T
HUMIDITY SENSORH
THERMOSTAT
AIR TERMINAL TAG WITH AIR FLOW (CFM)
ROUND DUCT DIMENSION
RECTANGULAR DUCT DIMENSIONS (INCHES)
FLEXIBLE ROUND DUCT (5'-0" MAX LENGTH)
12x10
12"Ø
SUPPLY DUCT, SUPPLY DUCT DOWN/UP
DOWNWARD DIRECTION OF SLOPED PIPING
RETURN DUCT, RETURN DUCT DOWN/UP
A
GLOBE VALVE
GATE VALVE
BUTTERFLY VALVE
AUTOMATIC FLOW BALANCING VALVE
MANUAL FLOW CONTROL BALANCING VALVE
CHECK VALVE
SQUARE HEAD BALANCING COCK
PRESSURE REDUCING VALVE
DRAIN VALVE WITH HOSE CONNECTION
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
BACKFLOW PREVENTER
RELIEF VALVE
MANUAL AIR VENT
VACUUM BREAKER
AUTOMATIC AIR VENT
STEAM TRAPT
VALVE IN VERTICAL PIPING
WYE STRAINER
SPRINKLER HEAD
STRAINER WITH BLOWDOWN VALVE
CLEAN OUT
PIPE REDUCER
ECCENTRIC REDUCER
UNION
PRESSURE GAUGE WITH SHUTOFF COCK
THERMOMETER IN PIPE WELL
PIPE CAP
FLANGE
FLEXIBLE PIPE CONECTOR
C.O.
HORIZONTAL (CEILING) FIRE DAMPER
PIPING TO BE REMOVED
MECHANICAL PIPING LEGEND
CONDENSER WATER RETURN PIPING
COMPRESSED AIR PIPING
CONDENSER WATER SUPPLY PIPING
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
CONDENSATE DRAIN PIPING
DUAL TEMPERATURE RETURN PIPING
DOMESTIC COLD WATER PIPING
DUAL TEMPERATURE SUPPLY PIPING
HOT GAS BYPASS PIPING
NATURAL GAS PIPING
HIGH PRESSURE STEAM PIPING
HOT WATER SUPPLY PIPING
HOT WATER RETURN PIPING
LOW PRESSURE CONDENSATE PIPING
REFRIGERANT LIQUID PIPING
LOW PRESSURE STEAM PIPING
REFRIGERANT SUCTION PIPINGVACUUM (AIR)
(NAME)
CA
CWR
CWS
CHWR
CHWS
CND
DCW
DTR
DTS
G
HG
HPS
HWR
HWS
LPC
LPS
RL
RSVAC
DOMESTIC HOT WATER PIPINGDHW
MECHANICAL SYMBOLS
POINT OF CONNECTION
POINT OF DISCONNECTION
ROOM TAG
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL TAG
ROOM NAME
ROOM NUMBER
? INTERIOR ELEVATION
TAG
INTERIOR ELEVATION NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SCALE
SHEET
REFERENCED
FROM
EXTERIOR ELEVATION
TAG
ELEVATION NUMBER
DIRECTION OF VIEW
SHEET WHERE DRAWN
WALL / PARTIAL
BUILDING SECTION
TAG
SECTION NUMBER
SHEET WHERE DRAWN
GENERAL PROJECT SYMBOLS
BUILDING SECTION
TAG
SECTION NUMBER
SHEET WHERE DRAWN
BUILDING
NEW WORK
KEYNOTE TAG
KEYNOTE NUMBER
DEMO
KEYNOTE TAG
KEYNOTE NUMBER
? PHOTOGRAPH TAG
PHOTOGRAPH NUMBER
SHEET WHERE SHOWN
PLAN
NORTH
SCALE
TRUE NORTH
SHEET
REFERENCED
FROM
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
M-001
LE
G
E N
D , A
B R
E V
IA
T
IO
N
S A
N D
N O
TE
S
CWSBRF BRF
1629300
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
TA
L
3/
1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND
GENERAL NOTES
DEMOLITION NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
MD100
D E
M O
LI
TI
O N
B
LD
G
M
E C
H A
N
IC
A L
F
LO
O R
P
LA
N
CWSBRF BRF
1629300
2 DEMOLISH EXHAUST FAN, CONTROLS AND ASSOCIATED DUCTWORK.
11 DEMOLISH EXISTING LOUVER.
26 DEMOLISH FITTING AND VERTICAL EXHAUST DUCT.
1/8" = 1'-0" C1
DEMOLITION BLDG 5055 - MECHANICAL FLOOR PLAN
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
TA
L
3/
4 4
18 18
1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND
NOTES.
GENERAL NOTES
DEMOLITION NOTES
4 44
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
MD131
D E
M O
LI
TI
O N
B
LD
G
M
E C
H A
N
IC
A L
F
LO
O R
P
LA
N
G R
O U
N D
A N
D M
E Z
Z A
N
IN
E
CWSBRF BRF
1629300
1/8" = 1'-0" B1
DEMOLITION - BLDG 5145 - MECHANICAL FLOOR PLAN - GROUND
1 DEMOLISH DUST COLLECTOR, CONTROLS, AND ASSOCIATED
APPURTENANCES.
2 DEMOLISH EXHAUST FAN, CONTROLS AND ASSOCIATED DUCTWORK.
3 DEMOLISH AIR HANDLING UNIT, CONTROLS, AND ASSOCIATED
APPURTENANCES.
4 DEMOLISH ELECTRIC UNIT HEATER, CONTROLS, AND ASSOCIATED
APPURTENANCES.
5 DEMOLISH MAKE-UP AIR UNIT, CONTROLS, AND ASSOCIATED
APPURTENANCES.
7 DEMOLISH DUCT, AIR DEVICES, HANGARS, AND APPURTENANCES.
11 DEMOLISH EXISTING LOUVER.
16 DEMOLISH DUCTLESS SPLIT SYSTEM FAN COIL UNIT, CONTROLS, AND
ASSOCIATED APPURTENANCES.
17 DEMOLISH SUB-GRADE DUST COLLECTION DUCTS.
18 DEMOLISH DUST COLLECTION DUCTS.
PLAN
NORTH
4' 8' 16'0'
1/8" = 1'-0" A1
DEMOLITION - BLDG 5145 - MECHANICAL FLOOR PLAN - MEZZANINE
4' 8' 16'0'
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
2 2 2 2
11 11 11 11
1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND
NOTES.
GENERAL NOTES DEMOLITION NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
MD141
D E
M O
LI
TI
O N
B
LD
G
M
E C
H A
N
IC
A L
F
LO
O R
P
LA
N
CWSBRF BRF
1629300
1/8" = 1'-0" C1
DEMOLITION BLDG 5146 - MECHANICAL FLOOR PLAN
2 DEMOLISH EXHAUST FAN, CONTROLS AND ASSOCIATED DUCTWORK.
3 DEMOLISH AIR HANDLING UNIT, CONTROLS, AND ASSOCIATED
APPURTENANCES.
5 DEMOLISH MAKE-UP AIR UNIT, CONTROLS, AND ASSOCIATED
APPURTENANCES.
7 DEMOLISH DUCT, AIR DEVICES, HANGARS, AND APPURTENANCES.
11 DEMOLISH EXISTING LOUVER.
12 DEMOLISH TEMPORARY AIR CONDITIONER.
21 CUT, SEAL, AND EVACUATE EXISTING REFRIGERANT LINES. RECOVER AND
DISPOSE OF REFRIGERANT IN ACCORDANCE WITH EPA GUIDELINES.
DEMOLISH ALL REFRIGERANT LINES FROM CU TO AHU.
22 DEMOLISH CHILLED WATER PIPING, VALVES, SUPPORTS, AND
APPURTENANCES FROM THE DRYDOCK MAIN CONNECTION UP TO
MECHANICAL EQUIPMENT. PIPING NOT SHOWN AT 15% SUBMITTAL, BUT WILL
BE ADDED AT NEXT SUBMITTAL.
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
GENERAL NOTES
DEMOLITION NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
MD151
D E
M O
LI
TI
O N
B
LD
G
M
E C
H A
N
IC
A L
F
LO
O R
P
LA
N
G R
O U
N D
A N
D M
E Z
Z A
N
IN
E
CWSBRF BRF
1629300
2 DEMOLISH EXHAUST FAN, CONTROLS AND ASSOCIATED DUCTWORK.
4 DEMOLISH ELECTRIC UNIT HEATER, CONTROLS, AND ASSOCIATED
APPURTENANCES.
1/4" = 1'-0" C1
DEMOLITION BLDG 5150 - MECHANICAL FLOOR PLAN - GROUND
PLAN
NORTH
2' 4' 8'0'
1/4" = 1'-0" A1
DEMOLITION BLDG 5150 - MECHANICAL FLOOR PLAN - MEZZANINE
PLAN
NORTH
2' 4' 8'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
GENERAL NOTES
WORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
MH100
B
LD
G
M
E C
H A
N
IC
A L
F
LO
O R
P
LA
N
CWSBRF BRF
1629300
3 NEW LOUVERS TO BE REPLACED IN KIND. FINAL SELECTION TO BE
DETERMINED AFTER 15% SUBMITTAL.
9 NEW EXHAUST FANS TO BE REPLACED IN KIND. FINAL SELECTION OF
SIDEWALL EXHAUST FANS TO COME AFTER 15% SUBMITTAL.
1/8" = 1'-0" C1
BLDG 5055 - MECHANICAL FLOOR PLAN
4' 8' 16'0'
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S
U B
M
IT
TA
L
3/
11 11 11
11 11
1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND
NOTES.
GENERAL NOTES
WORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
MH131
B
LD
G
M
E C
H A
N
IC
A L
F
LO
O R
P
LA
N
G R
O U
N D
CWSBRF BRF
1629300
1/8" = 1'-0" B1
BLDG 5145 - MECHANICAL FLOOR PLAN - GROUND
1 NEW CEILING MOUNTED CHILLED WATER FAN COIL UNIT. FINAL DUCT
ROUTING, EQUIPMENT SIZING AND SELECTION TO BE DETERMINED AFTER
15% SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL EQUIPMENT TO BE
DETERMINED AFTER 15% SUBMITTAL.
5 CHILLED WATER CEILING CASSETTE TO COOL EACH OFFICE. FINAL
EQUIPMENT SELECTION TO BE DETERMINED AFTER 15% SUBMITTAL.
7 NEW EXHAUST SYSTEM TO BE DESIGNED AFTER 15% SUBMITTAL. FINAL
DESIGNS TO INCLUDE DUCT ROUTING AND EQUIPMENT SELECTION.
11 ELECTRIC UNIT HEATER LOCATION AND CAPACITY TO BE REPLACED IN KIND.
FINAL EQUIPMENT SELECTION TO COME AFTER 15% SUBMITTAL.
14 NEW DUST COLLECTION SYSTEM. FINAL EQUIPMENT SELECTION AND DUCT
ROUTING TO BE DETERMINED AFTER 15% SUBMITTAL. USE EXISTING WALL
PENETRATIONS FOR NEW DUST COLLECTION DUCTS.
17 NEW CHILLED WATER PIPING. FINAL ROUTING TO MECHANICAL EQUIPMENT
TO BE DETERMINED AFTER THE 15% SUBMITTAL.
18 CHILLED WATER PIPE TO DRYDOCK MAIN. FINAL CONNECTION, PIPE
ROUTING, AND PENETRATION LOCATION TO BE DETERMINED AFTER THE 15%
SUBMITTAL.
25 NEW DEDICATED OUTDOOR AIR HANDLING UNIT MOUNTED ON GRADE. FINAL
SIZING, SELECTION, DUCT ROUTING, AND LOCATION TO BE DETERMINED
AFTER THE 15% SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL TO BE
DETERMINED AFTER 15% SUBMITTAL.
27 KNIFE GATES TO BE ADDED AT ALL WORKSTATIONS. FINAL DESIGN AND
LOCATIONS TO BE DETERMINED AFTER THE 15% SUBMITTAL.
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
11 11
1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND
NOTES.
GENERAL NOTES
WORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
MH132
B
LD
G
M
E C
H A
N
IC
A L
F
LO
O R
P
LA
N
M E
Z Z
A N
IN
E
CWSBRF BRF
1629300
1/8" = 1'-0" B1
BLDG 5145 - MECHANICAL FLOOR PLAN - MEZZANINE
1 NEW CEILING MOUNTED CHILLED WATER FAN COIL UNIT. FINAL DUCT
ROUTING, EQUIPMENT SIZING AND SELECTION TO BE DETERMINED AFTER
15% SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL EQUIPMENT TO
BE DETERMINED AFTER 15% SUBMITTAL.
7 NEW EXHAUST SYSTEM TO BE DESIGNED AFTER 15% SUBMITTAL. FINAL
DESIGNS TO INCLUDE DUCT ROUTING AND EQUIPMENT SELECTION.
11 ELECTRIC UNIT HEATER LOCATION AND CAPACITY TO BE REPLACED IN
KIND. FINAL EQUIPMENT SELECTION TO COME AFTER 15% SUBMITTAL.
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
GENERAL NOTES WORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
MH141
B
LD
G
M
E C
H A
N
IC
A L
F
LO
O R
P
LA
N
CWSBRF BRF
1629300
1 NEW CEILING MOUNTED CHILLED WATER FAN COIL UNIT. FINAL DUCT
ROUTING, EQUIPMENT SIZING AND SELECTION TO BE DETERMINED AFTER 15%
SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL EQUIPMENT TO BE
DETERMINED AFTER 15% SUBMITTAL.
5 CHILLED WATER CEILING CASSETTE TO COOL EACH OFFICE. FINAL
EQUIPMENT SELECTION TO BE DETERMINED AFTER 15% SUBMITTAL.
7 NEW EXHAUST SYSTEM TO BE DESIGNED AFTER 15% SUBMITTAL. FINAL
DESIGNS TO INCLUDE DUCT ROUTING AND EQUIPMENT SELECTION.
17 NEW CHILLED WATER PIPING. FINAL ROUTING TO MECHANICAL EQUIPMENT TO
BE DETERMINED AFTER THE 15% SUBMITTAL.
25 NEW DEDICATED OUTDOOR AIR HANDLING UNIT MOUNTED ON GRADE. FINAL
SIZING, SELECTION, DUCT ROUTING, AND LOCATION TO BE DETERMINED
AFTER THE 15% SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL TO BE
DETERMINED AFTER 15% SUBMITTAL.
1/8" = 1'-0" C1
BLDG 5146 - MECHANICAL FLOOR PLAN
PLAN
NORTH
4' 8' 16'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
A
S U
B M
IT
T
A L
/1
8/
GENERAL NOTES
WORK NOTES
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
DRAWFORM REVISION: 31 JANUARY 2017
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
O U
T H
E A
S T
A C
Q C
O R
E N
A V
A L A
IR
S
T A
T
IO
N
J A
C K
S O
N V
IL
L E
F
L
S U
B B
A S
E K
IN
G
S B
A Y
K
IN
G S
B A
Y G
E O
R G
IA
AS NOTED
R E
P A
IR
D
R Y
D O
C K
1305 EXECUTIVE BLVD.
SUITE 160
CHESAPEAKE, VA 23320
P A
C K
A G
E
B
MH151
B
LD
G
M
E C
H A
N
IC
A L
F
LO
O R
P
LA
N
G R
O U
N D
A N
D M
E Z
Z A
N
IN
E
CWSBRF BRF
1629300
10 NEW CHILLED WATER FAN COIL UNIT. FINAL EQUIPMENT SIZING AND
SELECTION TO BE DETERMINED AFTER 15% SUBMITTAL.
11 ELECTRIC UNIT HEATER LOCATION AND CAPACITY TO BE REPLACED IN KIND.
FINAL EQUIPMENT SELECTION TO COME AFTER 15% SUBMITTAL.
17 NEW CHILLED WATER PIPING. FINAL ROUTING TO MECHANICAL EQUIPMENT
TO BE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .