This document provides details for an industry day notice regarding the Kings Bay Dry Dock Recapitalization project at Naval Submarine Base Kings Bay, Georgia. The project scope includes repairs to the dry dock concrete body, cover, and various mechanical and electrical systems to support operations. The estimated construction cost is $400-600 million.

NAVFAC Southeast is seeking industry feedback at an industry day event on March 26, 2019 at the University of North Florida. Specific feedback will be requested concerning project phasing, scheduling, challenges, and acquisition strategy. Breakout sessions will be provided for potential prime contractors to meet one-on-one with the government after the formal presentation. Interested prime contractors should respond by March 19th to schedule a breakout session. This will provide an opportunity for contractors with relevant experience to learn about the project and acquisition approach. The contracting office is NAVFAC Southeast Building 903 in Jacksonville, Florida.

N6945019R0508_DWGs_15_1B_2of2.pdf

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAZARD

CLASSIFICATION

HAZARD SCHEDULE

EXTRA HAZARD

MARK

PAINT BOOTH

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FX101

B

LD

G

F

IR

E

S U

P P

R E

S S

IO

N

P

LA

N

G R

O U

N D

APLKMK KPZ

SPRINKLER SYSTEM VALVES AND PIPING ARE EXISTING TO REMAIN.

REPLACE ALL SPRINKLERS WITH NEW STANDARD TEMPERATURE

SPRINKLERS.

GENERAL NOTES

WORK NOTES

1/8" = 1'-0" A1

BLDG 5055 - FIRE SUPPRESSION PLAN - GROUND

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS

AND SYMBOLS.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

1 2 3 4

B

A

STORAGE

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FX110

B

LD

G

5A

F

IR

E

S U

P P

R E

S S

IO

N

P

LA

N

G R

O U

N D

APLKMK KPZ

FIRE SUPPRESSION IS NOT REQUIRED IN THIS OCCUPANCY. NOT IN FIRE

SUPPRESSION SCOPE.

GENERAL NOTES

WORK NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

1/8" = 1'-0" B2

BLDG 5055A - FIRE SUPPRESSION PLAN - GROUND

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS

AND SYMBOLS.

A

Unoccupied Unoccupied

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FX120

B

LD

G

5B

F

IR

E

S U

P P

R E

S S

IO

N

P

LA

N

G R

O U

N D

APLKMK KPZ

FIRE SUPPRESSION IS NOT REQUIRED IN THIS OCCUPANCY. NOT IN FIRE

SUPPRESSION SCOPE.

GENERAL NOTES

WORK NOTES

1/8" = 1'-0" B2

BLDG 5055B - FIRE SUPPRESSION PLAN - GROUND

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

/1

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS

AND SYMBOLS.

OFFICE

102 WOMEN'S TOILET/

LKR. RM.

VESTIBULE

JANITOR

MEN'S TOILET/

LKR. RM.

STORAGE

MECH. EQUIP. RM.

WOODWORKING

SHOP

EXISTING TO REMAIN

DRY PIPE SYSTEM

EXISTING TO REMAIN

WET PIPE SYSTEM

EXISTING TO REMAIN

WET PIPE SYSTEM

EXISTING TO REMAIN

WET PIPE SYSTEM

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FX130

B

LD

G

F

IR

E

S U

P P

R E

S S

IO

N

P

LA

N

G R

O U

N D

APLKMK KPZ

LOCATION OF EXISTING DELUGE SYSTEM VALVE FOR THE PROTECTION OF

THE DUST COLLECTION SYSTEM DUCT. RECONFIGURE DELUGE SPRINKLERS

TO PROTECT NEW DUCT COLLECTION DUCT. RETAIN EXISTING DELUGE

VALVE.

GENERAL NOTES

WORK NOTES

1/8" = 1'-0" A1

BLDG 5145 - FIRE SUPPRESSION PLAN - GROUND

1. REFER TO FX001 FOR GENERAL NOTES, DESIGN

CRITERIA, ABBREVIATIONS AND SYMBOLS.

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

/1

Unoccupied Unoccupied

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FX131

B

LD

G

F

IR

E

S U

P P

R E

S S

IO

N

P

LA

N

M E

Z Z

A N

IN

E

APLKMK KPZ

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

/1

EXISTING TO REMAIN DRY PIPE SYSTEM.1

GENERAL NOTES

WORK NOTES

1. REFER TO FX001 FOR GENERAL NOTES, DESIGN

CRITERIA, ABBREVIATIONS AND SYMBOLS.

1/8" = 1'-0" A1

BLDG 5145 - FIRE SUPPRESSION PLAN - MEZZANINE

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

HAZARD

CLASSIFICATION

HAZARD SCHEDULE

LIGHT HAZARD

ORDINARY HAZARD

MARK

SUBSAFE

STORAGE

ELECTRICAL

EQUIPMENT

SHOWER

DRYING

VESTIBULE

VESTIBULE

LOCKERS

VESTIBULE

JANITOR

NUCLEAR

STORAGE

VESTIBULE

VESTIBULE

WATER HEATER

INTERIM ITEM

STORAGE

Unoccupied Unoccupied

Unoccupied Unoccupied

Unoccupied Unoccupied

Unoccupied Unoccupied

Unoccupied Unoccupied

OFFICE

Unoccupied Unoccupied

Unoccupied Unoccupied

Unoccupied Unoccupied

Unoccupied Unoccupied

SPECIAL

HANDLING AND

STORAGE

Unoccupied Unoccupied

Unoccupied Unoccupied

Unoccupied Unoccupied

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FX140

B

LD

G

F

IR

E

S U

P P

R E

S S

IO

N

P

LA

N

G R

O U

N D

APLKMK KPZ

LOCATION OF EXISTING TO REMAIN SPRINKLER RISERS.

RECONFIGURE SPRINKLER LOCATIONS AS REQUIRED TO FIT NEW CEILING

AND WALL LAYOUTS.

GENERAL NOTES

WORK NOTES

1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND

SYMBOLS.

2. SPRINKLER SYSTEMS WITHIN BUILDING ARE EXISTING TO REMAIN.

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

1/8" = 1'-0" C1

BLDG 5146 - FIRE SUPPRESSION PLAN - GROUND

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FX150

B

LD

G

F

IR

E

S U

P P

R E

S S

IO

N

P

LA

N

G R

O U

N D

M

E Z

Z A

N

IN

E

APLKMK KPZ

BUILDING NOT IN SCOPE FOR FIRE SUPPRESSION.1

GENERAL NOTES

WORK NOTES

1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS

AND SYMBOLS.

1/8" = 1'-0" A2

BLDG 5150 - FIRE SUPPRESSION PLAN - GROUND

1/8" = 1'-0" C2

BLDG 5150 - FIRE SUPPRESSION PLAN - MEZZANINE

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

Room

Unoccupied Unoccupied

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

FX170

B

LD

G

F

IR

E

S U

P P

R E

S S

IO

N

P

LA

N

G R

O U

N D

R

O O

F

APLKMK KPZ

REPAIR RUSTED FDC PIPE SUPPORT.1

GENERAL NOTES

WORK NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

/1

1. REFER TO FX001 FOR GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND

SYMBOLS.

1/8" = 1'-0" B1

BLDG 5190 - FIRE SUPPRESSION PLAN - GROUND

1/8" = 1'-0"

B3

BLDG 5190 - FIRE SUPPRESSION PLAN - ROOF

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

PLAN

NORTH

SCALE IN FEET

0 4' 8' 16'

PLUMBING SYMBOLS

POINT OF CONNECTION

POINT OF DISCONNECTION

AAV AIR ADMITTANCE VALVE

AC ABOVE CEILING

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AP ACCESS PANEL

BF BELOW FLOOR

BG BELOW GRADE

BFP BACKFLOW PREVENTER

BTUH BRITISH THERMAL UNITS PER HOUR

CO CLEANOUT

CONC CONCRETE

CW DOMESTIC COLD WATER

DN DOWN

DWG DRAWING

DWV DRAINAGE, WASTE, VENT

EA EACH

EL ELEVATION

EQUIP EQUIPMENT

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

F FARENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FLA FULL LOAD AMPS

FT FEET

G NATURAL GAS

GAL GALLON

GFCI GOVERNMENT FURNISHED, CONTRACTOR

INSTALLED

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIBB

HC HANDICAP ACCESSIBLE

HP HORSEPOWER

HW DOMESTIC HOT WATER

HWR DOMESTIC HOT WATER RECIRC

HZ HERTZ

ICE ICE MAKER

INV INVERT ELEVATION

IWC INCHES OF WATER COLUMN

KS KITCHEN SINK

LAV LAVATORY

PLUMBING ABBREVIATIONS

MAX MAXIMUM

MIN MINIMUM

NIC NOT IN CONTRACT

NO NUMBER, NORMALLY OPEN

PH PHASE

PRS PRESSURE REDUCING STATION

PSI POUNDS PER SQUARE INCH

RL ROOF LEADER

RD ROOF DRAIN

REF REFRIGERATOR

RPM REVOLUTIONS PER MINUTE

SAN SANITARY

SH SHOWER

SIM SIMILAR

SS SERVICE SINK

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

UR URINAL

V VENT

VS VENT STACK

VTR VENT THRU ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WHA WATER HAMMER ARRESTOR

WS WASTE STACK

WSHR WASHING MACHINE

° DEGREE

PLUMBING LEGEND

DOMESTIC HOT WATER PIPNG (HW)

DOMESTIC COLD WATER PIPING (CW)

DOMESTIC HOT WATER RETURN PIPING (HWR)

SOIL, WASTE OR SANITARY SEWER PIPING (W)

NATURAL GAS PIPING (G)

RAIN LEADER

DOWNWARD SLOPE

VENT PIPING

GATE VALVE (HORIZONTAL AND VERTICAL)

TEMPERATURE AND PRESSURE RELIEF VALVE

CHECK VALVE

UNION

EXTERIOR WALL HYDRANT (WH)

HOSE BIBB (HB)

FLOOR DRAIN (FD)

WALL CLEANOUT (WCO)

FLOOR CLEANOUT (FCO)

CLEANOUT TO GRADE (COTG)

WATER HAMMER ARRESTOR

(PDI SIZE FIXTURE UNIT RATING 1-11)

VENT THRU ROOF (VTR)

FLOOR DRAIN MARK

(SEE SCHEDULE ON SHEET P-???)

PLUMBING FIXTURE MARK

(SEE SCHEDULE ON SHEET P-???)

WATER HEATER MARK

(SEE SCHEDULE ON SHEET P-???)

THIN LINE WEIGHT INDICATES EXISTING

ITEM TO REMAIN

PIPE TURNING DOWN

HEAVY LINE WEIGHT INDICATES NEW

WORK TO BE PROVIDED

ROOF DRAIN

HEAVY DASHED LINE WEIGHT INDICATES

EXISTING ITEM TO REMOVE, REFER TO

DEMOLITION NOTES.

G

RL

V

P-1

FD-1

WH-1

PIPE TURNING UP

(A)

RD

ROOM TAG

DETAIL NUMBER

SHEET WHERE DRAWN

DETAIL TAG

ROOM NAME

ROOM NUMBER

? INTERIOR ELEVATION

TAG

INTERIOR ELEVATION NUMBER

SHEET WHERE DRAWN

DETAIL NUMBER

SCALE

SHEET

REFERENCED

FROM

EXTERIOR ELEVATION

TAG

ELEVATION NUMBER

DIRECTION OF VIEW

SHEET WHERE DRAWN

WALL / PARTIAL

BUILDING SECTION

TAG

SECTION NUMBER

SHEET WHERE DRAWN

GENERAL PROJECT SYMBOLS

BUILDING SECTION

TAG

SECTION NUMBER

SHEET WHERE DRAWN

BUILDING

NEW WORK

KEYNOTE TAG

KEYNOTE NUMBER

DEMO

KEYNOTE TAG

KEYNOTE NUMBER

? PHOTOGRAPH TAG

PHOTOGRAPH NUMBER

SHEET WHERE SHOWN

PLAN

NORTH

SCALE

TRUE NORTH

SHEET

REFERENCED

FROM

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

P-001

LE

G

E N

D , A

B R

E V

IA

T

IO

N

S A

N D

N O

TE

S

CWS

BRF BRF

1629300

GENERAL PLUMBING NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

1. REFER TO DRAWING P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND

NOTES.

GENERAL NOTES

DEMOLITION NOTES9

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PD100

D E

M O

LI

TI

O N

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

CWSBRF BRF

1629300

9 DEMOLISH EMERGENCY EYEWASH STATION AND ALL ASSOCIATED PIPING.

10 DEMOLISH EMERGENCY SHOWER AND ALL ASSOCIATED PIPING.

13 DEMOLISH POTABLE WATER PIPING. TYPICAL FOR ALL RESTROOMS. PIPING

NOT SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

14 DEMOLISH SANITARY PIPING. TYPICAL FOR ALL RESTROOMS. PIPING NOT

SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

1/8" = 1'-0" C1

DEMOLITION BLDG 5055 - PLUMBING FLOOR PLAN

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

GENERAL NOTES

DEMOLITION NOTES

(TYP)

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PD131

D E

M O

LI

TI

O N

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

G

R O

U N

D

CWSBRF BRF

1629300

1 DEMOLISH WATER CLOSET, AS WELL AS ASSOCIATED SANITARY AND

WATER PIPING.

2 DEMOLISH URINAL, AS WELL AS ASSOCIATED SANITARY AND WATER PIPING.

3 DEMOLISH LAVATORY SINK, AS WELL AS ASSOCIATED SANITARY AND

WATER PIPING.

4 DEMOLISH SHOWER HEAD, AS WELL AS ASSOCIATED WATER PIPING.

5 DEMOLISH FLOOR DRAIN AND ASSOCIATED SANITARY PIPING.

16 DEMOLISH WATER COOLER. WATER AND SANITARY PIPING NOT SHOWN AT

15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

18 DEMOLISH MOP SINK. WATER AND SANITARY PIPING NOT SHOWN AT 15%

SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

19 DEMOLISH WATER HEATER. WATER AND DRAIN PIPING NOT SHOWN AT 15%

SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

20 DEMOLISH SERVICE AIR PIPING.

21 DEMOLISH SERVICE AIR PIPE CONNECTION TO THE DUST COLLECTOR.

22 DEMOLISH SERVICE AIR CONNECTION TO DRY DOCK MAIN.

1/8" = 1'-0" B1

DEMOLITION BLDG 5145 - PLUMBING FLOOR PLAN - GROUND

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

GENERAL NOTES DEMOLITION NOTES

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PD141

D E

M O

LI

TI

O N

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

CWSBRF BRF

1629300

1 DEMOLISH WATER CLOSET, AS WELL AS ASSOCIATED SANITARY AND

WATER PIPING.

2 DEMOLISH URINAL, AS WELL AS ASSOCIATED SANITARY AND WATER PIPING.

3 DEMOLISH LAVATORY SINK, AS WELL AS ASSOCIATED SANITARY AND

WATER PIPING.

4 DEMOLISH SHOWER HEAD, AS WELL AS ASSOCIATED WATER PIPING.

5 DEMOLISH FLOOR DRAIN AND ASSOCIATED SANITARY PIPING.

13 DEMOLISH POTABLE WATER PIPING. TYPICAL FOR ALL RESTROOMS. PIPING

NOT SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

14 DEMOLISH SANITARY PIPING. TYPICAL FOR ALL RESTROOMS. PIPING NOT

SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

15 DEMOLISH VENT PIPING. TYPICAL FOR ALL RESTROOMS. PIPING NOT

SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

16 DEMOLISH WATER COOLER. WATER AND SANITARY PIPING NOT SHOWN AT

15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

17 DEMOLISH SEWAGE LIFT SYSTEM. EQUIPMENT TO BE DESIGNED AFTER THE

15% SUBMITTAL.

18 DEMOLISH MOP SINK. WATER AND SANITARY PIPING NOT SHOWN AT 15%

SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

20 DEMOLISH SERVICE AIR PIPING.

22 DEMOLISH SERVICE AIR CONNECTION TO DRY DOCK MAIN.

1/8" = 1'-0" C1

DEMOLITION BLDG 5146 - PLUMBING FLOOR PLAN

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

GENERAL NOTES

DEMOLITION NOTES

5 5 5 5

141414

20 20 20

20 20 20

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PD150

D E

M O

LI

TI

O N

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

G

R O

U N

D A

N D

M E

Z Z

A N

IN

E

CWSBRF BRF

1629300

5 DEMOLISH FLOOR DRAIN AND ASSOCIATED SANITARY PIPING.

6 DEMOLISH SUMP PUMP AND ALL ASSOCIATED APPUTENANCES.

13 DEMOLISH POTABLE WATER PIPING. TYPICAL FOR ALL RESTROOMS. PIPING

NOT SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

14 DEMOLISH SANITARY PIPING. TYPICAL FOR ALL RESTROOMS. PIPING NOT

SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

20 DEMOLISH SERVICE AIR PIPING.

22 DEMOLISH SERVICE AIR CONNECTION TO DRY DOCK MAIN.

1/4" = 1'-0" C1

DEMOLITION BLDG 5150 - PLUMBING FLOOR PLAN - GROUND

1/4" = 1'-0" A1

DEMOLITION BLDG 5150 - PLUMBING FLOOR PLAN - MEZZANINE

PLAN

NORTH

PLAN

NORTH

2' 4' 8'0'

2' 4' 8'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

GENERAL NOTES

DEMOLITION NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PD171

D E

M O

LI

TI

O N

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

CWSBRF BRF

1629300

20 DEMOLISH SERVICE AIR PIPING.

22 DEMOLISH SERVICE AIR CONNECTION TO DRY DOCK MAIN.

1/8" = 1'-0" B1

DEMOLITION BLDG 5190 - PLUMBING FLOOR PLAN

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

GENERAL NOTES

WORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PL100

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

CWSBRF BRF

1629300

1 SANITARY PIPING TO BE REPLACED IN KIND. FINAL ROUTING TO OCCUR

AFTER THE 15% SUBMITTAL.

2 POTABLE WATER LINES TO BE REPLACED IN KIND. FINAL ROUTING TO OCCUR

AFTER THE 15% SUBMITTAL.

13 EMERGENCY EYEWASH STATION TO BE REPLACED IN KIND. FINAL

EQUIPMENT SELECTION TO BE DETERMINED AFTER THE 15% SUBMITTAL.

14 EMERGENCY SHOWER TO BE REPLACED IN KIND. FINAL EQUIPMENT

SELECTION TO BE DETERMINED AFTER THE 15% SUBMITTAL.

1/8" = 1'-0" C1

BLDG 5055 - PLUMBING FLOOR PLAN

4' 8' 16'0'

PLAN

NORTH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

GENERAL NOTES

WORK NOTES

2121 1515

(TYP)

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PL131

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

G

R O

U N

D

CWSBRF BRF

1629300

4 FINAL WATER COOLER SELECTION TO BE DETERMINED AFTER THE 15%

SUBMITTAL. SANITARY AND WATER LINES TO BE REPLACED IN KIND.

6 WATER HEATER TO BE REPLACED IN KIND. FINAL SELECTION TO BE

DETERMINED AFTER 15% SUBMITTAL.

15 FLOOR DRAIN TO BE REPLACED IN KIND.

17 MASTER CLEANOUT LOCATION TO BE DETERMINED AFTER THE 15%

SUBMITTAL.

18 WATER CLOSET TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE

DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE

DURABLE FOR NAVY USE.

19 URINAL TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE

DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE

DURABLE FOR NAVY USE.

20 LAVATORY SINK TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE

DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE

DURABLE FOR NAVY USE.

21 SHOWER TO BE REPLACED IN KIND. WATER PIPE ROUTING AND FIXTURE

SELECTION TO BE DETERMINED AFTER THE 15% SUBMITTAL.

22 MOP SINK TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION, AS WELL AS

WATER AND SANITARY PIPE ROUTING TO BE DETERMINED AFTER 15%.

23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE

DETERMINED AFTER THE 15% SUBMITTAL.

24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER

15% DESIGN.

25 SERVICE AIR PIPE CONNECTION TO THE DUST COLLECTOR TO BE REPLACED

IN KIND. FINAL LOCATION AND ROUTING TO BE DETERMINED AFTER THE 15%

SUBMITTAL.

1/8" = 1'-0" B1

BLDG 5145 - PLUMBING FLOOR PLAN - GROUND

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

GENERAL NOTESWORK NOTES

(TYP)

(TYP)

(TYP)

18 19

(TYP) (TYP)

(TYP)

(TYP)

(TYP)

(TYP)

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PL141

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

CWSBRF BRF

1629300

1 SANITARY PIPING TO BE REPLACED IN KIND. FINAL ROUTING TO OCCUR

AFTER THE 15% SUBMITTAL.

2 POTABLE WATER LINES TO BE REPLACED IN KIND. FINAL ROUTING TO

OCCUR AFTER THE 15% SUBMITTAL.

4 FINAL WATER COOLER SELECTION TO BE DETERMINED AFTER THE 15%

SUBMITTAL. SANITARY AND WATER LINES TO BE REPLACED IN KIND.

5 SEWAGE LIFT SYSTEM TO BE REPLACED IN KIND. FINAL SELECTION TO BE

DETERMINED AFTER THE 15% SUBMITTAL.

9 VENT PIPING TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO OCCUR

AFTER THE 15% SUBMITTAL.

15 FLOOR DRAIN TO BE REPLACED IN KIND.

18 WATER CLOSET TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE

DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE

DURABLE FOR NAVY USE.

19 URINAL TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE

DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE

DURABLE FOR NAVY USE.

20 LAVATORY SINK TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION TO BE

DETERMINED AFTER THE 15% SUBMITTAL. PLUMBING FIXTURES MUST BE

DURABLE FOR NAVY USE.

21 SHOWER TO BE REPLACED IN KIND. WATER PIPE ROUTING AND FIXTURE

SELECTION TO BE DETERMINED AFTER THE 15% SUBMITTAL.

22 MOP SINK TO BE REPLACED IN KIND. FINAL FIXTURE SELECTION, AS WELL AS

WATER AND SANITARY PIPE ROUTING TO BE DETERMINED AFTER 15%.

1/8" = 1'-0" C1

BLDG 5146 - PLUMBING FLOOR PLAN

4' 8' 16'0'

PLAN

NORTH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

GENERAL NOTES

WORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PP100

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

CWSBRF BRF

1629300

8 BREATHING AIR LINES TO BE SIZED AND ROUTED AFTER 15% DESIGN. PIPING

NOT SHOWN AT 15% SUBMITTAL, BUT WILL BE ADDED AT NEXT SUBMITTAL.

4' 8' 16'0'

PLAN

NORTH

1/8" = 1'-0" C1

BLDG 5055 - PLUMBING FLOOR PLAN

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

GENERAL NOTES

WORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PP141

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

G

R O

U N

D

CWSBRF BRF

1629300

23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE

DETERMINED AFTER THE 15% SUBMITTAL.

24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER

15% DESIGN.

25 SERVICE AIR PIPE CONNECTION TO THE DUST COLLECTOR TO BE REPLACED

IN KIND. FINAL LOCATION AND ROUTING TO BE DETERMINED AFTER THE 15%

SUBMITTAL.

26 TWO ADDITIONAL SERVICE AIR DROPS TO BE ADDED BASED ON

INFORMATION TO BE PROVIDED BY TRF PERSONEL.

PLAN

NORTH

4' 8' 16'0' 1/8" = 1'-0" B1

BLDG 5145 - FLOOR PLAN - GROUND

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

/1

GENERAL NOTESWORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PP141

B

LD

G

G

R O

U N

D F

LO

O

R P

LA

N

CWSBRF BRF

1629300

23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE

DETERMINED AFTER THE 15% SUBMITTAL.

24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER

15% DESIGN.

26 TWO ADDITIONAL SERVICE AIR DROPS TO BE ADDED BASED ON

INFORMATION TO BE PROVIDED BY TRF PERSONEL.

4' 8' 16'0'

PLAN

NORTH

1/8" = 1'-0" C1

BLDG 5146 - GROUND FLOOR PLAN

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

T A

L 3/

GENERAL NOTES

WORK NOTES

15 15 15

7 7 7

7 7 7

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PP150

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

G

R O

U N

D A

N D

M E

Z Z

A N

IN

E

CWSBRF BRF

1629300

2 POTABLE WATER LINES TO BE REPLACED IN KIND. FINAL ROUTING TO

OCCUR AFTER THE 15% SUBMITTAL.

3 FLOOR DRAIN SANITARY PIPING TO BE REPLACED IN KIND. FINAL ROUTING

TO OCCUR AFTER THE 15% SUBMITTAL.

7 SERVICE AIR LINES TO BE REPLACED IN KIND. FINAL ROUTING TO BE

DETERMINED AFTER THE 15% SUBMITTAL.

10 SUMP PUMP DISCHARGE LINE TO BE REPLACED IN KIND. FINAL ROUTING TO

OCCUR AFTER THE 15% SUBMITTAL.

15 FLOOR DRAIN TO BE REPLACED IN KIND.

16 SUMP PUMP TO BE REPLACED IN KIND. FINAL PUMP SELECTION TO BE

DETERMINED AFTER THE 15% SUBMITTAL.

23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE

DETERMINED AFTER THE 15% SUBMITTAL.

24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER

15% DESIGN.

1/4" = 1'-0" C1

BLDG 5150 - PLUMBING FLOOR PLAN - GROUND

1/4" = 1'-0" A1

BLDG 5150 - PLUMBING FLOOR PLAN - MEZZANINE

PLAN

NORTH

PLAN

NORTH

2' 4' 8'0'

2' 4' 8'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

GENERAL NOTES

WORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

PP171

B

LD

G

P

LU

M

B

IN

G F

LO

O

R P

LA

N

CWSBRF BRF

1629300

23 SERVICE AIR PIPE TO BE REPLACED IN KIND. FINAL PIPE ROUTING TO BE

DETERMINED AFTER THE 15% SUBMITTAL.

24 SERVICE AIR PIPE MAIN CONNECTION. LOCATION TO BE FINALIZED AFTER

15% DESIGN.

1/8" = 1'-0" B1

BLDG 5190 - PLUMBING FLOOR PLAN

4' 8' 16'0'

PLAN

NORTH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

1. THESE GENERAL NOTES APPLY TO ALL MECHANICAL DRAWINGS IN THIS SET.

SHEET SPECIFIC NOTES ARE INDICATED ON EACH SHEET UNDER GENERAL

SHEET NOTES.

2. PATCH ALL HOLES FROM REMOVAL OF PIPING, DUCTWORK, OR EQUIPMENT

TO MATCH ADJACENT CONSTRUCTION.

3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR

REQUIRED TO INSTALL COMPLETE AND OPERANLE MECHANICAL SYSTEMS AS

INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.

4. INSTALL ALL MECHANICAL EQUIPMENT AN APPURTENANCES IN ACCORDANCE

WITH MANUFACTURER'S RECOMMENDATIONS, THIS CONTRACT'S

DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.

5. PROVIDE VIBRATION ISOLATORS FOR ALL MECHANICAL EQUIPMENT TO

PREVENT TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.

6. PROVIDE ACCESS PANELS IN WALLS AND CEILINGS, WHERE REQUIRED, TO

SERVE FIRE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER

CONCEALED MECHANICAL EQUIPMENT THAT REQUIRES ROUTINE

MAINTENANCE. ACCESS PANELS MUST BE LARGE ENOUGH TO ALLOW

PROPER CLEARANCE FOR ACCESS DOORS.

7. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC.,

SHALL BE FIRE STOPPED.

8. EXISTING DUCT AND PIPING SIZES INDICATED ARE APPROXIMATE. FIELD

VERIFY ALL DIMENSIONS.

9. LOCATE ALL NEW HORIZONTAL DUCTWORK ABOVE THE SUSPENDED CEILINGS

UNLESS OTHERWISE INDICATED.

10. ALL 90 DEGREE RECTANDULAR MITERED DUCT ELBOWS IN THE SUPPLY AND

RETURN DUCT SHALL HAVE TURNING VANES.

11. PROVIDE PIPE SLEEVES FOR ALL PIPING PENETRATIONS THRU WALLS AND

FLOORS. EACH PIPE SHALL BE SEPARATELY SLEEVED. PROVIDE CONTINUOUS

SEALANT JOINT AROUND PIPE SLEEVE, BOTH SIDES OF WALL, WATERTIGHT.

12. PROVIDE P-TRAPS IN CONDENSATE DRAIN PIPING AT EACH AHU UNLESS THE

AHU IS EQUIPPED WITH AN INTERNAL TRAP.

13. AFTER PRELIMINARY OPERATIONAL TESTING OF ALL BOILERS OR DIRECT

FIRED DOMESTIC WATER HEATERS WITH A CAPACITY GREATER THAN 400,000

BHUH, THE BOILER SHALL BE INSPECTED AND AN OPERATIONAL TEST

PERFORMED BY A NAFVAC FACILITIES ENGINEERING COMMAND BOILER

INSPECTOR. ALLOW 15 DAYS ADVANCE NOTICE FOR SCHEDULING AN

INSPECTOR TO CONDUCT AN ACCEPTANCE OPERATIONAL TEST AND

INSPECTION.

14. MOUNT THERMOSTATS 48 INCHES ABOVE THE FINISHED FLOOR UNLESS

OTHERWISE INDICATED. REFER TO ELECTRICAL DRAWINGS FOR LOCATION

OF LIGHT SWITCHES AND COORDINATE.

15. CONDENSATE DRAIN PIPING SHALL BE PVC. CLEANOUTS SHALL BE INSTALLED

AT EACH CHANGE IN DIRECTION GREATER THAN 45 DEGREES. WHERE MORE

THAN ONE CHANGE OF DIRECTION OCCURS IN A RUN OF PIPING, ONLY ONE

CLEANOUT SHALL BE REQUIRED FOR EACH 45 FEET OF DEVELOPED LENGTH.

COMBINATION WYE AND 1/8 BENDS SHALL BE USED IN LIEU OF TEES.

16. AFTER THE PIPING IS INSULATED, PROVIDE SETON BRAND OR EQUAL

FACTORY-FABRICATED PIPE LABELS, WITH DIRECTION OF FLOW ARROWS,

ON THE FOLLOWING PIPING, AT 10 FOOT ON CENTER ON THE PIPING MAINS

AND 5 FOOT ON CENTER ON THE BRANCH RUNOUTS FROM THE MAINS.

GENERAL MECHANICAL NOTES

° DEGREES

Ø DIAMETER

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AP ACCESS PANEL

APD AIR PRESSURE DROP

AS AIR SEPARATOR

ATFP ANTITERRORISM FORCE PROTECTION

BD BALANCING DAMPER

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BR BASEBOARD RADIATOR

BTUH BRITISH THERMAL UNITS PER HOUR

C COMMON

Cv LOSS COEFFICIENT

CFM CUBIC FEET PER MINUTE

CLG CEILING

CND CONDENSER

COP COEFFICIENT OF PERFORMANCE

CRAHU COMPUTER ROOM AIR HANDLING UNIT

CU CONDENSING UNIT

CHW CHILLED WATER

DB DRY BULB

DDC DIRECT DIGITAL CONTROL

DEG DEGREE

DX DIRECT EXPANSION

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICENCY RATIO

EF EXHAUST FAN

EFF EFFECTIVENESS

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

F FARENHEIT

FCU FAN COIL UNIT

FD FIRE DAMPER

FT FEET

FT WG FEET WATER GAUGE

GPM GALLONS PER MINUTE

HGT HEIGHT

HP HEAT PUMP, HORSEPOWER

HR HOUR

HW HOT WATER

HX HEAT EXCHANGER

IAW IN ACCORDANCE WITH

IWG INCHES WATER GAUGE

kW KILOWATT

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LV LOUVER

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM (< 15PSIG)

MAU MAKEUP AIR UNIT

MAX MAXIMUM

MIN MINIMUM

NC NORMALLY CLOSED, NOISE CRITERIA

NO NUMBER, NORMALLY OPEN

OA OUTSIDE AIR

OAU OUTSIDE AIR UNIT

PH PHASE

PSI POUNDS PER SQUARE INCH

PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT

PTHP PACKAGED TERMINAL HEAT PUMP

QTY QUANTITY

RA RETURN AIR

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

SA SUPPLY AIR

SEER SEASONAL ENERGY EFFICIENCY RATIO

SIM SIMILAR

SP STATIC PRESSURE

SQ SQUARE

TYP TYPICAL

UH UNIT HEATER

UOI UNLESS OTHERWISE INDICATED

V VOLTS

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

W WIDTH

WB WET BULB

WPD WATER PRESSURE DROP

MECHANICAL ABBREVIATIONS

VOLUME DAMPER

MECHANICAL LEGEND

ACCESS DOOR (AD), ACCESS PANEL (AP)

VERTICAL (WALL) FIRE DAMPER

AD

T

HUMIDITY SENSORH

THERMOSTAT

AIR TERMINAL TAG WITH AIR FLOW (CFM)

ROUND DUCT DIMENSION

RECTANGULAR DUCT DIMENSIONS (INCHES)

FLEXIBLE ROUND DUCT (5'-0" MAX LENGTH)

12x10

12"Ø

SUPPLY DUCT, SUPPLY DUCT DOWN/UP

DOWNWARD DIRECTION OF SLOPED PIPING

RETURN DUCT, RETURN DUCT DOWN/UP

A

GLOBE VALVE

GATE VALVE

BUTTERFLY VALVE

AUTOMATIC FLOW BALANCING VALVE

MANUAL FLOW CONTROL BALANCING VALVE

CHECK VALVE

SQUARE HEAD BALANCING COCK

PRESSURE REDUCING VALVE

DRAIN VALVE WITH HOSE CONNECTION

2-WAY CONTROL VALVE

3-WAY CONTROL VALVE

BACKFLOW PREVENTER

RELIEF VALVE

MANUAL AIR VENT

VACUUM BREAKER

AUTOMATIC AIR VENT

STEAM TRAPT

VALVE IN VERTICAL PIPING

WYE STRAINER

SPRINKLER HEAD

STRAINER WITH BLOWDOWN VALVE

CLEAN OUT

PIPE REDUCER

ECCENTRIC REDUCER

UNION

PRESSURE GAUGE WITH SHUTOFF COCK

THERMOMETER IN PIPE WELL

PIPE CAP

FLANGE

FLEXIBLE PIPE CONECTOR

C.O.

HORIZONTAL (CEILING) FIRE DAMPER

PIPING TO BE REMOVED

MECHANICAL PIPING LEGEND

CONDENSER WATER RETURN PIPING

COMPRESSED AIR PIPING

CONDENSER WATER SUPPLY PIPING

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

CONDENSATE DRAIN PIPING

DUAL TEMPERATURE RETURN PIPING

DOMESTIC COLD WATER PIPING

DUAL TEMPERATURE SUPPLY PIPING

HOT GAS BYPASS PIPING

NATURAL GAS PIPING

HIGH PRESSURE STEAM PIPING

HOT WATER SUPPLY PIPING

HOT WATER RETURN PIPING

LOW PRESSURE CONDENSATE PIPING

REFRIGERANT LIQUID PIPING

LOW PRESSURE STEAM PIPING

REFRIGERANT SUCTION PIPINGVACUUM (AIR)

(NAME)

CA

CWR

CWS

CHWR

CHWS

CND

DCW

DTR

DTS

G

HG

HPS

HWR

HWS

LPC

LPS

RL

RSVAC

DOMESTIC HOT WATER PIPINGDHW

MECHANICAL SYMBOLS

POINT OF CONNECTION

POINT OF DISCONNECTION

ROOM TAG

DETAIL NUMBER

SHEET WHERE DRAWN

DETAIL TAG

ROOM NAME

ROOM NUMBER

? INTERIOR ELEVATION

TAG

INTERIOR ELEVATION NUMBER

SHEET WHERE DRAWN

DETAIL NUMBER

SCALE

SHEET

REFERENCED

FROM

EXTERIOR ELEVATION

TAG

ELEVATION NUMBER

DIRECTION OF VIEW

SHEET WHERE DRAWN

WALL / PARTIAL

BUILDING SECTION

TAG

SECTION NUMBER

SHEET WHERE DRAWN

GENERAL PROJECT SYMBOLS

BUILDING SECTION

TAG

SECTION NUMBER

SHEET WHERE DRAWN

BUILDING

NEW WORK

KEYNOTE TAG

KEYNOTE NUMBER

DEMO

KEYNOTE TAG

KEYNOTE NUMBER

? PHOTOGRAPH TAG

PHOTOGRAPH NUMBER

SHEET WHERE SHOWN

PLAN

NORTH

SCALE

TRUE NORTH

SHEET

REFERENCED

FROM

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

M-001

LE

G

E N

D , A

B R

E V

IA

T

IO

N

S A

N D

N O

TE

S

CWSBRF BRF

1629300

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

TA

L

3/

1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND

GENERAL NOTES

DEMOLITION NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

MD100

D E

M O

LI

TI

O N

B

LD

G

M

E C

H A

N

IC

A L

F

LO

O R

P

LA

N

CWSBRF BRF

1629300

2 DEMOLISH EXHAUST FAN, CONTROLS AND ASSOCIATED DUCTWORK.

11 DEMOLISH EXISTING LOUVER.

26 DEMOLISH FITTING AND VERTICAL EXHAUST DUCT.

1/8" = 1'-0" C1

DEMOLITION BLDG 5055 - MECHANICAL FLOOR PLAN

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

TA

L

3/

4 4

18 18

1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND

NOTES.

GENERAL NOTES

DEMOLITION NOTES

4 44

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

MD131

D E

M O

LI

TI

O N

B

LD

G

M

E C

H A

N

IC

A L

F

LO

O R

P

LA

N

G R

O U

N D

A N

D M

E Z

Z A

N

IN

E

CWSBRF BRF

1629300

1/8" = 1'-0" B1

DEMOLITION - BLDG 5145 - MECHANICAL FLOOR PLAN - GROUND

1 DEMOLISH DUST COLLECTOR, CONTROLS, AND ASSOCIATED

APPURTENANCES.

2 DEMOLISH EXHAUST FAN, CONTROLS AND ASSOCIATED DUCTWORK.

3 DEMOLISH AIR HANDLING UNIT, CONTROLS, AND ASSOCIATED

APPURTENANCES.

4 DEMOLISH ELECTRIC UNIT HEATER, CONTROLS, AND ASSOCIATED

APPURTENANCES.

5 DEMOLISH MAKE-UP AIR UNIT, CONTROLS, AND ASSOCIATED

APPURTENANCES.

7 DEMOLISH DUCT, AIR DEVICES, HANGARS, AND APPURTENANCES.

11 DEMOLISH EXISTING LOUVER.

16 DEMOLISH DUCTLESS SPLIT SYSTEM FAN COIL UNIT, CONTROLS, AND

ASSOCIATED APPURTENANCES.

17 DEMOLISH SUB-GRADE DUST COLLECTION DUCTS.

18 DEMOLISH DUST COLLECTION DUCTS.

PLAN

NORTH

4' 8' 16'0'

1/8" = 1'-0" A1

DEMOLITION - BLDG 5145 - MECHANICAL FLOOR PLAN - MEZZANINE

4' 8' 16'0'

PLAN

NORTH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

2 2 2 2

11 11 11 11

1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND

NOTES.

GENERAL NOTES DEMOLITION NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

MD141

D E

M O

LI

TI

O N

B

LD

G

M

E C

H A

N

IC

A L

F

LO

O R

P

LA

N

CWSBRF BRF

1629300

1/8" = 1'-0" C1

DEMOLITION BLDG 5146 - MECHANICAL FLOOR PLAN

2 DEMOLISH EXHAUST FAN, CONTROLS AND ASSOCIATED DUCTWORK.

3 DEMOLISH AIR HANDLING UNIT, CONTROLS, AND ASSOCIATED

APPURTENANCES.

5 DEMOLISH MAKE-UP AIR UNIT, CONTROLS, AND ASSOCIATED

APPURTENANCES.

7 DEMOLISH DUCT, AIR DEVICES, HANGARS, AND APPURTENANCES.

11 DEMOLISH EXISTING LOUVER.

12 DEMOLISH TEMPORARY AIR CONDITIONER.

21 CUT, SEAL, AND EVACUATE EXISTING REFRIGERANT LINES. RECOVER AND

DISPOSE OF REFRIGERANT IN ACCORDANCE WITH EPA GUIDELINES.

DEMOLISH ALL REFRIGERANT LINES FROM CU TO AHU.

22 DEMOLISH CHILLED WATER PIPING, VALVES, SUPPORTS, AND

APPURTENANCES FROM THE DRYDOCK MAIN CONNECTION UP TO

MECHANICAL EQUIPMENT. PIPING NOT SHOWN AT 15% SUBMITTAL, BUT WILL

BE ADDED AT NEXT SUBMITTAL.

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

GENERAL NOTES

DEMOLITION NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

MD151

D E

M O

LI

TI

O N

B

LD

G

M

E C

H A

N

IC

A L

F

LO

O R

P

LA

N

G R

O U

N D

A N

D M

E Z

Z A

N

IN

E

CWSBRF BRF

1629300

2 DEMOLISH EXHAUST FAN, CONTROLS AND ASSOCIATED DUCTWORK.

4 DEMOLISH ELECTRIC UNIT HEATER, CONTROLS, AND ASSOCIATED

APPURTENANCES.

1/4" = 1'-0" C1

DEMOLITION BLDG 5150 - MECHANICAL FLOOR PLAN - GROUND

PLAN

NORTH

2' 4' 8'0'

1/4" = 1'-0" A1

DEMOLITION BLDG 5150 - MECHANICAL FLOOR PLAN - MEZZANINE

PLAN

NORTH

2' 4' 8'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

GENERAL NOTES

WORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

MH100

B

LD

G

M

E C

H A

N

IC

A L

F

LO

O R

P

LA

N

CWSBRF BRF

1629300

3 NEW LOUVERS TO BE REPLACED IN KIND. FINAL SELECTION TO BE

DETERMINED AFTER 15% SUBMITTAL.

9 NEW EXHAUST FANS TO BE REPLACED IN KIND. FINAL SELECTION OF

SIDEWALL EXHAUST FANS TO COME AFTER 15% SUBMITTAL.

1/8" = 1'-0" C1

BLDG 5055 - MECHANICAL FLOOR PLAN

4' 8' 16'0'

PLAN

NORTH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S

U B

M

IT

TA

L

3/

11 11 11

11 11

1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND

NOTES.

GENERAL NOTES

WORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

MH131

B

LD

G

M

E C

H A

N

IC

A L

F

LO

O R

P

LA

N

G R

O U

N D

CWSBRF BRF

1629300

1/8" = 1'-0" B1

BLDG 5145 - MECHANICAL FLOOR PLAN - GROUND

1 NEW CEILING MOUNTED CHILLED WATER FAN COIL UNIT. FINAL DUCT

ROUTING, EQUIPMENT SIZING AND SELECTION TO BE DETERMINED AFTER

15% SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL EQUIPMENT TO BE

DETERMINED AFTER 15% SUBMITTAL.

5 CHILLED WATER CEILING CASSETTE TO COOL EACH OFFICE. FINAL

EQUIPMENT SELECTION TO BE DETERMINED AFTER 15% SUBMITTAL.

7 NEW EXHAUST SYSTEM TO BE DESIGNED AFTER 15% SUBMITTAL. FINAL

DESIGNS TO INCLUDE DUCT ROUTING AND EQUIPMENT SELECTION.

11 ELECTRIC UNIT HEATER LOCATION AND CAPACITY TO BE REPLACED IN KIND.

FINAL EQUIPMENT SELECTION TO COME AFTER 15% SUBMITTAL.

14 NEW DUST COLLECTION SYSTEM. FINAL EQUIPMENT SELECTION AND DUCT

ROUTING TO BE DETERMINED AFTER 15% SUBMITTAL. USE EXISTING WALL

PENETRATIONS FOR NEW DUST COLLECTION DUCTS.

17 NEW CHILLED WATER PIPING. FINAL ROUTING TO MECHANICAL EQUIPMENT

TO BE DETERMINED AFTER THE 15% SUBMITTAL.

18 CHILLED WATER PIPE TO DRYDOCK MAIN. FINAL CONNECTION, PIPE

ROUTING, AND PENETRATION LOCATION TO BE DETERMINED AFTER THE 15%

SUBMITTAL.

25 NEW DEDICATED OUTDOOR AIR HANDLING UNIT MOUNTED ON GRADE. FINAL

SIZING, SELECTION, DUCT ROUTING, AND LOCATION TO BE DETERMINED

AFTER THE 15% SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL TO BE

DETERMINED AFTER 15% SUBMITTAL.

27 KNIFE GATES TO BE ADDED AT ALL WORKSTATIONS. FINAL DESIGN AND

LOCATIONS TO BE DETERMINED AFTER THE 15% SUBMITTAL.

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

11 11

1. REFER TO DRAWING M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND

NOTES.

GENERAL NOTES

WORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

MH132

B

LD

G

M

E C

H A

N

IC

A L

F

LO

O R

P

LA

N

M E

Z Z

A N

IN

E

CWSBRF BRF

1629300

1/8" = 1'-0" B1

BLDG 5145 - MECHANICAL FLOOR PLAN - MEZZANINE

1 NEW CEILING MOUNTED CHILLED WATER FAN COIL UNIT. FINAL DUCT

ROUTING, EQUIPMENT SIZING AND SELECTION TO BE DETERMINED AFTER

15% SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL EQUIPMENT TO

BE DETERMINED AFTER 15% SUBMITTAL.

7 NEW EXHAUST SYSTEM TO BE DESIGNED AFTER 15% SUBMITTAL. FINAL

DESIGNS TO INCLUDE DUCT ROUTING AND EQUIPMENT SELECTION.

11 ELECTRIC UNIT HEATER LOCATION AND CAPACITY TO BE REPLACED IN

KIND. FINAL EQUIPMENT SELECTION TO COME AFTER 15% SUBMITTAL.

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

GENERAL NOTES WORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

MH141

B

LD

G

M

E C

H A

N

IC

A L

F

LO

O R

P

LA

N

CWSBRF BRF

1629300

1 NEW CEILING MOUNTED CHILLED WATER FAN COIL UNIT. FINAL DUCT

ROUTING, EQUIPMENT SIZING AND SELECTION TO BE DETERMINED AFTER 15%

SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL EQUIPMENT TO BE

DETERMINED AFTER 15% SUBMITTAL.

5 CHILLED WATER CEILING CASSETTE TO COOL EACH OFFICE. FINAL

EQUIPMENT SELECTION TO BE DETERMINED AFTER 15% SUBMITTAL.

7 NEW EXHAUST SYSTEM TO BE DESIGNED AFTER 15% SUBMITTAL. FINAL

DESIGNS TO INCLUDE DUCT ROUTING AND EQUIPMENT SELECTION.

17 NEW CHILLED WATER PIPING. FINAL ROUTING TO MECHANICAL EQUIPMENT TO

BE DETERMINED AFTER THE 15% SUBMITTAL.

25 NEW DEDICATED OUTDOOR AIR HANDLING UNIT MOUNTED ON GRADE. FINAL

SIZING, SELECTION, DUCT ROUTING, AND LOCATION TO BE DETERMINED

AFTER THE 15% SUBMITTAL. FINAL COORDINATION WITH ELECTRICAL TO BE

DETERMINED AFTER 15% SUBMITTAL.

1/8" = 1'-0" C1

BLDG 5146 - MECHANICAL FLOOR PLAN

PLAN

NORTH

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

S U

B M

IT

T

A L

/1

8/

GENERAL NOTES

WORK NOTES

N O

T F

O R

C O

N S

T R

U C

T

IO

N

P R

E L

IM

IN

A

R Y

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 31 JANUARY 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

S

O U

T H

E A

S T

A C

Q C

O R

E N

A V

A L A

IR

S

T A

T

IO

N

J A

C K

S O

N V

IL

L E

F

L

S U

B B

A S

E K

IN

G

S B

A Y

K

IN

G S

B A

Y G

E O

R G

IA

AS NOTED

R E

P A

IR

D

R Y

D O

C K

1305 EXECUTIVE BLVD.

SUITE 160

CHESAPEAKE, VA 23320

P A

C K

A G

E

B

MH151

B

LD

G

M

E C

H A

N

IC

A L

F

LO

O R

P

LA

N

G R

O U

N D

A N

D M

E Z

Z A

N

IN

E

CWSBRF BRF

1629300

10 NEW CHILLED WATER FAN COIL UNIT. FINAL EQUIPMENT SIZING AND

SELECTION TO BE DETERMINED AFTER 15% SUBMITTAL.

11 ELECTRIC UNIT HEATER LOCATION AND CAPACITY TO BE REPLACED IN KIND.

FINAL EQUIPMENT SELECTION TO COME AFTER 15% SUBMITTAL.

17 NEW CHILLED WATER PIPING. FINAL ROUTING TO MECHANICAL EQUIPMENT