N6945014R7610SectionC_Amendment0002.pdf

PDF 349 KB Posted

Attached to
Local Guard Services
Solicitation number
N6945014R7610
Issued by

About this file

Section C Specs - Amendment 0002

View the file

Other files

File Type Posted
N69450-14-R-7610-0005.pdf PDF
N6945014R7610SectionBConformed.pdf PDF
N6945014R7610_Amendment0004.pdf PDF
J-0200000-07ELINs_Amendment0003.xlsx XLSX spreadsheet
N69450-14-R-7610-0003.pdf PDF
N6945014R7610_GPIs.pdf PDF
N6945014R7610SectionJ_Amendment0002.pdf PDF
N6945014R7610SectionF_Amendment0002.pdf PDF
N6945014R7610_Amendment0002.pdf PDF
N6945014R7610SiteVisitSignIn.pdf PDF
N6945014R7610SiteVisitPresentation.pdf PDF
N6945014R7610_Amendment0001.pdf PDF
N6945014R7610_Attachments.zip ZIP file
N6945014R7610.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C-0100000 General Information

0100000 – General Information Spec Item Title 1 General Information

1.1 Outline of Services

1.2 Project Location

1.3 Acquisition of Additional Work

1.4 Background Information

1.5 Verification of Workload and Conditions

1.6 Climate Patterns

1.7 Related Information

1.8 Navy Approach to Service Contracting

1.9 Standard Template

1.10 Navy PBSA Approach

1.11 Technical Proposal Certification

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 1 of 40

Jacksonville, Florida

0100000 – General Information Spec Item Title Description 1 General

Information

1.1 Outline of

Services

Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at DLA Distribution Jacksonville, Florida; NAVSUP Fleet Logistics Center Jacksonville, Florida; and within the commuting areas by means of combination firm-fixed price (FFP) and indefinite delivery-indefinite quantity (IDIQ). The PWS is organized into annexes.

Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff N/A Annex 4 Public Safety

0401060 Security Operations Annex 5 Air Operations N/A Annex 6 Port Operations N/A Annex 7 Ordnance N/A Annex 8 Range Operations N/A Annex 9 Health Care Support N/A Annex 10 Supply N/A Annex 11 Personnel Support N/A Annex 12 Morale, Welfare and Recreation Support N/A Annex 13 Galley N/A Annex 14 Housing N/A Annex 15 Facilities Support N/A Annex 16 Utilities N/A Annex 17 Base Support Vehicles and Equipment N/A Annex 18 Environmental N/A

1.2 Project Location The work shall be performed at various locations and could vary from location to location. The following is an example of the dispersion of work at the various locations:

1) Access Control and Roving Guard services at DLA Distribution Jacksonville, Florida

2) Access Control and Roving Guard services at NAVSUP Fleet Logistics Center

Jacksonville, Florida

1.3 Acquisition of

Additional Work The Government reserves the right to acquire additional Security Operations services at additional locations in addition to the services and locations identified in the Firm-Fixed Price requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the indefinite delivery indefinite quantity provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background

Information

In May 1942, the command was called Naval Air Operational Training Command and was responsible for all aviation-related training in the southeast during World War II. By November 1945, the name changed to Naval Air Advanced Training

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 2 of 40

Command with fighter pilot training as the primary focus. The Navy's Blue Angels formed in 1946 and served under this command until 1948.

In 1948, Commander, Fleet Air Jacksonville assumed flag responsibilities as the command that controlled all operations-related aviation assets in the Jacksonville area. In 1974, the name was changed to Commander, Sea Based Antisubmarine Wing One. The command's name changed again when Commander, Helicopter Wings Atlantic, was established October 1, 1986.

The command then went through subsequent mission and name changes, including Commander, Naval Aviation Activities Jacksonville, on October 1, 1992, followed by Commander, Naval Base Jacksonville, on June 2, 1994. The latest and current name - Commander, Navy Region Southeast - was established February 2, 1999.

Commander, Navy Region Southeast (CNRSE) is the regional commander and immediate superior in command, and manages and oversees shore installation management support and execution for 19 installations within the Southeastern United States and Guantanamo Bay, Cuba. The commander is responsible for warfighter readiness supported by shore activities, standards of performance, anti-terrorism/force protection, disaster preparedness, safety, joint services, financial management, public affairs, state and local government liaison, environmental protection, and legal affairs.

The commander also serves as the Navy’s regional planning agent, regional environmental and public affairs coordinator and the U.S. Environmental Protection Agency liaison, as well as the casualty assistance calls officer in Alabama, Florida, Georgia, Kentucky, Louisiana, Mississippi, South Carolina, Texas, and Cuba.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as inventories, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit for offerors and to visit the technical library during posted hours as part of its due diligence to assess the nature of work and conditions under which work is to be performed.

1.6 Climate Patterns The climate in Northeast Florida is generally temperate. Summers are long and warm with an average relative humidity of about 75 percent. Winters, although punctuated with periodic invasions of cool to occasionally cold air from the north, are mild because of the southern latitude and the proximity to the warm Atlantic Ocean.

The annual average temperature for the area is 68 degrees. June, July, and August are the hottest months, with temperatures averaging above 90 degrees. December, January, and February are the coolest months, with temperatures averaging near the mid 50s. Temperatures exceed 95 degrees during the summer months and evening temperatures are usually comfortable, falling below 75 degrees.

The greatest rainfall, mostly in the form of local thunderstorms, occurs during the summer months when measurable amounts can be expected. Summer thunderstorms usually occur before noon along the beaches, while afternoon thunderstorms are the rural inland areas. The Climate is humid subtropical, but tends to be somewhat cooler than the Florida peninsula to the south. Winters can be marked by spells of cold weather, and limited snow or ice occurs once every few years.

The proximity to the Atlantic Ocean and Gulf Stream makes it extremely susceptible to Tropical Cyclones and their effects. The official Tropical Cyclone season begins June 1st and runs through November 30th each year, although Tropical Cyclones have been known to develop as early as May and as late as December. The peak period of Tropical Cyclone is August through October. It is during this period that

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 3 of 40 storm frequency and intensity increases.

1.7 Related

Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government.

Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach

to Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations. The Navy also supports the following principles:

1.8.1 Partnering

Philosophy

The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's

Knowledge

The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best

Practices

The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard

Template

Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.

This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 4 of 40 information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Firm Fixed-Price (FFP) requirements. Specification item 4 will always contain the Indefinite Delivery-Indefinite Quantity (IDIQ) requirements.

Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all firm fixed priced specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.

1.10 Navy PBSA

Approach

The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards,

3) consideration of incentives, and 4) performance assessment plan.

1.11 Technical

Proposal Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

Local Guard Services Page 5 of 40

Section C-0200000 Management and Administration

0200000 - Management and Administration Spec Item Title 2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

2.3.3 Partnering

2.3.3.1 Contract Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Government Information Technology (IT) System

2.3.8 Instructions, Directives, and References

2.3.9 Invoicing Procedures

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.4.2 Government-Furnished Utilities

2.4.2.1 Availability of Utilities

2.4.3 Government-Furnished Materials (GFM)

2.4.4 Government-Furnished Equipment (GFE)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Control

2.6.2 Work Schedule

2.6.3 Continuity of Services

2.6.4 Service Interruptions

2.6.5 Quality Management System (QMS)

2.6.5.1 Quality Control Plan (QCP)

2.6.5.2 QC Inspection

2.6.5.3 Contractor Quality Control/Assessment Reports

2.6.6 Property Management Plan

2.6.7 Environmental Management System (EMS)

2.6.8 Use of Recovered Materials

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Control Manager (QCM)

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.2 Employee Requirements

2.7.2.1 Employee Appearance

2.7.2.2 Employee Conduct

2.7.2.3 Removal of Employees

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 6 of 40

0200000 - Management and Administration Spec Item Title

2.7.2.4 Proof of United States of America Citizenship

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 Navy Commercial Access Control System (NCACS)

2.8.4.2 One-Day Passes

2.8.5 Access to Buildings

2.8.5.1 Access Arrangements

2.8.5.2 Escort Arrangement for Secured Areas

2.8.6 Security Clearances

2.8.7 Trustworthiness Security – Navy Contract/Task Orders

2.9 Contractor Safety Program

2.9.1 Subcontractor Safety Requirements

2.9.1.1 Experience Modification Rate (EMR)

2.9.1.2 OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) Rate

2.9.2 Accident Prevention Plan (APP)

2.9.3 Activity Hazard Analysis (AHA)

2.9.4 Hazard Specific Safety Plans

2.9.4.1 Contingency Plan for Severe Weather

2.9.4.2 Drug Abuse Prevention Plan

2.9.4.3 Emergency Response Plan

2.9.4.4 Hazard Communication Plan

2.9.4.5 Health Hazard Control Plan

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting Notification

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.10 Environmental Protection

2.10.1 Disposal

2.10.1.1 Non-Hazardous Waste

2.10.1.2 Hazardous Waste

2.10.2 Spill Prevention, Containment, and Clean-up

2.10.3 Hazardous Material Management

2.10.4 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.5 Noise Control

2.10.6 Salvage

2.10.7 Asbestos Containing Material (ACM)

2.10.8 Sustainable Procurement and Practices

2.11 Disaster Preparedness

2.12 Energy Management

2.12.1 Water Conservation Plan

2.13 Notification to the Government for Work Above the FFP Limitations

2.14 FFP Exhibit Line Item Numbers (ELINs)

2.15 IDIQ Work

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 7 of 40

0200000 - Management and Administration Spec Item Title

2.15.1 Unit Priced Task Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor Work (Negotiated)

2.15.2.1 IDIQ Preparation of Proposals

2.15.2.1.1 Labor Requirements

2.15.2.1.2 Material Requirements

2.15.2.2 Issuance of Final Task Order

2.15.3 IDIQ ELINS

Local Guard Services Page 8 of 40

0200000 - Management and Administration Spec Item Title Description 2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

2.2.1 Government

Regular Working Hours

The Government's regular working hours are:

NAVSUP Fleet Logistics Center Jacksonville, FL. – Heckscher Drive

Fuel Farm: 0700 to 1630 Monday through Friday

Jacksonville Zone – NAS Jacksonville: 0700-1630, Monday through Thursday and 0700 through 1530 on Fridays

Except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours to the KO for approval at least seven calendar days prior to requested day.

Excludes work to be performed during specified hours.

2.2.2 Wage

Determinations

Placeholder for appropriate Service Contract Act and Davis-Bacon Act wage determinations in Section J. Wage determinations are included in J- 0200000-02.

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item

3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

2.3 General

Administrative Requirements

2.3.1 Required

Conferences and Meetings

The Contractor may be required to attend administrative and coordination meetings. The Contractor shall attend meetings as shown in J-0200000-03.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the clients who will receive services, principal individuals from NAVFAC, the performance assessment

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 9 of 40

0200000 - Management and Administration Spec Item Title Description team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

2.3.3.1 Contract Partnering This level of partnering discusses partnering concepts and benefits and should become a part of the pre-performance conference. The senior Government and Contractor stakeholders present will jointly host the partnering sessions. The partners will determine the frequency of the follow-on sessions. The partnering sessions should be held at locations agreed to by the partners.

2.3.3.2 Contract Partnering

Administration

Upon award, the ACO will contact the Contractor, client(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. The initial session must be scheduled as soon as possible after award of the contract. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.

Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President *Contract/Project Manager *Supervisor/Superintendent *Quality Control Manager Safety Manager

2.3.4 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. Provide evidence of such Permits and Licenses to the KO before work commences and at other times as requested by the KO.

2.3.5 Insurance Within 15 calendar days after award of this contract, the Contractor shall furnish the KO a Certificate of Insurance as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-05, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 10 of 40

0200000 - Management and Administration Spec Item Title Description

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and State worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by State Law

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.7 Government

Information Technology (IT) System

Additional information about NMCI may be obtained at http://www.eds.com/nmci.

2.3.8 Instructions, Directives, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-04. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.9 Invoicing

Procedures

Refer to Section G for invoicing instructions.

2.4 Government-

Furnished Property, Materials and Services

In accordance with FAR 52.245-2, GOVERNMENT PROPERTY (Fixed- Price Contracts) and NAVFAC Clause 5252.245-9300, GOVERNMENT- FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities, utilities, materials, and equipment for use in connection with this contract. Refer to J-0200000-05.

2.4.1 Government-

Furnished Facilities

(GFF)

The Government will furnish or make available to the Contractor the facilities described in J-0200000-05, and as identified throughout the contract document. The Contractor shall maintain all facilities, and all areas furnished for the performance of this contract in a clean, neat, orderly and sanitary condition.

If the Contractor wants to make any modifications or alterations to Government furnished facilities, the Contractor shall obtain written approval from the KO before beginning work. All modifications or alterations approved by the Government will be made at the expense of the Contractor.

At the completion or termination of the contract, all facilities shall be returned to the Government in the same condition as received, except for reasonable ware and tear and for approved modifications or alterations performed.

2.4.2 Government-

Furnished Utilities

The Government will furnish utility services as specified in NAVFAC Clause 5252.245-9300. “Government-Furnished Property, Materials, and services” clause, Section I.

2.4.2.1 Availability of

Utilities

The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor.

Information concerning the location of existing outlets may be secured from

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 11 of 40

0200000 - Management and Administration Spec Item Title Description the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and activity codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

2.4.3 Government-

Furnished Materials

(GFM)

A type of government property that is made available by the Government and accepted by the Contractor where this property is consumed or expended during the performance of the contract. Component parts or a higher assembly, or items that lose their individual identity through incorporation into an end-item are materials. Equipment, special tooling, and special test equipment are not considered materials.

2.4.4 Government-

Furnished Equipment (GFE)

A tangible asset made available by the Government and accepted by the Contractor where the asset is fundamentally complete for its intended purpose, durable, nonexpendable, needed for the performance of a contract, and does not lose its identity or become a component part of another article when put to use.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and PCB’s shall not be brought on site. The KO may at any time require Samples, Material Safety Data Sheets (MSDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards.

Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide a staff with the necessary management expertise to assure performance objectives and standards are met.

2.6.1 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and Work Status Reports shall be provided when requested by the KO. A written status report of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.2 Work Schedule The Contractor's work shall not interfere with normal Government business.

In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

2.6.3 Continuity of The services provided by this contract are vital to the Government and

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 12 of 40

0200000 - Management and Administration Spec Item Title Description

Services continuity must be maintained at a consistently high level without interruption. The Contractor is expected to meet full performance requirements from the start date of the contract. The Contractor shall furnish the KO a phase-in plan and a phase-out plan as evidence of the following requirements in accordance with the FAR Clause 52.237-3, Continuity of Services.

2.6.4 Service

Interruptions

If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.

2.6.5 Quality

Management System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

• Accurate documentation of work processes, procedures, and output measures.

• A systematic procedure for assessing compliance with performance objectives and standards.

• Accurate documentation of quality inspections conducted throughout the execution of work.

• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.5.1 Quality Control

Plan (QCP)

Within 15 calendar days after award of the contract, the Contractor shall submit to the KO a QCP. The QCP shall describe the QMS methodology and approaches used under this contract. Within seven calendar days of any change during period of performance, submit to the KO a revised QCP for acceptance.

2.6.5.2 QC Inspection The Contractor shall establish and maintain an inspection system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall maintain a file of all scheduled and performed QC inspections, inspection results, and dates and details of corrective and preventive actions. The file shall be the property of the Government and made available during the Government’s regular working hours. The QC Inspection File shall be turned over to the KO within five calendar days of completion/termination of the contract.

2.6.5.3 Contractor Quality

Control/Assessment Reports

The Contractor shall submit a copy of the Contractor Quality Control/Assessment Report to the KO monthly for the quality control events performed and assessment-driven corrective actions and process adjustments during the previous week. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

2.6.6 Property

Management Plan

The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4 of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. This Property Management Plan shall be submitted within 45 calendar days after award and shall consist of an original plus three copies of plan by the Contractor for Government’s acceptance.

2.6.7 Environmental

Management

The Contractor shall perform work under this contract consistent with the following EMS goals and policy.

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 13 of 40

0200000 - Management and Administration Spec Item Title Description

System (EMS) Goals:

• Reduce purchase and use of toxic and hazardous materials;

• Expand purchase of green products and services; increase recycling;

• Reduce energy and water use;

• Increase use of alternative fuels and renewable energy;

• Integrate green building concepts in major renovations and new construction;

• Prevent pollution at the source; and

• Continual improvement.

Policy:

• Protect public health and the environment by being an environmentally responsible member of the community;

• Preserve our natural, historic and cultural resources;

• Conserve natural resources by reducing what we discard, reusing items, and recycling materials, which includes purchasing products made from recycled materials;

• Integrate sound environmental practices into all our operations and business decisions; Integrate environmental protection requirements and pollution prevention initiatives into the early planning, design and procurement of facilities, equipment and material, as well as the planning and implementation of military training activities;

• Prevent or minimize pollution at its source as we seek out ways to eliminate or further minimize use of hazardous materials and generation of hazardous waste;

• Maintain a sound partnership with regulatory agencies to sustain our compliance with existing and new environmental laws and regulations;

• Enhance our program as we develop and implement an Environmental Management System; and

• Adhere to this policy, remind one another to do so, and ensure that our entire community knows this is our policy by our actions as well as our words.

The Contractor shall maintain monitoring and measurement information to address the EMS goals and policy and provide the EMS Goals and Policy Measurement Information to the KO when requested. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, the Contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall assume legal and financial liability for the noncompliance and take corrective action immediately to remedy the noncompliance. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the KO. The Contractor shall ensure that its employees are aware of their roles and responsibilities under the EMS and how these EMS roles and responsibilities affect work performed under the contract.

2.6.8 Use of Recovered

Materials

The Government has an affirmative procurement program to promote the purchase of products containing recovered materials. The intent is to reduce the solid waste stream and conserve natural resources by establishing markets for recycled content products and encouraging manufacturers to produce quality products containing recovered materials. Participate in this program by using, for Environmental Protection Agency (EPA) designated items, recovered materials to the maximum extent practicable without jeopardizing the intended end use of the item. The percentage of recovered

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 14 of 40

0200000 - Management and Administration Spec Item Title Description materials content levels for use in the performance of this contract will be, at a minimum, the amount recommended in the EPA Comprehensive Procurement Guideline (CPG) Product Index (website www.epa.gov./cpg/products). Use of EPA designated products is not required for products that are either not available within a reasonable period of time, are not available at a reasonable price, are not available from a sufficient number of sources to maintain a satisfactory level of competition, or fail to meet performance standards based on technical verification. EPA designation of products is an ongoing process. Listings of EPA designated products containing recovered materials are found in 40 CFR 247. Make recommendation and submit Recovered Material Certification, to the KO, when a product containing recovered materials is equal to or better than the original and could be used for this contract. All changes of products shall be accepted by the KO before it is used.

2.7 Personnel

Requirements

The Contractor shall comply with the personnel requirements stated below.

2.7.1 Key Personnel Within 15 calendar days after award of the contract, for other than qualification requirements required to be submitted with the offer, the Contractor shall submit to the KO a List of Key Personnel and Their Qualifications and any additional information requested by the KO to certify their qualifications.

Within 15 calendar days after award of the contract, the Contractor shall submit to the KO an Organizational Chart showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, QCM, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

2.7.1.1 Project Manager

(PM)

The Contractor shall provide a PM who has relevant experience at a comparable level of responsibility in projects of similar size, scope and complexity. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be available on-site within one hour during and after the Government’s regular working hours.

2.7.1.2 Quality Control

Manager (QCM)

The Contractor shall provide a QCM who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met. The QCM may be the same person as the project manager. The QCM or alternate shall be available on-site within one hour during and after the Government’s regular working hours.

2.7.1.3 Site Safety and

Health Officer

(SSHO)

The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract.

The SSHO or alternate shall be available on-site within one hour during and after the Government’s regular working hours.

The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

• The SSHO shall have completed three years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past.

• The SSHO shall have completed the OSHA 30-hour General Industry safety course or equivalent and maintain competency through 24 hours of formal safety and health related coursework

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 15 of 40

0200000 - Management and Administration Spec Item Title Description every four years.

• The SSHO shall have and maintain an average of at least 24 hours of safety training per year for the past three years.

• The SSHO shall meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project.

The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience.

2.7.2 Employee

Requirements

The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Competent personnel shall be provided as required. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.

2.7.2.1 Employee

Appearance

The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

2.7.2.2 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

2.7.2.3 Removal of

Employees

The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.

2.7.2.4 Proof of United

States of America Citizenship

No employee or representative of the Contractor will be admitted to the site of work unless satisfactory Proof of United States of America Citizenship is furnished. Dual citizenship is a disqualifying factor for Government security clearance eligibility.

2.7.3 Enterprise-wide

Contractor Manpower Reporting Application (eCMRA)

The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://doncmra.nmci.navy.mil.

Per Section F, reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

2.8 Security

Requirements

The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.

2.8.1 Employee Listing The Contractor shall maintain and provide upon request a current Employee List. The list shall include employee’s name, social security number, and level of security clearance.

2.8.2 Vehicles The company name shall be displayed on each of the Contractor’s vehicles in

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 16 of 40 https://doncmra.nmci.navy.mil/

0200000 - Management and Administration Spec Item Title Description a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.

2.8.3 Passes and Badges All Contractor employees shall obtain the required employee badge and vehicle passes. Each employee shall wear the badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within 10 calendar days.

2.8.4 Access to

Installation

All Contractor personnel shall obtain access to the installation by participating in the Navy Commercial Access Control System (NCACS) or by obtaining passes each day from the Base Pass and Identification Office.

Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge.

The Contractor shall furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.

2.8.4.1 Navy Commercial

Access Control System (NCACS)

NCACS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit.

The Government performs background screening and credentialing.

Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued NCACS participation and installation access privileges. Under the NCACS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON).

Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com/vendors/how-to-enroll or by calling 1- 877-727-4342. Contractors should be aware that the costs incurred to obtain NCACS credentials, or costs related to any means of access to a Navy Installation, are not reimbursable. Any time invested, or price(s) paid, for obtaining NCACS credentials will not be compensated in any way or approved as a direct cost of any contract with the Department of the Navy.

2.8.4.2 One-Day Passes Participation in the NCACS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the NCACS.

2.8.5 Access to Buildings The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas

N69450-14-R-7610 Amendment 0002 Local Guard Services Page 17 of 40

0200000 - Management and Administration Spec Item Title Description will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.

2.8.5.1 Access

Arrangements

The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.

2.8.5.2 Escort

Arrangement for Secured Areas

The Contractor shall make…