This document is a Questions and Answers (Q&A) file for a federal contract opportunity at Guantanamo Bay (GTMO), involving food service and related support services. Key details include: the contract is performance-based, with no site visit scheduled, and a 60-day period between contract award and performance start. The incumbent workforce consists entirely of third-country nationals (Jamaicans and Filipinos), with no US citizens. The contract is firm-fixed price, with 4 vehicles in use, and housing for contractors based on availability. Unique location-specific requirements include ocean freight from Jacksonville for contractor-furnished items, and potential housing overflow to be managed through NGIS. The Naval hospital will provide a Diet Therapy Technician, and the government emphasizes that staffing levels and specific resources are at contractor discretion. Potential offerors should review Section L & M of the RFP for evaluation criteria, and a new Performance Work Statement (PWS) has been uploaded to address previous inconsistencies.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Will there be a site visit scheduled for GTMO?
A: There will not be a site visit. The Government is working to determine an alternative to help contractors visualize the space and requirements. If and when this is determined, that information will be provided in an amendment to the solicitation.
2. Ocean Freight: How should we estimate the bi-monthly sea barge costs from Jacksonville for contractor-furnished items like uniforms and specialized cleaning gear? (PWS 3.8)
A: This is handled directly between the Contractor and the barge operator.
USTRANSCOM has a new process in place for cost estimates:
https://www.ustranscom.mil/common/transportation-estimate.cfm?menuPrimary=db
1. Click on the link provided.
2. Click on Doing Business with USTRANSCOM
3. Click on Transportation Cost Estimate on your right top screen – This will bring you to Request a Validated Transportation Estimate.
4. Please select Customer Type from the dropdown menu
5. Fill in the fields marked with an * and then at the bottom of the page select Request Estimate.
You can also email the cost estimate team at: transcom.scott.tcj8.mbx.cost-estimates@mail.mil
3. Are there Service Contract Act wage determinations applicable?
A: The Service Contract Act does not apply overseas. As this service is to be performed in Cuba, no wage determinations apply.
4. What percentage of the incumbent workforce are US Citizens and third country nationals?
A: No US Citizens; all third country nationals. (Jamaicans and Filipinos).
5. Are there minimum wage expectations?
A: There are no minimum wage expectations.
6. What is the average staff turnover rate?
A: No turnover rate.
7. What is the current staffing by position and location?
A: This is a performance-based contract. The Government does not dictate staffing;
this is up to Contractor determination.
8. What staffing levels are required during migrant surge and Southern Guard escalation?
A: This is a performance-based contract. The Government does not dictate staffing;
this is up to Contractor determination.
9. Will there be a formal phase-in period?
A: 60 days between contract award and start of performance.
10. Are housing units guaranteed or based on availability?
A: Availability. Please refer to PWS 4.10.
11. What happens if contractor housing capacity is exceeded?
A: Put up in NGIS.
12. How many vehicles are in use?
A: 4 vehicles.
13. Are price adjustments allowed for wage inflation, medical cost increases, and labor sourcing disruptions?
A: This is a firm-fixed price contract, so all price adjustments should be addressed in the proposal.
14. Could you please verify if the OCN (Other Country Nationals) working on base are brokered through the Navy or through a 3rd party personnel management company?
A: The Navy does not handle Contractor staffing.
15. If the current food service employees (whether they are US citizens or Other Country Nationals) are hired through a broker, could you please provide the name and the contact information of the broker?
A: See answer to Question 14.
16. Is there a phase-in period?
A: See answer to Question 9.
17. Will you provide a separate CLIN for management and other fixed costs of Other Direct Costs that will incur for the overall management of the contract?
A: The CLINs included in the SF1449 are the only CLINs considered.
18. Are Diet Therapy Technicians required to be on-site full-time positions?
A: No, the Naval hospital has one on staff.
19. Can the Government comment on its satisfaction with the incumbent contractor's performance under the current contract?
A: The Government cannot share that information.
20. Are there any material performance gaps, challenges, or areas of improvement the Government is seeking to address in this recompete?
A: The Government’s requirements are addressed in the PWS.
21. Is the Government primarily seeking continuity of current operations, or is it open to alternative approaches that materially change how services are delivered?
A: The Government’s requirements are addressed in the PWS.
22. How will the Government assess transition risk, especially for a non-incumbent offeror?
A: Evaluation criteria are outlined in Section M of the RFP.
23. Are there any incumbent-specific resources, personnel, or systems that offerors should assume will not be available post-award?
A: Resources available to all offerors are addressed in the PWS.
24. What, if anything, would a new offeror need to demonstrate to be viewed as a low-risk alternative to the incumbent?
A: All instructions and evaluation criteria are outlined in Section L & M of the RFP.
25. Given that the contract incumbent has been providing services for 10 years and has an established working relationship with the Government, what is the likelihood that the Government will consider new vendors for this solicitation?
A: All offerors will be evaluated in accordance with the RFP.
26. In the event that an amendment or amendments are issued where would the government like signed amendments to be included in the proposal?
A: Please sign and return amendments along with the signed proposal (SF1449).
27. Will the Government be posting Attachment 2- Pricing Spreadsheet? Currently the only Attachment 2 posted on Sam.gov is 2.04b_Attach_2_Menu_Guidelines.pdf.
A: Reference to a pricing sheet has been removed. The only pricing required is to be completed under RFP Section B – Supplies or Services & Prices or Costs.
28. Can the government please clarify when the offeror is to provide the Quality Control Plan?
The information in the RPF and PWS are conflicting. The RFP is requiring a Quality Control Plan in the Technical Capability Volume. However, the PWS clearly states the Quality Control plan shall be submitted no later than 5 business days from award.
A: Please refer to the updated PWS now uploaded in SAM fixing this inconsistency.
Please thoroughly review this new PWS (2.04i_Attach_9_PWS_FINAL) as this was intended to be uploaded initially.
29. Will the USG allow a 30-day minimum transition period before the first day of full performance under this contract?
A: Please see answer to Question 9 above.
30. Will the government amend VOLUME I: TECHNICAL CAPABILITY to include a Transition Plan technical subfactor for evaluation?
A: No.
31. Will the USG allow another question-and-answer period after the site visit?
A: This will be taken under consideration.