This document is Amendment 0003 to solicitation N6852026Q1024, issued by the Fleet Readiness Center Southeast (FRCSE) at Naval Air Station Jacksonville on May 22, 2026. The amendment extends the response due date from May 28, 2026 to June 4, 2026, adds a new CLIN 0002 for contract data requirements, revises Statement of Work paragraphs 3.5-3.8 and adds paragraphs 3.9-3.10, updates the period of performance, and attaches a Draft Exhibit A.

The solicitation requires comprehensive hazardous materials disposal services for approximately 782 compressed gas cylinders of various types and sizes currently stored at FRCSE. The contractor must perform an initial on-site assessment, characterize and identify unknown cylinder contents through analytical testing or "Generator Knowledge" methodology, prepare cylinders for DOT-compliant transport, and arrange proper disposal or reclamation at permitted Treatment, Storage, and Disposal Facilities (TSDs) or certified reclamation facilities. Work must be completed between June 18 and September 30, 2026. The contractor bears responsibility for all labor, materials, tools, equipment, transportation, and supervision. Deliverables include an initial assessment inventory within 7 calendar days and a comprehensive final technical report within 45 calendar days, with copies of signed disposal manifests and certificates of disposal provided to the Technical Point of Contact. The evaluation criteria emphasize price (fixed unit pricing per cylinder with testing and complete disposal inclusive of all costs) and technical capability, with proposals requiring detailed methodology addressing cylinder removal and transportation, identification and disposal procedures, regulatory compliance with federal (OSHA, EPA, DOT, HAZWOPER) and state/local standards, and a detailed project timeline. CLIN 0001 covers the primary removal and disposal services with performance from June 18 to September 30, 2026, while CLIN 0002 addresses contract data requirements. The facility point of contact is Stephanie Bunnell at (904) 790-4841 or stephanie.bunnell.civ@us.navy.mil.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): Amendment 0003:

The purpose of this Amendment is to:

1. Extend the response due date.

2. Add Not Separately Priced Data CLIN 0002.

3. Revise the Statement of Work paragraphs 3.5-3.8, add paragraph 3.9-3.10.

4. Update Period of Performance.

5. Revise Addendum to 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services.

6. Attach Draft Exhibit A.

Solicitation/Contract Form Continuation

The following changes have been made:

INFORMATION FROM TO

Response Due Date 28 May 2026 04 Jun 2026

N6852026Q10240003

Continuation of Supplies or Services and Prices/Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were added:

Item Supplies / Services Quantity Unit Unit Price Amount

DataRequired by Exhibit A, DD1423 Contract Data Requirements List Product Service Code: F108 Pricing Arrangement: Firm Fixed Price

1 Lot

Continuation of Description

Miscellaneous text in this section has been modified to:

1 Scope & Requirement Background

1.1 Scope: FRCSE is required to maintain the safety and compliance regulations set by state and federal guidelines. The Contractor shall remove the cylinders, test them for constituents, and properly dispose of the cylinders.

1.2 Background. Part of compliance entails managing hazardous materials containers and hazardous waste containers until their transport to the appropriate disposal site. The current site for emptied/spent cylinders and needs to have a full removal of the cylinders.

Removal will also require testing of some of the unknown cylinders to ensure proper disposal. The Contractor shall be responsible for all labor, materials, tools, and equipment required.

2 Applicable Documents

2.1 FRCSE Work Restrictions (Enclosure (1))

2.2 OPNAVINST 5100.23 Navy Safety and Occupational Health Manual, Chapter 7 Hazardous Material Control and Management

2.3 OPNAVM 5090.1 Environmental Readiness Program Manual, Chapter 23 Hazardous Materials Management Ashore, Chapter 27 Hazardous Waste Management Ashore

2.4 29 CFR 1910.120 Subpart H - Hazardous Materials

2.5 29 CFR 1910.120 Hazardous Waste Operations and Emergency Response (HAZWOPER)

2.6 29 CFR 1910.1200 Hazard Communication Standard (HCS) (HAZCOM)

2.7 29 CFR 1910 Subpart Z - Toxic and Hazardous Substances

2.8 29 CFR 1910.134 - Respiratory Protection

2.9 29 CFR 1910.38 - Emergency Action Plans

2.10 40 CFR Part 260 - Hazardous Waste Management System: General

2.11 40 CFR Part 261 - Identification and Listing of Hazardous Waste

2.12 40 CFR Part 262 - Standards Applicable to Generators of Hazardous Waste

2.13 40 CFR Part 263 - Standards Applicable to Transporters of Hazardous Waste

2.14 40 CFR Part 264/265 - Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

2.15 40 CFR Part 268 - Land Disposal Restrictions

2.16 49 CFR 173.301 General requirements for shipment of compressed gases and other hazardous materials in cylinders, UN pressure receptacles, and spherical pressure vessels.

3 Contract Requirements

All work shall be performed on site at FRCSE. The following table lists cylinder types accounted for:

Cylinder Types Size Qty

Acetylene Large 5

Air Large 3

Argon Large 59

Argon Small 5

Cal Gas(Hydrogen Sulfide ppm in Air) 2.2 Lecture 4

Carbon Dioxide Large 4

Carbon Dioxide in Argon Large 28

Carbon Dioxide in Helium Large 11

Carbon Monoxide ppm in Air Large 2

Empty Cylinder Small 2

Empty Nitrogen (No Valve) Large 1

Helium Large 32

Helium 10% in Nitrogen Large 6

Hydrogen Large 58

Hydrogen Chloride in Neon 2.2 Med 4

Hydrogen in Nitrogen 2.2 Large 1

MAPP Gas Med 1

Methane 10% in Argon 2.2 Large 2

Methane in Air 2.2 Med 1

Nitrogen Large 142

Nitrogen Small 19

Nitrogen Med 2

Nitrous Oxide Large 1

Oxygen Large 39

Oxygen Small 23

Oxygen in Nitrogen 2.2 Large 2

R-134a Grill 1

R-23 Med 7

R-407C Grill 3

Sus. Ammonia Small 1

Sus. Carbon Dioxide Med 7

Sus. Nitrogen Large 128

Sus. Nitrogen Med 1

Sus. Propane (1/2 Full) Large 4

UNK. 2.2 Med 143

3.1 The Contractor shall provide all labor, supervision, transportation, vehicles, supplies, test equipment, materials, and tools required to perform work under this contract.

3.2 The Contractor shall do an initial assessment of all cylinders present onsite, including quantity, labeling, and condition.

3.3 The Contractor shall prepare cylinders for transport and ensure all cylinders are properly labeled and compliant with Department of Transportation (DOT) guidelines for transport over roadways.

3.4 The Contractor shall identify and document all cylinder materials with OSHAs Hazard Communication Standard (29 CFR 1910.1200) and other relevant regulatory guidelines.

3.5 The Contractor shall characterize and identify the contents of all unknown compressed gas cylinders. Analytical testing is the preferred method for characterizing unknown compressed gas cylinders. However, the Contractor may perform a hazardous waste determination using "Generator Knowledge" (pursuant to 40 CFR 262.11) if the cylinder's contents can be definitively identified through physical characteristics--such as markings, valve types, or Compressed Gas Association (CGA) connections--and the Contractor's professional expertise. Any determination made via Generator Knowledge shall be documented with written justification to ensure a compliant administrative record for disposal. Following positive identification, the Contractor shall ensure all cylinders are labeled appropriately in accordance with applicable federal and safety standards.

3.6 The Contractor shall manage the transport, reclamation, or disposal of all characterized cylinders in strict accordance with federal, state, and local regulations.

3.6.1 If the cylinder contents, or the physical cylinder itself (whether full, partially full, or empty), are designated for recycling or reclamation, the Contractor shall transport the materials to a certified reclamation facility. The Contractor shall maintain and provide full tracking documentation to the Technical Point of Contact (TPOC) to verify the receipt and processing of the cylinders at the reclamation facility.

3.6.2 If the material, gas, or physical cylinder cannot be reclaimed and is designated as waste, the Contractor shall transport the cylinders to a permitted Treatment, Storage, and Disposal Facility (TSDF). The Contractor shall provide a copy of the final, signed disposal manifest to the TPOC within 45 calendar days of shipment.

3.7 The Contractor shall provide a Technical Report - Study/Services (CDRL A001) via email to the Technical Point of Contact (TPOC). The reporting requirements shall be executed in two distinct phases as outlined below:

3.7.1 Initial Assessment Inventory: Within 7 calendar days of completing the on-site visit, the Contractor shall provide a comprehensive list of all cylinders found on-site. This tracking list must specify the exact quantity, structural/physical condition, known markings, and a separate count identifying the suspected unknown cylinders (per Section 3.2).

3.7.2 Final Characterization and Technical Report: Within 45 calendar days of completing the on-site visit, the Contractor shall deliver the final, comprehensive technical report. This report must consolidate all final project data, to include:

- Documentation confirming that all cylinders have been packaged, labeled, and prepared in accordance with DOT roadway guidelines (per Section 3.3) and OSHA Hazard Communication Standards (per Section 3.4).

- For known cylinders, formal documentation of identity.

- For unknown compressed gas cylinders, a detailed summary of the analytical testing results used to characterize the contents (per Section 3.5).

- Where "Generator Knowledge" (40 CFR 262.11) was utilized instead of analytical testing, the formal, written justification detailing the specific physical characteristics (e.g., valve types, markings, CGA connections) and professional expertise relied upon to establish the administrative record (per Section 3.5).

- A clear designation of the final path for each cylinder, categorized by those slated for recycling/reclamation (per Section 3.6.1) versus those designated as waste for TSDF transport (per Section 3.6.2).

3.8 The Contractor shall prepare documentation for each cylinder including the manifest, waste profile, and certificate of disposal /Land Disposal Restrictions (LDR), per 40 CFR Part 262. These manifests must be signed by the Public Works Department before leaving the Station and utilize EPA ID number FL6170024412. Final signed copies of manifests and certificates of disposal /reclamation must be provided to the TPOC immediately upon receipt from the receiving facility, not to exceed the timeline specified in Section 3.6.2.

3.9 The Contractor shall not proceed with any additional work or invoice any parts or services to the Government outside of the scope of this contract without an approved contract modification issued by the Contracting Officer.

3.10 The Government will review any reports and quotes generated by the Contractor and decide whether to approve any additional parts or services.

Enclosure (1) - FRCSE Work Restrictions

1. GENERAL

1.1. This attachment covers the most common work restrictions for contractors working at Fleet Readiness Center Southeast (FRCSE) facilities. The contractor shall obtain the necessary passes and/or identification for entry into Naval Air Station (NAS) Jacksonville and FRCSE for all employees prior to commencement of work.

2. CONTRACTOR ACCESS AND USE OF PREMISES

2.1. NAS Jacksonville Base Regulations

2.1.1. Each contractor must identify itself as either a U.S.-owned or a Foreign Owned, Controlled or Influenced (FOCI) entity.

2.1.1.1. A company is considered to be a FOCI entity when a foreign interest has the power, either direct or indirect, whether or not exercised, to direct or decide matters affecting the management or operations of the company in a manner which may result in unauthorized access to classified information or may adversely affect the performance of a classified contract. A FOCI entity must contact the Technical Point of Contact (TPOC) or Contracting Officer's Representative (COR) within 5 days of contract award to begin paperwork necessary to obtain base access in a timely manner. A non-U.S. citizen employed by a FOCI entity is considered a foreign national of the foreign interest's country. A U.S. citizen employed by FOCI entity is considered a foreign representative of the foreign interest's country, but access will be managed the same as a foreign national.

2.1.2. The contractor shall be responsible for securing the necessary permits and base access passes for contractor personnel through a request to the sponsoring organizations Command Sponsorship Liaison (CSL) for vehicles, and equipment for the duration of the contract. NAS Jacksonville Security Forces reserve the right to refuse to issue a pass to an employee of the contractor for any reason deemed valid by the Government.

2.1.2.1. Non-U.S. citizen personnel of a FOCI entity will be required to provide the CSL a Request for Foreign National Visits form to approve and forward to NAS Jacksonville Pass and ID Office located at the Main Gate on Yorktown Ave. The information provided must contain valid vehicle registration, proof of insurance, driver's license, and a passport in order to obtain a pass for entry onto the NAS, Jacksonville.

2.1.2.2. U.S. Citizen Personnel of a FOCI entity will be required to provide the NAS Jacksonville Pass and ID Office Security with vehicle registration, proof of insurance, driver's license, and second form of picture ID.

2.1.2.3. U.S.-owned company personnel will be required to provide the NAS Jacksonville Pass and ID Office with vehicle registration, proof of insurance, and driver's license.

2.1.2.4. The contractor shall submit Base Access Request Forms (provided by the TPOC/COR) for all contractor and subcontractor personnel, equipment and vehicles to the TPOC/COR or FRCSE Security, complete and in a timely manner, no less than 5 workdays prior to actual visit.

2.1.3. Flight Line Access: Unless stated in the main body of the Statement of Work, flight line access will not be granted for the contract. Contractor personnel shall not, under any circumstances, enter the flight line without authorization, nor shall they solicit FRCSE personnel for tours. Personnel found on the flight line without valid credentials maybe detained by NAS Jacksonville security personnel and will be permanently denied further access to FRCSE and NAS Jacksonville property. The contractor shall report any such violations to the FRCSE TPOC immediately. There will be no exceptions made to this requirement.

2.1.4. Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry control point.

2.1.5. To obtain DBIDS credentials present a letter or official document to my government sponsoring organization that provides the purpose for your access, list of active employees, and beginning and end dates of contract. Provide a completed copy of the SECNAV 5512/1 form to the sponsoring organization along with a completed DBIDS Company Enrollment form to obtain your background check.

The sponsoring organization will submit DBIDS Enrollment form and SECNAV 5512/1 to the installation VCC for approval. Present valid identification, such as a passport or Real ID Act-compliant state driver's license. Upon completion of the background check and submission of the DBIDS Enrollment form the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential. You may now proceed to work.

2.1.6. For additional questions about obtaining a DBIDS card, contact your local base visitor control center.

2.1.7. Truck deliveries to NAS Jacksonville

2.1.7.1. Are limited to the commercial gate north of Yorktown Avenue on US 17 (Roosevelt Boulevard). To minimize traffic congestion, delivery of materials shall be outside of peak traffic hours (0500-1400 for VCC at Bldg. 1004 and 1400-1600 Bldg. 9 Main Yorktown Gate).

2.1.7.2. In order to ensure there are no delays in material delivery, manifests shall bear the contract number, FRCSE Building number, and the FRCSE TPOC name and telephone number, and the contractors name and phone numbers.

2.2. FRCSE Complex Regulations

2.2.1. Contractors shall ensure contractor personnel employed on the FRCSE complex become familiar with and obey all regulations.

2.2.2. Contractor's Access

2.2.2.1. The contractor's company must submit an FRCSE Visit Access Request 5 days in advance of the visit, FRCSE 5500/17, through the Security Operations Division Office email address jaxs_security@navy.mil. This form is reviewed, approved, and entered into AMAG, making the requesting employee eligible for a temporary NAS JAX Gate Access Pass.

2.2.2.2. The FRCSE Visit Access Request, FRCSE 5500/17, is submitted for each visit to FRCSE and will indicate the number of days required for facilitating the conduct of business at FRCSE, not to exceed 30 days. If a visit exceeds 30 days, an updated FRCSE Visit Access Request, FRCSE 5500/17, must be submitted at least 5 days before the request expires. Failure to do so will delay the individuals' access to the station, as these forms are processed in the order received. (Emergent requirements are handled on a case-by-case basis, depending upon the needs of FRCSE.)

2.2.2.3. Long-term (more than 30 days) contractor personnel must compose a request on company letterhead stationery. For information required to be on the request, contact your FRCSE TPOC/COR.

2.2.2.4. No personnel shall be permitted inside the FRCSE complex that has been previously denied an access badge to any Department of Defense facility, entity, or organization.

2.2.2.5. Personnel who do not maintain a valid FRCSE contractor's badge will not be permitted inside the FRCSE complex.

2.2.2.6. Immediately report instances of lost or stolen badges to the FRCSE Badging office ( or call (904)jaxs_security@navy.mil -790-5803). Upon completion of the contract and/or termination of the service of any employee, the contractor shall return the badges to the FRCSE Badging office. Compliance with this requirement is mandatory.

2.2.3. Vehicle Access Fenced portions of FRCSE Complex require contractor's to obtain a vehicle access pass. The pass may be Pass:

obtained from the FRCSE Badging Office. Passes will be strictly limited to business vehicles only that are plainly marked with the name, address, and telephone number of the business. Personal Owned Vehicles will not be permitted inside the FRCSE complex for any reason. All personnel who request a vehicle pass must have a valid driver's license.

2.2.4. Contractor personnel will not be permitted to enter FRCSE buildings, spaces, and areas not covered by this contract except without prior approval of the FRCSE Security Office. Coordinate action with the FRCSE TPOC/COR to obtain such entry approval.

2.2.5. Restrict employees/representatives to the work site and control travel directly to and from the work site. Do not enter any restricted areas unless required to do so and until cleared for such entry, keeping within the limits of the work area and avenues of ingress and egress.

2.2.6. Restore all traffic/parking/security signs and markings, including space numbers, designations, and lines, to their original form if such signs/markings are defaced or deleted during repair.

2.2.7. If the building cannot be secured at the end of the workday, coordinate action with the FRCSE Quarter Deck at (904)790-5500 and the FRCSE TPOC to notify the cognizant code to arrange for a security watch. Notification should be provided with sufficient time to arrange for a security watch and limit a non-secure condition to the minimum time possible.

2.2.8. Alcohol, drugs, and weapons are prohibited on site. Any person suspected of being under the influence of drugs or alcohol or found carrying any weapon will be promptly removed from the job site; their access badge will be confiscated. Personnel may also be permanently prohibited from entry to NAS Jacksonville and FRCSE property if any of these items are found in their possession.

Failure to comply with this requirement may also result in detainment by NAS Jacksonville security personnel. The FRCSE POC will not intercede for the contractor or contractor personnel on their behalf for any violation of this requirement.

2.2.9. Smoking is not permitted inside government buildings. All personnel shall smoke only in designated smoking areas. Failure to comply may result in reprimand or denial of access to the FRCSE complex..

2.2.10. Working Hours

2.2.10.1. Standard working hours normally consist of an 8-1/2 hour period between 6 a.m. and 2:30 p.m., Monday through Friday (Eastern Time), excluding federal holidays.

2.2.10.2. The contractor shall conduct operations so as to cause the least possible interference with normal operations of the activity, and shall coordinate his work with supervisors and other shop personnel in the affected area so as to minimize disruption to production.

2.2.10.3. Any work involving asbestos removal and/or possible disturbance should be scheduled on a Saturday/Sunday or second /third shift and coordinated through the FRCSE TPOC/COR with the FRCSE's facility Asbestos Program Manager.

2.2.10.4. Work outside regular working hours requires coordination by the FRCSE POC and may also require Contracting Officer approval. Make request 15 calendar days prior to such work to allow arrangements to be made by the Government for coordinating and inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.

During periods of darkness, the different parts of the work shall be lighted in a manner approved by the FRCSE TPOC.

2.2.11. Environmental

2.2.11.1. FRCSE Environmental Guide Spec should be included with SOW but can be provided by FRCSE TPOC/COR. Guide spec is an overall guide for all environmental considerations as they pertain to this project at the FRCSE.

2.2.11.2. The contractor shall comply with all federal, state, and local environmental regulations throughout the course of the contract. The contractor shall ensure that their employees are adequately trained to ensure compliance while working on NAS Jacksonville for the FRCSE.

2.2.12. Utility Cutovers and Interruptions

2.2.12.1. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

2.2.12.2. All utility outages that do not require securing base services (high voltage systems, water/sewer, base compressed air or steam) shall be requested not less than 15 working days in advance from the FRCSE TPOC/COR. Small outages, such as individual lighting circuits, may be coordinated locally with the shop supervisor responsible for the work area.

N6852026Q10240003 mailto:jaxs_security@navy.mil

2.2.12.3. Utility outages that require securing base services shall be coordinated with the FRCSE TPOC

2.2.12.4. Approvals of outages are dependent on FRCSE production requirements, and may be denied or cancelled at any time.

2.2.12.5. For operation of station utilities the contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, or steam. The Government will operate the control devices as required for normal conduct of work. The contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.

2.2.13.

2.2.13.1. Cellular phones with cameras shall not be operated in camera, video or audio capture mode, to include video-telecommunications, within the FRCSE compound area or FRCSE buildings. Cellular phones are not authorized for any telecommunications in and around aircraft in hangar and industrial spaces, or where otherwise posted. All photographic and videography imagery and audio captured shall be provided to the FRCSE Information Security office for review prior to the device, imagery or data being removed from the FRCSE premises. FRCSE ID Application and Acceptance FRCSE 5500/25, is documentation providing confirmation the cell phone user will not utilize the camera function on the cellphone within or in the vicinity of the FRCSE facilities.

2.2.13.2. Laptop, tablet and other handheld computer or computing devices shall be approved in writing by the FRCSE Information security office and vetted through the FRCSE Information Systems Security Manager prior to the device being brought into FRCSE spaces.

2.2.13.3. Electronic devices shall not be introduced to, or used in, Secure Areas, Restricted Access Areas or Controlled Access Areas while classified materials, information or operations are present.

2.2.13.4. Anyone violating this policy is subject to device confiscation.

2.2.13.5. Electronic devices confiscated may be sanitized or processed for destruction at the discretion of the Commanding Officer.

2.2.14. Tool and Material Controls:

2.2.14.1. The FRCSE complex is a constrained working area where aircraft and components are open and exposed. The contractor shall take steps to ensure no tools or materials come in contact with equipment, aircraft or aircraft components. The contractor shall also ensure no tools or materials are left in the building.

2.2.14.2. The contractor shall limit the amount of material stored on-site. Material shall be brought to the job site in amounts sufficient to perform the work on a daily basis. The contractor shall remove demolished materials from the job site at the end of the workday and shall not store demolished materials at the lay-down area for more than one week.

2.2.14.3. All unused material shall be removed from the work site and stored in the lay-down area or contractor's shop at the end of the workday. All equipment shall be conspicuously marked for identification.

2.2.14.4. The contractor shall take special precautions when working around the aircraft and components. All tools shall be secured to the lift or person by a lanyard. The contractor shall ensure the space below his working area is covered or protected from damage by falling tools or materials. If a falling object strikes any aircraft or components the worker shall notify the nearest shop person immediately. Failure to notify shop personnel shall be grounds for permanent removal of the worker from the job site. There will be no exceptions.

2.2.14.5. When working within an aircraft line, contractor personnel shall check in with the local Quality Assurance personnel for inventory of tools to be used. Coordinated through your contract TPOC/COR.

2.2.14.6. All tools used on the job shall be marked with the name of the owner or the company. All tools shall be controlled by the worker and shall not be left unattended in the building at any time. Contractor supervisory personnel shall remind the workforce DAILY of this requirement and shall enforce the requirement for the duration of the job. All tools left unattended will be confiscated by shop personnel or by the FRCSE TPOC/COR. Unmarked tools will be returned to the contractor at the end of the workday.

2.2.15. Cleanliness Controls

2.2.15.1. All work shall be performed in a neat and orderly manner. Workspace cleanup shall be mandatory before, during and at the close of the workday for the entire duration of the contract. The contractor shall ensure the job site is clean and free from debris and foreign materials at all times.

2.2.15.2. The contractor shall perform a walk down of the area at the close of each workday to verify the area is clean and that all surplus material is removed from the building.

3. OPERATIONS SECURITY (OPSEC):

3.1 The Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of controlled unclassified information and to control distribution of controlled unclassified information in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), and SECNAV M-5510.36. All Contractor facilities shall provide an appropriate means of storage for controlled unclassified information and materials. All controlled unclassified information shall be appropriately identified and marked as For Official Use Only in accordance with DoDM 5200.01, Information Security Program: Controlled Unclassified Information (CUI) Volume 4 (enclosure 3).

3.2 The Contractor shall develop, implement, and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. This program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Decision Directive (NSDD) 298, and at a minimum shall include:

1) Assignment of responsibility for OPSEC direction and implementation.

2) Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.

3) Establishment of OPSEC education and awareness training.

4) Provisions for management, annual review, and evaluation of OPSEC programs.

5) Flow down of OPSEC requirements to subcontractors when applicable.

3.3 While performing aboard NAVAIR or NAVAIR sites, the contractor shall comply with facility OPSEC program instructions and contribute to organization-level OPSEC efforts. Include OPSEC as part of its ongoing security awareness program and take all required Agency training. Be responsive to the Supporting OPSEC Manager on a non-interference basis. Protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the RO and contractor in support of the mission.

4. JOINT BASE OPERATING SUPPORT (JBOS) CONTRACTOR:

4.1 The JBOS contractor is retained by the Government to perform certain facility maintenance support services.

Many FRCSE equipment projects require some interface and coordination with the JBOS contractor for utility or other services. The contractor shall coordinate with the FRCSE TPOC/COR for services available from the JBOS contractor.

4.2 The contractor shall not assume the JBOS contractor is available for non-reimbursable work for bidding, planning, production, or modification purposes. Any arrangements with JBOS contractor personnel for work associated with this contract shall be strictly the fiscal responsibility of the contractor and will not be assumed by the FRCSE or by any other government entity, and may not be added to the contract for reimbursement.

4.3 Services Expressly the Responsibility of the JBOS contractor: The JBOS contractor is responsible for fire alarm services, utility services and outage coordination, facility maintenance and repair, equipment maintenance and repair, and grounds maintenance. The contractor shall coordinate all work with the JBOS contractor through the FRCSE TPOC where such work is to be performed on equipment or facilities that are the responsibility of the JBOS contractor.

Continuation of Inspection and Acceptance

The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN(s) were added:

Inspection and Acceptance Location - N65886 - FLEET READINESS CENTER SOUTHEAST

INFORMATION VALUE

Action Both Location Destination

Acceptance Location

N65886

FLEET READINESS CENTER SOUTHEAST

BLDG 101 NADEP N65886, NAVAL AIR STATION

JACKSONVILLE, FL 32212-0016

UNITED STATES

Instructions Inspection and acceptance in accordance with the SOW.

POC Name Stephanie Bunnell POC Email stephanie.bunnell.civ@us.navy.mil POC Telephone (904) 790-4841

Continuation of Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were added:

INFORMATION VALUE

Period of Performance 18 Jun 2026 to 30 Sep 2026

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Period of Performance 15 May 2026 to 30 Sep 2026 18 Jun 2026 to 30 Sep 2026

List of Contract Documents, Exhibits, or Attachments

The following attachments were added:

Exhibit A Draft CDRL

Addendum to 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services

Miscellaneous text in this section has been modified to:

This addendum provides specific instructions for preparing and submitting proposals in response to this solicitation. All proposals shall be based on the requirements outlined in the Statement of Work (SOW).

A. FACTORS FOR AWARD

The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Factor 1: Price

Offerors shall propose a fixed unit price for the testing (as required) and complete disposal of each cylinder. The price shall be inclusive of all labor, materials, tools, equipment, supervision, and transportation required to perform the work described in the SOW. Pricing should be based on the cylinder types and quantities listed in the SOW.

Factor 2: Technical Proposal

The technical proposal shall demonstrate the offeror's understanding of and capability to meet the requirements of the SOW. All pricing information must be excluded from the technical proposal and provided separately. The proposal must include a comprehensive plan detailing the disposal of all cylinders listed in the SOW.

The plan must address all applicable safety, environmental, and regulatory compliance standards as outlined in the SOW and, at a minimum, include the following sections:

1. Cylinder Removal and Transportation:

a. A detailed methodology for the initial on-site assessment, preparation, and removal of all cylinders from FRCSE.

b. Procedures for preparing cylinders for transport, ensuring proper labeling and compliance with all Department of Transportation (DOT) shipping regulations (e.g., 49 CFR 173.301).

2. Cylinder Identification and Disposal:

a. A description of the methods and procedures that will be used to test and identify the contents of all unknown and suspected-material cylinders. This description must address both analytical testing and, if proposed, the use of "Generator Knowledge" as detailed in SOW paragraph 3.5. If using Generator Knowledge, the offeror must describe their methodology for providing the required written justification.

b. The name(s) and location(s) of the permitted treatment, storage, and disposal facility (TSDF) and/or reclamation facility that may be used.

c. A description of the final disposal or reclamation procedures for each category of cylinder/material.

3. Regulatory Compliance and Documentation:

a. A summary of how the offeror will ensure compliance with all applicable federal, state, and local regulations listed in the SOW, including but not limited to OSHA (29 CFR), EPA (40 CFR), and DOT (49 CFR) standards.

b. A plan for preparing and managing all required documentation, including waste profiles, manifests, Land Disposal Restriction (LDR) forms, and certificates of disposal, in accordance with 40 CFR Part 262. The plan must acknowledge the requirement for the Public Works Department to sign manifests using EPA ID FL6170024412 before transport.

4. Project Timeline:

a. A projected detailed timeline for the entire project, from the initial site assessment to the delivery of the final certificate of disposal or reclamation to FRCSE.

All pricing information must be excluded from the technical proposal and provided separately.

IDCode: J
Page: 1
Pages: 16
AmendNo: 0003
EffDate: 22 May 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N68520
AdmCode:
IssuedBy: FLEET READINESS CENTER

ATTN CHIEF OF STAFF, 47038 MCLEOD ROAD, BLDG 448

PATUXENT RIVER, MD 20670

UNITED STATES

Massoud Koleini, Email: massoud.m.koleini.mil@us.navy.mil Telephone: 2408089986 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N6852026Q1024
SolDate: 13 Apr 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Continuation
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Beverley S. Rhamdeow
ContDate:
CODate: 22 May 2026

File details come from the government source that posted it. Updated .