Amendment 3 MRO RFP 0029 Final.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Request for Proposal - Maintenance, Repair, Overhaul, and Logistics Support for Fleet Readiness Center, Aviation Support Equipment
Solicitation number
N6852022R0029
Issued by

About this file

This solicitation requests proposals for a maintenance, repair, overhaul, and logistics support contract to be awarded by the Commander Fleet Readiness Center Aviation Support Equipment. The Navy seeks these services for a base period of three years with one six-month option period. Eligible vendors must be 8(a) small businesses. Questions are due by November 15th and proposals are due by December 5th. The incumbent is Amentum Services, LLC. The solicitation specifies maintenance and logistical support for aviation ground support equipment at multiple Navy sites. Offerors should price required labor categories and hours at each location according to the attachments. The Navy will award a single-source IDIQ contract for these services in the third quarter of fiscal year 2023.

View the file

Other files

File Type Posted
RFP Question Clarification N6852022R0029 v02.xlsx XLSX spreadsheet
MRO Amendment 4 Questions Final.xlsx XLSX spreadsheet
AWD 15-5607 ELCEN.txt TXT text file
AWD 15-5635 NBC.txt TXT text file
Amendment 4 Conform.docx DOCX document
Amendment 4 Modification.docx DOCX document
Amendment 3 N6852022R0029 RFP.docx DOCX document
Attachment 13 - LOE Chart B-1 Vol 1 FBL Amended.xlsx XLSX spreadsheet
Attachment 16 - FRCASE QASP Amended.docx DOCX document
Amendment 3 N6852022R0029 RFP Modification.docx DOCX document
Copy of Industry Feedback_Final RFP ASE Working Copy v04.xlsx XLSX spreadsheet
15-4341 AWD CHT.txt TXT text file
15-4539 AWD BIC.txt TXT text file
15-4281 AWD SOLM.txt TXT text file
15-5189 AWD NOLA.txt TXT text file
15-5535 AWD EVRT.txt TXT text file
15-5799 AWD BFT.txt TXT text file
15-5231 AWD JRBFTW.txt TXT text file
15-5781 AWD CPNC.txt TXT text file
Attachment L-4_Vol_3_Hours Amended.xlsx XLSX spreadsheet
Attachment L-2_Vol 3_CSS_AMD0002.xls XLS spreadsheet
Amendment 2 MRO Released.docx DOCX document
Attachment 15 - Team Complement Table.xls XLS spreadsheet
Attachment 13 - LOE Chart B-1 Vol 1 FBL.xlsx XLSX spreadsheet
Enclosure (1) Industry Feedback.xlsx XLSX spreadsheet
N6852022R0029 Amendment 0001 MRO_L.docx DOCX document
Attachment 14 - FRCASE GFE_GFP.pdf PDF
Attachment 13 - LOE Chart B-1 Vol 1 FBL.xlsx XLSX spreadsheet
Attachment 12 - Inventory List - FRCASE Cap Reprt 31Aug22.xlsx XLSX spreadsheet
Attachment 2 - List of Key Personnel.docx DOCX document
Attachment 17 - Minimum Toll Box Rqmnt.docx DOCX document
Attachment 6 - Lemoore FRC ASE CBA.pdf PDF
MRO RFP - N68520-22-R-0029.docx DOCX document
Attachment 11 - MRO Data Item Transmittal Form.docx DOCX document
Attachment 3 - CBA North Island FRC ASE CBA.pdf PDF
Attachment 7 - WD 99-0316.pdf PDF
Attachment 16 - FRCASE QASP.docx DOCX document
Attachment L-3_Vol_3_ AFBL.xlsx XLSX spreadsheet
Attachment 4 - El Centro CBA Amentum.pdf PDF
Attachment L-2_Vol 3_CSS.xls XLS spreadsheet
EXHIBIT A-CONTRACT DATA REQUIREMENTS LIST 1 Sep 22.pdf PDF
Attachment 10 - MRO OCI.docx DOCX document
Attachment 8 - WD 2015-0025 Rev 25 (19APR22).txt TXT text file
Attachment 1 - N68520-22-R-0029 BID DD-254 signed.pdf PDF
Attachment 9 - MRO TASK ORDER CLOSEOUT.docx DOCX document
Attachment 5 - Solomons Island CBA Amentum.pdf PDF
Attachment L-4_Vol_3_Hours.xlsx XLSX spreadsheet
Attachment 15 - Team Complement Table.xls XLS spreadsheet
Att L-1 Vol 1 ES Tables.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

#Document
(RFP, Attachment)Section
(A-M)Reference ParagraphPage NumberQuestionProprietary (Yes/No)Response
1RFPLVolume 3 (Cost Price), Paragraph 3.3.h136Section L, Part B, Volume 3 (Cost Price), paragraph 3.3.h (page 18 of 21):

The RFP states to “Provide a breakout to demonstrate how the prime contractor or, if the Offeror is proposed as a JV or mentor protégé, the 8(a) entity will perform at least 50% of the cost of the contract incurred for personnel with its own employees for each period of performance in accordance with FAR clause 52.219-14.”

This RFP requirement applies the 50% to both a prime contractor as well as to a JV.

However, FAR 52.219-14(g)(1) states that the small business protégé in a JV shall perform at least 40% of the work performed by the JV, and paragraph (g)(2) states that in an 8(a) JV, the 8(a) participant(s) shall perform at least 40% of the work performed by the JV. Additionally, 13 CFR Parts 124.513(d) and 125.8(c)(2) support the 40% workshare in a JV. Will the Government please provide clarification of the 50% requirement for a JV in light of FAR 52.219-14(g) and the cited CFR references?NoPlease see the updated RFP.
2RFPL1. VOLUME 4 – CONTRACT administration, Paragraph B139Provide the mailing address, telephone, fax numbers, email address and facility codes for the Offeror’s cognizant Contract Administration Office, Defense Contract Audit Agency (DCAA), and Government Paying Office. In addition, please provide the name, telephone number, fax number and email address for the Administrative Contracting Officer (ACO) at the Defense Contract Management Agency (DCMA).
Please clarify what the Offeror's cognizant Contract Administration Office and Government Paying Office are in terms of this solicitation. Typically, these are memorialized on the cover sheet of an awarded contract.NoThe mailing address is associated with the offeror's respective Defense Contract Management Agency (DCMA) Office.
3RFPCPWS - 4.3.5554.3.5 Exceptions to qualification substitution chart. The following labor categories require a minimum of a bachelor’s degree and no substitution for a bachelor’s degree is allowed: 4.3.5.1 Program/Operations Manager, Senior.

Will the Government consider highly relevant technical and operational experience in lieu of a degree for the position of Program Manager?

NoNo, the Government requires a minimum of a bachelor's degree for the Program/Operations Manager, Senior. Please see Section 4.3.5.1 of the Statement of Work.
4RFPLVolume 3 (Cost Price)133-138Will you provide the current carry-over leave/paid personal time/vacation balances of the current workforce so that Offerors can account for these costs in the fringe build-up?NoThe Government does not dictate what the fringe benefits a company provides. In addition, we are not looking at compensation plans as stated in Section L.
5RFPLVolume 3 (Cost Price)133-138Will the Government provide Offerors the breakout of employees utilizing the various H&W plans (individual, individual/spouse, individual/child, family, opt out) under the current CBA so that Offerors can adequately address the costs and ensure the most competitive pricing is provided to the Government?NoNo, the Government will not provide the breakout of the employees utilizing various H&W plans.
6RFPLVolume 3 (Cost Price)133-138Please provide the workforce demographics relating to medical and dental plans so that Offerors can accurately estimate H&W costs to be included in the proposal.NoThe Government does not dictate what the fringe benefits a company provides. In addition, we are not looking at compensation plans as stated in Section L.
7RFPLVolume 3 (Cost Price)133-138Please provide the workforce demographics of seniority of the incumbent workforce so that Offerors can accurately include applicable cost in the fringe build up.NoNo, the Government will not provide the workforce demographics. As stated in Section L, "For proposal development purposes, the Offeror shall assume all employees, for any

CBA Labor Category, at the median (3 years but less than 8 years) seniority/years of service level."

8 RFP L.2.3 2.3 Key Personnel - Resume 78 In Amendment 0002 the following language was added: "Offeror shall not propose prospective personnel in labor category position identified as key. " This appears to say, by using the language "shall not propose prospective personnel", that an offeror must use a current employee in the Program Manager position. Question: Does this mean that offerors MUST propose only a current employee of the company in the Key Position of Program Manager? and cannot propose a contingent hire for the Program Manager position? PLease clarify and correct language in the RFP. No Question 1: No, an offeror does not have to propose a current employee of the company in the position of Program Manager. As stated in Section L 2.3, "Resume: For all proposed current or contingent Key Personnel, provide a resume of the work assignments, training, etc., which demonstrates the experience and specialized qualifications of the key personnel proposed." Question 2: An offeror can propose a contingent hire for the Program Manager position. As stated in Secton L 3.3, "A “contingent hire” is an individual who has committed, under a signed letter of intent, inclusive of salary information, to being employed by the Offeror if the Offeror is awarded the contract."

9RFPL.2.32.3 Key Personnel78If an offeror is required to propose a current employee in the position of Program Manager this will limit, significantly, the ability of 8a and 8a JV companies to bid this solicitation. This will limit competition to a small number companies. Respectfully request the government remove the requirement and allow offerors to bid contingent hires in the position of program manager. Please clarify the requirement.NoAn offeror can propose a contingent hire as stated in the answer to Question #8. Please see Section L 2.3 as it states "For all proposed current or contingent Key Personnel…"
10RFPSection AProposal Due date2The due date of 3 January puts a significant requirement on offerors to finalize and submit a proposal over the Holiday period. Respectfully request the government extend the due date to 10 January to allow offerors and their employees time to complete the proposal and celebrate the Holidya Season.NoThe Government has extended the deadline of 03 Jan 2023 to 05 Jan 2023 at 1400 EST.
11MRO+RFP+-+N68520-22-R-0029L2.2.1.2124Section 2.2.1 Solicitation Submission Instructions, Subsection 2.2.1.2, “All volumes of the proposal shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE)…” In keeping with Section 3.2 Ground Rules and Assumptions, para. (c) indicates “[i]f subcontractors are proposed, they shall provide the same information required for the prime contractor, unless otherwise noted in the Cost/Price Information section below.”
Q: Will the Government please clarify whether Section 3.2 pertains to “Principal Subcontractors” as opposed to any subcontractor?NPlease see the updated RFP. The Government will further evalute this.
12MRO+RFP+-+N68520-22-R-0029L3.3.c, last sentence135c. Indirect Rates: “Subcontractors and team members shall provide this information either separately or included in the Offeror’s submission of this document.”
Q: Will the Government please clarify whether the language in Section 3.3 pertains to “Principal Subcontractors” as opposed to any subcontractor?Please see the updated RFP. The Government will further evalute this.
13MRO+RFP+-+N68520-22-R-0029L3.3.c, last sentence135c. Indirect Rates: “Subcontractors and team members shall provide this information either separately or included in the Offeror’s submission of this document.”
Q: With regard to separately providing this information, should (Principal) Subcontractors / subcontractors follow the alternate method of submission indicated within Subsection 2.2.1.4 (e.g., send direct via email with added labeling in subject heading to the two Gov’t POC’s) for their confidential / proprietary submission, as applicable since they cannot clarify in the PIEE system they are subcontractors to a specific Prime contractor?NAll offerors shall follow submission instructions in Section L 2.2.1.3. Additionally, please follow instructions in "Table ES-1 Offeror Summary."
14MRO+RFP+-+N68520-22-R-0029L3.3.c, last sentence135c. Indirect Rates: “Subcontractors and team members shall provide this information either separately or included in the Offeror’s submission of this document.”
Q: With regard to separately providing this information, should (Principal) Subcontractors / subcontractors follow the alternate method of submission indicated within Subsection 2.2.1.4 (e.g., send direct via email with added labeling in subject heading to the two Gov’t POC’s) for their confidential / proprietary submission, as applicable since they cannot clarify in the PIEE system they are subcontractors to a specific Prime contractor?NPlease see answer to above, Question #13.
15MRO+RFP+-+N68520-22-R-0029LPart A121Section L, Part A, the term “Principal Subcontractor” is defined but only used once within Volume 3 Cost (p.128 of 150) with its line of demarcation of entering Principal Entity (Yes / No).
Q: Shouldn’t the instructions throughout the RFP regarding subcontractors be revised such that it applies to Principal Subcontractors providing supporting documentation / information to the Government as opposed to subcontractors in general?NPlease see the updated RFP.
16PGI 245.103-71

and PGI 245.103-72 GFP Attachments such as “Attachment_12_Inventory_List_FRCASE_Cap_Reprt_31Aug22.xlsx” and “Attachment_14_FRCASE_GFE_GFP.pdf” do not appear to be coming from the PIEE System / GFP Module. According to PGI 245.103-71 Transferring Government Property Accountability and PGI 245.103-72 Government-Furnished Property Attachments to Solicitations and Awards the GFP / GFE should be populated within the PIEE / GFP Module and attached to the solicitation as GFP Attachment(s).

Q: Will the Government please re-issue these GFP / GFE / CAP attachments as print outs from PIEE / GFP Module?NAttachments 12 and 14 are up to date and loaded into PIEE.
17MRO+RFP+-+N68520-22-R-0029n/ageneraln/aWill the Government please consider releasing any answers to questions they have ready so offerors can start working on their revisions?NPlease see Amendment 0002
18RFPL2.1.6, Table G-2126Table G-2 indicates that the Proposal Volumes are required to be submitted as both .docx/.xslx and .pdf.
Q: Will the Government please clarify whether Offerors are to submit all documents in both formats or whether they may choose to submit the documents in either .docx/.xlsx or .pdf?NAny Microsoft Excel files are not required to be submitted as a .pdf. Please see the updated RFP.
19SOW and Attachment 15 - Team ComplementC and Attachment3.3.1.16 and 4.3.6.1919 and page 1SOW paragraph 3.3.1.16 states "The Contractor shall have four (4) Site Supervisors (BLS-49-1011) at the following sites SOL (2), NNSY (1) , NBC (1). At the other remaining sites (with the exception NWS Cheatham Annex Williamsburg), the Contractor shall designate a Ground Support Equipment Mechanic or Electronic Technician III (Site Lead) to perform as the site lead." In Attachment 15, there is also an Automotive Painter listed as a Site Lead. Question: Is there also an Automotive Painter Site Lead at SERF NTHI and SERF EVRT?NoPlease see the answer to Question #103 from Amendment 0002 of the RFP
20RFP and Attachments 7 and 8I and Attachment52.222-42104RFP paragraph 52.222-42 states "STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014). In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION. Employee Class. Monetary Wage-Fringe Benefits. PLEASE SEE ATTACHMENT (8) FOR COMPLETE LISTING. Question: Is it the government's intention to have offerrors use Attachment 8 for proposal bidding purposes despite listing two Nationwide Wage Determinations under RFP, Section A, 2?NoPlease see Amendment 0002 for updates. The NWD have been removed and AWDs have been specified.
21RFP and Attachment L-3L and AttachmentL 3.3 (i)137RFP paragraph L 3.3 (i) states "In an effort to ensure realism of costs during contract execution, Offerors, including subcontractors, shall propose Year 1 through Year 3 and FAR 52.217-8 (6 months) escalation rate of 5% or higher for all labor categories. Offerors, including subcontractors, that propose less than 5% escalation will be considered unrealistically low and will have their proposals adjusted by the Government to Year 1 through Year 3 and FAR 52.217-8 (6 months) escalation rate of 5% for all labor categories." Question: Is it the government's intent to have Offerors, including subcontractors, to have an escalation rate of 5% on a FAR 52.217-8 (6 months) extension?NoYes, this is the Government's intent.
22Attachment L-4 and Attachment 15Attachments3.4.2Offeror understands Attachment L-4_Vol_3_Hours lists the Total Hours for each position at each location and that Attachment 15 - Team Complement Table lists the number of FTEs at each location. Attachment L-4 lists "5,760 hours" for the "23380 Ground Support Equipment (GSE) Mechanic (Site Lead)" at the NBC location and 1,920 at the NNSY location. However, Attachment 15 lists zero "23380 Ground Support Equipment (GSE) Mechanic (Site Lead)" FTEs at NNSY and NBC locations. Similarly, the Attachment L-4 lists "23530 Machinery Maintenance Mechanic" has 13,440 hours at the JAX and 21,160 hours at the JRB location. However, Attachment 15 reflects 0 FTEs in both locations. Question: Will the government clarify the number of "23380 Ground Support Equipment (GSE) Mechanic (Site Lead)" and "23530 Machinery Maintenance Mechanic" FTEs and the Total Hours for both NNSY/NBC and JAX and JRB locations respectively?NoPlease see Amendment 0002 including "Attachment L-4_Vol_3_Hours Amended" of the RFP.
23RFP, Attachment L-4 and Attachment 15L and Attachments3.4.2138Offeror understands the total hours for each position listed on Attachment L-4_Vol_3_Hours reflects 1,920 Annual Direct Labor Hours for three years as well as a 6-month extension (for a total of 6,720 Total Hours). For the "01020 Administrative Assistant" position at BFT and JAX locations, it lists 7,680 Total Hours. Question: Will the government verify the number of "01020 Administrative Assistant" FTE and hours needed at both BFT and JAX locations?NoPlease see answer to Question #107 from Amendment 0002 of RFP Questions.
24In view of the significance of the questions asked and the answers not provided as well as two federal holidays during the response period, will the Government consider a two week extension for proposal submission?NoThe Government will extend the proposal submission date to 05 January 2023 at 1400 ET
25Attachment 15 - FULL TIME EQUIVALENT TEAM COMPLEMENT3.87.11Fork Lift OperatorFTE TabA fork lift operator is listed but there are 'zeros" for all sites. Q: Is a fork lift operator required at any of the sites listed?NoPlease see answer to Question #51 from Amendment 0002 of the RFP Questions.
26RFPC4.3.5.154Q: Will the USG provide position requirements for the Program/Operations Manager, Senior?NoParagraph 4.3.5.1 is not for postion requirements. The functions, required experience, and required education is Section 4.3.6.1 are the position requirements for Program/Operations Manager (Senior).
27RFPC60Q: Will the USG number the Order Filler paragraphNoThis paragraph is already numbered and is paragraph 4.3.6.17
28RFPC62Q: Will the USG number the Supply Technician paragraphNoThis paragraph is already numbered and is paragraph 4.3.6.25
29Attachment 15 - FULL TIME EQUIVALENT TEAM COMPLEMENT and RFPAttachment 15 - FULL TIME EQUIVALENT TEAM COMPLEMENT and section CAll of Attachment 15 and 4.3 of the SOWPage 1 and starting on Page 54 of 150 of the SOWThere are a number of discrepancies between the Attachment 15 Team Complement Work Locations and the SOW Work Locations. Question: Will the Government reconcile the Attachment 15 Work Locations to align with the SOW Work Locations or advise which reference the Offeror should use to price the effort?NoPlease see Amendment 0002.
30RFPC4.3.6.2162 of 150For the Production Control Clerk position description, there seems to be little discussion of Records Management as no other labor categories reference this task, but the Contractor is responsible for the Records Management. Question: Is the "function" of the Production Control Clerk a complete listing of all their duties, or is the function of the Production Control Clerk intended to be the same as the function of the Technical Publications Librarian Clerk?NoPlease see the updated RFP. The Government has refined the description.
31Attachment 15 - Team Compliment and Attachment 7 - WD 99-0316AttachmentsCell D19 of Attachment 151Attachment 15 - Team Compliment Table references Order Clerk II (Row 19, SOW Skill 4.3.6.16) as SCA Code 01192 (cell D19). Multiple questions answered in "Questions_Industry_All_Questions_Finalized 11 2 2022" by the response "Attachment 7 is the agreement to use for proposal preparation purposes." Attachment 7 - WD 99-0316 does not have an SCA Code 01192, Order Clerk II in it. Question: Will the government give another SCA code or WD to use for proposal reference purposes?NoPlease see Amendment 0002 for updates. The NWD have been removed and AWDs have been specified.
32Attachment L-4 Vol 3 Hours Amended & Attachment 13 LOE Chart B-1 Vol 1 FBL, CPNC TabLN/AN/AAttachment 13 LOE Chart B-1 Vol 1 FBL, CPNC Tab lists the labor category Stock Clerk. However, Attachment L-4 Vol 3 Hours Amended Column G, CPNC lists hours for labor category Production Control Clerk, not a Stock Clerk. Which labor category should be priced in Attachment 13, Stock Clerk or Production Control Clerk? Request the government correct all Attachments so they match.NoPlease see the updated RFP.

File details come from the government source that posted it. Updated .