N68520-22-R-0007 Amend 2.pdf
PDF 1008 KB Posted
- Solicitation number
- N6852022R0007
About this file
This solicitation seeks proposals for Contractor Maintenance Support Services (CMSS) to support the Fleet Readiness Center Mid-Atlantic Detachment at Patuxent River, Maryland. The requirement includes level II maintenance support for aircraft components, engines, support equipment, and administrative functions. The anticipated contract is a single-award, cost-plus-fixed-fee contract with cost reimbursable CLINs for other direct costs and travel. The period of performance is one base year with four option periods and an option to extend services. The incumbent contractor is Tyonek Worldwide Services, Inc. Proposals are due by June 15, 2022 and the requirement is being competed as a 100% 8(a) small business set-aside.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QAs CMSS 6 June 2022.pdf | ||
| N6852022R0007.pdf | ||
| QAs CMSS 27 May 2022.pdf | ||
| N68520-22-R-0007.docx | DOCX document | |
| CMSS QAs 16 May 2022.pdf | ||
| N68520-22-R-0007 Amend 1.docx | DOCX document | |
| Att L_1 Contract Experience Summary.xlsx | XLSX spreadsheet | |
| Att 6 COR Designation Letter.docx | DOCX document | |
| N68520-22-R-0007.docx | DOCX document | |
| Att L-2 Cost Summary Spreadsheet.xls | XLS spreadsheet | |
| Att 4 List of Key Personnel.docx | DOCX document | |
| Exhibit A Contract Data Requirement List (CDRLs).docx | DOCX document | |
| Att 2 Surveilance Activity Checklist (SAC).pdf | ||
| Att 1 DD 254.pdf | ||
| Att 5 Wage Determination.docx | DOCX document | |
| RFP Question Submittal Form.xlsx | XLSX spreadsheet | |
| Att L_1 Contract Experience Summary.xlsx | XLSX spreadsheet | |
| Att 8 CBA IAMAW PAX Tyonek.pdf | ||
| Att 7 GFP Data Input Spreadsheet (XLSX).xlsx | XLSX spreadsheet | |
| Att 3 Data Item Transmittal Form.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this modification is to resolve inconsistencies w ithin the solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 74
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-May-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6852022R0007
X 9B. DATED (SEE ITEM 11)
29-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-May-2022
CODE
COMFRC PROCUREMENT GROUP
47038 MCLEOD ROAD; BUILDING 448
PATUXENT RIVER MD 20670
N68520 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6852022R0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 01-Jun-2022 05:00 PM to 15-Jun-
2022 05:00 PM.
The following have been modified:
ADDITIONAL INFORMATION
1. Level of Effort (LOE) contract will be issued under this solicitation. NAVAIR clause 5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT)(NAVAIR)(DEC 2012) will be included in issued contract.
2. This contract will be, subject to the Service Contract Act (SCA) of 1965, as amended, and to FAR clause
52.222.41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014), contained in Section I of this solicitation.
The cost/price proposal shall demonstrate compliance with the minimum monetary wages and fringe benefits for service employees as specified in the Wage Determination (provided as an attachment in Section J of this solicitation). The following Wage Determinations are applicable for this effort:
PLACE OF PERFORMANCE
WD#: REV#: DATE: STATE AND COUNTY:
2015-4281 R22 03/15/2022 Calvert, Charles, Prince George's, MD
CBA IAMAW PAX
3. The NAICS code for this effort is 488190 – Other Support Activites for Air Transportation.
The Product Service Code (PSC) for the procurement is J015 – Maintenance, Repair, and Rebuilding of Equipment- Aircraft and Airframe Structural Components.
4. This contract will have a base year plus four (4) option years, with the possibility of a six month option to extend services in accordance with FAR 52.217-8.
5. The contractor will be required to have the appropriate facility security clearance as stated on the DD Form 254.
The contractor will not be permitted access to classified information until a final DD254 is incorporated as an attachment to the contract award.
The following addresses and points of contact are provided:
CONTRACT SPECIALIST
Name: Lyndsay Krebs Email address: lyndsay.b.krebs.civ@us.navy.mil
PROCURING CONTRACTING OFFICER
Name: Tiffany L. Crayle Email address: tiffany.l.crayle.civ@us.navy.mil
U.S. Postal Service Mailing Address:
COMFRC Procurement Group 40738 Mcleod Road, Bldg. 448
Naval Air Station Patuxent River, MD 20670
Direct Delivery Address (UPS, FedEx, etc.):
COMFRC Procurement Group 40738 Mcleod Road, Bldg. 448 Naval Air Station Patuxent River, MD 20670
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0004
The contract type has changed from FFP to COST.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Government Furnished Property - NSP
COST
Government Furnished Property (GFP) in support of Item 0001 in accordance with the Statement of Work in Section C FOB: Destination
ESTIMATED COST
CLIN 1004
OPTION OPY I Government Furnished Property-NSP
COST
Government Furnished Property (GFP) in support of Item 1001 in accordance
CLIN 2004
OPTION OPY II Government Furnished Property-NSP
COST
Government Furnished Property (GFP) in support of Item 2001 in accordance
CLIN 3004
OPTION OPY III GFP NSP
COST
Government Furnished Property (GFP) in support of Item 3001 in accordance
CLIN 4004
OPTION OPY IV Government Furnished Property NSP
COST
OPY IV, Government Furnished Property (GFP) in support of Item 0001 in accordance with the Statement of Work in Section C
CLIN 5004
OPTION Option to Extend, GFP - NSP
COST
Option to Extend, Government Furnished Property (GFP) in support of Item 5001 in accordance with the Statement of Work in Section C
5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012)
(a) The level of effort estimated to be ordered during the term of this contract is 792,000 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor by classification is as follows:
Labor Category Man-hours Total Man-hours Site Manager (SM) * 1,920.0 1,920.0 Senior Maintenance Controller
(SMC) *
1,920.0 1,920.0
Senior Quality Inspector (SQI) (X5O) *
1,920.0 1,920.0
Aircraft Power Plants/ Structure/ Support Equip Inspector (QI-AP) (X5O)
1,920.0 1,920.0
Aircraft Life Support Systems Inspector(QI-ALSS) (X5O)
1,920.0 1,920.0
Aircraft Avionics / Electrical Inspector (QI-AV) (X5O)
1,920.0 1,920.0
Supply Tech (ST-IMRL) (X5M-
IMRL)
1,920.0 7,680.0
Hazardous Materials Working Supervisor (HMWS) (X5H& X5S)
1,920.0 1,920.0
Supply Tech -Hazardous Materials ST-H) ( (X5H)
1,920.0 3,840.0
Aerospace Structural Welder
(ASW)(X5S)
1,920.0 1,920.0
Aircraft Mechanic I – CNC Machine Operator
1,920.0 1,920.0
T-56 Working Supervisor (EWS-
56) (X5L/X5E) *
1,920.0 1,920.0
Aviation Mechanic I (AM-T56) (X5L- T-56)
1,920.0 11,520.0
Senior Production Control Clerk (PCC-T56) (X5L- Engine Logs/Records)
1,920.0 1,920.0
Test Cell Electronics Tech
(ETTC) (X5E)
1,920.0 1,920.0
Avionics/Electronics Working Supervisor (AVWS) (X5B/X5A/X5C) *
1,920.0 1,920.0
Electronic Tech II Battery (ETBS)
(XB5 )
1,920.0 5,760.0
Electronic Tech III (Calibrations)
(ETCAL) (X5C)
1,920.0 5,760.0
Senior Production Control Clerk
(PCC-AA&E) (X57-
Logs/Records)
1,920.0 1,920.0
Electronic Tech II Ordnance
(ETAO)
1,920.0 9,600.0
Aviation Life Support Systems Working Supervisor (ALSSWS) (X58/X5D/X5F/X5P) *
1,920.0 1,920.0
Supply Tech (ST-ALSS) (X58-
ALSS)
1,920.0 1,920.0
Senior Production Control Clerk
(PCC-ALSS) (X58- ALSS
Records)
1,920.0 1,920.0
Production Control Clerks (PCC- ALSS) (X58- ALSS Records)
1,920.0 1,920.0
Aircraft Mechanic I (AM-ALSS) (X5D-Parachute)
1,920.0 5,760.0
Aircraft Mechanic I (AM-ALSS) (X5F-Float)
1,920.0 11,520.0
Aircraft Mechanic I AM-ALSS) (X5D-Oxygen )
1,920.0 5,760.0
Tire & Paint Shop Working Supervisor (TPWS) (X5T & X55)
1,920.0 1,920.0
Aircraft Mechanic I(AM) (X5T) 1,920.0 1,920.0
Aircraft Worker(AW) (X5T) 1,920.0 3,840.0
Aircraft Painter (AP) (X55) 1,920.0 7,680.0
Support Equipment Working Supervisor (SEWS) (X59) *
1,920.0 1,920.0
Motor Vehicle Mechanic – SE
(MVMSE) (X59)
1,920.0 19,200.0
Automotive Worker –SE (AWSE) (X59)
1,920.0 3,840.0
Production Control Clerk – SE
(PCC-SE) (X59)
1,920.0 1,920.0
Totals
* denotes Key Personnel labor categories
(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded contracts and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded contracts. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.
(c) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or 52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.
(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.
(e) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
STATEMENT OF WORK
Statement of Work for Contractor Maintenance Support Services
1. Scope:
This Statement of Work (SOW) sets forth the contractual requirements for providing Contractor Maintenance Support Services (CMSS) for the Fleet Readiness Center Mid-Atlantic Detachment at Patuxent River FRCMA DET PAX), Maryland. FRCMA DET PAX provides direct support primarily to squadrons and activities assigned to Naval Test Wing Atlantic and Naval Air Station Patuxent River (NAS PAX RIVER) and other activities (e.g., foreign military and other Department of Defense (DOD) branches) as may be directed by the United States Government (USG). Under this contract, the Contractor is required to possess Intermediate Maintenance (I LEVEL) knowledge and expertise to seamlessly integrate qualified personnel into a maintenance organization under the Naval Aviation Maintenance Program (NAMP), responsible for Navy test, restoration rebuild, maintenance, and repair. The Contractor is required to perform as a functional part of the FRCMA DET PAX maintenance organization in support of the maintenance requirements and priorities to meet the Navy’s maintenance support mission. The Contractor is required to provide maintenance support expertise and subject-matter-experts (SME) to ensure uninterrupted support for LEVEL II aircraft maintenance and administrative support on aircraft components, engines, and support equipment (SE) as specified in this SOW. Level II is classified as maintenance or repair performed by designated I-level Maintenance Activities (IMA) in direct support of O-level activities. I-level maintenance normally consists of diagnostic testing performed with automated equipment, calibration, repair or replacement of damaged or unserviceable parts, components, or assemblies, limited manufacture of parts, and on aircraft/equipment technical assistance to O-level activities. The Contractor shall comply with all maintenance, safety, and quality assurance (QA) criteria as specified in this SOW and documents, manuals, directives, and instructions delineated in the SOW.
2. Applicable documents: The Contractor shall adhere to the following documents in accordance with (IAW) the technical/service requirements of this SOW. Refer any conflicts to the Contracting Officer Representative (COR) for resolution.
2.1 DOD specifications.
N/A
2.2 DOD standards.
2.2.1 Defense Logistics Management Standards Volume 2, Supply Standards and Procedures Change 13 DLM
4000.25 Volume 2 Chapter 17, dated November 26, 2019.
2.2.2 Department of Defense Standard Practice for Military Packaging MIL-STD-2073-1E w/CHANGE 4, dated April 22, 2019.
2.3 Other Government documents (e.g. NAVAIR Documents):
Office of the Chief of Naval Operations (OPNAV) Instructions/Manuals:
3440.17A Navy Installation Emergency Management Program 3750.6S Naval Aviation Safety Management System 5090.1E Environmental Readiness Program
5100.23 CH-1
5102.1E
Navy Safety and Occupational Health Program Manual Navy Safety Investigation and Reporting Program
5239.1D U.S. Navy Cybersecurity Program 8000.16E Naval Ordnance Maintenance Management Program
8023.24D Navy Personnel Conventional Ammunition and Explosives Handling Qualification and Certification Program
Office of the Chief of Naval Operations (OPNAV) Document:
5239/14 SAAR-N Form Secretary of the Navy (SECNAV) Instruction:
5211.5F Department of the Navy Privacy Program
5510.36B
Department of the Navy (DON) Information Security Program (ISP) Instruction
5510.30C Department of the Navy Personnel Security Program Commander, Naval Air Forces (CNAF) Instruction (CNAFINST):
4790.2 Naval Aviation Maintenance Program (NAMP)
Naval Air Systems Command (NAVAIR) Instructions:
3710.1 Contractor's Flight and Ground Procedures
3750.5 Safety Program
10350.3 Use of Lubricants, Fluids, Compounds
10350.4 Utilization of Aircraft Engine/Transmission Oil
13070.1 NAVAIR Nondestructive Test and Inspection Program
13280.1 Battery Standardization Program
13640.1C Naval Aviation Metrology Calibration Program
13650.1 Aircraft Maintenance Material Readiness List (AMMRL) Metrology
13680.1 Depot Level Rework Program for SE End Items
13700.15 Navy Aircraft Engine Management System
Naval Air Warfare Center Aircraft Division (NAWCAD) Instruction
5510.1 Information, Personnel and Industrial Security Program Manual Naval Test Wing Atlantic/NAS PAX RIVER Instruction
13720.1 Foreign Object Damage (FOD)
NAS PAX RIVER Instructions 3140.6P Destructive Weather Plan
3721.2 Airfield Vehicle Operators Indoctrination Course
3750.1 Aviation Safety Program
4100.3D Energy and Water Management Program
4602.1 Transportation of Liquid Oxygen and Nitrogen
5090.5A Regulated Waste Management Plan Implementation Order 5100 Commanding Officer's Occupational Safety and Health Administration (OSHA)
5100.35 Occupational Safety and Health Manual
5530.6 Anti-Terrorism/Physical Security Plan
8010.1 NAS PAX RIVER Ordnance Manual
8020.15 Explosive Safety program Oversight
11320.1 Fire Protection and Fire Prevention Regulations
FRCMA Instruction
8024.1 Explosive Handling Personnel Qualification and Certification Program Training Plan FRCMA DET PAX Instructions
3140.2F Destructive Weather Warnings, Readiness Conditions, Personnel Evacuation and Recovery Plan
4790.7 IMRL Program
4790.5 Beyond Capability of Maintenance (BCM) Management
4790.7.1 Electronic Publication Management
4790.8 Government Furnished Aeronautical Equipment Test Bench Installation/Maintenance
Assist Modules
4790.10 Power Plants Customer Service Guide
4790.14 BCM Management
5510.1 Classified Material Handling Security Program
5530.1 Physical Security
FRCMA DET PAX Local Command Procedure N/A Aeronautical Equipment Welding Program N/A Corrosion Prevention and Emergency Reclamation Program N/A Maintenance Training Program N/A Foreign Object Damage Prevention Program N/A Support Equipment Operator Training and Licensing Program N/A Planned Maintenance System Program N/A Naval Aviation Metrology and Calibration Program N/A Tool Control Program N/A Central Technical Publications Library (CTPL) Technical Directives Compliance Program N/A Miniature/Micro-Miniature Repair Program N/A Hydraulic Contamination Control Program N/A Support Equipment (900 Division) Pre-Expended Bin Program Naval Facilities and Engineering Command (NAVFAC) Instruction
11450.1 Acquisition and Management of Weight Handling Equipment NAVFAC Manual P-307 Management of Weight Handling Equipment Naval Sea Systems Command (NAVSEA) Instructions OP-5 Ammunition and Explosives Ashore SW020-AF-HBK-010 Motor Vehicle Driver and Shipping Inspector’s Handbook For Ammunition, Explosives and Related Hazardous Materials SW023-AG-WHM-010 On-Station Movement of Ammunition and Explosives by Motor Vehicle
8020.6 Department of the Navy Weapon Systems Explosives Safety Review Board DOD Regulations 7000-14 DOD Financial Management Regulation DOD Manual 1000.13-M-V1 DOD Identification (ID) Cards: ID Card Life-Cycle, January 23, 2014 Incorporating
Change 1, Effective July 28, 2020.
4145.26 DOD Contractor’s Safety Manual for Ammunition and Explosives
4161.2 DOD Manual for the Performance of Contract Property Admin
5200.01 DoD Information Security Program
5220.22-M National Industrial Security Program Operating Manual, February 28, 2006, Incorporating Change 2, May 18, 2016.
DOD Instruction
4715.4 Pollution Prevention
5200.46 DOD Investigative and Adjudicative Guidance for Issuing the Common Access Card
(CAC) September 9, 2014 Incorporating Change 1, Effective May 4, 2018.
5200.48 Controlled Unclassified Information
5230.24 Distribution Statements on Technical Documents DOD Directives
4715.1 Environmental Security
5220.22 Industrial Security Manual for Safe Guarding Classified Information NAVAIR Manuals 00-25-100 Technical Manual Program 00-25-300 NAVAIR Technical Directive System Management and Procedure 00-80T-96 Basic Handling & Safety Manual 00-80T-119 NAVAIR Weight Handling Support Equipment 01-1A-17 Aviation Hydraulics Manual, Organizational, Intermediate and Depot Maintenance 01-1A-35 Aircraft Fuel Cells and Tanks 01-1A-509-1 thru -4 Cleaning/Corrosion Control 04-10-506 Aircraft Tires and Tubes 13-1-6 ALSS Equipment Publications 15-01-500 Preservation of Naval Aircraft 17-1-123 Tire Inflator Assembly Kit, Remote Inflator Assembly, Dual Chuck 17-15BAD-1 NAVAIR Aircraft & Naval Aircraft Support Equipment Storage Batteries
17-1-125 GSE Cleaning and Corrosion Control 19-70-46 Index and Application Tables for Aircraft Jacks Naval Supply Systems Command (NAVSUP) Publications
P-409 MILSTRIP/MILSTRAP Desk Guide P-485 Volume III Ashore Supply P-505 Preparation of Hazardous Material for Military Air Shipment P-538 Management of Materials Handling Equipment (MHE) and Shipboard Mobile Support
Equipment (SMSE) Code of Federal Regulations (CFR) Part 1910 Code of Federal Regulations Title 29 Labor
2.4 Industry documents.
2.4.1 American National Standards Institute (ANSI)/International Safety Equipment Association (ISEA) Occupational and Educational Eye and Face Protection - ANSI/ISEA Z87.1-2020, dated March 11, 2020.
2.4.2 ANSI/ISEA Industrial Head Protection - ANSI/ISEA Z89.1-2014 (R2019), dated May 15, 2014 (Reaffirmed April 26, 2019).
2.4.3 ANSI/Electrostatic Discharge (ESD) Association Standard for the Development of an ESD Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment - S20.20-2014
2.4.4 ANSI/ESD Association Standard for the Protection of ESD Susceptible Items, Wrist Straps - ANSI/ESD S1.1- 2013.
2.4.5 American Society of Mechanical Engineers Cranes and Monorails (With Underhung Trolley or Bridge) - B30.17 – 2020, dated May 7, 2021.
2.4.6 ESD Association Advisory for the protection of ESD susceptible items, ESD Protective Workstations - ESD- ADV53.1-1995, dated February 7, 1995.
2.4.7 ESD Association Technical Report – Handbook for the Development of an ESD Control Program for the Protection of Electronic Parts, Assemblies and Equipment. TR20.20-2016.
2.4.8 Society of Automotive Engineers International Quality Management Systems – Requirements for Aviation Maintenance Organizations - AS9110C, dated November 4, 2016.
2.5 Due to frequent changes to documents and directives, it is expected that listed instructions may be superseded or additional instructions may be added as necessary, and the most current versions of applicable documents and directives will be used at no increase in cost to the Government. Links to frequently used directives are:
https://www.secnav.navy.mil/doni/allinstructions.aspx (OPNAV and SECNAV Instructions) https://myteam.navair.navy.mil/km/71/Directives (NAVAIR, NAVTESTWINGLANT, NAS PAX RIVER Instructions; also contains links to other command Instructions) https://mynatec.navair.navy.mil/ (Aircraft Publications; Users must register to access) https://www.navair.navy.mil/Naval-Aviation-Maintenance-Program (4790.2 Series) https://www.acquisition.gov/content/regulations Federal Acquisition Regulation (FAR)/ Defense Federal Acquisition Regulation Supplement (DFARS)/Navy Marine Corps Acquisition Regulation Supplement (NMCARS) https://myteam.navair.navy.mil/default.aspx (NAVAIR Website)
3. Requirements
3.1 General Requirements.
3.1.1 General Maintenance Functions. The Contractor shall be responsible for providing designated maintenance support, logistics, and technical support for aircraft component maintenance actions and associated equipment in order to meet the mission requirements of supported activities. This SOW requires LEVEL II aircraft maintenance support functions to be performed in the following primary areas:
(1) Site management, production control, QA and safety, Supply System Expediter, and Individual Material Readiness List (IRML) processes.
(2) Aircraft engine/auxiliary power unit (APU) and related components, propellers, and engine test cell maintenance/repair functions.
(3) Aircraft structural component maintenance/repair functions, including tire/wheel, welding, and paint.
(4) Management of hazardous materials.
(5) Avionics/battery/calibration maintenance/repair functions.
(6) Aviation Life Support System (ALSS) functions.
(7) SE maintenance/repair functions.
(8) Aircraft Armament Equipment (AAE)/Aircraft Armament Systems management and scheduled maintenance.
(9) Machinist/Fabricator.
3.1.1 Compatibility - The Contractor shall maintain the capability to prepare documents and software packages compatible with the Government Information Technology (IT) environment through the security classification of unclassified. The current operating environment required for this contract includes:
Microsoft Windows 10 Microsoft Project 2010 Microsoft Office Professional Plus 2010 Adobe Acrobat XI (reader) Internet access The Contractor shall maintain the ability to interface with and transfer data to and from requiring office software applications and their upgraded versions. The Contractor shall maintain the most current version of anti-virus software and ensure that all media are virus free when delivered. The Contractor shall be capable of Internet and Local Area Network communications with the FRCMA DET PAX. Contractor personnel shall be capable of maintaining real-time communications, both voice and data transfer capabilities, with FRCMA DET PAX during working hours whether at Contractor work site or on travel.
3.1.2 Work Location, Facilities and Telework
3.1.2.1 Work Location: 100% of work will be performed at Government site. Government sites include: Hanger 301, area 1832, buildings 158, 177, 307, 307A, 319, 324, 876, 1120, 1383, 1403, 1684, 1832, 2241, 3202, and others hangars aboard NAS PAXRIVER. Contractors performing on-site support will be provided (examples include but are not limited to: access to workspaces, telephones, printers, facsimile machines, copy machines, shredders, computers, and network access including web servers and applicable databases or other applications) necessary to carry out assigned tasks.
All work services specified in this SOW will normally be accomplished at FRCMA DET PAX. Contractor personnel may be directed to perform aircraft component, engine, and SE maintenance support at alternate or off-site locations. Alternate work sites include other facilities located at NAS PAX RIVER. Off-site work involves travel away from the confines of NAS PAX RIVER. Maintenance actions that require travel that exceeds normal maintenance support hours (MSH) or incurs travel expenses will be negotiated at the time of the requirement under a travel Contract Line Item Number per NMCARS 5252.232-9509 Reimbursement of Travel, Per Diem, and Special Material Costs and Joint Travel Regulations.
3.1.2.2 Meeting support: In support of the tasking outlined in this SOW, the Contractor shall have the capability to host and conduct meetings at the classification levels up to unclassified with the capacity to support a minimum of two (2) persons.
3.1.2.3 Telework: Telework is not authorized for this contract
3.1.3 Contract Status reporting. The Contractor shall provide the following documentation.
3.1.3.1 Monthly Progress and Financial Status Report and Measurement and Manning Summary: The Contractor shall provide a progress and financial status report IAW the Contract Data Requirement List (CDRL) A011 and measurement and manning summary IAW (CDRL A012). The financial status report shall include work accomplished since submittal of the last report, both monthly and cumulative man-hour labor costs expended by labor category and material and travel costs.
3.1.4 Work Schedule, Compressed Work Schedule (CWS), Holidays, and Installation Closure.
3.1.4.1 Work schedule: The Contractor shall provide the required services and staffing coverage during normal working hours. Normal working hours are usually 8.5 hours (including a 30-minute lunch break), Monday through Friday (except on the legal holidays specified in paragraph 3.1.4.1.8).
3.1.4.1.1 Compressed Work Schedule (CWS): CWS is an alternative work schedule to the traditional five 8.5 hour workdays (which includes a 30-minute lunch) worked per week. Under a CWS schedule, an employee completes the following schedule within a two-week period of time: Eight weekdays are worked at 9.5 hours each (which includes a 30-minute lunch), one weekday is alternately worked as 8.5 hours (which includes a 30-minute lunch) and one weekday is not worked by the employee. The result is 80 hours worked every two weeks, with 44 work hours one week and 36 work hours the other.
The Contractor may allow its employees to work a CWS schedule provided the requirements of this SOW are met.
If the Contractor chooses to allow its employees to work a CWS schedule in support of this contract, any additional costs associated with the implementation of the CWS schedule vice the standard schedule are unallowable costs under this contract and will not be reimbursed by the Government. Additionally, the CWS schedule shall not prevent Contractor employees from providing necessary staffing and services coverage as required by the Government to the COR/Alternate COR (ACOR). The COR will determine FRCMA DET PAX and Contractor daily shift Maintenance Support Hours (MSH). To ensure a cooperative maintenance approach, Contractor MSHs shall be performed in tandem with the normally scheduled USG shift work-hours to ensure a cooperative organization of maintenance practices and interface. The COR may authorize exceptions to Contractor daily shift work hours to meet special maintenance requirements or training evolutions. The COR will provide 48 hours advanced notice to the Contractor Site Manager (or alternate) in such instances. The COR may adjust weekday shifts forward or back three (3) hours with 48 hours advanced notice to the Contractor Site Manager. In doing so, the overall continuous duration of the shift shall not change (i.e., remain either nine MSH for the compressed work schedule, or eight MSH for the standard work schedule). The COR will select, from the primary shift, work schedule options (Compressed or Standard), and the option selected will, at the COR’s discretion, appertain to either all, or only a portion, of the Contractor workforce. MSH schedule options (CWS and Standard Work Schedule (SWS)) for Contractor personnel/work centers will normally be elected to provide five-day a week work center support and/or adjust to the dynamics of workload requirements.
3.1.4.1.8 Holidays: The Government observes the following holidays:
New Year’s Day, January 1;
Martin Luther King’s Birthday, the third Monday in January;
President’s Birthday, the third Monday in February;
Memorial Day, the last Monday in May;
Juneteenth National Independence Day, June 19;
Independence Day, July 4;
Labor Day, the first Monday in September;
Columbus Day, the second Monday in October;
Veteran’s Day, November 11;
Thanksgiving Day, the fourth Thursday in November;
Christmas Day, December 25;
and any days covered by Presidential Proclamation or granted by Executive Order.
With the exception of the events in section 3.1.4.1.9 below, the Contractor is permitted to observe the above Holidays IAW its Corporate policy.
3.1.4.1.9 Installation Closure: When Government facilities are closed by the Government, or when Government employees are officially excused from work due to a holiday or a special event, severe weather, a security threat, or any other Government facility related problem that prevents Government employees from working at the Government facility, Contractor personnel assigned to work at that Government facility in support of such Government employees shall follow their parent company’s policies.
In very limited circumstances, work being performed by Contractor personnel may be deemed mission essential and performance of such mission essential work may be authorized to continue at the Government facility despite the facility being otherwise closed for normal operations. The circumstances permitting work being performed by Contractor personnel to be deemed mission essential are extremely limited and generally only apply to performance of efforts related to public health, safety, or matters related to national security. The cognizant Contracting Officer (CO) must concur with any determination that work being performed by Contractor personnel is mission essential.
3.1.5 Other Direct Costs:
3.1.5.1 Travel: Travel may include general and administrative expenses, but shall not include profit. Travel is extremely minimal (less than two (2) % of work hours), but may be required. If required, temporary travel locations include the Continental United States and Outside of the Continental United States.
Contractor personnel may be required to travel to off-site locations (e.g., requiring flights, per diem, auto rental, etc.). Expeditious Contractor response shall be required, since notice from the Government regarding travel will be communicated with no less than four (4) days advanced notice.
3.1.5.2 Material: All materials not depleted during the performance of this contract shall become Government Property (GP) upon completion of this contract. The contractor shall transfer all materials not depleted to the COR by way of Material Inspection and Receiving Report (DD Form 250). Material costs may include general and administrative expenses but shall not include profit/fee.”
3.1.6 Subcontractors and Consultants: Provisions stated herein shall be clearly and effectively communicated to all subcontractors providing support under this contract. All provisions of this SOW shall flow down to subcontractors providing support under this contract.
3.1.7 Management of Contractor Personnel: The Government will neither supervise Contractor employees, nor control the method by which the Contractor performs the required tasks. Under no circumstances will the Government assign tasks to, or prepare work assignments for individual Contractor employees. The Contractor shall manage its employees and guard against any actions that are of the nature of personal services, or give the perception of personal services.
3.1.7.1 Non-Personal Service Statement. Contractor employees performing services will be controlled, directed, and supervised at all times by management personnel of the Contractor. Contractor management will ensure that employees comply with the CMSS work standards outlined in the SOW. Contractor employees will perform their duties independently and without the supervision of any Government official. However, due to the critical and high risk nature of the CMSS provided in this contract, the COR/ACOR and/or the Government Quality Assurance Representative (GQAR) (under cognizance of the COR/ACOR), may provide direction to the Contractor in areas mandated by CNAFINST 4790.2 and applicable directives (e.g. safety and QA). The tasks, duties, and responsibilities set forth in this SOW may not be interpreted or implemented in any manner that results in any Contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government (USG), overseeing the work of Government employees, providing direct personal services to any Government employee, or otherwise violating the prohibitions set forth in FAR Parts 7.5 and 37.1.
3.1.8 Mobilization and Transition Out Strategy.
3.1.8.1 Mobilization Phase. The mobilization period is the period after contract award and prior to the Services Start Date (SSD) that the Contractor shall prepare to assume CMSS responsibilities.
3.1.8.1.1 Requirements/Responsibilities.
a. During mobilization, the Contractor shall comply with the mobilization portion of the technical proposal submitted in response to the solicitation. The Contractor shall acquire workforce personnel, attain security clearances, attain National Agency Check with Inquiries / CAC, attain base auto passes, conduct training/certification operations, complete inventory(s) (Government Furnished Property (GFP), IMRL items, SE, tools, etc.), and perform other mobilization tasks in preparation of full CMSS responsibility on the SSD. During this period, the Contractor may observe all maintenance tasks being performed by the transitioning contractor as an on-the-job training (OJT) function, provided it does not interfere with maintenance services. Actual turnover of custody material will be accomplished as near to the end of the mobilization phase as possible in order to align custodial accountability with the change in CMSS responsibility.
b. The Contractor shall submit resumes for all key personnel. Resumes shall be submitted to the COR no later than (NLT) 30 days prior to Contractor Support Date (CSD) for Government review and determination of acceptability. A cover letter, with resumes attached, shall be submitted that includes a list of the incumbent/transitioning personnel and new hire personnel.
1) The cover letter shall include all employee names, any Department of Labor occupational title, and specific SOW qualifications that will be fulfilled (e.g. Supply Technician, Aircraft Mechanic III, Site Manager). The cover letter shall identify any incumbent personnel.
2) Planned employment status (Full-time or Part-time).
3) Anticipated on-site reporting date of employee.
4) Any qualification waivers requested. Waivers will be considered by the CO on a case-by-case basis and granted waivers may not be used as a precedent for future requested waivers.
c. Resumes shall include necessary information and detail to enable the Government to determine how the individual meets SOW qualifications. Resumes for individuals with military or equivalent experience shall annotate rank/rate/title, length of experience, licenses, training/military schools, Navy Enlistment Codes/Military Occupation Specialties, officer designator, and fulfilled positions of leadership (e.g. AVCM F/A-18 Maintenance Master Chief Petty Officer (16 months), supervised 240 personnel in 9 aviation maintenance shops; Maintenance Officer (MO), Collateral Duty Inspector (CDI), Collateral Duty Quality Assurance Representative (CDQAR), etc.). Resumes with cover letters are required for any key personnel replacements or substitutions during this contract per Clause 5252.237-9501 of the contract. Qualification waiver requests will be considered by the Government on a case-by-case basis and may include a probationary period with the waiver acceptance. The Contractor shall provide verification documentation for claimed employee qualifications. The Contractor shall have all personnel on-board at the site, qualified with security clearances (if applicable), or with pending clearances NLT 10 working days prior to the CSD unless otherwise specified in the contract.
d. The Contractor shall complete all inventories (e.g. GFP, Government Furnished Equipment GFE, tool, and IMRL) NLT five (5) working days prior to CSD IAW CDRLs A001 and A002.
e. During mobilization, a joint inventory shall be conducted with Government, Contractor and incumbent contractor to establish a baseline of condition and equipment inventory IAW CDRLs A001 and A002.
f. The Contractor shall develop specific written procedures for all ground operations. The Contractor shall not begin ground operations until the ground operations procedures have been approved by the Ground Government Flight Representatives (GGFR) IAW CDRL A014.
3.1.8.1.2 Joint Meetings. A joint on-site mobilization meeting may be conducted at the request of the Contracting Officer’s Representative after contract award to discuss the Contractor’s mobilization plan and the respective responsibilities of all parties. A joint “Pre-SSD” meeting may be conducted at the request of the Contracting Officer’s Representative (approximately one (1) week prior to SSD) to discuss the Contractor’s readiness to assume full responsibility, outstanding maintenance action forms, repair backlogs/deadlines, and mobilization process.
3.1.8.1.3 Monthly Maintenance Plan Meeting. The Contractor shall attend and participate in the monthly maintenance plan meeting during mobilization in preparation for CMSS for the first month prior to SSD.
3.1.8.1.4 SSD. The Contractor shall be responsible for mobilizing and assuming full CMSS responsibility at SSD.
3.1.8.1.5 Mobilization CDRLs. The Contractor shall be responsible for submitting data lists on CDRL DD Form 1423-1. Per Exhibit A, the following mobilization CDRLs are required:
CDRL#: Title: Subtitle: DID #:
A001 Technical Report – Study/Services IMRL Inventory Report DI-Misc-80508B A002 Technical Report – Study/Services Non-IMRL / Plant Property &
Contractor Property Inventory Report DI-Misc-80508B
A003 Technical Report – Study/Services Contractor Quality Assurance Plan DI-Misc-80508B A004 Technical Report – Study/Services Contractor Safety Plan DI-Misc-80508B A005 Technical Report – Study/Services Information Technology (IT) Personnel
Security Report DI-Misc-80508B
A006 Technical Report – Study/Services CVS-TA/CAC Status Report DI-Misc-80508B A011 Technical Report – Study/Services Contract Funding Status Report DI-Misc-80508B A012 Technical Report – Study/Services Contractor Maintenance Support
Services (CMSS) Measurement and Manning Summary
DI-Misc-80508B
A013 Conference Minutes Conference Minutes DI-Admin- 81250A
A014 Ground Operating Procedures Ground Operating Procedures NAVAIRINST 3710.1
A015 Industrial Hygiene Survey Industrial Hygiene Survey MIL-PRF-2585E
3.1.8.2 Transition Phase.
3.1.8.2.1 Responsibility. The incumbent contractor shall retain all CMSS responsibilities specified in this SOW and shall continue to meet all contractual requirements during the entire transition phase.
3.1.8.2.2 Transition to Successor. If the incumbent is not the successor contractor for the subsequent contract for this requirement, the incumbent shall provide all reasonable support to the succeeding contractor to ensure orderly transition and minimize impact on CMSS. At a minimum, the incumbent shall provide the succeeding contractor access to the site, work centers, materials, and maintenance documentation. In addition, as an OJT function throughout the transition phase, the incumbent shall allow the succeeding contractor to observe all required maintenance and support tasks on a not-to-interfere with maintenance basis. The transition phase will be the last two
(2) months (~60 days) of service of the contract or any portion of the contract requirement that terminates prior to the end of the contract.
3.1.8.2.3 GFP Inventory. The Contractor shall perform all inventories of tools, GFP, equipment, SE, and technical data IAW the GFP clause in the contract schedule. Inventory reports for the transition phase shall be submitted IAW CDRLs A001 and A002 (e.g. GFP, GFE, tool, and IMRL).
3.1.8.2.4 Facilities. Facility condition will be determined by Government inspection during the transition phase or near contract expiration.
3.1.8.2.5 Transition CDRLs. The Contractor shall be responsible for submitting data lists on CDRL DD Form 1423-
1. The Contractor’s overall transition out strategy shall be built around maintaining the mission of the program/division with minimal impact, not only in terms of timeliness of performance, but also to ensure that critical data and knowledge transfer occurs. Upon termination or expiration of the contract, the Contractor shall ensure an orderly transition of responsibilities, while minimizing impact to the operation. The Contractor shall submit a Transition Out Plan, to include the minimum elements listed below:
CDRL#: Title: Subtitle: DID #:
A001 Technical Report –
Study/Services IMRL Inventory Report DI-Misc-80508B
A002 Technical Report – Study/Services
Non-IMRL / Plant Property & Contractor Property Inventory Report
DI-Misc-80508B
A003 Technical Report – Study/Services
Contractor Quality Assurance Plan DI-Misc-80508B
A004 Technical Report – Study/Services
Contractor Safety Plan DI-Misc-80508B
A005 Technical Report – Study/Services
Information Technology (IT) Personnel Security Report
DI-Misc-80508B
A006 Technical Report – Study/Services
CVS-TA/CAC Status Report DI-Misc-80508B
A010 Progress Status and Management Report
Maintenance Action Summary Report DI-Misc-80508B
A011 Technical Report – Study/Services
Contract Funding Status Report DI-Misc-80508B
A012 Technical Report – Study/Services
Contractor Maintenance Support Services (CMSS) Measurement and Manning Summary
DI-Misc-80508B
A013 Conference Minutes Conference Minutes DI-Admin-81250C A014 Ground Operating Procedures Ground Operating Procedures NAVAIRINST
3710.1 A015 Industrial Hygiene Survey Industrial Hygiene Survey MIL-PRF-2585E
Work Turnover. The Contractor shall provide a plan of action to effectively transfer tasked work that is in process at the expiration or termination of the contract to the successor contractor. Establish and maintain effective communication with the incoming contractor or Government personnel for the period of transition via weekly status meetings.
QA. The Contractor shall provide a plan of action to ensure continuation of quality review processes during the transition period to the successor contractor.
Risk Mitigation Strategies. The Contractor shall provide a plan of action to mitigate contract performance risks (quality and schedule) encountered during the transition period.
Data/Information Transfer. The Contractor shall provide a plan of action for the efficient inventory and transfer of program data to the successor contractor.
3.1.9 Program Unique Requirements: Not Applicable (N/A).
3.2 Security
3.2.1 Citizenship Requirements: Only United States (U.S.) citizens may perform under this contract. If the Contractor cannot find qualified U.S. citizens to perform the work, the Contractor shall submit a citizenship waiver request with justification to the Government Security Office. The waiver request should include:
a. The individual's name, date and place of birth, position title, and current citizenship.
b. A statement that a qualified U.S. citizen cannot be hired in sufficient time to meet the contractual requirements.
c. A statement of the unusual expertise possessed by the applicant.
d. A statement that access will be limited to a specific Government contract (specify contract number).
e. A statement that the Contractor has obtained an export license for the information required to perform the contract.
3.2.2 Investigative Requirements:
Unclassified: All Contractor personnel must be eligible to perform Non-Critical Sensitive work as defined by SECNAVINST 5510.30C. All Contractor personnel are required to have a favorably adjudicated Tier-3 investigation from the Office of Personnel Management. The Contractor shall submit a request for personnel security investigation to the Government Security Office. The Government Security Office shall initiate the Contractor's Electronic Questionnaire for Investigations Processing (eQIP), and shall do a preliminary screening of the Contractor's eQIP for suitability and derogatory information. The Contractor employee shall provide all requested information pursuant to the Privacy Act of 1974. The Government Security Office may deny the Contractor access to Government facilities and information and may prohibit the Contractor from performance of sensitive duties for failure to provide requested information or when derogatory or adverse information is present on the Contractor's eQIP. In such cases, the Contractor employee may not perform on the Contract.
The Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of controlled unclassified information (CUI) and to control distribution of CUI IAW 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), and SECNAVINST 5510.36B. All Contractor facilities shall provide an appropriate means of storage for CUI and materials. All CUI shall be appropriately identified and marked IAW DOD Instruction 5200.48.
CUI including Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DOD Instruction 5200.48.
CUI available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DODI 5230.24 (Distribution Statements on Technical Documents); and have this statement displayed per DODI 5230.24, Enclosure 3.
All controlled unclassified technical information shall be appropriately identified and marked with the following distribution statement(s) and Export Control warnings IAW DODI 5230.24, and program Security Classification Guidance:
Distribution Statement (Insert Appropriate Letter and Authorization Title), (Insert Appropriate Reason Category) (dated – (Date of Distribution Authorization). Other requests shall be referred to: Commander, Naval Air Systems Command, Attn: (Program/User Agency mailing address).
3.2.3 CAC, System Authorization Access Request (SAAR-N), DD-254.
3.2.3.1 SAAR-N: All Contractor personnel requiring access to Government IT systems shall have an approved SAAR-N Form OPNAV 5239/14 (Rev Sep 2011) on file, and complete required Annual Information Awareness Training. New employees must submit their SAAR-N forms within thirty (30) days of their first day of work.
Instructions for processing the SAAR-N forms are available at:
http://www.cnrc.navy.mil/publications/Forms/OPNAV_5239_14_SAAR_N.pdf.
SAAR-N forms shall be submitted to the COR, TPOC, or to the assigned Government Trusted Associate Sponsorship System Trusted Associate.
3.2.3.2 CAC/Local Badges: Contractor CACs and facility specific identification badges will be issued by the Government to on-site Contractor personnel and shall be visible at all times while personnel are at the Government site. The Contractor shall furnish all requested information required to facilitate issuance of identification badges and shall conform to DODI 5200.46 September 9, 2014 Incorporating Change 1, Effective May 4, 2018. All CACs and identification badges issued to Contractor employees shall be returned to the Government Security Department at the Government site IAW DODM 1000.13-M-V1, January 23, 2014 following completion of the contract, relocation or termination of an employee, or upon request from the COR. The Government will provide the Contractor access to Government facilities, as required, for performance of tasks under this contract. Contractor personnel shall comply with DOD 5220.22-M NISPOM, February 28, 2006, Incorporating Change 2, May 18, 2016.
3.2.3.3 DD-254: The Contractor shall comply with security requirements specified in the DD-254 (Attachment 10).
Information or data that the Contractor accesses shall be handled at the appropriate classification level, unclassified information shall be handled as “CUI”. Distribution is authorized to the Requiring Office’s Organization and supported Activity only. Other requests for deliverables under this contract shall be referred to the TPOC/COR of this contract for approval.
3.2.4 Information Security. The Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and CUI…