About this file

N68335-16-R-0052 AMENDMENT 2

View the file

Other files

File Type Posted
N68335-16-R-0052_Amendment__1.docx DOCX document
N68335-16-R-0052_Solicitation.docx DOCX document
B_-_FORS_Logistics_CDRLS_Rev_D_20160322.docx DOCX document
3_-_FORS_ALSSOW_REV_C_20140914.docx DOCX document
2_-_FORS_System_Performance_Specification_20160322.docx DOCX document
A_-_FORS_Technical_CDRL__20160322.xlsx XLSX spreadsheet
1_-_FORS_Statement_of_Work__20160322.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N68335-16-R-0052

Section A - Solicitation/Contract Form

SECTION A

SECTION A

1. This will be a five (5) year Fixed-Price indefinite delivery, indefinite quantity (IDIQ) contract with one (1) base year and four (4) ordering periods for the procurement of the Fiber Optic Repair Set (FORS) in accordance with Section J, Attachment 1 "Engineering Statement of Work for the Fiber Optic Repair Set", Attachment 2 "System Specification for the Fiber Optic Repair Set", Attachment 3 "Acquisition Logistics Support Statement of Work for the Fiber Optic Repair Set", and Exhibits A and B, “DD Form 1423, Contract Data Requirements List."

2. A Single-Award Contract is intended to be issued for this requirement.

3. This procurement will be a 100% small business set aside. The North American Industry Classification System (NAICS) Code is 334417 with a size standard of 500 employees.

4. The minimum quantity for this contract is two (2) each Fiber Optic Repair Set (FORS) Pilot Production Units (CLIN 0001); and technical data, training material and testing (CLINs 0002-0029). The guaranteed minimum will be met on Delivery Order 0001 upon award of the basic contract.

5. The maximum quantity for this contract is two (2) Pilot Production Units; technical data, training material, and testing; and four hundred (400) Production FORS units (100 production units in each of the four ordering periods).

6. Delivery Orders may be placed as follows:

Base Ordering Period CLINs 0001 – 0029; from date of contract award through 365 days after contract award.

Ordering Period 1, CLINs 0100 – 0102; from date of release for production through 365 days after Government release for production.

Ordering Period 2, CLINs 0200 – 0202; from date of release for production through 730 days after Government release for production.

Ordering Period 3, CLINs 0300 – 0302; from date of release for production through 1,095 days after Government release for production.

Ordering Period 4, CLINs 0400 – 0402; from date of release for production through 1,460 days after Government release for production.

7. The completion of Contractor and Government Pilot Production Testing and the issuance of production delivery orders are separate events. Release for production must be granted before production may commence. In no case will release for production be granted prior to successful completion of Contractor and Government pilot production testing.

8. For clarification purposes, the term Pilot Production is synonymous with First Article.

9. Pilot-Production Qualification Test Units are not considered part of the production quantities.

10. The Acquisition Logistics Support Statement of Work (ALSSOW) contains: Provisioning Statement of Work (PSOW), Data Item Descriptions (DIDs), and Technical Manual Contract Requirement (TMCR).

11. Proposal validity shall be for 180 days or longer as annotated by the offeror in Block 12 of the cover page of the SF33.

12. The Government Point of Contact is:Keith Welge
keith.welge@navy.mil
(732) 323-7213
13. Mail proposal to:Naval Air Warfare Center
Aircraft Division Lakehurst
Route 547, Mail Stop 562-306
Joint Base MDL, NJ 08733-5000
Attn: Keith Welge 2.5.2.1.1

In accordance with Section L, sealed offers with original and five (5) copies of the Technical and Past Performance Volumes and one (1) copy of the Price Volume for furnishing the supplies or services in the schedule are due by 09 May 2016, 16:00 EDT. Proposals are not to be submitted via facsimile or electronically via email.

AMENDMENT #1

The purpose of this amendment is to answer questions received in response to the FORS solicitation.

All other terms and conditions remain unchanged.

The Government Point of Contact is:Keith Welge
keith.welge@navy.mil
(732) 323-7213

QUESTION #1

In the System Specification, page 7, there is a table of five fiber optic cables. It seems that at least three of them are no longer available, or at least current information on them is lacking. Are these part numbers are still available?

ANSWER #1

Yes, additional information is provided in the table below.

4.2.1.1 Fiber types - The fiber types requirements in section 3.2.1.1 shall be verified via demonstration by performing 25 splices on each of the following fiber types (or their equivalents). The table below has a listing of the sizes and alternate manufacturer’s part numbers.

FIBER SIZE
TYPE
P/N
MANUFACTURER
COMMENTS
9/125
SM
F19163
Optical Fiber Solutions (OFS)
OFS Specialty Photonics Division, phone

860-678-0371

9/125
SM
RMS12-2515 Type 1
Raytheon
50/125
MM-GI
C14370
OFS
50/125
MM-GI
BC06815
OFS
50/125
MM-GI
AS5382/5

Society of Automotive Engineers (SAE) Spec

62.5/125
MM-GI
M85045/16-01
Draka
62.5/125
MM-GI
S458T-01-62G
Draka
62.5/125
MM-GI
OC 1468
General Cable
62.5/125
MM-GI
OC-0003213
Optical Cable Corporation (OCC)
62.5/125
MM-GI
M62SX01C3NLO20
Fiber Instrument Sales (FIS)
100/140
MM-GI
OC 1260
General Cable
Polyimide buffer
100/140
MM-GI
AS5382/1

SAE Spec

200/230
MM-SI
CF01493-10
OFS
200/230
MM-SI
AS5382/6

SAE Spec

QUESTION #2

Can proposals contain multiple configurations?

ANSWER #2

No, proposals cannot contain multiple configurations. However, alternate proposals are acceptable in accordance with Section L, Part A, of the solicitation.

QUESTION #3

In the SPS, paragraph 4.3.2, reference is made to Table V of MIL-STD-461F. However, it is Table IV that lists the specific tests. Should the reference be to Table IV?

ANSWER #3

Yes, Table IV is the correct reference.

AMENDMENT #2

The purpose of this amendment is extend the due date for proposals from 09 May 2016, 16:00 EDT to 16 May 2016, 16:00 EDT.

In accordance with Section L, sealed offers with original and five (5) copies of the Technical and Past Performance Volumes and one (1) copy of the Price Volume for furnishing the supplies or services in the schedule are due by 16 May 2016, 16:00 EDT. Proposals are not to be submitted via facsimile or electronically via email.

All other terms and conditions remain unchanged.

The Government Point of Contact is:Keith Welge
keith.welge@navy.mil
(732) 323-7213

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2
Each

Pilot-Production Qualification Test Unit

FFP

Pilot-Production Qualification Test (PPQT) units In accordance with Section J, Attachment 1 "Engineering Statement of Work for the Fiber-Optic Repair Sets (FORS)", Attachment 2 "System Specification for the Fiber-Optic Repair Sets (FORS)", Attachment 3 "Acquisition Logistics Support Statement of Work for the Fiber-Optic Repair Sets (FORS)", and Exhibits A and B, “DD Form 1423, Contract Data Requirements List" in Section J.

Pilot-Production Qualification Test Units are due 30 days after successful completion of PPQT in accordance with the Engineering SOW and SPS.

FOB: Destination

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Configuration Management Plan

Configuration Management Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.6 and CDRL A001 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Pilot-Production Qualification Test

Pilot-Production Qualification Test (PPQT) Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.3.1.1 and CDRL A002 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Pilot-Production Qualification Test

Pilot-Production Qualification Test (PPQT) Procedures - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.3.1.2 and CDRL A003 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Pilot-Production Qualification Test

Pilot-Production Qualification Test (PPQT) Report - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.3.1.3 and CDRL A004 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Requirements Verification Matrix

Requirements Verification Matrix (RVM) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.3.1.4 and CDRL A005 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Hazardous Materials Management Program

Hazardous Materials Management Program (HMMP) Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.5 and CDRL A006 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Hazardous Materials Management Program

Hazardous Materials Management Program (HMMP) Report - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.5 and CDRL A007 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Request for Deviation

Request for Deviation - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.6 and CDRL A008 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Production and Quality Assurance

Productionand and Quality Assurance Plans and Processes - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.2.5 and CDRL A009 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Lithium Battery Report

Lithium Battery Report - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.5.1 and CDRL A010 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
10
Each

Conference Agenda

Conference Agenda - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.1 and CDRL B001 in Section J.

Up to 10 - priced as each

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
10
Each

Conference Minutes

Conference Minutes - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.1 and CDRL B001 in Section J.

Up to 10 - priced as each

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Integrated Master Schedule (PPQT units)

Integrated Master Schedule (IMS) (PPQT units) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

Up to 12 - priced as each

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Schedule Status Reports (PPQT units)

Schedule Status Reports (PPQT units) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Risk Management Plan

1Risk Management Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.4 and CDRL B004 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0016AA

1
Each

DRAFT Risk Management Plan

DRAFT Risk Management Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.4 and CDRL B004 in Section J.

Due 30 calendar days prior to the PDR/CDR event.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0016AB

1
Each

FINAL Risk Management Plan

FINAL Risk Management Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.4 and CDRL B004 in Section J.

Due 15 calendar days after the PDR/CDR event.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Logistics Product Data

Logistics Product Data - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraphs 4.2 the Provisioning Statement of Work (PSOW) Paragraphs 11 & 14 and CDRL L001 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Maintenance Planning (MaPl) Input Data

Maintenance Planning (MaPl) Input Data - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 4.4 and CDRL L002 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Provisioning Input Data

Provisioning Input Data - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 4.7.1 and CDRL L003 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Design Change Notices

Design Change Notices - In accordance with the Provisioning Statement of Work (PSOW) Paragraph 12, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 7.0 and CDRL L004 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Engineering Data for Provisioning

Engineering Data for Provisioning - In accordance with the Provisioning Statement of Work (PSOW) Paragraphs 5, 6, 7, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 4.7.4 and CDRL L005 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Statement of Prior Submission

Statement of Prior Submission - In accordance with Provisioning Statement of Work (PSOW) Paragraph 13, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 4.7.5 and CDRL L006 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Technical Manual

Technical Manual - In accordance with the Technical Manual Contract Requirement (TMCR) Volume 13-013, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 5.0 and CDRL L007 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0023AA

1
Each

Technical Manual First Review

Technical Manual In Process Review (IPR) - In accordance with Table 1, First Review Execution Criteria in the Technical Manual Contract Requirement (TMCR) Volume 13-013, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 5.0 and CDRL L007 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0023AB

1
Each

Technical Manual Second Review

Technical Manual In Process Review (IPR) - In accordance with Table 2, Second Review Execution Criteria in the Technical Manual Contract Requirement (TMCR) Volume 13-013, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 5.0 and CDRL L007 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0023AC

1
Each

Technical Manual Third Review

Technical Manual In Process Review (IPR) - In accordance with Table 3, Third Review Execution Criteria in the Technical Manual Contract Requirement (TMCR) Volume 13-013, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 5.0 and CDRL L007 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0023AD

1
Each

Technical Manual Fourth Review

Technical Manual In Process Review (IPR) - In accordance with Table 4, Final Review Execution Criteria in the Technical Manual Contract Requirement (TMCR) Volume 13-013, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 5.0 and CDRL L007 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Interim Support Items List

Interim Support Items List - In accordance with the Provisioning Statement of Work (PSOW) Paragraph 9, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 6.2 and CDRL L008 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Long Lead Time Item List

Long Lead Time Item List- In accordance with the Provisioning Statement of Work (PSOW) Paragraph 10, the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 6.3 and CDRL L009 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Training

Training - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) and CDRL L010 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0026AA

1
Each

Training - Course Conduct Information

Training - Course including the Conduct Information Package- In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraphs 8.2, and CDRL L010 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0026AB

1
Each

Initial Factory Training

Initial Factory Training - to include the Course Conduct Information Package - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraphs 8.3 and CDRL L010 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Diminishing Mfg. Sources & Material

Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 11.2 and CDRL L011 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Item Unique Identification (IUID) Plan

Item Unique Identification (IUID) Plan - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 12.0 and CDRL L012 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Technical Manual Validation Cert.

Technical Manual Validation Certification including Copyright Release and Duplication Authority for Government Use - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 5.1, 5.2, 5.5, TMCR 13-013 and CDRL L013 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

FORS Production Unit - Ordering Year 1

FORS Production Unit - Ordering Year 1 - (maximum quantity 100) IAW SOW, System Performance Specification, ALSSOW and CDRLs.

RANGE QUATITIES

QuantityUnit Price
01-19$____________
20-49$____________
50-79$____________
80-100$____________

FOB: Origin

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Integrated Master Schedule - Year 1

Integrated Master Schedule (IMS) (Ordering Year 1) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Schedule Status Reports - Year 1

Schedule Status Reports (Ordering Year 1) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

FORS Production Unit - Ordering Year 2

FORS Production Unit - Ordering Year 2 - (maximum quantity 100) IAW SOW, System Performance Specification, ALSSOW and CDRLs in Section J.

RANGE QUATITIES

QuantityUnit Price
01-19$____________
20-49$____________
50-79$____________
80-100$____________

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Integrated Master Schedule - Year 2

Integrated Master Schedule (IMS) (Ordering Year 2) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Schedule Status Reports - Year 2

Schedule Status Reports (Ordering Year 2) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

FORS Production Unit - Ordering Year 3

FORS Production Unit - Ordering Year 3 - (maximum quantity 100) IAW SOW, System Performance Specification, ALSSOW and CDRLs in Section J.

RANGE QUATITIES

QuantityUnit Price
01-19$____________
20-49$____________
50-79$____________
80-100$____________

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Integrated Master Schedule - Year 3

Integrated Master Schedule (IMS) (Ordering Year 3) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Schedule Status Reports - Year 3

Schedule Status Reports (Ordering Year 3) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

FORS Production Unit - Ordering Year 4

FORS Production Unit - Ordering Year 4 - (maximum quantity 100) IAW SOW, System Performance Specification, ALSSOW and CDRLs in Section J.

RANGE QUATITIES

QuantityUnit Price
01-19$____________
20-49$____________
50-79$____________
80-100$____________

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Integrated Master Schedule - Year 4

Integrated Master Schedule (IMS) (Ordering Year 4) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Each

Schedule Status Reports - Year 4

Schedule Status Reports (Ordering Year 4) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

MAX

Section C - Descriptions and Specifications

SECTION C

Item 0001 – Base Year – The contractor shall provide two (2) Pilot-Production Qualification Test (PPQT) units in accordance with Section J, Attachment 1 "Engineering Statement of Work for the Fiber-Optic Repair Sets (FORS)", Attachment 2 "System Specification for the Fiber-Optic Repair Sets (FORS)" dated, Attachment 3 "Acquisition Logistics Support Statement of Work for the Fiber-Optic Repair Sets (FORS)", and Exhibits A and B, “DD Form 1423, Contract Data Requirements List" in Section J. Pilot-Production Qualification Test Units are due 30 days after successful completion of PPQT in accordance with the Engineering SOW and SPS.

Item 0002 – Base Year – The contractor shall provide Configuration Management Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.6 and CDRL A001 in Section J.

Item 0003 – Base Year – The contractor shall provide Pilot-Production Qualification Test (PPQT) Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.3.1.1 and CDRL A002 in Section J.

Item 0004 – Base Year – The contractor shall provide Pilot-Production Qualification Test (PPQT) Procedures - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.3.1.2 and CDRL A003 in Section J.

Item 0005 – Base Year – The contractor shall provide Pilot-Production Qualification Test (PPQT) Report - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.3.1.3 and CDRL A004 in Section J.

Item 0006 – Base Year – The contractor shall provide Requirements Verification Matrix (RVM) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.3.1.4 and CDRL A005 in Section J.

Item 0007 – Base Year – The contractor shall provide Hazardous Materials Management Program (HMMP) Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.5 and CDRL A006 in Section J.

Item 0008 – Base Year – The contractor shall provide Hazardous Materials Management Program (HMMP) Report - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.5 and CDRL A007 in Section J.

Item 0009 – Base Year – The contractor shall provide Request for Deviation - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.6 and CDRL A008 in Section J.

Item 0010 – Base Year – The contractor shall provide Production and Quality Assurance Plans and Processes - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.2.5 and CDRL A009 in Section J.

Item 0011 – Base Year – The contractor shall provide Lithium Battery Report - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.5.1 and CDRL A010 in Section J.

Item 0012 – Base Year – The contractor shall provide up to 10 Conference Agendas (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.1 and CDRL B001 in Section J.

Item 0013 – Base Year – The contractor shall provide up to 10 Conference Minutes (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.1 and CDRL B001 in Section J.

Item 0014 – Base Year – The contractor shall provide Integrated Master Schedule (IMS) (PPQT units) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

Item 0015 – Base Year – The contractor shall provide up to 12 Schedule Status Reports for the PPQT units (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

Item 0016 – Base Year – The contractor shall provide a Risk Management Plan - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.4 and CDRL B004 in Section J. This will include submission of a Draft Risk Management Plan, 30 calendar days prior to the PDR/CDR event (SLIN 0016AA), and a Final Risk Management Plan, 15 calendar days after the PDR/CDR event (SLIN 0016AB).

Item 0017 – Base Year – The contractor shall provide Logistics Product Data - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraphs 4.2 the Provisioning Statement of Work (PSOW) Paragraphs 11 & 14 and CDRL L001 in Section J.

Item 0018 – Base Year – The contractor shall provide Maintenance Planning (MaPl) Input Data - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 4.4 and CDRL L002 in Section J.

Item 0019 – Base Year – The contractor shall provide Provisioning Input Data - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 4.7.1 and CDRL L003 in Section J.

Item 0020 – Base Year – The contractor shall provide Design Change Notices - In accordance with the Provisioning Statement of Work (PSOW) Paragraph 12 and the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 7.0 and CDRL L004 in Section J.

Item 0021 – Base Year – The contractor shall provide Engineering Data for Provisioning - In accordance with the Provisioning Statement of Work (PSOW) Paragraphs 5, 6, 7 and the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 4.7.4 and CDRL L005 in Section J.

Item 0022 – Base Year – The contractor shall provide Statement of Prior Submission - In accordance with Provisioning Statement of Work (PSOW) Paragraph 13 and the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 4.7.5 and CDRL L006 in Section J.

Item 0023 – Base Year – The contractor shall provide Technical Manual - In accordance with the Technical Manual Contract Requirement (TMCR) Volume 13-013 and the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 5.0 and CDRL L007 in Section J. This will include submissions of the In Process Review (IPR) for the Technical Manual First Review (SLIN 0023AA), IPR Technical Manual Second Review (SLIN 0023AB), IPR Technical Manual Third Review (SLIN 0023AC) and IPR Technical Manual Fourth Review (SLIN 0023AD)

Item 0024 – Base Year – The contractor shall provide Interim Support Items List - In accordance with the Provisioning Statement of Work (PSOW) Paragraph 9 and the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 6.2 and CDRL L008 in Section J.

Item 0025 – Base Year – The contractor shall provide Long Lead Time Item List- In accordance with the Provisioning Statement of Work (PSOW) Paragraph 10 and the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 6.3 and CDRL L009 in Section J.

Item 0026 – Base Year – The contractor shall provide “Training Course” including the Conduct Information Package- In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraphs 8.2 and CDRL L010 in Section J. The contractor shall provide Initial Factory Training to include the Course Conduct Information Package - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraphs 8.3 and CDRL L010 in Section J.

Item 0027 – Base Year – The contractor shall provide Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 11.2 and CDRL L011 in Section J.

Item 0028 – Base Year – The contractor shall provide Item Unique Identification (IUID) Plan - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 12.0 and CDRL L012 in Section J.

Item 0029 – Base Year –Technical Manual Validation Certification including Copyright Release and Duplication Authority for Government Use - In accordance with the Acquisition Logistics Support Statement of Work (ALSSOW) Paragraph 5.1, 5.2, 5.5, TMCR 13-013 and CDRL L013 in Section J.

Item 0100 – Year 1 – The contractor shall provide FORS Production Unit(s) - Ordering Year 1 - (maximum quantity 100) IAW SOW, System Performance Specification, ALSSOW and CDRLs. Full-Rate Production (FRP) Units will be ordered in accordance with the Engineering SOW, provided that release for production has been authorized. The contractor shall deliver the production units 150 days after receipt of the delivery order. The government will supply shipping instructions for each delivery order after contract award.

Item 0101 – Year 1 – The contractor shall provide up to 12 Integrated Master Schedules (IMS) in Ordering Year 1 (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

Item 0102 – Year 1 – The contractor shall provide up to 12 Schedule Status Reports in Ordering Year 1 (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

Item 0200 – Year 2 – The contractor shall provide FORS Production Unit(s) - Ordering Year 2 - (maximum quantity 100) IAW SOW, System Performance Specification, ALSSOW and CDRLs in Section J. Full-Rate Production (FRP) Units will be ordered in accordance with the Engineering SOW, provided that release for production has been authorized. The contractor shall deliver the production units 150 days after receipt of the delivery order. . The government will supply shipping instructions for each delivery order after contract award.

Item 0201 – Year 2 – The contractor shall provide up to 12 Integrated Master Schedules (IMS) in Ordering Year 2 (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

Item 0202 – Year 2 – The contractor shall provide up to 12 Schedule Status Reports in Ordering Year 2 (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

Item 0300 – Year 3 – The contractor shall provide FORS Production Unit(s) - Ordering Year 3 - (maximum quantity 100) IAW SOW, System Performance Specification, ALSSOW and CDRLs in Section J. Full-Rate Production (FRP) Units will be ordered in accordance with the Engineering SOW, provided that release for production has been authorized. The contractor shall deliver the production units 150 days after receipt of the delivery order. The government will supply shipping instructions for each delivery order after contract award.

Item 0301 – Year 3 – The contractor shall provide up to 12 Integrated Master Schedules (IMS) in Ordering Year 3 (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

Item 0302 – Year 3 – The contractor shall provide up to 12 Schedule Status Reports in Ordering Year 3 (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

Item 0400 – Year 4 – The contractor shall provide FORS Production Unit(s) - Ordering Year 4 - (maximum quantity 100) IAW SOW, System Performance Specification, ALSSOW and CDRLs in Section J. Full-Rate Production (FRP) Units will be ordered in accordance with the Engineering SOW, provided that release for production has been authorized. The contractor shall deliver the production units 150 days after receipt of the delivery order. The government will supply shipping instructions for each delivery order after contract award.

Item 0401 – Year 4 – The contractor shall provide up to 12 Integrated Master Schedules (IMS) in Ordering Year 4 (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.2 and CDRL B002 in Section J.

Item 0402 – Year 4 – The contractor shall provide up to 12 Schedule Status Reports in Ordering Year 4 (priced as each) - In accordance with the Engineering Statement of Work (SOW) Paragraph 3.2.1.3 and CDRL B003 in Section J.

Section D - Packaging and Marking

CLAUSES INCORPORATED BY FULL TEXT

5252.223-9502HAZARDOUS MATERIAL (NAVAIR)(APR 2009) -
(a) Packaging, Packing, Marking, Labeling and Certification of Hazardous materials for shipment by any mode or combination of transportation modes shall be prepared (properly classed, described, packaged, marked, labeled, transport vehicle placarded, etc.) for shipment in accordance with MIL-STD-129 and Title 49 Code of Federal Regulations (CFR), Part 100-199 as applicable. In the event of any contradictions between the documents, 49 CFR shall govern or the applicable modal transport regulation.
(b) In the event of a conflict between specific requirements in the contract or order and existing applicable modal transport regulations, the regulations shall take precedence. Under no circumstances shall the contractor knowingly use materials, markings or procedures that are not in accordance with laws and regulations applicable to the mode of transportation employed.
(c) To ascertain which Department of Defense, or local installation regulations, concerning hazardous materials may have impact on this contract, the contractor should contact: Environmental Director

Environmental Director, Lakehurst

(732) 323-7544 Building 5 Floor 1 Lakehurst, NJ 08733-5060

5252.247-9503MARKING OF WARRANTED ITEMS (NAVAIR) (OCT 2005)
(a) Each item covered by a warranty shall be stamped or marked in accordance with MIL-STD-129, Marking for Shipment and Storage, and MIL-STD-130, Identification Marking of U.S. Military Property, current at the date of award. Where this is impracticable, written notice shall be attached to or furnished with the warranted item.
(b) Each item covered by a warranty shall have a written notice attached to or furnished with the warranted item, and marked with the following:
(1) National stock number or manufacturer's part number.
(2) Serial number or other item identifier (if the warranty applies to uniquely identified items).
(3) Contract number.
(4) Indication that a warranty applies.
(5) Manufacturer or entity (if other than the contractor) providing the warranty.
(6) Date or time when the warranty expires.
(7) Indication of whether or not attempted on-site repair by Government personnel will void the warranty.
5252.247-9507PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005)
(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M.
(b) The contractor shall prominently display on the cover of each report the following information:
(1) Name and business address of contractor.
(2) Contract Number/Delivery/Task order number.
(3) Contract/Delivery/Task order dollar amount.
(4) Whether the contract was competitively or non-competitively awarded.
(5) Name of sponsoring individual.
(6) Name and address of requiring activity.
5252.247-9508PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
5252.247-9509PRESERVATION, PACKAGING, PACKING AND MARKING (NAVAIR)(JUL 1998)
(a) Preservation, packaging and packing shall conform to prevailing industry standards for the type of commodity purchased under this contract.
(b) All packages will be clearly marked with applicable contract number/delivery order number, and will contain appropriate packing slip. All deliveries will be marked for and/or consigned as follows: specific instructions will be included in the delivery order.
(c) In the event of any discrepancy in material shipped (overage, technical rejection, damage), the contractor shall, immediately upon request of the Contracting Officer, furnish disposition instructions. Normally, such disposition instruction shall be a properly completed Commercial Bill of Lading, which includes, but is not limited to, the mode of shipment, routing, special handling, and so forth.
(d) If the contractor is required to install equipment upon delivery, then the contractor shall inform the Government of the date of shipment from the contractor’s facilities and the anticipated date of arrival at the site. This report shall be made no later than the actual date that the shipment is made from the contractor’s facilities. The report may be made by facsimile or e-mail, to the point of contact listed in Section G. All transportation, rigging, drayage, packing, unpacking, and handling necessary to accomplish the installation shall be the responsibility of the contractor.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Origin
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
0004
Destination
Government
Destination
Government
0005
Destination
Government
Destination
Government
0006
Destination
Government
Destination
Government
0007
Destination
Government
Destination
Government
0008
Destination
Government
Destination
Government
0009
Destination
Government
Destination
Government
0010
Destination
Government
Destination
Government
0011
Destination
Government
Destination
Government
0012
Destination
Government
Destination
Government
0013
Destination
Government
Destination
Government
0014
Destination
Government
Destination
Government
0015
Destination
Government
Destination
Government
0016
Destination
Government
Destination
Government
0016AA
Destination
Government
Destination
Government
0016AB
Destination
Government
Destination
Government
0017
Destination
Government
Destination
Government
0018
Destination
Government
Destination
Government
0019
Destination
Government
Destination
Government
0020
Destination
Government
Destination
Government
0021
Destination
Government
Destination
Government
0022
Destination
Government
Destination
Government
0023
Destination
Government
Destination
Government
0023AA
Destination
Government
Destination
Government
0023AB
Destination
Government
Destination
Government
0023AC
Destination
Government
Destination
Government
0023AD
Destination
Government
Destination
Government
0024
Destination
Government
Destination
Government
0025
Destination
Government
Destination
Government
0026
Destination
Government
Destination
Government
0026AA
Destination
Government
Destination
Government
0026AB
Destination
Government
Destination
Government
0027
Destination
Government
Destination
Government
0028
Destination
Government
Destination
Government
0029
Destination
Government
Destination
Government
0100
Origin
Government
Origin
Government
0101
Destination
Government
Destination
Government
0102
Destination
Government
Destination
Government
0200
Origin
Government
Origin
Government
0201
Destination
Government
Destination
Government
0202
Destination
Government
Destination
Government
0300
Origin
Government
Origin
Government
0301
Destination
Government
Destination
Government
0302
Destination
Government
Destination
Government
0400
Origin
Government
Origin
Government
0401
Destination
Government
Destination
Government
0402
Destination
Government
Destination
Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996
52.246-16
Responsibility For Supplies
APR 1984
252.246-7000
Material Inspection And Receiving Report
MAR 2008
52.246-11HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard selected below.
ANSI/ISO/ASQ Q9001-2008
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-- (i) Control of such things as design, work operations, in-process control, testing, and inspection; or (ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
5252.246-9512INSPECTION AND ACCEPTANCE (NAVAIR) (OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by the applicable DCMA office.
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
5252.246-9514INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR) (FEB 1995)
Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate.

Section F - Deliveries or Performance

DELIVERY SCHEDULE

See Clause 52.211-8 for schedule.

52.211-17
Delivery of Excess Quantities
SEP 1989
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-29
F.O.B. Origin
FEB 2006
52.247-34
F.O.B. Destination
NOV 1991
52.211-8TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NUMBER
MAX QTY
WITHIN DATE AFTER

DELIVERY ORDER

DELIVERY ADDRESS

2 Each

Pilot-Production Qualification Test Units are due 30 days after successful completion of PPQT in accordance with the Engineering SOW and SPS.

Contractor testing shall be completed within 315 days after contract award.

(Pilot-production units are separate from production units and will not be counted as production units.)

PPQT - Contractor’s facility using the 2 PPUs.

IGT – After successfully completing PPQT, the 2 PPUs will be Delivered for Independent Government Testing (IGT). Delivery of the PPUs will be FOB Destination to Patuxent River, MD. The exact delivery address will be provided at time of delivery order award.

FOB: Destination

0002-0029, 0101, 0102, 0201, 0202, 0301, 0302, 0401 & 0402
1 Each
In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A or B.

In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A or B.

FOB: Destination

0100
100 Each Maximum
FORS Production Unit(s) - Ordering Year 1 - (maximum quantity 100). The contractor shall deliver the production units 150 days after receipt of the delivery order.

*See Note The delivery address(es) will be provided at time of delivery order award.

0200
100 Each Maximum
FORS Production Unit(s) - Ordering Year 2 - (maximum quantity 100). The contractor shall deliver the production units 150 days after receipt of the delivery order.

The delivery address(es) will be provided at time of delivery order award.

0300
100 Each Maximum
FORS Production Unit(s) - Ordering Year 3 - (maximum quantity 100). The contractor shall deliver the production units 150 days after receipt of the delivery order.

The delivery address(es) will be provided at time of delivery order award.

0400
100 Each Maximum
FORS Production Unit(s) - Ordering Year 4 - (maximum quantity 100) IAW SOW. The contractor shall deliver the production units 150 days after receipt of the delivery order.

The delivery address(es) will be provided at time of delivery order award.

*Note - Award of Delivery Orders and Release for Production are separate events; both must occur before production may commence. In no case will Release for Production be granted prior to successful completion of Contractor and Government Pilot Production Qualification Testing.

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

WITHIN DAYS AFTER
ITEM NO.QUANTITYDATE OF CONTRACT

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

5252.216-9506MINIMUM AND MAXIMUM QUANTITIES (NAVAIR) (MAR 1999)
As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is two (2) each Fiber Optic Repair Set (FORS) Pilot Production Units (CLIN 0001); technical data, training material and testing (CLINs 0002-0029). The maximum quantity is two (2) each Fiber Optic Repair Set (FORS) Pilot Production Units (CLIN 0001); technical data, training material and testing (CLINs 0002-0029, 0101, 0102, 0201, 0202, 0301, 0302, 0401 and 0402); and four hundred (400) Production FORS units (CLINs 0100, 0200, 0300 and 0400).
5252.247-9505TECHNICAL DATA AND INFORMATION (NAVAIR) (FEB 1995)
Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit A Engineering CDRLs A001-B004 and Exhibit B Logistics CDRLs L001-L013, attached hereto, and the following:
(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423.
(1) PCO, Code 2.5.2.1.1
(2) ACO, Code [insert code].
(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.
(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.
(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.
(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.
(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.
(g) DD Form 1423, Block 14 Mailing Addresses: [See CDRLs]

Section G - Contract Administration Data

DELIVERY ORDERS

FUNDING TO BE PROVIDED ON DELIVERY ORDERS

All funding for this contract will be provided on the individual delivery orders. Delivery order 0001 issued concurrent to award of this contract meets the Government’s minimum requirement.

252.204-7006
Billing Instructions
OCT 2005
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
5252.242-9511
CONTRACT ADMINISTRATION DATA
SEP 2012
252.232-7006WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. as used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .