The file's text, extracted by GovTribe without its formatting.
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0017 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L001 |
| Logistics Product Data |
| LPD Candidate List |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81758 See Block 16 |
| ALSSOW Para. 4.2 |
| NAVAIR 6.7.1.2 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| SD |
| REQUIRED |
| One/R |
| 90 DAC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
AD
See block 16
| 16. REMARKS |
| NAVAIRLKE 6.6.4.9 |
| 1 |
| 1 |
BLOCK 4: LPD Candidate list must be accompanied by an engineering top-down hardware breakdown drawing tree. Columns shall include LCN, Nomenclature, Cage code, Part Number, suggested SM&R Code, estimated cost, MTBF, potential scheduled, preventative and corrective maintenance, calibration and MSC. Contractor format is acceptable. Electronic deliveries shall be submitted in the following format:
a. CD-ROM or
b. Electronic Mail
1. Saved as an attached file (compatible with government software)
2. Compatible with MS-DOS
BLOCK 13: Updates to be submitted as changes occur. Government Approval/Disapproval will be given within 30 days after receipt. The contractor shall incorporate all comments and return to government within 30 days after receipt of government response.
BLOCK 15: DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733 ATTN: Gary Webster, DAPML Code 6.6.4.9, Bldg 596-2 ATTN: Charles Kyle, DIMP Code 6.7.1.2, Bldg 596-2
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Charles Kyle, Code 6.7.1.2 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0018 |
| B |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L002 |
| Maintenance Planning (MaPl) Input Data |
| MaPl Input Data |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81758 |
| ALSSOW Para 4.4 |
| NAVAIR 6.7.1.2 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| SD |
| REQUIRED |
| One/R |
| 90 DAC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
AD
See block 16
| 16. REMARKS |
| NAVAIRLKE 6.6.4.9 |
| 1 |
| 1 |
BLOCK 4: GEIA-STD-0007A specifications cited in DID are for guidance only.
BLOCK 13: Government Approval/Disapproval will be given within 30 days after receipt. The contractor shall incorporate all comments and return to government within 30 days after receipt of government response.
BLOCK 14: Contractor format is acceptable. Electronic deliveries shall be submitted in the following format:
a. CD-ROM or
c. Electronic Mail
1. Saved as an attached file (compatible with government software)
2. Compatible with MS-DOS
BLOCK 15: DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733 ATTN: Gary Webster, DAPML Code 6.6.4.9, Bldg 596-2 ATTN: Charles Kyle, DIMP Code 6.7.1.2, Bldg 596-2
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Charles Kyle, Code 6.7.1.2 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0019 |
| B |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L003 |
| Provisioning Input Data |
| Provisioning Input Data |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81758 |
| ALSSOW Para 4.7.1 |
| NAVAIR 6.7.1.2 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| SD |
| REQUIRED |
| One/R |
| 90 DAC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
AD
See Block 16
| 16. REMARKS |
| NAVAIRLKE 6.6.4.9 |
| 1 |
| 1 |
BLOCK 1: If the database selected by the contractor can provide for extraction of the PPL/LSA-036 by the government, then the CDRL requirements for the PPL can be considered as part of this CDRL.
BLOCK 4: GEIA-STD-0007A specifications cited in DID are for guidance only. Provisioning input data required for all spare parts, not just candidates.
BLOCK 13: Government Approval/Disapproval will be given within 30 days after receipt. The contractor shall incorporate all comments and return to government within 30 days after receipt of government response.
BLOCK 14: Contractor format is acceptable. Electronic deliveries shall be submitted in the following format:
a. CD-ROM or
a. Electronic Mail
1. Saved as an attached file (compatible with government software)
2. Compatible with MS-DOS
BLOCK 15: DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733 ATTN: Gary Webster, DAPML Code 6.6.4.9, Bldg 596-2 ATTN: Charles Kyle, DIMP Code 6.7.1.2, Bldg 596-2
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Charles Kyle, Code 6.7.1.2 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0020 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L004 |
| Design Change Notices |
| DCN |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS 81758 See block 16 |
| PSOW Para 12 and ALSSOW Para 7.0 |
| NAVSUP WSS |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| X Time |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
See Block 16
| 16. REMARKS |
| NAVSUP WSS 03622.17 |
| 1 |
| 1 |
BLOCK 4: DID is for guidance only.
BLOCK 12, 13: DCNs are not to be submitted until thirty (30) days after completion of processing the Provisioning Baseline File, approval of an ECP, and/or in accordance with the sustainability contract.
BLOCK 14: A list of all required DCN elements can be found in GEIA-HB-0007A Appendix D. DCNs shall be submitted in LSA-036 change file format. For further guidance, contact NAVSUP WSS 03622.17.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Raymond Schweigart, Code: 03622 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0021 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L005 |
| Engineering Data for Provisioning |
| EDFP |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81874 See Block 16 |
| PSOW Para 5, 6, 7 and ALSSOW Para 4.7.4. |
| NAVSUP WSS 036 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| SD |
| REQUIRED |
| One/R |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
AD
See Block 16
| 16. REMARKS |
| NAVSUP WSS 03622.17 |
| 1 |
| 1 |
BLOCK 4: DID is for guidance only.
EDFP data is being used for initial and follow-on provisioning. EDFP is technical data which provides definitive identification of dimensions, material, mechanical, electrical and other characteristics adequate for provisioning of support items of the end article(s) on contract. EDFP consists of product drawings and associated lists, such as contractor specification standards, drawing sketches and descriptions and the necessary assembly drawings needed to indicate physical characteristics and function of the item. The data is used to accomplish the cataloging of new item selection in support of the provisioning process.
BLOCK 5: EDFP shall be submitted in PDF file format in accordance with PSOW paragraphs 5, 6, and 7.
BLOCK 12 and 13: Preliminary EDFP shall be delivered 30 DAC. Subsequent submissions due when revisions or design changes occur. Final EDFP shall be delivered 30 days after completion of government testing to include any updates from testing. Government has 30 days to provide response after each submission.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Raymond Schweigart, Code 03662 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0022 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L006 |
| Statement of Prior Submission |
| SPS |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81758 See Block 16 |
| PSOW Para 13 and ALSSOW Para 4.7.5 |
| NAVSUP WSS |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| One/R |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
As Required
| 16. REMARKS |
| NAVSUP WSS 03655.17 |
| 1 |
| 1 |
BLOCK 4: DID is for guidance only. Contractor digital format is acceptable.
BLOCK 12: To be submitted concurrently with the PPL.
BLOCK 13: Requirements in accordance with PSOW paragraph 13.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Raymond Schweigart, Code 03622 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0023 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L007 |
| Technical Manual |
| Technical Manual |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| See Block 16 |
| ALSSOW Para 5.0; TMCR 13-013 |
| NAVAIRLKE 6.8.5.1 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| See Block 16 |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
AD
See Block 16
| 16. REMARKS |
| NAVAIRLKE 6.6.4.9 |
| 1 |
| 1 |
BLOCK 4: Per TMCR Number 13-013 dated 27 November 2013.
The TMs will become the property of the government.
BLOCK 10: TM Content and Product Plan(Outline) – is due at Post Award Conference
First Review submittal – 30 days prior to CDR
Second Review submittal – 60 days after CDR
Third Review submittal – 30 days prior to Government Testing
Fourth Review submittal – 90 days after completion of Government Testing.
Government shall approve/disapprove and provide comments within 30 days after receipt of document. Contractor shall have 15 days after receipt of Government comments (TMERs) to provide concurrence/non-concurrence to the Government and 30 days after Receipt of Government comments to re-submit corrected document, if required.
BLOCK 15: DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733 Attn: Gary Webster, Code 6.6.4.9, Bldg 596-2
NATEC
Attn: Kevin Hein, Code 6.8.5.1
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Kevin Hein, Code 6.8.5.1 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0024 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L008 |
| Interim Support Items List |
| ISIL |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81758 |
| PSOW Para 9 and ALSSOW Para 6.2 |
| NAVICP WSS, NAVAIRLKE |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| SD |
| REQUIRED |
| One/R |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
AD
See Block 16
| 16. REMARKS |
| NAVSUP WSS 0317.01 |
| 1E |
| 1E |
BLOCK 12: The preliminary ISIL shall be delivered 30 days after Critical Design Review (CDR).
BLOCK 13: The final ISIL shall be delivered 30 days after successful completion of Independent Government Test (IGT) to include any updates resulting from IGT.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Raymond Schweigart, Code 03622 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0025 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L009 |
| Long Lead Time Item List |
| LLTIL |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81758 |
| PSOW Para 10 and ALSSOW Para 6.3 |
| NAVSUP WSS |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| One/R |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
See Block 16
| 16. REMARKS |
| NAVSUPP WSS 0317.01 |
| 1 |
| 1 |
BLOCK 1: If no LLTIL is required (when the system or equipment contains no items that have a production lead time of 24 months or greater) this data item shall be deleted upon written notification to the Government Contracting Officer.
BLOCK 12: First submission (if required) due 30 days after completion of CDR.
Block 13: Subsequent submissions to include all revisions from previous submissions. Contractor format is acceptable.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Raymond Schweigart, Code 03622 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0026 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L010 |
| Course Conduct Information Package |
| CCIP |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81522B |
| ALSSOW Para 8.2 and 8.3 |
| NAVAIRLKE 6.7.5.1 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| One/R |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
See Block 16
| 16. REMARKS |
| NAVAIRLKE 6.7.5.1 |
| 1 |
| 1 |
BLOCK 4: Only paragraphs 3.5.1, 3.5.5 and 3.5.7 of part 4 are required.
BLOCK 10, 12, 13: Submittal due NLT 10 days after Developmental Test Training and Initial Factory Training session. The Letter of Transmittal shall accompany the separate reports completed by each trainee. Government will approve/disapprove and provide comments within 10 days after receipt of document. If required, the contractor shall incorporate comments and resubmit documents for government approval within 10 days after receipt of government response. Certificates of Completion shall be provided to each student at the end of the Factory Training session.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Dana Merrill, Code 6.7.5.1 |
| 2 Dec 2013 |
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page of Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0027 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L011 |
| DMSMS Management Plan |
| Obsolescence Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SDMP-81748 |
| ALSSOW Para 11.2 |
| NAVAIRLKE 6.6.4.9 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| One/R |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
See Block 16
| 16. REMARKS |
| NAVAIRLKE 6.6.4.9 |
| 1 |
| 1 |
BLOCK 4: DID if for guidance only. Contractor format is acceptable.
BLOCK 12: The Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan shall be submitted within 60 days of the completion of the Critical Design Review (CDR). The first Obsolescence Report shall also be submitted within 60 days of the completion of CDR.
BLOCK 13: The DMSMS Management Plan shall be submitted once and updated as required. Obsolescence Reports shall be submitted semi-annually.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Gary Webster, Code 6.6.4.9 |
| 2 Dec 2013 |
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page of Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0028 |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L012 |
| Item Unique Identification (IUID) Plan |
| Unique Item Identifier (UID) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| ALSSOW Para 12.0 |
| NAVAIRLKE 6.6.4.9 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| SD |
| REQUIRED |
| AS REQ |
| 90 DAC Award |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
AD
As Required
| 16. REMARKS |
| NAVAIRLKE 6.6.4.9 |
| 1 |
| 1 |
a. CONTRACTOR UID PLAN: The contractor shall provide a written plan of how it will meet the UID marking requirements identified in the ALSSOW, including a timeline for implementation starting with the submittal of this CDRL. This CDRL (UID Plan) is to be submitted NLT 90 days after contract award.
b. REQUIREMENTS: Unique Item Identification (UID) marking and registry requirements are found in MIL-STD-130N w/Change 1. Please refer to ALSSOW Para 12.0 – 12.5.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Gary Webster, Code 6.6.4.9 |
| 2 Dec 2013 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0029 |
| B |
| TDP ____ |
| TM _____ |
| OTHER Provisioning |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Fiber Optic Repair Set (FORS) |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| L013 |
| Technical Manual Validation Certification including Copyright Release and Duplication Authority for Government Use |
| Technical Manual Validation Certification |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| See Block 16 |
| ALSSOW Para 5.1; 5.2; 5.5; |
TMCR 13-013
NAVAIRLKE 6.8.5.1
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| SD |
| REQUIRED |
| See Block 16 |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
AD
See Block 16
| 16. REMARKS |
| NAVAIRLKE 6.6.4.9 |
| 1 |
| 1 |
BLOCK 4: Per TMCR Number 13-013 dated 27 November 2013.
BLOCK 10: The Validation Certificate shall be delivered with the final draft copies of the TM. This TM Validation does not constitute final TM delivery.
BLOCK 12: Initial Guidance meeting and quality program review will be conducted within 60 DAC.
BLOCK 13: A Validation certificate shall be prepared IAW NAVAIR 00-25-604 concurrent with delivery of the technical/source data. The technical manual will become property of the U.S. Government.
BLOCK 15: DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733 Attn: Gary Webster, Code 6.6.4.9, Bldg 596-2
NATEC
Attn: Kevin Hein, Code 6.8.5.1
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Kevin Hein, Code 6.8.5.1 |
| 2 Dec 2013 |