4.03c AMEND 0003.pdf
PDF 589 KB Posted
- Attached to
- VOYAGE REPAIR (VR)
- Solicitation number
- N6817126QN067
About this file
This document is Amendment 0003 to Solicitation N6817126QN067, issued by NAVSUP FLC Sigonella Naples Office on 04 August 2026, extending the response deadline and modifying contract requirements for the USS ROSS (DDG 71).
The response deadline has been extended from 05 August 2026 to 10 August 2026 at 15:00 Central European Time. The amendment updates Section C to include a new work item (508-11-001) and revises Attachment J-2 "Composite Work Package" to reflect REV 1, which includes the new work item and adjusts AGR CLIN 0002. The period to request references has been extended to Friday 07 August 2026 at 12:00 Central European Time. Three work items will be performed on a firm fixed price basis: 508-11-001 (Lagging and Insulation; replace), 529-11-001 (Main Drainage Educator Fire-main Supply Valve Teleflex Cable Inspection and Correction; accomplish), and 993-11-001 (Rigging and Crane Service; provide). Quoters must submit pricing in US Dollars using Attachment J-1 Pricing Breakdown format, include completed Standard Form 18, technical qualifications per Attachment J-3 Contract Qualification Checklist, and completed Representations and Certifications from Section K. The contracting officer contact is Joseph E. Norcross. Contractors must be SAM-registered and aware that work will operate on a 24-hour tether, requiring removal of temporary services and departure within 24 hours of notification. If the successful offeror holds an active Navy Master Agreement for Repair and Alteration of Vessels (MARAV), award will be made as a firm fixed price job order under that agreement; non-MARAV holders will receive a purchase order or contract with equivalent terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4.03d AMEND 0004.pdf | ||
| 4.02b J-2 Composite Work Package- REV 1.pdf | ||
| 4.02a J-1 Price Breakdown REV 1.xlsx | XLSX spreadsheet | |
| 4.03b AMEND 0002.pdf | ||
| 4.03a AMEND 0001.pdf | ||
| 4.02e S-1. Non-Disclosure Agreement.pdf | ||
| 4.02b J-2 Composite Work Package.pdf | ||
| 4.02a J-1 Contractor Price Breakdown.xlsx | XLSX spreadsheet | |
| 4.02d J-4. Contract Qualification TIP Example.pdf | ||
| 4.02 N6817126QN067.pdf | ||
| 4.02c J-3. Contract Qualification Checklist.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 05 Aug 2026 10 Aug 2026
N6817126QN0670003
Section C - Description/Specifications/Statement of Work
Miscellaneous text in this section has been modified to:
C-1 General Information
This acquisition is in support of the USS ). The Contractor shall prepare for and accomplish the work items as ROSS (DDG 71 described in the specification package #NAPL-026-26 provided as Attachment J-2 Performance Work Statement.
The attachment J-2 also includes the Standard Items (Category I & II ) applicable to this Request for Quote. The Standard Items can be found by going to the website: https://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/.
C-2 References
Quoter must submit a request for references via email at the following email with a signed Attachment S-1 (NonDisclosure Agreement). Quoter must submit a request for references via email at the following email with a signed Attachment S-1 (NonDisclosure Agreement). Mr. Joseph Norcross E-mail address: joseph.e.norcross.civ@us.navy.mil
C-3 Pricing
Prices shall be submitted in the format specified in Section B "Supplies/Services and Price" and Attachment J-1 Pricing Breakdown must be filled in providing the number of man hours, labor rate, total labor cost, material and other costs. Prices must be stated in US Dollars.
C-4 Work Items Description
The work item for which a Firm Fixed Price (FFP) is to be established and will be executed during the Period of Performance (POP) is the following:
508-11-001 Lagging and Insulation; replace
529-11-001 Main Drainage Educator Fire-main Supply Valve Teleflex Cable Inspection and Correction; accomplish
993-11-001 Rigging and Crane Service; provide
C-5 Subsequent Repairs - Scope of the contract
If additional work is discovered during performance, the Contracting Officer will determine if it can be considered growth or new work, after following required contracting procedure.
C-5.1 Growth Work
(a) The government anticipates that any subsequent repairs identified as a result of work items associated with this requirement may be performed by the awardee in accordance with the applicable Changes clause.
(b) Growth work is defined as any additional work identified after award of contract that is required to complete the original scope of work. All growth work will be related to a work specification item in the awarded contract and will be priced at the same labor rate as the originally quoted work. Performance of authorized growth work shall commence after the issuance of a contract modification. The Contractor shall not perform growth work without the Contracting Officer's authorization. The Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm-fixed price, when it is in the best interest of the Government.
N6817126QN0670003
https://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/ mailto:joseph.e.norcross.civ@us.navy.mil
(c) The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any quote submitted for a contract modification for growth. If the quote includes a request for a time extension, justification shall be furnished with the quote.
C-5.2 New Work
New work is defined as additional work that cannot be reasonably tied to an existing work item in the specification package, but is still essential for the satisfactory completion of the vessel overhaul effort. New work will be negotiated and agreed to by both parties.
C-6 Authorized Changes Only by the Contracting Officer
Except as specified in the paragraph directly below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under contract clause 252.217-7003 "Changes" of this contract.
The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
The NAVSUP FLCSI Code 200 Contracting Officers are the only persons authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the NAVSUP FLCSI Code 200 Contracting Officers. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made.
Section J - List of Attachments
The following attachments were added:
Composite Work Package- REV 1 Price Breakdown REV 1
The following attachments were deleted:
J-1 Contractor Price Breakdown J-2 Composite Work Package
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
1. Quotes must be received no later than (NLT) Monday 10 August 2026 at 15:00 Central European Time. All pricing shall be in US DOLLARS
The quoter is also required to fill the following contracting documentation and return with the quote submission:
- Standard Form 18/Request for quotation - Request for quotation with blocks 12-16 completed by the Quoter. If amendments to the RFQ are issued, each Standard Form 30 "Amendment of Solicitation/Modification of Contract" shall be included with blocks 8 and 15 (a) through (c) completed by the Quoter.
- Technical Qualifications that are marked within the Attachment J-3 Contract Qualification Checklist
- Completed Representations and Certifications - Located in Section K of this Request for quote. The Quoter shall fill them out and include them with his/her quote.
2. References shall be requested via e-mail to the emails listed above no later than Friday 07 August 2026 at 12: 00 (CEST).
When asking for the references to be provided, the Quoters shall send via e-mail - along with their request the attached "S-1 Use and Non- Disclosure Agreement (NDA)" duly filled in and signed
3. Award will be made in accordance with terms and conditions of this Request for Quote.
Note: The contracted work will be on a 24 hour tether, which means the contractor should be able to remove all temporary services and be off the ship within 24 hours after notification.
4. Contractors are required to be registered in the SAM (www.sam.gov).
5. Please note that this is a request for quote and not an authorization to perform the described work. The Government will not be liable for any costs for the work described herein prior to an issuance of a purchase agreement of authorization to proceed from an U.S. Government Contracting Officer. Note: " In the event the successful offeror possesses an active Navy Master Agreement for Repair and Alteration of Vessels (MARAV) with the U.S. Navy, award for this requirement will be made in the form of a firm fixed price job order under the applicable agreement and all of the terms and conditions of the MARAV will apply. Non MARAV holders are instructed to substitute the work "contract"/"purchase order" in place of all occurrences of "job order" in the following clauses: DFARS 252.217-7003 through DFARS 252.217-7016".
| IDCode: J |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0003 |
| EffDate: 04 Aug 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N68171 |
| AdmCode: |
| IssuedBy: NAVSUP FLC SIGONELLA NAPLES OFFICE |
NAVAL REGIONAL CONTRACTING CEN DET, PSC 817 BOX 50
FPO, AE 09622-0050
UNITED STATES
Joseph Norcross, Email: joseph.e.norcross.civ@us.navy.mil Telephone: 8435682200 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6817126QN067 |
| SolDate: 29 Jul 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The Purpose of this Amendment is to: |
1.Update Section C to include new Work Item new work item 508-11-001
2. Revise Attachment J-2 "Composite Work Package" to include new work item 508-11-001 3.Revise Attachment J-1 Price Breakdown REV 1 to include new work item 508-11-001and adjust AGR CLIN 0002 4.Extend the RFQ period until Monday, 10 August 2026 at 15:00 Central European Time
5. Extend the period to request References to Friday 07 August 2026 at 12:00 Central European Tim
| ContNameTitle: |
| CoNameTitle: Joseph E. Norcross |
| ContDate: |
| CODate: 04 Aug 2026 |