This is a Specifications for Work to Be Accomplished document issued by the Department of the Navy for USS ROSS (DDG 71), specification number NAPL-036-26, including all changes through July 24, 2026.
The document establishes the work requirements for a naval ship maintenance and repair job order. Category I contains 47 standard FY-26 items applicable to this contract without further reference, including general criteria, environmental compliance, toxic substance control, quality management, fire protection, asbestos-containing material control, confined space entry, electrical/electronic cable procedures, safety and health planning, ship facility maintenance, compartment closeout, and various operational certifications. Category II identifies one item—Cleaning and Painting Requirements (009-032)—that may be invoked in work items. Two specific work items are detailed: Item 529-11-001 requires inspection and correction of the Main Drainage Eductor Fire-main Supply Valve Teleflex Cable in Auxiliary Machinery Room No. One, involving visual inspection, pre-repair operational testing, cable disconnection and reconnection, and final operational verification with joint inspection by the supervisor and Commanding Officer's representative. Item 993-11-001 requires provision of crane, forklift, and rigging services to off-load and on-load a Balanced Joiner Door (26 inches by 66 inches) between multiple ship locations, with cranes capable of lifting up to 10,000 pounds and forklifts capable of handling 2,000 pounds. No government-furnished materials are provided for either work item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4.03d AMEND 0004.pdf | ||
| 4.02b J-2 Composite Work Package- REV 1.pdf | ||
| 4.03c AMEND 0003.pdf | ||
| 4.02a J-1 Price Breakdown REV 1.xlsx | XLSX spreadsheet | |
| 4.03b AMEND 0002.pdf | ||
| 4.03a AMEND 0001.pdf | ||
| 4.02d J-4. Contract Qualification TIP Example.pdf | ||
| 4.02e S-1. Non-Disclosure Agreement.pdf | ||
| 4.02a J-1 Contractor Price Breakdown.xlsx | XLSX spreadsheet | |
| 4.02 N6817126QN067.pdf | ||
| 4.02c J-3. Contract Qualification Checklist.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
FDRMC NAPLES
FPO, AE
USS ROSS (DDG 71)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: NAPL-036-26
INCLUDES ALL CHANGES THROUGH 7/24/2026
INDEX
SHIP: USS ROSS (DDG 71) NAPL-036-26
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-26 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-001 General Criteria; accomplish 09/04/2024 Original
009-002 Environmental Compliance Report for Material Usage; accomplish 07/22/2024 Original
009-003 Toxic and Hazardous Substance; control 07/22/2024 Original
009-004 Quality Management System; provide 09/16/2024 Original
009-005 Temporary Access; accomplish 11/18/2024 CH-1
009-006 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
07/22/2024 Original
009-007 Confined Space Entry, and Certification; accomplish 09/04/2024 Original
009-008 Shipboard Fire Protection and Fire Prevention; accomplish 09/30/2024 Original
009-010 Asbestos-Containing Material (ACM); control 09/16/2024 Original
009-018 Mine Warfare Ships Magnetic Material; control 09/04/2024 Original
009-019 Provisioning Technical Documentation (PTD); provide 07/22/2024 Original
009-020 Government Property; control 07/22/2024 Original
009-021 Alteration Verification, Logistic and Technical Data; provide 07/22/2024 Original
009-023 Interference; remove and install 11/18/2024 CH-1
009-024 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/16/2024 Original
009-034 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 07/22/2024 Original
009-039 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for
Commercial Equipment/Component; accomplish
07/22/2024 Original
009-040 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a
Naval Facility; provide
07/22/2024 Original
009-060 Schedule and Associated Report for CNO Availability; provide and manage 09/16/2024 Original
009-061 Shipboard Use of Fluorocarbons; control 09/16/2024 Original
009-067 Integrated Total Ship Testing; manage 09/16/2024 Original
009-068 Availability Work Certification (AWC) Data for Chief of Naval Operations (CNO)
Availabilities; provide
09/16/2024 Original
009-069 Heavy Weather/Mooring Plan; provide 09/16/2024 Original
009-070 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
09/16/2024 Original
009-072 Physical Security at a Private Contractor Facility; accomplish 09/16/2024 Original
009-073 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
09/16/2024 Original
009-074 Occupational, Safety and Health Plan; accomplish 09/16/2024 Original
009-080 Ship Facility; maintain 09/16/2024 Original
009-081 Compartment Closeout; accomplish 09/16/2024 Original
009-082 Installation of Equal Component Vice Specified Component; report 07/22/2024 Original
009-084 Threaded Fastener Requirement; accomplish 07/22/2024 Original
009-088 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify
09/16/2024 Original
009-093 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
07/22/2024 Original
Page 1 of 4 EXECUTING WORK
ITEM_NO. TITLE CHANGE DATE CHANGE
009-099 Ship Departure Report; provide 09/16/2024 Original
009-100 Ship's Stability; maintain 09/16/2024 Original
009-101 Ship Transit and Berthing; accomplish 09/16/2024 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/16/2024 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 07/22/2024 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 07/22/2024 Original
009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 09/16/2024 Original
009-117 Combat Systems, Light-Off Suport; provide 09/17/2024 Original
009-118 CG Deck Loading; accomplish 07/22/2024 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 09/17/2024 Original
009-122 Temporary Padeye; install and remove 11/18/2024 CH-1
009-125 Boat 65 Feet (20meters) Long and Less; accomplish 11/18/2024 CH-1
009-126 Schedule Model Review (SMR); accomplish 09/17/2024 Original
Page 2 of 4 EXECUTING WORK
CATEGORY II. FY-26 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
TITLE CHANGE DATEITEM NO. CHANGE
009-032 Cleaning and Painting Requirements; accomplish 09/25/2024 Original
Page 3 of 4 EXECUTING WORK
ITEM NO. TITLE
Main Drainage Eductor Fire-main Supply Valve Teleflex Cable Inspection and Correction; accomplish
529-11-001
Rigging and Crane Service; provide993-11-001
Page 4 of 4 EXECUTING WORK
SHIP: USS ROSS (DDG 71) ITEM NO: 529-11-001
COAR: 26 PCN: ER04-4138
CSWT FILE NO: 529-011 (DDG 51) CMP: NONE
REVISED: 03 OCT 2024 PLANNER: KRIEGER, DANIEL
JONES, DOUGLAS
SSP: NAPL-036-26 1 of 2 ITEM NO: 529-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Main Drainage Eductor Fire-main Supply Valve Teleflex Cable Inspection and Correction; accomplish
1.2 Location of Work:
1.2.1 Auxiliary Machinery Room No. One (4-126-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Teleflex Remote Valve Operator for
Auxiliary Machinery Room No. One Eductor Fire-main Supply Valve Valve
MD-V-53
2. REFERENCES:
2.1 NAVSEA, Standard Items (FY26 CH-1)
2.2 529-6597126 Rev M, Main & Secondary Drainage Sys Diagram
2.3 S6435-QJ-MMI-010 Rev 8, Actuator, Valve Dual Linear Remote Mechanical (Chapter 6 and Chapter 7)
3. REQUIREMENTS:
(V) "PRE-REPAIR INSPECTION"
3.1 Accomplish a visual inspection and pre-repair operational test of the valve remote operator listed in 1.3 and located in 1.2 to determine actual operating condition using 2.2 and 2.3 for guidance.
3.1.1 Cycle the valve manually from its remote operating station from fully closed to fully open to fully closed.
3.1.2 Inspect all remote operator components for any deterioration, damage, loose or any missing parts.
3.2 Accomplish disconnecting and reconnecting Teleflex cable from the valve operator to insure proper direction to open and close the valve, as designated by SUPERVISOR, using 2.2 as guidance.
(V)(G) "OPERATIONAL TEST"
3.3 Accomplish an operational test of the valve and remote valve operator assembly listed in 1.3 and located in 1.2 to verify ease of operation and proper alignment.
3.3.1 Cycle the valve from its remote operating station from fully closed to fully open to fully closed 4 times. Allowable sticking or binding: None.
3.4 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance
SHIP: USS ROSS (DDG 71)
SSP: NAPL-036-26 2 of 2 ITEM NO: 529-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
with 009 004 of 2.1.
4. NOTES:
4.1 Ship's Force reports the valve is operating opposite the direction from the remote valve operator. It is believed the Teleflex cables are installed crossed, and requires swapping.
4.2 DFS DDG-71-0021-2026 applies.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: USS ROSS (DDG 71) ITEM NO: 993-11-001
COAR: 26 PCN: ER04-4137
CMP: NONE
PLANNER: KRIEGER, DANIEL
JONES, DOUGLAS
SSP: NAPL-036-26 1 of 2 ITEM NO: 993-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Rigging and Crane Service; provide
1.2 Location of Work:
1.2.1 Escape Trunk (4-220-2-T)
1.2.2 Main Engine Room Number One (4-174-0-E)
1.2.3 Throughout the Ship
1.3 Identification:
1.3.1 Quantity (One EA), Balanced Joiner Door (4-220-2), 26 Inch by 66 Inch, Ellison, Left Hand, Line Number 0041 of 2.2, APL 312090186
2. REFERENCES:
2.1 NAVSEA, Standard Items (FY26 CH-1)
2.2 624-6597115 Rev R, Joiner Door & Service Window List - Zone 2
2.3 S9167-AS-MMO-010 Rev A, Maintenance and Repair for the Balanced Joiner Door
2.4 101-7061019, Equipment Removal Route DWG
3. REQUIREMENTS:
3.1 Provide crane, forklift, and rigging services using 2.2 through 2.4 as guidance.
(V)(G) "WEIGHT HANDLING EQUIPMENT INSPECTION"
3.1.1 Inspect crane and all rigging gear being utilized and ensure it is certified for use. Crane and all rigging equipment be within calibration for each date work is to be accomplished.
3.1.2 Crane must be capable of lifting a maximum of 10,000 pounds and must be capable of handling material from the top of the mast to the furthest outboard point of the ship.
3.1.3 Forklift must be able to lift a maximum of 2,000 pounds.
3.2 Off-load the existing equipment listed in 1.3, located in 1.2, and onload the new equipment, as directed by the SUPERVISOR. Existing asset will be rigged off the ship to the pier.
(V)(G) "COMPARTMENT CLOSEOUT"
3.3 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.
4. NOTES:
SHIP: USS ROSS (DDG 71)
SSP: NAPL-036-26 2 of 2 ITEM NO: 993-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
4.1 The intent of this work item is to off load 1 EA Ellison Door, and load 1 EA Ellison Door, from and to the location listed in 1.2.
4.2 Ship's Force will be responsible for removal of old door and installation of the new door.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.