This document is a Performance Work Statement (PWS) or technical specification detailing modifications to existing 2-inch waste drain piping systems at multiple locations on a vessel. The work involves cold cutting existing pipes and installing carbon steel flanges to create removable piping sections for maintenance access and cleanout capabilities.

The work is divided into multiple tasks: Task A requires modifications to two 2-inch waste drain pipes in the Port side EOS A/C compartment (3-66-02), involving installation of four 2-inch carbon steel flanges on the outboard pipe to allow a removable spool, and two flanges with a nipple and cap on the inboard GW pipe for cleanout access, plus connection to an inboard overboard pipe using a 2-inch Y fitting with gaskets and hardware. Task D specifies cold cutting a 2-inch waste drain pipe in the Upper Shop (3-70-1) with installation of two 2-inch 150# carbon steel socket welded flanges to fabricate removable piping sections, including gaskets and hardware. Task E involves cold cutting 2-inch waste drain piping from compartment 3-72-3 (joiner door to overhead crane controller) with installation of eight 2-inch 150# carbon steel socket welded flanges to create multiple removable piping sections, with gaskets and hardware installed throughout. All tasks require proper sealing and hardware installation to maintain system integrity.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. COLD CUT EXISTING TWO EACH 2" WASTE DRAIN

PIPES LOCATED IN THE PORT SIDE EOS A/C

COMPARTMENT (3-66-02). ON THE OUTBOARD PIPE

LABELED OVERBOARD INSTALL 4 EACH, 2" CARBON

STEEL FLANGES TO ALLOW FOR ONE REMOVABLE

SPOOL. ON THE INBOARD PIPING LABELED GW CUT

EXISTING PIPING APPOXIMATELY 1 FOOT BEFORE

EXISTING LOCK RING AND INSTALL TWO FLANGES

WITH A NIPPLE AND CAP TO BLANK PIPING FOR A

CLEANOUT. ON THE OTHER END INSTALL ONE EACH

2 INCH Y TO CONNECT PIPING TO THE INBOARD PIPE

LABELED OVERBOARD. INSTALL GASKETS AND

HARDWARE.

peter.mcloughlin Highlight peter.mcloughlin Highlight peter.mcloughlin Highlight peter.mcloughlin Highlight peter.mcloughlin Highlight

D. COLD CUT EXISTING 2" WASTE DRAIN PIPE LOCATED

UPPER SHOP (3-70-1), INSTALL 2 EACH 2" 150# CARBON

STEEL SOCKET WELDED FLANGES TO FABRICATE

REMOVABLE PIPING SECTIONS.

INSTALL GASKETS AND HARDWARE.

E. COLD CUT EXISTING 2" WASTE DRAIN PIPING

FROM 3-72-3 JOINER DOOR TO OVERHEAD CRANE

CONTROLLER, INSTALL 8 EACH 2" 150# CARBON

STEEL SOCKET WELDED FLANGES TO FABRICATE

REMOVABLE PIPING SECTIONS. INSTALL GASKETS

AND HARDWARE.

E. COLD CUT EXISTING 2" WASTE DRAIN

PIPING FROM 3-72-3 JOINER DOOR TO

OVERHEAD CRANE CONTROLLER, INSTALL 8

EACH 2" 150# CARBON STEEL SOCKET WELDED

FLANGES TO FABRICATE REMOVABLE PIPING

SECTIONS. INSTALL GASKETS AND

HARDWARE.

E. COLD CUT EXISTING 2" WASTE DRAIN PIPING FROM

3-72-3 JOINER DOOR TO OVERHEAD CRANE

CONTROLLER, INSTALL 8 EACH 2" 150# CARBON STEEL

SOCKET WELDED FLANGES TO FABRICATE REMOVABLE

PIPING SECTIONS. INSTALL GASKETS AND HARDWARE.