About this file
This document is a Questions and Answers (Q&A) file for a federal contract opportunity for the USNS WILLIAM MCLEAN (T-AKE 12) Vessel Repair Availability (VRA) scheduled for April 2026 under contract number N6817126QN006. The file contains 29 bidder questions with corresponding responses from the government across 11 different work items, addressing technical clarifications, material specifications, work procedures, and logistical requirements for various ship maintenance and modification tasks.
The work items span multiple maintenance categories including bilge preservation, deck covering installation, handrail replacement, kingpost preservation, ladder modifications, light bracket work, kick pipe and stuffing tube replacement, deck grating installation, and pipe bracket replacement. Key responses address material specifications (304L stainless steel for handrails, 4x4x3/8 inch and 2x2x¼ inch steel angles for platform modification), work heights (16 feet for most exterior work), dimensions (4-foot width for deck grating, 50 feet cable length estimates), and operational constraints. Notable clarifications include confirmation that Main Diesel Engine overhauls will have separation distance from concurrent preservation work, pressure washing is essential for kingpost work, stanchions are welded directly to deck, and contractors must provide their own water while the vessel supplies 120V electrical power for portable tools. The government indicated that photos were previously provided in work item files, additional drawings will be supplied by DoDSAFE, and condition reports must be submitted by contractors for various penetration and structural assessments.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS WILLIAM MCLEAN (T-AKE 12)
VRA Apr 2026 – N6817126QN006
RFC ITEM
NO.
Work Item Description BIDDER QUESTION RESPONSE TO BIDDER
QUESTION
1. WI 0629 MMR Bilge Preservation
7.1 Tag-Out all
required systems and equipment. Drain and dispose of any liquid in accordance with all federal, state, and local regulations.
7.6 CAUTION: Two
Main Diesel Engines will be opened for overhaul for the entire availability.
Protect engines from paint and dust contamination.
7.14 Pump affected
areas dry and no remaining standing water is permitted.
Question 1:
Paragraph 7.1 please give an estimate of kind of liquid and quantity to dispose.
Question 2:
Paragraph 7.6 Is not recommended to perform this work at same time of cleaning and painting, please advise priority.
Question 3:
Paragraph 7.14 please provide photo of space.
Question 4:
Is not recommended to paint the bilge/hull below the waterline, who will take the responsability?
0629-1 – 7.1 No ship system liquid is anticipated to be drained – this is a generic statement in many work items.
However, oily waste water is anticipated due to pressure washing of surfaces.
0629-2 – 7.6 Main Diesel Engine No.1 may be opened for overhaul by the OEM – there is a separation distance between the Engine and bilge area preservation. The dust containment together with blower ventilation required by paragraph 7.7 is to minimize contamination.
0629-3 – Photo not available.
0629-4 – The area of the bilge to be worked is the tank top or innerbottom not shell plating.
2. WI 0630 MMR Various Equipment Deck Covering
PRC Epoxy Install
7.1 Contractor shall
remove all interferences in way of work performance.
Upon completion of work and when directed by the
0630-5 – 7.1 No ship equipment is anticipated to be removed -this is a generic statement in many work items. There is clearance of approximately 4
MSC rep, reinstall interferences.
Question 5:
Paragraph 7.1 what you mean for interferences, most of things are welded/bolted to the deck.
Question 6:
As per WI 0629, this work cannot be done at same time of engine opening, please advise.
Question 7:
Please provide photo of all area listed on paragraph 3.1.
inches below each piece of equipment.
0630-6 - there is a separation distance between the Engine and areas of Equipment Deck Covering. The protective covering required by paragraph 7.2, together with ventilation and exhausting systems required by paragraph 7.5 is to minimize contamination.
0630-7 – The available photos were already provided in the work item – no additional photos are available.
3. WI 1001 Gypsy Winch Master Control Pedestal
Foundation Plate
7.3.1 Remove wire from
control box. Inspect wire insulation. Accomplish a resistance check on each cable and submit a condition report to Port Engineer. If wire is damaged, replace with new wire.
Question 8:
Paragraph 7.3.1, are the wires running inside the pipe stand of control box?
1001-8 – Yes the wires are inside the pipe.
4. WI 0102 Exterior Weather Deck Handrail
Replace
Question 9: Are the stanchions welded on doublers plate or to the deck directly?
Question 10: Provide few photo of handrails to replace.
Question 11: Material is stainless steel 316?
Question 12: Provide thickness of pipe listed in 3.1
Question 13: Provide
0102-9 – Stanchions are welded to the deck.
0102-10 – Similar installation is provided in files: “Answer 10 Work Completion Report_Handrails Renew Exterior” and “Answer 10 Work Completion_kingpost handrail renew”.
0102-11 – Material is 304L as identified in paragraph 7.1.3 drawings. 0102-12 – As identified in paragraph 7.1.3 the thickness of 1 inch pipe is Schedule 40 while the ¾ inch round bar is solid.
0102-13 – No drawing is available for this class of vessel.
5. WI 0104 UNREP Stations 3 thru 6 Kingposts
Preservation
3.2.1 Stations 03 and 04
(Frame 49 Port and Stbd)
3.2.2 Stations 05 and 06
(Frame 55 Port and Stbd)
7.1.1 Scaffolding is
required to be installed up to the top of the kingpost to allow for safety or personnel.
7.3 Pressure wash all
surfaces of king posts to SSPC SP-1 using CFM biodegradable solution.
Utilize pressure washer with 2,500psi – 4,500psi to remove salt, grease, stains, flaking paints, etc.
Question 14: Provide photo of location listed in 3.2
Question 15: Paragraph 7.1.1, specify max height to reach.
Question 16: Can the ship provide power and water?
Question 17: Paragraph 7.3 for this work a complete protection to environmental cases must be provided; also water needs to be collected and disposed. Is possible to clean the area preservated only with detergent and rags (by hand) in order to avoid the washing of entire kingpost?
0104-14 – See file “Answer 14 Kingpost No 4”.
0104-15 – The heights of the kingposts can be viewed in file
“8499076_GENERAL
ARRANGEMENT”
0104-16 – 120V electrical power for portable hand tools will be available from the vessel.
Contractor must provide water.
0104-17 – Pressure washing is considered essential.
6. WI 0108 UNREP Stations 3 thru 6 Vertical Ladders
Modification & Preservation
7.3 Provide and erect all
necessary staging and/or provide suitable alternative means as required for proper working conditions.
Question 18: Provide photo and drawings of ladder.
Question 19: Paragraph 7.3, could you specify max height to reach?
0108-18 – See file of photos “Answer 18 Vertical ladders”.
Additional drawings will be provided by DoDSAFE.
0108-19 – The heights of the ladders can be viewed in file
“8499076_GENERAL
ARRANGEMENT”
7. WI 0109 Exterior Light Brackets
4.2.1 It is anticipated that
scaffolding/ladders will be necessary to safely reach 50% of the light brackets.
Question 20: Paragraph 4.2.1, specify max height to reach.
0109-20 – Height of 16 feet.
8. WI 0301 Kick Pipe & Stuffing Tube
7.1.1 Ships Force, MSC Rep
and SY perform an inspection of all penetrations identified above to be replaced. A report shall be submitted via Condition Report that lists the size of the tube, the length of cable to be pulled back, condition of EMI shielding, number of conductors, interferences, and circuit designation.
7.3.3.3 Provide and erect
staging to facilitate access to deck and bulkhead cable penetrations where applicable.
7.3.3.4 Cable penetrations
will require cables to be pulled back and removed prior to pipe penetrations removal and reinstallation.
Notify Ships Force to ensure cables are de-energized, tagged out, etc.
7.3.3.7 Some cable
0301-21 – Report is to be issued by contractor.
0301-22 - Height of 16 feet.
0301-23 – Length of 50 feet each.
0301-24 – See file “Answer 24 7489017_C Insulation Details”.
0301-25 – See file of Photos “Answer 25 Work Completion Stuffing Tubes Kick Pipes”.
penetrations will require lagging and insulation to be removed for replacement of penetration. For estimation purposes, assume 15FT^2 of lagging/insulation to removed and reinstalled.
7.3.3.8 Some Cable
penetrations may require overhead panel removals and reinstallation. For estimation purposes, assume 4 locations will require overhead panels to be removed. For the 03 kick pipe, the overhead in the decon station is a stainless steel welded compartment.
Reinstallation must be a welded piece.
Question 21: Paragraph 7.1, please provide report with photo.
Question 22: 7.3.3.3 specify max height to reach.
Question 23: 7.3.3.4, please give an estimate of cable length to remove and reinstall.
Question 24: 7.3.3.7 please specify type of insulation to use.
Question 25: 7.3.3.8 please provide photo.
9. WI 0515 MMR Deck Grating Diamond Plate
Install
Question 26: Please could you specify the max width of grating?
0515-26 – Width of 4 feet.
10. WI 0516 Reverse Osmosis Platform Modification
3.2.1 4 inch Steel angle, 8 Feet length
3.2.3 2 inch steel angle, 6 Feet length
Question 27: Please specify
0516-27 – 4 inch x 4 inch x 3/8 inch angle. 2 inch x 2 inch x ¼ inch angle.
0516-28 – Provide and install stainless steel fasteners.
thickness of steel angle listed in 3.2.1/3.2.3
Question 28: Angle bar / flat bar are in steel, while the sheet cover is in aluminum, how are you going to weld the angle bar on it?
11. WI 0517 Exterior Weather Deck Pipe
Bracket Replace
7.9 Remove welded pipe
hangers and pipe hanger bracket clamp as identified in paragraph 7.3.
Question 29: Paragraph 7.9 -remove complete until the doubler plate or overlap to existing angle bar as per attached photo?
0517-29 – Overlap to existing angle bar or submit Condition Report if the corrosion degradation of the steel is excessive. See file “Answer 29 Work Completion _PIPE
HANGERS RENEW HOUSE
EXTERIOR”.