J-1 Contractor Price Breakdown.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- VOYAGE REPAIRS (VR)
- Solicitation number
- N6817126QN006
About this file
The document is a J-1 Contractor Price Breakdown for a Voyage Repairs (VR) solicitation (RFQ #N6817126QN006) for the USNS SHIP (T-AKE), issued by the Department of the Navy Naval Supply Systems Command. The pricing template breaks down potential work items across multiple ship system categories, including hull and structural modifications, electrical work, auxiliary machinery, habitability, and underway replenishment equipment.
The detailed spreadsheet includes specific line items such as exterior weather deck handrail work, UNREP station preservation, equipment modifications, and deck covering installations. However, all line items currently show zero personnel, zero hours, and zero cost, suggesting this is a blank template for contractors to complete with their specific pricing and labor estimates. The total price is currently listed as $0, indicating the document is a preparatory pricing framework for potential repair and modification work on the naval vessel.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR'S PRICE BREAKDOWN
| J-1 Contractor's Price Breakdown | ||
| USNS SHIP (T-AKE) RFQ #N6817126QN006 | Price in US DOLLARS | |
| CLIN 0001 |
| Work Item # | DESCRIPTION | NO. OF PERSONNEL | NO. OF DAYS | MAN HOURS | LABOR RATE | TOTAL LABOR COST | MATERIAL COST | SUBCONTRACTOR | TRAVEL EXPENSES | TOTAL PRICE |
| 000 | GENERAL SERVICES AND REQUIREMENTS | |||||||||
| 0020 | TAKE-SWI-GAS FREE CERTIFICATES | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 100 | HULL AND STRUCTURAL | |||||||||
| 102 | Exterior Weather Deck Handrail | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 104 | UNREP Stations 3 thru 6 Preservation | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 108 | UNREP Stations 3 thru 6 Ladder Modification | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 109 | Exterior Light Bracket | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 300 | ELECTRICAL | |||||||||
| 301 | Kick Pipe & Stuffing Tube Various | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 500 | AUXILIARY MACHINERY | |||||||||
| 515 | ENGINEROOM Deck Grating Diamond Plate Install | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 516 | Reverse Osmosis Platform Modification | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 517 | Exterior Weather Deck Pipe Bracket Replace | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 600 | HABITABILITY, OUTFITTING & FURNISHING | |||||||||
| 629 | MMR BILGE PRESERVATION | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 630 | MMR Various Equipment Deck Covering PRC Epoxy Install | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1000 | UNDERWAY REPLENISHMENT EQUIPMENT | |||||||||
| 1001 | Gypsy Winch Master Control Pedestal Foundation Plate (VRR 25-086) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TOTAL PRICE | $ - 0 |
File details come from the government source that posted it. Updated .