J-6 - Past Performance Questionnaire.doc
DOC document 51 KB Posted
- Attached to
- Ship Repair Federal contract opportunity
- Solicitation number
- N6817120R0009
About this file
This document is a past performance questionnaire for a ship repair solicitation by the Department of the Navy Naval Supply Systems Command. The solicitation requires a contractor to complete 108 work items aboard a USNS TRENTON within 60 days at the contractor's pier, including repairs to the hull, propulsion machinery, communication and navigation aids, auxiliary systems, outfitting and habitability features, sponsor equipment, HVAC systems, docking and undocking operations, and mission UNREP equipment. The past performance questionnaire asks the contact to rate the contractor's performance on seven criteria using an adjectival rating system and provide a narrative for each rating, and also asks whether the contact would do business with the contractor again. Details are requested about the contract being assessed, such as the number, period of performance, and value.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMEND 03 (CHANGES ONLY).pdf | ||
| AMEND 01 (CHANGES ONLY).pdf | ||
| RFP N6817120R0009.pdf | ||
| AMEND 02 (CHANGES ONLY).pdf | ||
| J-1 Pricing TRT MTA rev 200820.xlsx | XLSX spreadsheet | |
| J-2 WIs.pdf | ||
| J-5 - Past Performance Information.docx | DOCX document | |
| J-2 WIs (Revised).pdf | ||
| J-3 GFM.pdf | ||
| J-1 Pricing TRT MTA 200924 rev DM.XLSX | XLSX spreadsheet | |
| J-4 MSC SHIP REPAIR FACILITY SURVEY.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE QUESTIONNAIRE
Fleet Logistics Center (FLC) Naples is currently evaluating competitive offers for ship repair work items required to enable the vessel to maintain mission readiness and complete ABS class surveys. This requirement consists 91 regular work items and 17 optional work items to be performed on board of a USNS TRENTON (EPF 5) within 60 days at the contractor’s pier.
The principal dimensions of the ship are the following:
LENGTH
103.0 m (337.9 ft)
BEAM
28.5 m (93.5 ft)
DRAFT FULL LOAD (mean)
3.92 m (12.85 ft)
ESTIMATED GROSS TONNAGE
9780 TONNES
DESIGN DEADWEIGHT
1700 TONNES
ESTIMATED ARRIVAL DRAFT
3.4M (11.0 FT) FWD
3.4M (11.0 FT) Aft
AIR DRAFT WITH MAST DOWN
25.3M (83 ft) The work items include repairs for the following categories:
· hull repairs (such as flight deck parking area non-ski renewal, inspect flight deck tie-downs, underwater hull inspection);
· propulsion machinery (such as heat exchanger cleaning, reduction gear service);
· communication and navigation aids (such as gyro service maintenance, radio communication certification, VDR annual servicing, magnetic compass calibration);
· auxiliary system (such as fire doors and shutter inspection, SSDG maintenance support, SCBA annual certification, and fixed gas firefighting system inspection);
· outfit, furnishings and habitability (such as galley equipment, rescue boat and Davit annual inspection, and life raft & m.e.s. certification);
· sponsor equipment (mission space and package support);
· HVAC (air conditioning and refridgeration system maintenance, ventilation duct cleaning, laundry vent cleaning, Gaylord hood cleaning)
· Docking and undocking (deck drains inspections)
· Mission UNREP Equipment (UNREP VERTREP Equipment and System Testing).
You have been named as a point of contact for services previously provided by the contractor cited herein. Please provide the information requested in the questionnaire. The information you provide will become part of the source selection documentation; however, your name will not be released to any of the parties. Should you have any questions concerning this request, please contact LT Kyle Wagner in Naples, Italy at Tel 0039 081-568-3467 or E-mail at kyle.wagner@eu.navy.mil (To be completed by NAVSUP FLC SIGONELLA NAPLES)
Contractor:
Address:
(To be completed by person to whom questionnaire is addressed):
1.
Background Information a.
Name of person completing this questionnaire and position.
Name:
Agency:
Tel No.
E-mail Address:
b.
Contract No: ___________________________ c.
Detailed description of services:
d.
Period of Performance (all years): ____________________________________ e.
Total value of the contract (all years): _________________________________
2.
Contractor's Past Performance
a. In your opinion, is the work performed under your contract similar to the government’s requirement which comprises the repairs listed above? ____________________________________________________________________________________________________________________________________________________________________________
b. Please answer each of the following questions by checking the appropriate rating for each item and by providing a narrative to support the corresponding adjectival rating selected.
Adjectival Rating
Description Outstanding (O)
Superior accomplishment of contract requirements and very high customer satisfaction.
Acceptable (A)
Fully compliant accomplishment of contract requirements and positive customer satisfaction.
Unacceptable (U)
Failure to properly accomplish contract requirements and failure to satisfy customer.
Not Applicable (N)
Unable to provide a score. Performance in this area not applicable to effort assessed.
(1) Quality/Achieving Contract Requirements: The offeror’s demonstrated history of delivering products and services that met or exceeded the requirements of the contract.
How would you describe your level of customer satisfaction?
Outstanding
Acceptable
Unacceptable
Not Applicable
(2) Timeliness: Did the Contractor meet/comply with performance schedules?
Rate the timeliness of submission of requested information, reports and invoicing.
Outstanding
Acceptable
Unacceptable
Not Applicable
(3) Contractor Responsiveness: The offeror’s demonstrated ability to: Respond to customer concerns (Identify specific concerns and the contractor’s resolution)
Outstanding
Acceptable
Unacceptable
Not Applicable
(4) Isolate and resolve problems: The number and severity of problems, the effectiveness of corrective actions taken, and the ability to implement corrective actions on future work.
Outstanding
Acceptable
Unacceptable
Not Applicable
(5) Contractor's cost control: Did the contractor deliver at the agreed-to price/cost? Describe the reasons for changes to contract value (e.g., scope changes, overrun/underrun, Government-imposed schedule changes, etc.)
Outstanding
Acceptable
Unacceptable
Not Applicable
(6) Were there significant problems with contract administration and/or interpretation of the contract after award? If YES, please explain in the additional comments section below. Comments: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
(7) Would you do business with this company again?
File details come from the government source that posted it. Updated .