N6817119R0013_RFP_AMENDMENT_1.pdf

PDF 195 KB Posted

Attached to
Ship repair maintenance
Solicitation number
N6817119R0013
Issued by

About this file

N6817119R0013_RFP_AMENDMENT_1.pdf

View the file

Other files

File Type Posted
Amend_5.pdf PDF
0503_A_MISC_PIPING_REPAIRS_(VRR_18-044,_19-047,_19-045)_R_20_SEPT_2019.pdf PDF
AMEND_04.pdf PDF
0511_A_E-BOILERS_GROOM.pdf PDF
J-1_Contractor_Price_Breakdown_R_20_SEPT_2019.xlsx XLSX spreadsheet
Amend_03.pdf PDF
Amend_02.pdf PDF
J-1_Contractor_Price_Breakdown.xlsx XLSX spreadsheet
N6817119R0013_RFP.pdf PDF
J-2_Work_Items.pdf PDF
J-3_GFM_Report.XLSX XLSX spreadsheet
N6817119R0013_N6817119R0013_Pre_sol_notice.docx DOCX document
N6817119R0013_MTW_Pre-sol_Notice.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N4044420RCMW001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to provide a response the follow ing Questions:

1. Question 1: regarding page 34 of the Request for Proposal (Section L, paragraph 2.2.1 Facilities Requirements, d. (vi)).

2. Revision to Work Item 011, to reflect revisions to paragraph 2.2.1 Facilities Requirements, d. (vi) of the Request for Proposal. The Work Item 011 (General Services Rev 29 Aug 19) attached to this amendment replaces the one previously posted in its entirety.

3. Question 2: regarding the air draft of the USS Mount Whitney.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6817119R0013

X 9B. DATED (SEE ITEM 11)

22-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Aug-2019

CODE

NAVSUP FLC SIGONELLA NAPLES OFFICE FLEET

BOX 50

VIALE F. RUFFO DI CALABRIA

CAPODICHINO

NAPOLI 80144

N68171 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6817119R0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 1

Questions and Answers:

Question 1:

“IRT the subject RFP, please kindly clarify the following discrepancy/alleged typographical error, page 34 of 43 of the Solicitation/SF33:

2.2.1 FACILITIES REQUIREMENTS

Paragraph d. (vi) The Offeror shall submit written confirmation that they shall provide a reliable source of electrical shore power that conforms with Section 7.0 of Work Item 0011, Furnish General Services (T‐EPF Class).

Two (2) shore power cables must originate from the same generator or transformer bank, provided with a capacity of 460 Volts, 60 Hz under no load conditions at the shore power cable ends to be connected to the ship's shore power receptacle. At a maximum amperage of 800 amps, the Voltage shall be maintained at 450 +/‐ 5 Volts and at 60 Hz +/‐ 3%. If a generator is proposed, the contractor shall submit a generator maintenance schedule with its proposal.

In particular, please kindly advise if the above reference to a T‐EPF Class Vessel may effect the number of shore power cables to be connected to the Ship's (USS MT. WHITNEY) shore power receptacle.”

Response to Question 1:

Please see revised Work Item 011 (General Services Rev 29 Aug 19) with the correct information that replaces Paragraph 2.2.1 FACILITIES REQUIREMENTS d. (vi) in section L. All revisions to Work Item 011 are in red. The Work Item 011 (General Services Rev 29 Aug 19) attached to this amendment replaces the one previously posted in its entirety.

Question 2:

“Please could you confirm the extreme air draft to the uppermost structure at normal seagoing condition?”

Response to Question 2:

Air draft is 48 Meters for the USS Mount Whitney. From waterline to the highest point onboard.

(End of Summary of Changes)